This is a Material Submittals Schedule document that outlines the submission requirements for contractors on two federal construction projects managed by the U.S. Air Force. The schedule applies to Project QUUG 06-1003 (Renovate Meeting Hall, B105) and Project QUUG 19-1003 (CNS Finished Water Tank), with the latter being the active solicitation (FA557526B0001) with bids due by May 7, 2026.

The document establishes detailed submission timelines and required documentation across 313 line items for the water tank project and comparable items for the meeting hall renovation. Contractors must submit materials according to specified deadlines tied to contract milestones (Contract Award, Notice to Proceed, Final Inspection, etc.), with submission dates ranging from 5 to 60 days after key events. Required submittals include certificates of compliance, shop drawings, samples, manufacturer's warranties, catalog data, test reports, and field reports across all construction disciplines: structural steel, concrete, masonry, roofing, mechanical systems, plumbing, fire suppression, electrical distribution, lighting systems, HVAC, telecommunications, fire alarms, earthwork, paving, fencing, water distribution, and underground utilities. The schedule specifies the number of copies required (typically one copy for the water tank project, four copies for the meeting hall project), designates responsible parties for review and approval, and includes columns for tracking submittal numbers, approval/disapproval dates, and contractor resubmittal requirements. This template serves as the contractual mechanism for managing material quality control and compliance verification throughout the construction contract execution period.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 06-1003PROJECT TITLE
RENOVATE MEETING HALL, B105SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATE OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTS
APPROVED

: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DISAPPROVED

: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

SECTION 01 11 01

GENERAL CONDITIONS

01Warranty letter4Acceptance+15
02Construction Schedule4CNTP+7
03Progress Schedule4CNTP+10
04Work Plan4CNTP+7
05DD Form 13544FI+15
06As-Built drawings4FI+15
07Mobility Plan4CNTP+15
08Project Sign4CNTP+15
09Quality Control Plan4CNTP+15
10Waste & construction debris management4Final Inspection
11Key Staff4DNTP+15
12Environmental Protection Plan4CNTP+15
13Spatial Data4As Built+10
14Health and safety Plan4CNTP +15
PART 12 - SMALL PROJECT DESIGN-BUILD PROGRESS SCHEDULES
15Design-Build Schedule1DNTP+10
16Monthly Updates1Every 1st of month
SECTION 01 11 02

SPECIAL CONDITIONS

17Construction Schedule1CNTP+7
18Work Plan1CNTP+7
19Government furnished material request1Work-15
20Inventory of the excess supplies, materials and equipment imported free duty1Prior to FI
21Classification certificate1CNTP+30
SECTION 02 41 00

DEMOLITION

22Progress schedule of the work1CNTP + 15
23Demolition Plan1CNTP + 15
24Management and disposal plan for waste from demolition11CNTP+15
25Authorized dump or treatment and recovery plant1CNTP+15
26Delivery and disposal certificate1CNTP+15
SECTION 02 82 00

ASBESTOS REMEDIATION

27Respiratory protection equipment.1
28All Individual Protective Equipment (EPI’s) used1
29HEPA filtered vacuum cleaners1
30Landfill Approval1
31Certificates on Risk Prevention training1
32Certificate of registration as Asbestos Risk1
33Certification of Industrial Hygienist responsible1
34Asbestos Hazard Abatement Plan1
35Notifications1
SECTION 02 84 16

HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBS AND MERCURY

36Qualifications of CIH1
37Training Certification1
38PCB and Lamp Removal Work Plan1
39PCB and Lamp Disposal Plan1
40Transporter certification1
41Certification of Decontamination1
42Certificate of Disposal and/or recycling1
43DD Form 1348-11
44Testing results1
SECTION 03 30 00

CAST IN PLACE CONCRETE

45Inspection certificate of the concrete batch plant.1
46Concrete Control Tests Program.1
47Results of the concrete control tests.1
48Polyethylene sheet catalog data.1
49Quality Control Program1
SECTION 04 20 00

MASONRY

50Manufacturer's Catalog Data1
51Certificates11
52Close-out Take Back Program1
SECTION 05 12 00

STRUCTURAL STEEL

53Erection Plan1
54Welding Procedures and Qualifications11
SECTION 05 50 13

MISCELLANEOUS METAL FABRICATIONS

55Handrails11
56Access doors and panels, installation drawings1
57Cover plates and frames, installation drawings11
58Steel welding inspection results11
59Welding Procedures and Qualifications1
SECTION 07 22 00

ROOF AND DECK INSULATION

60Vapor Barrier11
61Lightweight Concrete1111
62Protective Fleece Layer1111
63Waterproof Membrane111
64Waterproof Membrane11
65Waterproof Fluid applied membrane11
66Filtering tile1111
67Flashing1
68Flashing11
69Heat Welding1
70Mastic111
71Sealant for Expansion Joints111
72Gutters and Downspouts11
73Fall Arresting System1
74Fall Arresting System11
75Watertight test11
SECTION 07 84 00

FIRESTOPING

76Fillers1NTP + 30
77Firestopper Products11NTP + 30
SECTION 07 92 00

JOINT SELANTS

78Sealants, Primers and Bond Brakers111NTP + 30
SECTION 08 11 13

STEEL DOOR AND FRAMES

79Doors111NTP + 45
80Fireproof Doors1
81Frames111NTP + 45
82Accessories111NTP + 45
SECTION 08 14 00

WOOD DOORS

83Manufacture's Catalog Data1NTP + 45
84Certificates of Fireproofing1NTP + 45
SECTION 08 51 20

ALUMINUM WINDOWS

85Aluminum windows1111NTP + 45
86Frames111NTP + 45
87Accessories111NTP + 45
SECTION 08 71 00

DOOR HARDWARE

88Hardware (locks, hinges, closers, master keying, etc)11
89Hardware (locks, hinges, closers, master keying, etc)1
90Hardware (locks, hinges, closers, master keying, etc)1NTP + 60
SECTION 08 81 00

GLAZING

91Glazing11NTP + 60
SECTION 09 24 23

CEMENT STUCCO

92Portland Cement Characteristics1NTP + 30
93Mortar additives1NTP + 30
94Bonding Bridge1
95Fiber Reinforcing Mesh1
SECTION 09 29 00

GYPSUM BOARD

96Water resistant gypsum boards1
97Gypsum board11
98Suspension system1
99Instructions1
100Asbestos Free Materials1
SECTION 09 30 00

CERAMIC TILES

101Manufacturer's Catalog Data1
102Ceramic wall tile.11
103Ceramic floor tile11
SECTION 09 51 00

ACOUSTICAL CEILINGS

104Acoustic Ceiling1111
SECTION 09 65 00

RESILIENT FLOORING

105Vinyl sheet flooring11
106Resilient wall base and accessories11
107Fire test performance1
108Bond and Moisture Tests1
109Operation and Maintenance Data1
110Moisture, alkalinity and bond tests1
SECTION 09 84 20

ACOUSTICAL WALL PANELS

111Acoustical Panels details1
112Acoustical Panels11
113Warranty1
SECTION 09 90 00

PAINTING AND COATING

114Coatings11
115Lead content1
116Deliverty Tickets1
SECTION 10 28 00

TOILET ACCESSORIES

117Recessed wash basin (java) and accessories1NTP + 45
118Recessed Wash Basin for handicapped persons1NTP + 45
119WC Bowl and Accesories1NTP + 45
120Urinal and accessories1NTP + 45
121Bathroom Hanger Accesories1NTP + 45
122Plate Glass Mirror1NTP + 45
123Mirror for handicapped persons restroom1NTP + 45
124Toilet roll dispenser.1NTP + 45
125Soap holder1NTP + 45
126Not used
127Soap Dispenser for handicapped toilet1NTP + 45
128Soap Dispenser for male and female toilets1NTP + 45
129Paper towel dispenser1NTP + 45
130Not used
131Grab bar for handicapped perons1
132Water Cooler Drinking Fountain1NTP + 45
133Not used
SECTION 10 44 16

FIRE EXTINGUISHERS

134Fire Extinguishers11
135Cabinets1
136Wall Brackets1
SECTION 13 48 73

SEISMIC CONTROL FOR MECHANICAL EQUIPMENT

137Bracing11
138Resilient Vibration Isolation Devices
139Equipment Requirements11
140Anchor Bolts1
SECTION 21 13 13.00 10

WET PIPE SPRINKLERS SYSTEM, FIRE SUPPRESSION

141Automatic sprinklers1
142Control station for sprinklers11
143Water motor alarm1
144Waterflow detector1
145Piping and Accessories11
146Pipe Hangers and Supports1
147Double Check Valve Assembly (DCVA)1
148Butterfly valve1
149Fire department connection1
150Tamper switch1
151Pressure switch on retard chamber1
152Gate valve and indicator posts1
153Underground piping and components1
154Qualification of installer1
155Specialized fire protection engineer1
156Sprinkler system hydraulic calculation1
157Sprinkler heads and system layout1
158As-Built drawings1
159Operating and Maintenance (O&M) Instructions1
SECTION 20 00 00

PLUMBING

160Rigid PVC piping11
161PE100 Polyethylene piping and connection fittings.11
162Clamp connection1
163Underground gate valve and valve box1
164Galvanized steel pipe DIN 24401
165Plastic piping (PP-R)11
166Ball valve1
167Check valve1
168Automatic air vent1
169Water meter1
170Hose bibb and hose connection vacuum breaker1
171Backflow preventer (RPPD)1
172Floor drain1
173Recirculation pumps1
174Hammer arrestors1
175Thermostatic Mixing valve1
176Dielectric Sleeve Fitting1
177Pluming System1
SECTION 23 07 00

THERMAL INSULATION FOR MECHANICAL SYSTEMS

178Refrigerant piping insulation1
179Duct insulation1
180Insulation aluminum jacket1
SECTION 23 31 13.16 40

METAL DUCTS

181Exhaust and supply air intake grilles into the rooms.1
182Outside air intakes / exhaust louvers1
183Sheet metal for rectangular ducts.1
184Sheet metal for circular ducts.1
185Manual balancing dampers.1
186Diffuser.1
187Diffuser.1
188Return Grills1
189Return Grills1
190Fire dampers1
191Low leakage motorized damper1
192Backdraft dampers1
193Testing and balancing of ductwork systems.1
194Quality Certificated1
195Operation and Maintenance Manuals1
SECTION 23 35 19

AIR CONDITIONING SYSTEM AND EXHAUST SYSTEMS

196Dedicated Out Door Air System DX (DOAS)11
197Direct Expansion AHU11
198Direct Expansion Multi split or VRF system11
199Direct Expansion Split system 1X111
200Exhaust fans11
201Copper pipes per refrigerants1
202Operation and Maintenance Manuals1
SECTION 26 20 00

INTERIOR DISTRIBUTION SYSTEM

203Receptacles (one of each type)1
204GFI receptacles1
205GFI receptacles1
206Circuit Breakers1
207Conduit and fittings (one of each type)1
208Wires and cables1
209Outlet boxes and covers1
210Junction boxes1
211Panel Board1
212Panel Board1
213Panel Board1
214Surge Protective Device1
215Surface raceways1
216Network analyzer1
217Labels1
218Devices Plates1
219Toggle switches1
220Safety switches1
221Electric power meter1
222Emergency HVAC Shut-Off Push Buttons1
223Intersystem bonding termination1
224Occupancy sensor switches1
225Damper actuators and transformers1
226Audio visual conduit and junction boxes1
2270.6/1 kV insulation test.1
228Certificate of compliance of each panelboard1
229Electrical Systems1
SECTION 26 41 00

LIGHTNING PROTECTION SYSTEM

230Air terminals1
231Connection and terminations1
232Components1
233Ground rods1
234Exothermic welding kits1
235Overall lightning protection system1
236Each major component1
237Grounding system test1
238Lightning protection system inspection1
239Lightning protection system1
SECTION 26 51 00

INTERIOR LIGHTING

240Lighting Fixture1
241LED Light Sources1
242Light occupancy / vacancy sensors and controllers1
243LED Power Supply Units (Drivers)1
244LED Emergency Drivers1
245Operating test1
246Warranty1
247Lighting control system1
248Lighting control system1
249Lighting control system1
250Lighting System1
SECTION 26 56 00

EXTERIOR LIGHTING

251LED luminaire1
252Photocell1
253Operating test1
254Operational service1
255Warranty1
256Lighting System1
257Exterior Lighting Control System1
SECTION 27 10 00

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

258Cable trays1
259Conduits1
260Labels1
261Telecommunications Cabling and Pathway System1
SECTION 28 31 76

INTERIOR FIRE ALARM AND MASS NOTIFICTION SYSTEM

262Smoke detector1
263Heat detector1
264Pull station (with outdoor box “double action” STI Stopper II)1
265Duct Smoke detector1
266Strobe and speaker combined – FA1
267Strobe and speaker combined – MNS1
268Exterior Strobe and speaker combined – FA1
269Radio Fire Alarm Transmitter BT-XM1
270Fire damper detector1
271Retarding chamber switch1
272FACP/MNS EST41
273Remote LCD Text Display1
274Antenna1
275Control panel interior wiring diagrams.1
276Point-to-point wiring diagrams1
277Battery power calculations1
278Nameplates1
279Instructions1
280Wiring Diagrams1
281System Operation1
282Notification Appliances1
283Amplifiers1
284Operation and Maintenance (O&M) Instructions1
285Instruction of Government Employees1
286Field Quality Control1
287Testing Procedures1
288System Operation1
289Fire Alarm/Mass Notification System1
SECTION 31 00 00

EARTHWORK

290Shoring1
291Borrow Site Testing1
292Materials proposed as Backfill1
293Materials proposed as Soil and Topsoil1
SECTION 31 05 19

GEOTEXTILE

294Geotextile11
295Execution control1
SECTION 32 92 19

SEEDING

296Seed1
297Fertilizer1
298Topsoil1
299Existing soil1
SECTION 33 30 00

SANITARY SEWER

300PVC pipe and fittings.1
301Round handhole.1
302Round manhole.1
303Round manhole frame and cover.1
304Sewer pipe protection film and sealant.1
SECTION 33 71 02

UNDERGROUND ELECTRICAL DISTRIBUTION

305Low voltage cable1
306Ground rods1
307Ground wires1
308Exothermic Welding Cadweld1
309Buried Warning and Identification Tape1
310Handholes1
311Handholes covers1
312Conduits1
313Field acceptance checks and tests1

&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 19-1003PROJECT TITLE
CNS FINISHED WATER TANKSOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
NUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKSsubmittals presentados por JJEXT
CERTIFICATE OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTS
APPROVED

: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DISAPPROVED

: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

SECTION 01 11 01

GENERAL CONDITIONS

01Warranty letter1Acceptance+15
02Construction Schedule1Contract Award+7A
03Progress Schedule1Contract Award+10
04Work Plan1Contract Award+7A
05DD Form 13541Final Inspection-10
06As-Built drawings1Final Inspection-5
07Mobility Plan1Contract Award+15A
08Project Sign1Contract Award+15
09Quality Control Plan1Final Inspection-15A
10Waste & construction debris management1Final Inspection
11Key Staff1Final Inspection-15A
12Environmental Protection Plan1As-Built Drawings+10NR
13Spatial Data1Final Inspection-5
14Health and safety Plan1Contract Award+15A
SECTION 01 11 02

SPECIAL CONDITIONS

15Deliberate Risk Assessment Worksheet1Contract Award+15
16Airfield Construction Requirements Checklist1Contract Award+15
SECTION 02 41 00

DEMOLITION

17Demolition Plan1CWC + 15NR
18Existing conditions1
19Authorized dump or treatment and recovery plant1
20Delivery and disposal certificate1
SECTION 03 30 00

CAST IN PLACE CONCRETE

21Polyethylene sheet catalog data1
22Quality Control Program1
23Concrete Mix design1
24Slump Tests1
25Compressive Strength Tests1
26Inspection certificate of the concrete batch plant1
27Reinforcing Bars1
SECTION 04 20 00

MASONRY

28Bricks11
SECTION 05 12 00

STRUCTURAL STEEL

29Erection and Erection Bracing Drawings1
30Fabrication Drawings Including Details of Connections1
31Direct Tension Indicator Washers1
32Non-Shrink Grout1
33Tension Control Bolts1
34Bolts, Nuts, and Washers1
35Direct Tension Indicator Washer Inspection Reports1
36Manufacturer´s Qualifications11
37Bolts, Nuts, and Washers1
38Bolts, Nuts, and Washers1
39Pins and Rollers1
40Welding procedures and qualifications1
41Quality control inspections1
SECTION 05 50 13

MISCELLANEOUS METAL FABRICATIONS

42Handrails11A
43Access doors and panels, installation drawings1A
44Cover plates and frames, installation drawings11A
45Electrowelded hot-dip galvanized steel plate grating1A
46Steel welding inspection results1A
47Welding Procedures and Qualifications1A
SECTION 07 00 00.01

FALL ARRESTING CLASS C ANCHORING DEVICE

48Drawings1
49Fall arresting system1
50Rated capacity1
51Calculations1
52Manufacturer's installer accreditation1
53Manufacturer's certificate1
54Warranty1
55Spare Parts1
56Tensile Tests1
57Operating instruction1
SECTION 07 72 20

GRAVITY-TYPE ROOF VENTILATORS

58Roof Ventilators1
59Manufacturers Warranty1
SECTION 07 92 00

JOINT SEALANTS

60Sealants, Primers and Bond Breakers1
SECTION 08 11 13

STEEL DOORS AND FRAMES

61Doors111
62Frames111
63Accessories111
SECTION 08 71 00

DOOR HARDWARE

64Hardware items111
SECTION 09 90 00

PAINTING AND COATING

65Coatings11
66Lead content1
67Deliverty Tickets1
SECTION 09 97 13.16

INTERIOR COATING OF STEEL WATER TANKS

68Coating1
69Roof joint sealant materials11
70Coating sample collection and shipping kit1
71Inspection Report1
72Manufacturer Qualifications1
73Qualifications of Coating Contractors1
74Qualifications of QC Specialist Coating Inspector11
75Coating system instructions1
SECTION 14 21 13

ELECTRIC TRACTION FREIGHT ELEVATORS

76Elevator Components1
77Wiring Diagrams1
78Elevator and Accessories1
79Elevator Parts and Components1
80Endorsement Letter1
81Welders´Qualifications1
82Warranty1
83Elevator1
84Maintenance Control Program (MCP)1
85Software and Documentation1
SECTION 23 09 00

INSTRUMENTATION AND CONTROL (SCADA)

86Contractor Design Drawings1
87Programming Software1
88Controller Application Programs1
89Hardware1
90Post-Construction Quality Control1
91Start-Up Testing Report1
92Integrator Qualifications1
SECTION 25 05 11

CYBERSECURITY FOR FACILITY RELATED CONTROL SYSTEM

93Network Communication Report1
94Cybersecurity Riser Diagram/Network Architecture Diagram1
95Wireless and Wired Broadcast Communication Request1
96Account Lock Exception Request1
97Multiple Ethernet Connection Device Request1
98Contractor Computer Cybersecurity Compliance Statements1
99Contractor Temporary Network Cybersecurity Compliance Statements1
100Cybersecurity Interconnection Schedule1
101Proposed STIG and SRG Applicability Report1
102Control System Cybersecurity Documentation1
103Control System Cybersecurity Testing Procedures1
104Control System Cybersecurity Testing Report1
105Enclosure Keys1
106Software and Configuration Backups1
107Auditing Front End Software1
108Device Audit Record Upload Software1
109System Maintenance Tool Software1
110Control System Scanning Tools1
111STIG, SRG and Vendor Guide Compliance Result Report1
112Control System Inventory Report1
113Software Licenses1
114Accounts1
115Hardware List1
116Software List1
117Questionnaire1
SECTION 26 20 00

INTERIOR DISTRIBUTION SYSTEM

118Circuit Breakers1
119Conduit and fittings (one of each type)1
120Wires and cables1
121Junction boxes1
122Junction boxes1
123Panel Board1
124Panel Board1
125Panel Board1
126Surge Protective Device1
127Surface raceways1
128Labels1
129Safety switches1
130Receptacles1
131Dry-type pad-mounted transformers 15 kVA1
1320.6/1 kV insulation test.1
133Electrical Systems1
SECTION 26 41 00

LIGHTNING PROTECTION SYSTEM

134Air terminals1
135Connection and terminations1
136Components1
137Ground rods1
138Exothermic welding kits1
139Overall lightning protection system1
140Each major component1
141Lightning Protection and Grounding system test1
142Lightning protection system1
SECTION 26 42 15

CATHODIC PROTECTION SYSTEM FOR THE INTERIOR OF STEEL WATER TANKS

143Drawings1
144Wiring and Schematic Diagrm1
145Equipment1
146Components1
147Anodes1
148Permanent reference electrodes1
149Anode junction boxes1
150Cable and wire1
151Spare Parts1
152Anode Connecting Cables1
153Rectifier Testing1
154Field acceptance checks and tests1
155Qualifications1
156Cathodic Protection Design Package1
157Cathodic Protection System1
158Training Course1
SECTION 26 51 00

INTERIOR LIGHTING

159Lighting Fixture1
160LED Light Sources1
161Light occupancy sensors and controllers1
162LED Power Supply Units (Drivers)1
163LED Emergency Drivers1
164Local / Regional materials1
165Operating test1
166Lighting tests1
167Warranty1
168Useful life of light sources1
169Spare parts1
170Lighting control system1
171Lighting System1
172Lighting Control System1
SECTION 26 56 00

EXTERIOR LIGHTING

173LED luminaire1
174Photocell1
175Local / Regional materials1
176LED Power Supply Units (Drivers)1
177Obstruction lighting1
178Obstruction lighting1
179Operating test1
180Provisions For Lighting Fixtures1
181Warranty1
182Useful life of light sources1
183Warranty obstructions lights1
184Spare parts1
185Lighting System1
186Exterior Lighting Control System1
187Obstruction lighting1
SECTION 31 00 00

EARTHWORK

188Shoring1
189Analysis of the results1
190Materials proposed as Backfill1
191Materials proposed as Soil and Topsoil1
SECTION 31 05 19

GEOTEXTILE

192Geotextile11
193Execution control1
SECTION 32 05 10

AGGREGATES

194Aggregates origin control11
195Job mix formula1
196Test section1
197Acceptance control1
SECTION 32 05 12

SOIL STABILIZED IN-SITU

198Underlaying Surface1
199Water1
200Cement Origin Control111
201Soil Origin Control11
202Job Mix Formula1
203Test Section11
204Execution Control11
205Acceptance Control1
SECTION 32 05 30

PRIME COAT

206Existing surface1
207Prime coat origin control11
208Coverage aggregate origin control11
209Prime coat application rate to be applied1
210Coverage aggregate application rate to be placed1
211Execution control1
SECTION 32 05 42

BITUMINOUS CONCRETE TYPE BITUMINOUS MIXES

212Control of origin of the bitumen11
213Control of origin of the aggregates11
214Control of origin of the filler11
215Production plant1
216Job mix formula1
217Test section1
218Paving plan1
219Production control11
220Placing and compaction control1
221Acceptance control1
SECTION 32 07 00

PAVEMENT MARKINGS

222CE certification of the painting.1
223CE certification of the glass microspheres1
224Signing system during the painting.1
225Tests of verification.1
SECTION 32 31 13.53

HIGH-SECURITY FENCES AND GATES

226Fence Fabric11
227Posts1
228Post Caps1
229Braces1
230Rails1
231Tension Wire1
232Barbed wire1
233Barbed Wire Supporting Arms1
234Stretcher Bars1
235Wire Ties1
236Ground rods1
237Ground wires1
238Static grounding cable reel1
239Gounding system test1
240Gate Assembly1
241Gate Hardware and Accessories1
SECTION 32 92 19

SEEDING

242Seed1
243Fertilizer1
244Topsoil1
245Existing soil1
SECTION 33 11 00

WATER UTILITY DISTRIBUTION PIPING

246Pipe, Fittings, Joints and Couplings1
247Valves1
248Electrowelded joining1
249Turbine Type Meters1
250Compound type meters1
251Bacteriological Samples1
252Leakage test1
253Hydrostatic Test1
SECTION 33 16 15

WATER STORAGE STEEL TANK

254Detail Drawings1
255Tank Installation1
256Piping and Valve Installation1
257Manufacturer's Technical Literature1
258System Description1
259Galvanized steel sheet1
260PVC waterproofing sheet reinforced1
261Roof panel1
262Valves1
263Pipe, Fittings, Joints and Couplings1
264Sealants and Gaskets1
265Disinfection Procedures1
266Chlorination system1
267Manufacturer's Design Analysis1
268Tank Installation1
269Testing of Valves and Piping1
270Hydrostatic Test1
271Leak Test1
272Manufacturer's Qualifications1
273Lining and Coating1
274Shipping, Handling, and Storage1
275Warranty1
SECTION 33 40 00

STORMDRAINAGE UTILITIES

276Gratings1
277Pipeline1
278Culvert (headwall)1
279Fittings1
280Jointing materials1
SECTION 33 71 02

UNDERGROUND ELECTRICAL DISTRIBUTION

281Low voltage cable1
282Ground rods1
283Ground wires1
284Exothermic Welding Cadweld1
285Buried Warning and Identification Tape1
286Handholes1
287Handhole Covers1
288Conduits1
289Field acceptance checks and tests1
290Handhole and covers1

&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS (Spanish)

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 06-1003TÍTULO DE PROYECTO:
RENOVAR SALA DE REUNIONES , B 105SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNNUMBER OF COPIES REQUIREDFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
CERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPO
APROBADO

: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DESAPROBADO

: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

SECCIÓN 01 11 01

CONDICIONES GENERALES

01Carta de garantía4Acceptance+15
02Programa de obra4CNTP+7
03Programa de avance de obra4CNTP+10
04Plan de obra4CNTP+7
05DD Form 13544FI+15
06Planos As-Built4FI+15
07Plan de movilización4CNTP+15
08Proyecto firmado4CNTP+15
09Plan de control de calidad4CNTP+15
10Certificado de gestión de residuos y escombros4Final Inspection
11Personal clave4DNTP+15
12Plan de protección medioambiental4CNTP+15
13Datos especiales4As Built+10
14Plan de salud y seguridad4CNTP +15
PART 12 - PROYECTOS PEQUEÑOS DESIGN-BUILD AVANCE DE OBRA
15Programa Design-Build1DNTP+10
16No usado
SECCIÓN 01 11 02

CONDICIONES ESPECIALES

17Calendario de obra1CNTP+7
18No usado
19Solicitud de material suministrado por el Gobierno1Work-15
20Inventario del excedente de suministros, materiales y equipos importados libre de impuestos1Prior to FI
21No usado
SECTION 02 41 00

DEMOLITION

22No usado
23Plan de demolición1CNTP + 15
24Plan de gestión y eliminación de los residuos procedentes de la demolición11CNTP+15
25Vertedero autorizado o planta de tratamiento y recuperación1CNTP+15
26Certifica de cumplimiento1CNTP+15
SECCIÓN 02 82 00

REMEDIOS PARA EL AMIANTO

27Equipo de protección respiratoria.1
28Todos los Equipos de Protección Individual (EPI) utilizados1
29Aspiradoras con filtro HEPA1
30Aprobación de Relleno Sanitario1
31Certificados de formación en Prevención de Riesgos1
32Certificado de registro como Riesgo de Amianto1
33Certificación de Higienista Industrial responsable1
34Plan de reducción de riesgos de asbesto1
35Notificaciones1
SECCIÓN 02 84 16

MANIPULACIÓN DE BALASTOS DE ILUMINACIÓN Y LÁMPARAS QUE CONTIENEN PCB Y MERCURIO

36Cerfificados del CIH1
37Certificado de Capacitación1
38PCB y Plan de trabajo de eliminación de lámparas1
39Plan de eliminación de PCB y lámparas1
40Certificación de transporte1
41Certificación de descontaminación1
42Certificación de eliminación y/o reciclaje1
43DD Form 1348-11
44Resultados de las pruebas1
SECCIÓN 03 30 00

HORMIGÓN VERTIDO IN SITU

45Certificado de la inspección de la central de fabricación1
46Programa de ensayo de control de hormigón1
47Resultado de los ensayos de control de hormigón1
48Catálogo de la lámina de polietileno1
49Programa de control de calidad1
SECCIÓN 04 20 00

ALBAÑILERÍA

50Catálogos del fabricante1
51No usado
52No usado
SECCIÓN 05 12 00

STRUCTURAL STEEL

53Levantamiento de planos1
54Procedimientos de soldadura y calificaciones11
SECCIÓN 05 50 13

FABRICACIONES VARIAS DE METAL

55Pasamanos11
56No usado
57No usado
58Resultados de inspección de soldadura de acero11
59Procedimientos de soldadura y calificaciones1
SECCIÓN 07 22 00

CUBIERTA TRANSITABLE LOSA FILTRANTE

60Barrera de vapor11
61Hormigón aligerado1111
62Lámina antipunzonamiento1111
63Membrana de Impermeabilización111
64Membrana de Impermeabilización11
65Membrana fluida impermeabilizante11
66Losa filtrante1111
67Remates1
68Remates11
69Soldadura en calor1
70Masilla111
71Sellantes para juntas de dilatación111
72Canalones y bajantes11
73Sistema de protección contra caídas de Alturas1
74Sistema de protección contra caídas de Alturas11
75Prueba de estanqueidad11
SECCIÓN 07 84 00

CORTAFUEGOS

76Información de productos1NTP + 30
77Instrucciones de fabricante11NTP + 30
SECCIÓN 07 92 00

SELLANTES

78Sellantes, imprimación y desencofrantes111NTP + 30
SECCIÓNN 08 11 13

PUERTAS Y MARCOS DE ACERO

79Puertas111NTP + 45
80Puertas Resistente al fuego1
81No usado
82No usado
SECCIÓN 08 14 00

PUERTAS DE MADERA

83Catálogos del fabricante11NTP + 45
84No usadoNTP + 45
SECCIÓN 08 51 20

VENTANAS DE ALUMINIO

85Puertas y ventanas de aluminio1111NTP + 45
86No usadoNTP + 45
87No usadoNTP + 45
SECCIÓN 08 71 00

CERRAJERÍA

88Componentes de cerrajería1111
89No usado
90No usado
SECCIÓN 08 81 00

ACRISTALAMIENTO

91Acristalamiento11NTP + 60
SECCIÓN 09 24 23

ENFOSCADOS Y ENLUCIDOS

92Características del Cemento Portland1NTP + 30
93Aditivos del Mortero1NTP + 30
94Puente de Unión1
95Malla de Fibra de refuerzo1
SECCIÓN 09 29 00

TECHOS REGISTRABLES DE PLACA DE CARTÓN-YESO

96Placas de cartón-yeso resistente a la humedad1
97Placas de cartón-yeso11
98Sistema de Suspensión1
99Instrucciones de fabricante1
100Materiales exentos de Amianto1
SECCIÓN 09 30 00

AZULEJOS

101Datos del catálogo del fabricante1
102Azulejos cerámicos11
103Pavimento cerámico11
SECCIÓN 09 51 00

TECHO ACÚSTICO SUSPENDIDO

104Sistema de falso techo1111
SECCIÓN 09 65 00

SUELOS VINÍLICOS

105Lámina de suelo vinícica111
106Base de pared resistente y accesorios11
107No usado
108No usado
109No usado
110No usado
SECCIÓN 09 84 20

PANELES ACÚSTICOS DE PARED

111Detalles de paneles acústicos1111
112No usado
113No usado
SECCIÓN 09 90 00

PINTURAS Y RECUBRIMIENTOS

114Pinturas11
115Contenido de plomo1
116Tickets de entrega1
SECCIÓN 10 28 00

SANITARIOS, ACCESORIOS DE BAÑO

117Lavabo y accesorios1NTP + 45
118Lavabo y accesorios para discapacitados1NTP + 45
119Inodoro y accesorios1NTP + 45
120No usado
121Perchas1NTP + 45
122Espejo1NTP + 45
123Espejo para discapacitados1NTP + 45
124Dispensador de papel higiénico1NTP + 45
125Jabonera1NTP + 45
126No usado
127Dispensador de jabón para WC discapacitados1NTP + 45
128Dispensador de jabón para baños masculinos y femeninos1NTP + 45
129Dispensador de papel1NTP + 45
130No usado
131Barra de apoyo1
132Fuente enfriadora de agua para consumo1NTP + 45
133No usado
SECCIÓN 10 44 16

EXTINTORES

134Extintores11
135Armarios1
136Soportes de pared1
SECCIÓN 13 48 73

CONTROL SÍSMICO PARA EQUIPOS MECÁNICOS

137Bracing11
138Dispositivos de aislamiento de vibraciones resistentes
139Requisitos de equipo11
140Pernos de anclaje1
SECCIÓN 21 13 13.00 10

ROCIADORES DE TUBERÍAS HÚMEDA, EXTINCIÓN DE INCENDIOS

141Manerial y equipamiento11
142No usado
143No usado
144No usado
145No usado
146No usado
147No usado
148No usado
149No usado
150No usado
151No usado
152No usado
153No usado
154Calificación del instalador1
155No usado
156Cálculos de aspesores del sistema hidráulico1
157No usado
158Planos de taller1
159No usado
SECCIÓN 22 00 00

FONTANERÍA

160Sistama de Fontanería y equipamiento11
161No usado
162No usado
163No usado
164No usado
165No usado
166No usado
167No usado
168No usado
169No usado
170No usado
171No usado
172No usado
173No usado
174No usado
175No usado
176No usado
177No usado
SECCIÓN 23 07 00

AISLAMIENTO TÉRMICO PARA SISTEMAS MECÁNICOS

178Aislamiento de tuberías de refrigerante1
179No usado
180No usado
SECCIÓN 23 31 13.00 40

CONDUCTOS METÁLICOS

181Materiales de conductos11
182No usado
183No usado
184No usado
185No usado
186No usado
187No usado
188No usado
189No usado
190No usado
191Amortiguador motorizado de baja fuga1
192Amortiguadores de retroceso1
193Prueba y equilibrado de sistemas de conductos1
194No usado
195No usado
SECTION 23 35 19

SISTEMA DE IMPULSIÓN, DISTRIBUCIÓN, VENTILACIÓN Y EXTRACCIÓN DE AIRE

196Unidad esterior de aire dedicada sitema DX (DOAS)11
197Unidad de expansión directa11
198Sistema de expansion directa multi spplit o VRF11
199Sistema de equipo partido 1x111
200Extractores11
201Tuberías de cobre y refrigerante1
202No usado
SECCTÓN 26 20 00

SISTEMA DE DISTRIBUCIÓN INTERIOR

203Enchufes (uno de cada tipo)1
204Enchufes GFI1
205Enchufes GFI1
206Interruptores de circuito1
207Conductos y accesorios (uno de cada tipo)1
208Cables1
209Cajas y cubiertas de enchufes1
210Cajas de unión1
211Panel eléctrico1
212Panel eléctrico1
213Panel eléctrico1
214Dispositivo de protección contra sobretensiones1
215Canaleta de superficie1
216Analizador de redes1
217Etiquetas
1
218Placas de dispotitivos1
219Intrruptor de palanca1
220Interruptor de seguridad1
221Medidor de potencia eléctrica1
222Botones de apagado de emergencia hvac1
223Terminación de unión entre sistemas1
224Interruptores de sensores de ocupación1
225Actuadores y transformadores de amortiguadores1
226Conductos audiovisuales y cajas de conexiones1
227Prueba de aislamiento 0,6/1 kV.1
228Certificado de cumplimiento de cada cuadro1
229Sistemas eléctricos1
SECCIÓN 26 41 00

PROTECCIÓN CONTRA RAYOS

230Terminales aéreos1
231Conexiones y terminaciones1
232Componentes1
233Varillas de tierra1
234Kits de soldarura exotérmica1
235Sistema de protección contra rayos1
236Cada elemento principal1
237Prueba del sistema de puesta a tierra1
238Inspección del sistema de protección contra rayos1
239Sistema de protección contra rayos1
SECCIÓN 26 51 00

ILUMINACIÓN INTERIOR

240Luminarias1
241Fuente de luz LED1
242Control y sensores de ocupación de iluminación1
243Unidades de alimentación LED1
244Controladores de emergencia LED1
245Prueba de funcionamiento1
246Garantía1
247Sistema de control de iluminación1
248Sistema de control de iluminación1
249Sistema de control de iluminación1
250Sistema de iluminación1
SECCIÓN 26 56 00

ILUMINACIÓN EXTERIOR

251Luminarias LED1
252Célula fotoeléctrica1
253Puesta en servicio1
254Servicio operativo1
255Garantía1
256Sistema de iluminación1
257Sistema de Control de Iluminación Exterior1
SECCIÓN 27 10 00

SISTEMA DE CABLEADO DE TELECOMUNICACIONES EN EDIFICIOS

258Bandeja de cables1
259Conductos1
260Etiquetas
1
261Sistema de canalización y cableado de telecomunicaciones1
SECCIÓN 28 31 76

SISTEMAS DE ALARMAS CONTRAINCENDIOS INTERIOR Y NOTIFICACIÓN MASIVA

262Detector de humos1
263Detector de calor1
264Pulsador de alarma (con caja exterior“doble acción” STI Stopper II)1
265Detector de humos de conductos1
266Estroboscopio y altavos combinado – FA1
267Estroboscopio y altavoz combinado – MNS1
268Estroboscopio exterior y altavoz combinado– FA1
269Radio BT-XM1
270Compuerta cortafuego1
271Interruptor con cámara de retardo1
272AFCP/MNS EST41
273Pantalla de texto LCD remota1
274Antena1
275Diagramas de cableado interior del panel de control.1
276Diagrama de cableado punto a punto1
277Cálculo de energía de la batería1
278Placas de equipo1
279Instrucciones1
280Diagrama de cableado1
281Funcionamiento del sistema1
282Dispositivos de notificación1
283Amplificadores1
284Manual de operaciones y mantenimiento1
285Instrucciones para los empleados del Gobierno1
286Informes de pruebas1
287Procedimientos de pruebas1
288Funcionamiento del sistema1
289Sistema de alarmas de incendio/notificación masiva1
SECCIÓN 31 00 00

MOVIMIENTO DE TIERRA

290Apuntalamiento1
291Pruebas de campo1
292Materiales propuestos como Relleno1
293Materiales propuestos como Suelo y Tierra vegetal1
SECCIÓN 31 05 19

GEOTEXTIL

294Geotextile11
295No usado
SECCIÓN 32 92 19

CÉSPED

296Semillas1
297Fertilizante1
298Terreno vegetal1
299No usado
SECCIÓN 33 30 00

SANEAMIENTO

300Tuberías y accesorios de PVC1
301Arquetas redondas1
302Pozos redondos1
303Marcos y tapas de pozos redondos1
304Película protectora y sellador apra tuberías1
SECCIÓN 33 71 02

INSTALACIONES ELÉCTRICAS ENTERRADAS

305Cable de baja tensión1
306Picas de tierra1
307Cables de tierra1
308Soldadura exotérmica Cadweld1
309Cinta de advertencia e identificación enterrada1
310Arqutetas1
311Tapas de arquetas1
312Conductos1
313Informes de prueba1