FA557526B0001 Post Site Visit Q and A.pdf
PDF 89 KB Posted
- Attached to
- CNS Finished Water Tank
- Solicitation number
- FA557526B0001
About this file
This is a Questions and Answers document for federal contract FA5575-26-B-0001, Project CNS Finished Water Tank.
The document addresses a single clarification question raised during the solicitation process regarding the electrical infrastructure for two recirculation pumps (RCL-1 and RCL-2). The pumps have specifications of 505 m³/h capacity, 208 V, 60 Hz, and 30 kW power rating. The answer clarifies that these pumps are responsible for recirculating chlorinated water within the new elevated water storage tank and are powered by electrical panel PCL marked as 16, located in room 103 of Building #558. The response references drawing EP 101/C6 Power Plan for detailed specifications. This document contains minimal substantive information beyond this single technical clarification and does not address procurement requirements, pricing, timelines, or other material contract terms.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT CNS FINISHED WATER TANK (FA5575-26-B-0001)
QUESTIONS AND ANSWERS DURING THE SOLICITATION PROCESS
Q1: The location of the feeder for the new pumps RCL-1 and RCL-2 (505 m³/h, 208 V, 60 Hz, 30 kW) is not shown on the drawings. Please provide the panel board location for these pumps.
A1: RCL-1 and RCL-2 pumps are those in charge of recirculating the chlorinated water inside the new elevated water storage tank. These pumps are fed from the electrical panel PCL marked as 16 inside room 103 (see drawing EP 101/C6 Power Plan, Building#558 detail).