This is a blank cost estimate template for the CNS Finished Water Tank project (QUUG 19-1003) at Moron Air Base, Spain. The template is designed for contractors to provide detailed pricing breakdowns across multiple work categories and line items.

The cost estimate template is organized into six major work sections: Demolition Works (5 line items including exterior fence removal and electrical system demolition); New Exterior Works (13 line items covering soil excavation, asphalt paving, fencing, utility trenches, concrete slabs, and drainage/water distribution piping); Elevated Water Storage Tank Civil Works (7 line items for excavation, compaction, geotextile, ballast, and concrete); Elevated Water Storage Tank Structural Works (3 line items for concrete footings, steel support structure, and safety fencing); Elevated Water Storage Tank Architectural Works (5 line items for wall demolition, steel doors, brick partitions, and safety systems); Elevated Water Storage Tank Mechanical Systems (6 line items including 3,000-liter water tank, elevator, valves, recirculation/chlorination system, SCADA control, and fall arrestor system); Elevated Water Storage Tank Electrical System (19 line items covering transformers, wiring, distribution panels, lighting fixtures, outlets, and cathodic protection); and TV Camera System (2 line items). The template requires contractors to populate columns for unit measurements, quantities, material costs, labor hours/rates, other direct costs, and totals. A separate line item for unforeseen site conditions at 2 percent of total direct cost is included. The template calculates total material costs, total labor costs, total other direct costs, subtotals with overhead percentage, and final project cost in Euros, with fields for contractor name, address, date, title, and preparer information.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KTR

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS FINISHED WATER TANK
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 19-1003
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
DEMOLITION WORKS
TRABAJOS DE DEMOLICIÓN
Demolition Civil Works
Trabajos de demolición de Civil
1Demolition of existing exterior fence
Demolición de la valla exterior existenteml
2Trench soil excavation, up to required height, including clearing-up, load and transportation of excavated material to authorized dump.
Excavación de zanja en terreno, hasta cota requerida, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
3Soil excavation, up to required height, (new fence)
Excavación del terreno, hasta cota requerida, (nueva valla)m3
Demolition Electrical works
Trabajos de demolición de electricidad
4Demolition exteror lighting and poles
Demolición de las luminarias exterioresUd
5Demolition electrical lighting line, handhole, etc
Demolición de la línea eléctrica para iluminación, arquetas, etcml
TOTAL DEMOLITION WORKS
TOTAL TRABAJO DE DEMOLICIÓN
NEW EXTERIOR WORKS
NUEVOS TRABAJOS EXTERIORES
Civil Works
Trabajos de Civil
6Soil excavation, up to required height, including clearing-up, load and transportation of excavated material to authorized dump outside Morón AB. (New unpaved road)
Excavación del terreno, hasta cota requerida, incluso desescombro, carga y transporte a depósito autorizado fuera de la base de Morón. (nuevo camino no pavimentado )m3
730cm lime stabilized subgrade 95% Modified Proctor
30cm suelo explanada estabilizado con cal 95% Proctor Modificadom3
8Grading and compaction of the subgrade to 95% Modified Proctor
Nivelación y compactación de la capa base al 95% Proctor Modificadom2
9Geotextile Geotesan NT35
Geotextil Geotesan NT35m2
10Selected soil for E3 platform as per PG3 CBR 20 compacted 98% PM (30cm thickness)
Suelo seleccionado para platataforma E3 según PG3 CBR 20 compactado al 98% PM (30cm de espesor)m3
11Grades-crash aggregate compacted to 100% PM (20cm thickness)
Zahorra compactado al 100% PM (20cm de espesor)m3
12Application of prime coat C60BF4IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4IMP, incluyendo barrido y preparación de superficie.t
13Placing and compaction 5 cm of bituminous hot mix asphalt AC16 SURF 35/50 type.
Extensión y compactación de capa bituminosa de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50.t
14Painting of line road symbol, white, type II(RR), reflective, acrylic, including surface prepraration and premarking.
Pintado de señal de líneas de símbolo de vial, blanca, tipo II (RR), reflectante, acrílica, incluyendo preparación y de superfice y premarcaje.ml
15Security fence: chanin link fabric, post, barbed wire, accesories, etc
Vallado de seguridad: malla de simple torsión, postes, alambre de espina, accesorios,etcml
16Typical filling for warter line trench section (natural soil)
Relleno de zanja para tuberías de agua (en terreno natural)m3
17Typical filling for electrical line trench section (natural soil)
Relleno de zanja para línea eléctrica (en terreno natural)m3
18Reinforced concrete slab 1 (valve support), 30cm thick
Losa de hormigón armado 1 (soporte de válvulas), 30cm de espesorm3
19Reinforced concrete slab 2 (valve support), 30cm thick
Losa de hormigón armado 2 (soporte de válvulas), 30cm de espesorm3
20Reinforced concrete slab 3 (valve support), 30cm thick
Losa de hormigón armado 3(soporte de válvulas), 30cm de espesorm3
21Reinforced concrete slab 4 (stairs and elevator), 30cm thick
Losa de hormigón armado 4 (escaleras y elevador), 30cm de espesorm3
22Concrete headwalls, concrete wingwalls and apron
Pasacunetas de hormigón, muros y plataforma de hormigónUd
23Concrete rip-rap
Encachado de piedra y hormigónm2
24Top soil and seeding
Tierra vegetal y sembradom2
25Reinforced concrete wall, 25cm
Muro de hormigón armado de 25cmm3
26Grating Class E-600
Rejilla Clase E-600ml
Exterior Electrical works
Trabajos de electricidad exteriores
27Underground electrical ductbank, including manholes and HDPE double wall conduit
Conducción eléctrica enterrada, incl. arquetas y conductos de HDPE de doble pared corrugadoml
28Underground electrical ductbank, including manholes and HDPE double wall conduit (SCADA system)
Conducción eléctrica enterrada, incl. arquetas y conductos de HDPE de doble pared corrugado (sistema de SCADA)ml
Drainage line works
Trabajos de drenaje
29HDPE underground drain pipe (Ø300)
Tubería de drenaje enterrada HDPE (Ø300)ml
30HDPE underground drain pipe (Ø400)
Tubería de drenaje enterrada HDPE ( Ø400)ml
31HDPE drain pipe (Ø300)
Tubería de drenaje HDPE (Ø300)ml
Water distribution line works
Trabajos de línea de agua
32HDPE underground water supply pipe to the tank (Ø250)
Tubería enterrada de salida de agua del depósito de HDPE (Ø250)ml
33HDPE underground water outlet pipe from the tank (Ø300)
Tubería enterrada de agua de salida del depósito de HDPE (Ø300)ml
34HDPE water supply pipe to the tank (Ø250)
Tubería de salida de agua del depósito de HDPE (Ø250)ml
35HDPE Water outlet pipe from the tank (Ø300)
Tubería de agua de salida del depósito de HDPE ( Ø300)ml
36Recirculation /chlorination pipes works
Trabajos de tuberías de circulación /cloración
37HDPE underground recirculation / chlorination pipes (Ø300)
Tubería enterradas del sistema de recirculación y cloración HDPE (Ø300)ml
38HDPE recirculation / chlorination pipes (Ø300)
Tubería del sistema de recirculación y cloración HDPE (Ø300)ml
TOTAL NEW EXTERIOR WORKS
TOTAL TRABAJOS NUEVOS DE EXTERIOR
WORKING RELATED TO THE ELEVATE WATER STORAGE TANK
TRABAJOS RELACIONADOS CON EL TANQUE ELEVADO DE AGUA
Civil works
Trabajos de Civil
39Soil excavation, up to required height, including clearing-up, load and transportation of excavated material to authorized dump.
Excavación del terreno, hasta cota requerida, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
40Compaction of the subgrade to 98% Modified Proctor
Compactación de la capa base al 98% Proctor Modificadom2
41Geotextile Geotesan NT35
Geotextil Geotesan NT35m2
42Artificial Ballast ZA 20, 30 cm thickness, compacted in two layers to 98% modified Proctor.
Zahorra artificial ZA 20 de 30cm de espesor compactada en dos capas al 98% Proctor Modificadom3
43Polyethylene sheet 0,3mm thickness
Lámina de polietileno de 0,3mm de espesorm2
44Clean concrte 10cm thickness
Hormigón de limpieza 10cm de espesorm3
45Natural soil from excavation, without stones and soil clods. Compacted to 98% P.M.
Terreno natural procedente de la excavación, libre de piedras y terrones. Compaactado al 98% P.Mm3
Total Civil works
Total de trabajos de Civil
Structural works
Trabajos de Estructura
46Reinforced concrete footings and bracing beams HA-30/B/22/XA2
Zapatas y vigas riostras de hormigón armado de HA-30/B/22/XA2m3
47Steel structure supporting the tank including ladders, accessories and painting. Including manufacturer specialist
Estructura metálica soporte del depósito incluído escaleras, accesorios y pintada. Incluye fabricante especializadot
48Safety fence made of 20x2mm hot-dip galvanized steel electro-welded mesh plates. Grid dimension 21x23mm.
Valla de seguridad de rejilla de pletinas electrosoldada de acero galvanizado en caliente de 20x2mm. Dimensión de la retícula 21x23mmml
Total Structural works
Total Trabajos de Estructura
Architectural works (building #558)
Trabajos de Arquitectura (edificio #558)
49Demolition existing wall to new opening
Demolición del muro para nuevo huecom2
50Steel exterior door 1 leaf including hardware
Puertas exteriores de 1 hoja de acero incluyendo cerrajeríaUd
51Interior brick partition (LHD), smooth plastered and painting
Pared interior de ladrillo (LHD), enfoscada y pintadam2
52Fall arrestor system
Sistema de línea de vidaLs
53Safety ladder
Escalera de seguridadLs
Total Architectural works
Total Trabajos de Arquitectura
Mechanical System
Sistema de mecánica
543.000l water tank galvanized and corrugated steel sheet thickness 3+3 mm , profile 18/76 mm and coating for potable water . Roof panel galvanized and corrugated steel sheet 18/76, thickness 0,8mm and coating for potable water including accesories (interior and exterior ladders, etc)
Depósito de agua de 3.000 litros en chapa de acero galvanizada y ondulada de 3+3 mm de espesor, perfil de 18/76 mm y revestimiento para agua potable. Panel de techo de chapa de acero galvanizado y corrugado 18/76, espesor 0,8mm y revestimiento para agua potable incluyendo accesorios (escalera interior y exterior, etc).Ud
55Elevator and maintenance
Elevador y mantenimientoUd
56Valves
ValvuleríaLs
57Recirculation and chlorination system
Sistema de reciruclación y cloraciónLs
58Control and programming (SCADA)
Control y programación (SCADA)Ls
59Fall arrestor system
Sistema de línea de vidaLs
Total Mechanical System works
Total de trabajos del Sistema de mecánica
Electrical System
Sistema eléctrico
60Dry-type pad-mounted transformers 15 kVA
Transformador seco 15 kVAUd
61Electrical power supply wiring
Cableado eléctrico para alimentaciónml
62Electrical power supply wiring (SCADA system)
Cableado eléctrico para alimentación (sistema SCADA)ml
63Main Distribution Panel (MDP)
Panel de distribución principal (MDP)Ud
64Controller (obstruction lighting)
Controlador (iluminación de obstrucción)Ud
65UPS (obstruction lighting) minimum 12h power supply
UPS (iluminación de obstrucción) mínimo 12h suministro energíaUd
66Exterior lighting fixture (type A)
Luminaria exterior (Tipo A)Ud
67Exterior lighting fixture and pole (type A)
Luminaria exterior y poste (Tipo A)Ud
68Exterior lighting fixture (type B) (obstruction lighting)
Luminaria exterior (Tipo B) (luces de señalización)Ud
69Exterior lighting fixture (type C)
Luminaria exterior (Tipo C)Ud
70Exterior lighting fixture (type D) emergency
Luminaria exterior (Tipo D) emergencyUd
71Exterior lighting fixture (type E)
Luminaria exterior (TipoE)Ud
72Exterior lighting fixture (type F)
Luminaria exterior (Tipo F)Ud
73Exterior lighting fixture (type G)
Luminaria exterior (Tipo G)Ud
74Outlets including conduits and wiring (WP/GFI)
Enchufes incluyendo conductos y cableado(WP/GFI)Ud
75Outlets including conduits and wiring
Enchufes incluyendo conductos y cableadoUd
76Lightning arrestors
Sistema de pararrayosLs
77Gounding system
Puesta a tierraLs
78Elevate water tank cathodic protection
Protección catódica del depósito elevado de aguaUd
Total Electrical System
Total Sistema eléctrico
TOTAL RELATED TO THE ELEVATED WATER TANK
TOTAL RELACIONADO CON EL TANQUE DE AGUA ELEVADO
TV camera SpAF
Cámara TV SpAF
79Electrical system (conduit + wiring)
Sistema eléctrico (conducto + cableado)Ud
80Pre installation Telecom system rigid conduit
Preinstalación Sistema de telecomunicaciones conducto rígidoUd
TOTAL TV CAMERA SpAF
TOTAL TV CÁMARA SpAF
81Unforeseen site conditions (2% Total direct cost)
Condiciones imprevistas del emplazamiento (2% Coste directo total)LS
TOTAL
TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD % 0.00

SUBTOTAL 0.00

DATE: FIRM NAME: PROFIT % 0.00

TOTAL PROJECT EUROS0.00
TITLE:PREPARED BY:

These costs and overhead and profit will be applied in any possible future modifications