About this file
The document provided is a Question and Answer (Q&A) related to a Request for Information (RFI) for a federal contract opportunity to upgrade the Intrusion Detection System (IDS) at Kadena Air Base, building 160.
The key details are:
- The RFI has a due date of June 20, 2024 at 11:00 AM Japan Standard Time.
- The scope of work includes replacing all antiquated sensors, installing new alarm sensors and associated equipment to meet security criteria requirements outlined in AFI31-101 and FIPS 140-2 for the protection of Protection Level (PL) 2-4 assets.
- The government has provided responses to 19 questions related to the technical requirements, installation logistics, and programmatic details of the project.
- The bid submission deadline has been extended to July 5, 2024 at 11:00 AM Japan Standard Time.
- The contracting agency is the Department of the Air Force Pacific Air Forces.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo_FA527024QA1140003.pdf | ||
| Attachment 7_QA_r2.pdf | ||
| Combo_FA527024QA1140002.pdf | ||
| Combo_FA527024QA1140001.pdf | ||
| Attachment 7_QA.pdf | ||
| Attachment 2_SOW.pdf | ||
| Attachment 3_Brand Name Justification.pdf | ||
| Attachment 5_DFAS Japan AF EFT Submission.pdf | ||
| Combo_FA527024QA114.pdf | ||
| Attachment 1_Price List.xlsx | XLSX spreadsheet | |
| Attachment 4_DEAMS EFT Enrollment Form Updated 05_2023.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA527024QA114-0002
RFI due date 20 June 2024, 11:00 AM JST
1. 1. Please confirm that FIPS 140-2 is not required for B160.
A. It is required for B160.
2. Is the current Legacy IDE at B160 operational and if so, shall it remain online during the installation of new IDE?
A. It is operational and it does not need to remain online during the new installation as existing conduit needs to be used.
3. 3. Please confirm that all existing legacy IDE to include all conduits and wiring are to be deinstalled.
A. If yes, please confirm that ceiling and wall restoration work is to be included, as needed.
Existing conduit shall be used, however current wiring is to be deinstalled and replaced.
IF the wiring replacement causes wall damage, restoration work shall be included.
4. The SOW and list identify 3 Honeywell Vindicator panel devices; however, the total sensor count is not all inclusive. Please confirm that we may increase the panel devices as needed to physically land inputs and/or for regulations compliance.
A. The number of devices has been calculated for Vindicator 1500s, and only 3 are required for this project. Any more would need justification.
5. Junction box tamper switches, per current regulations, are to be separate alarmed inputs. Please confirm that this requirement will be waived and that we may series wire junction box tamper switches with the sensor or device tamper. Please note that the scope states no series. wiring.
A. Per AFI 31-101, Chapter 9, section 9.11. (T3) Junction Box tampers are only required if the Junction box is not protected by a sensor. There will not be wiring in series (daisy chaining) of any sensors. Resistor packs will be used for the tamper alarm coming from the device (motion/BMS).
6. Does B160 have a comm room and if so, is separate keypad access required.
A. Yes, no separate keypad access is required.
7. Please confirm that the Post Office personnel can support after hours installation work as needed.
A. No, Post Office personnel (718 FSS personnel) cannot support after hours work.
8. Please confirm that all existing legacy IDE to include all conduits and wiring are to be deinstalled.
A. If yes, please confirm that ceiling and wall restoration work is to be included, as needed.
Same question stated in question #3.
9. Please confirm that all conduit and cable installations may be accomplished by local nationals.
A. Yes
10. Please provide the latest CMD listing.
A. See Attachment 6_CMD list.
11. What version of firmware is the 18SF head end V5 currently running?
A. 4.3 Rel 2 VR14.
12. Please confirm that post installation firmware upgrades will be accomplished by the USG.
A. Yes the USG will upgrade firmware.
FA527024QA114-0002
RFI due date 20 June 2024, 11:00 AM JST
13. Please confirm that all head end programming will be accomplished by the USG.
A. No, the USG does will not program the head end server. It must be accomplished by a certified vindicator technician, with a min. of a secret clearance.
14. Do all Honeywell Vindicator panel devices need to by reachable via IP connection?
A. Yes.
15. Please specify the network switch preference if applicable.
A. It must be Cisco 9300, 10G, with SFP’s.
16. Will there be any GFE provided for this installation?
A. No, the contractor must provide power, connectivity and all other necessities to complete
Government Acceptance testing and alarm certifications IAW Electronic Security Equipment (ESE). Master Installation Acceptance Test and Turnover Plan (ESE-TP- 0023).
17. KTR would like to confirm if shipping to Tracy, CA is correct as no tracking information of the equipment will be available if shipped to Tracy.
A. Section 3.7 of the SOW states that a company with auto freight tracking.
18.
Reference: Q.5 and the answer.
Additional Question:
The motion sensors will be in an accessed state during normal business hours. Please confirm that all BMS, wireless receiver and keypad junction boxes will not require tamper switches.
A. Yes, the motion sensors will stay in access as long as 718FSS is working. All BMS, wireless receivers, and keypads are equipped with their own internal tampers. If any junction box is not protected by a motion sensor, it will require a tamper. For clarification purposes, all tampers must be wired independently, and they will be wired with resistor packs.
19. Can the government consider extending the bid submission deadline to 5 July?
A. The deadline is extended to 5 July 2024 at 11:00 AM Japan Standard Time.
Nothing Follows
PRIMARY POC:
Keigo Miyagi Contract Specialist
18 CONS/PKA
Base Operator: 098-961-1110 Ext: 634-4693 keigo.miyagi.jp@us.af.mil
ALTERNATE POC:
Justin K. Townsend, SSgt, Contracting Officer
18 CONS/PKA
Base Operator: 098-961-1110 Ext: 634-4789 justin.townsend.2@us.af.mil mailto:keigo.miyagi.jp@us.af.mil