AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to extend the solicitation due date to 30 June 2016, add the Q & A's, add the updated PWS, add the inventory list to the PWS, and update X003 CLINs.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5270-16-R-0006
X 9B. DATED (SEE ITEM 11)
08-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Jun-2016
CODE
18 CONS/LGCB
POC: KAITLYN WOODRUFF
UNIT 5199, BLDG 95 KADENA AB
APO AP 96368
FA5270 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA5270-16-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 15-Jun-2016 04:30 PM to 30-Jun-2016 04:30 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0003
The CLIN extended description has changed from The contractor shall obtain material, parts and supplies per PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for material, parts and supplies only -overhead, profit and G&A are not allowed. Approval required prior to purchase.NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.BASICPerformance
Period: 1 Oct 16- 30 Sep 17Total amount of this CLIN is NOT TO EXCEED Y40,629,558.00 to The contractor shall obtain permits, tests, analyses, material, parts and supplies per PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6.
The contractor shall be reimbursed for permits, tests, analyses, material, parts and supplies only -overhead, profit and G&A are not allowed. Approval required prior to purchase.NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.BASICPerformance Period: 1 Oct 16- 30 Sep
17Total amount of this CLIN is NOT TO EXCEED Y40,629,558.00.
CLIN 1003
The CLIN extended description has changed from The contractor shall obtain material, parts and supplies per PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for material, parts and supplies only -overhead, profit and G&A are not allowed. Approval required prior to purchase.NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.OPTION YEAR
1Performance Period: 1 Oct 17- 30 Sep 18Total amount of this CLIN is NOT TO EXCEED Y41,198,372.00 to The contractor shall obtain permits, tests, analyses, material, parts and supplies per PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for permits, tests, analyses, material, parts and supplies only -overhead, profit and G&A are not allowed. Approval required prior to purchase.NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.OPTION YEAR 1Performance
Period: 1 Oct 17- 30 Sep 18Total amount of this CLIN is NOT TO EXCEED Y41,198,372.00.
CLIN 2003
The CLIN extended description has changed from The contractor shall obtain material, parts and supplies per PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for material, parts and supplies only -overhead, profit and G&A are not allowed. Approval required prior to purchase.NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.OPTION YEAR
2Performance Period: 1 Oct 18- 30 Sep 19Total amount of this CLIN is NOT TO EXCEED Y42,401,364.00 to The contractor shall obtain permits, tests, analyses, material, parts and supplies per PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for permits, tests, analyses, material, parts and supplies only -overhead, profit and G&A are not allowed. Approval required prior to purchase.NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.OPTION YEAR 2Performance
Period: 1 Oct 18- 30 Sep 19Total amount of this CLIN is NOT TO EXCEED Y42,401,364.00.
CLIN 3003
The CLIN extended description has changed from The contractor shall obtain material, parts and supplies per PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for material, parts and supplies only -overhead, profit and G&A are not allowed. Approval required prior to purchase.NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.OPTION YEAR
3Performance Period: 1 Oct 19- 30 Sep 20Total amount of this CLIN is NOT TO EXCEED Y44,381,508.00 to The contractor shall obtain permits, tests, analyses, material, parts and supplies per PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for permits, tests, analyses, material, parts and supplies only -overhead, profit and G&A are not allowed. Approval required prior to purchase.NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.OPTION YEAR 3Performance
Period: 1 Oct 19- 30 Sep 20Total amount of this CLIN is NOT TO EXCEED Y44,381,508.00.
CLIN 4003
The CLIN extended description has changed from The contractor shall obtain material, parts and supplies per PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for material, parts and supplies only -overhead, profit and G&A are not allowed. Approval required prior to purchase.NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.OPTION YEAR
4Performance Period: 1 Oct 20- 30 Sep 21Total amount of this CLIN is NOT TO EXCEED Y47,244,115.00 to The contractor shall obtain permits, tests, analyses, material, parts and supplies per PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for permits, tests, analyses, material, parts and supplies only -overhead, profit and G&A are not allowed. Approval required prior to purchase.NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.OPTION YEAR 4Performance
Period: 1 Oct 20- 30 Sep 21Total amount of this CLIN is NOT TO EXCEED Y47,244,115.00.
The following have been modified:
Addenda to FAR 52.212-1 Instructions to Offerors - Commercial Items (October 2015)
(a) Paragraphs 52.212-1(b), “Submission of offers,” and 52.212-1(f), “Late submissions, modifications, revisions, and withdrawals of offers,” are deleted in their entirety and replaced with 52.215-1(c), “Submission, modification, revision, and withdrawal of proposals,” by reference.
(b) Paragraph 52.212-1(c), “Period for Acceptance of Offers,” is tailored as follows: “The offeror agrees to hold the prices in its offer firm for 180 calendar days from the date specified for receipt of offers.”
(c) The following is inserted as new paragraph (m) of the provision:
“(m) Proposal Preparation Instructions.
A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.
Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors.
Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of three (3) separate parts; Part I - Summary and Miscellaneous
Data, Part II - Price Proposal, and Part III - Past Performance Proposal.
B. Specific Instructions:
1. PART I – SUMMARY AND MISCELLANEOUS DATA. Submit original..
(a) The offeror shall provide a master table of contents of the entire proposal.
(b) Standard Form (SF) 1449. Complete blocks 12, 17a, 30a, 30b, and 30c. In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation.
(c) Complete the necessary fill-ins and certifications in provisions and in the on-line Representations and
Certifications at www.sam.gov. Return the provision FAR 52.212-3, Offeror Representations and Certifications –
Commercial Items, along with the proposal. For other provisions and clauses in the solicitation, the offeror is required to submit the pages that require an offeror fill-in.
(d) Submit an acknowledgment of the all solicitation amendments, if issued.
(e) If applicable, provide a copy of the letter from the Small Business Administration (SBA) showing proof of Section 8(a) status.
(f) If none proposed, submit an Affirmation of no Exceptions, Deviations, or Waivers.
2. PART II – PRICE PROPOSAL - Submit original.
(a) This Part shall contain a completed Schedule of Supplies/Services, continuation sheets of SF 1449, blocks 19 – 24.
(b) Insert proposed unit price(s) and extended amount(s) in the Schedule of Supplies/Services for each
Contract Line Item Number (CLIN) 0004-0013, 1004-1013, 2004-2013, 3004-3013 and 4004-4013 including all option periods. The contractor shall not fill prices for CLIN 0001-0003, 1001-1003, 2001-2003, 3001-3003 and
4001-4003. The extended amount must equal the unit price multiplied by the number of units. It is imperative that mathematical calculations are correct; particular care should be taken to ensure the amounts match when using the
EXCEL program and the rounding of figures, limited to two decimal places.
c) Extreme care should be exercised to ensure that no price data of any kind are included in any other Part of the proposal.
3. PART III – PAST PERFORMANCE PROPOSAL - Limited to no more than 10 pages per contract listed. Only references for past efforts/contracts of relevance are desired. Submit original.
(a) Quality and Satisfaction Rating of Contracts: Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) that demonstrates customer satisfaction with overall job performance and/or quality of completed and/or ongoing contracts. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems, such as cost overruns, extended performance periods, numerous warranty calls, etc. (See 52.212-2(d)(C))
(b) Performance Surveys/Questionnaires: Past Performance Questionnaires (PPQs) shall be used by the offeror in obtaining and providing past performance information. The government requires the offeror send out a
PPQ to each of the Points-of-Contact (POCs) identified in the Past Performance Proposal (paragraph (c) below).
The offeror shall send out the PPQ (Attachment 3), using the Past Performance Evaluation Cover Letter (Attachment
3), to each of their references.
THE RESPONSIBILITY TO SEND OUT THE PAST PERFORMANCE QUESTIONNAIRE RESTS SOLELY
WITH THE OFFEROR.
Once the questionnaires are completed by the POCs, the information contained therein will be considered source selection sensitive and will not be released outside the government. The POCs shall forward their completed questionnaires directly to the government – NOT BACK TO THE OFFEROR.
http://www.sam.gov/
PPQs shall be sent directly from your reference to this office marked to the attention of MSgt Derek Allar, via e-mail to derek.allar@us.af.mil, and Mr. Jeremy Peppler at jeremy.peppler@us.af.mil.
or mailed to the following address:
18th Contracting Squadron/LGCB
Attn: MSgt Derek Allar & Mr. Jeremy Peppler
Unit 5199, Bldg. 95, Kadena AB, Okinawa, Japan 96368
NOTE: All PPQ’s must be received by the government by the solicitation closing time and date. All PPQ’s received after this time and date will not be considered.
(c) Past Performance Information: The government will evaluate recent and relevant performance information on all offerors based on (i) the references provided by the offeror, and (ii) any past performance information obtained from survey/questionnaires (Solicitation Attachment 3) and (iii) any data independently obtained by the government. If a reference identified by the offeror in accordance with 52.212-1(m)(B)(3) does not submit a survey/questionnaire, the government will follow up with the reference POC, but it is not responsible for the failure of a reference POC to provide a survey/questionnaire.
(A) Recent past performance information includes contracts performed and/or being performed for any customer within the last three (3) years from the issuance date of the solicitation.
(B) Relevant past performance is that which involved similar scope, magnitude of effort, and complexity that this solicitation requires. The government will assess relevancy for each contract and assign a rating as described in
FAR 52.212-2(d).
Furnish the following information for each contract listed:
(i) Company/Division name
(ii) Product/Service
(iii) Contracting Agency/Customer
(iv) Contract Number
(v) Contract Dollar Value
(vi) Period of Performance
(vii) Verified, up-to-date name, mailing and e-mail addresses, and telephone number of the contracting officer (Point-of-Contact)
(viii) Comments regarding compliance with contract terms and conditions
(ix) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.
Include rationale supporting your assertion of relevance and identify aspects of the contracts deemed relevant and how they relate to the proposed effort. If an offeror has no past performance history of relevance, the offeror must affirmatively state it possesses no past performance history of relevance.
(d) The evaluation of past performance information will not take into account past performance regarding
(i) predecessor companies, (ii) will not take into account past performance of key personnel who have relevant experience, and/or (iii) will not take into account past performance regarding subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this acquisition.
(e) If a teaming arrangement is contemplated, provide complete information as to the arrangement, including any relevant and recent past performance information on previous teaming arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past contracts of relevance.
mailto:derek.allar@us.af.mil mailto:jeremy.peppler@us.af.mil
(f) Subcontractor Consent: Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor’s consent. Provide with the proposal a letter from each subcontractor that will perform major or critical aspects of the requirement, consenting to the release of its past performance information to the prime contractor.
C. Documents submitted in response to this RFP must be consistent with the following:
1. Requirements of the solicitation (CLINs and PWS) and government standards and regulations pertaining to the PWS.
2. FAR 52.212-2, Evaluation – Commercial Items, of this solicitation.
3. If a Part in a proposal exceeds the specified page limit cited in the Part Content, the excessive pages will not be evaluated.
4. Format for proposal Parts I, II, and III shall be as follows:
(a) Each written Part of the proposal shall be separately bound and labeled in standard three ring loose-leaf binders and clearly identified on the front and side. Each Part shall contain a Table of Contents, Cross References, and the List of Tables and Drawings (if applicable). Cover pages, Table of Contents, and Tabs will not be counted against the page limits. However, pages depicting tables, charts, graphs and figures will count toward the page limit.
The number of copies of each part is specified in paragraph B, Specific Instructions, above.
(b) The proposals will be on 8 1/2” x 11” paper, except for fold-outs used for charts, tables, or diagrams, which may not exceed 11” x 17”.
(c) A page is defined as one face of a sheet of paper containing information. Two pages may be printed on one sheet of paper.
(d) All printing shall be single-spaced. Spacing characteristics are applicable to charts and graphs.
(e) Typing shall not be less than 10 pitch. Size of print is applicable to charts and graphs.
(f) Page margins shall be a minimum of 1 inch top, bottom, and each side.
(g) In addition to the paper copies specified for each Part, one electronic copy of each Part of the entire offer must be submitted. The electronic version of the proposal shall be submitted in a format readable by Microsoft
Office 2007 which includes software programs such as WORD, EXCEL, or PowerPoint. For those pages of the proposal that cannot be submitted using Microsoft Office, such as the Standard Form 1449, offerors shall include those pages electronically using Adobe Acrobat portable document files (.pdf) format. The Price Part shall be submitted in spreadsheet format, such as EXCEL, and MS WORD for price narrative. The electronic version shall be submitted on a compact disc (CD). USB flash drives, floppy disks, and zip disks are not acceptable.
Indicate on each CD the Part number and title. The paper copies and electronic versions shall be identical in all respects. In the event there are any discrepancies between the paper copies and electronic copies, the paper copies take precedence and will be used for evaluation. Ensure the electronic documents stored on the CD can be opened. Use separate files and folders to permit rapid location of all portions, including exhibits and attachments, if any. Replacement CDs will be required to update the final proposal resulting from any discussions and updates, if applicable.
(h) Offerors can also submit electronic copies of proposals via e-mail. Files are not to exceed 4 MB. By submitting an electronic copy, offerors assume all risk of proposals not getting through security measures and firewalls. Only files created using Microsoft WORD, Microsoft EXCEL, and/or Adobe .pdf files will be accepted.
No zip files will be accepted. If submitting proposals electronically, email the file(s) by the solicitation closing date and time to the following email addresses: derek.allar@us.af.mil & jeremy.peppler@us.af.mil.
(i) Each Part shall be complete in itself and shall not reference information contained in other Parts. Page
1 of a Part is defined as the first page after the Table of Contents. All pages shall be numbered.
(j) Price data of any kind shall be presented only in the Price Proposal Part.
(k) Elaborate formats, bindings, and color presentations are not desired or required.
The following table summarizes the proposal submission:
D. General Information:
1. Information regarding submission of proposals: Hand carried or mailed proposals must be delivered to the following address:
2. The sealed envelope or package used to submit your proposal must show the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
3. Offerors are cautioned that 18 CONS/LGCB, Bldg. 95, Kadena AB, Okinawa has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAY
SHOULD BE EXPECTED WHEN HAND-CARRYING PROPOSALS. Offerors should allow sufficient time to obtain a visitor pass and arrive at Bldg. 95 prior to the time specified for receipt. Late proposals will be processed in accordance with FAR 52.215-1(c)(3),“Submission, modification, revision, and withdrawal of proposals.”
4. FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by this base:
New Year’s Day 1 January
Birthday of Martin Luther King Third Monday in January
Washington’s Birthday Third Monday in February
Memorial Day Last Monday in May
Independence Day 4 July
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans Day 11 November
Thanksgiving Day Fourth Thursday in November
Christmas Day 25 December
PART TITLE
ELECTRONIC
COPY
PAPER
COPY
PAGE LIMIT DUE DATE
I
Summary and Misc
Data
(File Name: Part I) 1 1 original 10 pages 30 Jun 2016
II
Price
(File Name: Part II) 1 1 original 33 pages 30 Jun 2016
III
Past Performance
(File Name: Part III) 1 1 original
Max 5 Ref.
10 pages per Ref. 30 Jun 2016
5. JOINT VENTURE AGREEMENTS. Joint Ventures are allowable on competitive 8(a) set-asides; however, the joint venture agreement must be received by SBA prior to proposal due date and approved before award of any resulting contract. If you are contemplating a joint venture on this project, you must advise your assigned SBA
Business Opportunity Specialist (BOS) as soon as possible. It is also recommended that the agreement be submitted as soon as practicable to ensure compliance with established regulations. Any corrections and/or changes needed can be made only when your BOS has adequate time for a thorough review before the proposal due date. NO
CORRECTIONS AND/OR CHANGES ARE ALLOWED AFTER TIME OF SUBMISSION OF PROPOSAL OR
BIDS.”
(End of Addenda)
(End of Summary of Changes)
18 CONS/LGCB
POC: DEREK ALLAR
UNIT 5199 BLDG 95
APO AP 96368
315-634-5967
315-634-4795
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
FA5270-16-R-0006 08-Apr-2016
b. TELEPHONE NUMBER
315-634-5967
8. OFFER DUE DATE/LOCAL TIME
04:30 PM 30 Jun 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
FA5270
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DEREK ALLAR
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
561210
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
0 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Unscheduled Maintenance (Duty hours)
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to perform unscheduled and maintenance service calls during Non- duty hours, based on Appendix 2c and 2d - Unscheduled Maintenance Data and paragraph 1.4.
of the Performance-Based Work Statement (PWS).
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
BASIC
Performance Period: 1 Oct 16- 30 Sep 17
Total amount of this CLIN is NOT TO EXCEED Y5,254,140.00
FOB: Destination
SIGNAL CODE: A
NET AMT
0002 1 Lot Unscheduled Maintenance (Non Duty-Hours)
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to perform unscheduled and maintenance service calls during Non- duty hours, based on Appendix 2c and 2d - Unscheduled Maintenance Data and paragraph 1.4.
of the Performance-Based Work Statement (PWS).
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
BASIC
Performance Period: 1 Oct 16- 30 Sep 17
Total amount of this CLIN is NOT TO EXCEED Y7,247,448.00
0003 1 Lot Acquisition of Parts and Supplies
FFP
The contractor shall obtain permits, tests, analyses, material, parts and supplies per
PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for permits, tests, analyses, material, parts and supplies only -overhead, profit and
G&A are not allowed. Approval required prior to purchase.
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
BASIC
Performance Period: 1 Oct 16- 30 Sep 17
Total amount of this CLIN is NOT TO EXCEED Y40,629,558.00
0004 12 Months Schedule Maintenance for Bldg. 90
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
BASIC
Performance Period: 1 Oct 16- 30 Sep 17
0005 12 Months Schedule Maintenance for Bldg. 428
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
0006 12 Months Schedule Maintenance for Bldg. 626
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
0007 12 Months Schedule Maintenance for Bldg. 731
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
0008 12 Months Schedule Maintenance for Bldg. 850
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
0009 12 Months Schedule Maintenance for Bldg. 853
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
0010 12 Months Schedule Maintenance for Bldg. 859
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
0011 12 Months Schedule Maintenance for Bldg. 910
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
0012 12 Months Schedule Maintenance for Bldg. 912
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
0013 12 Months Schedule Maintenance for Bldg. 920
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
1001 1 Lot Unscheduled Maintenance (Duty hours)
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to perform unscheduled and maintenance service calls during normal duty hours, based on Appendix 2c and 2d - Unscheduled Maintenance Data and paragraph 1.4.
of the Performance-Based Work Statement (PWS).
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 1
Performance Period: 1 Oct 17- 30 Sep 18
Total amount of this CLIN is NOT TO EXCEED Y5,327,698.00
1002 1 Lot Unscheduled Maintenance (Non Duty-Hours)
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to perform unscheduled and maintenance service calls during Non- duty hours, based on Appendix 2c and 2d - Unscheduled Maintenance Data and paragraph 1.4.
of the Performance-Based Work Statement (PWS).
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 1
Performance Period: 1 Oct 17- 30 Sep
Total amount of this CLIN is NOT TO EXCEED Y7,348,912.00
1003 1 Lot Acquisition of Parts and Supplies
FFP
The contractor shall obtain permits, tests, analyses, material, parts and supplies per
PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for permits, tests, analyses, material, parts and supplies only -overhead, profit and
G&A are not allowed. Approval required prior to purchase.
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 1
Performance Period: 1 Oct 17- 30 Sep 18
Total amount of this CLIN is NOT TO EXCEED Y41,198,372.00
1004 12 Months Schedule Maintenance for Bldg. 90
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
OPTION YEAR 1
Performance Period: 1 Oct 17- 30 Sep 18
1005 12 Months Schedule Maintenance for Bldg. 428
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
1006 12 Months Schedule Maintenance for Bldg. 626
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
1007 12 Months Schedule Maintenance for Bldg. 731
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
1008 12 Months Schedule Maintenance for Bldg. 850
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
1009 12 Months Schedule Maintenance for Bldg. 853
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
1010 12 Months Schedule Maintenance for Bldg. 859
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
1011 12 Months Schedule Maintenance for Bldg. 910
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
1012 12 Months Schedule Maintenance for Bldg. 912
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
1013 12 Months Schedule Maintenance for Bldg. 920
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
2001 1 Lot Unscheduled Maintenance (Duty hours)
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to perform unscheduled and maintenance service calls during normal duty hours, based on Appendix 2c and 2d - Unscheduled Maintenance Data and paragraph 1.4.
of the Performance-Based Work Statement (PWS).
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 2
Performance Period: 1 Oct 18- 30 Sep 19
Total amount of this CLIN is NOT TO EXCEED Y5,483,267
2002 1 Lot Unscheduled Maintenance (Non Duty-Hours)
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to perform unscheduled and maintenance service calls during Non- duty hours, based on Appendix 2c and 2d - Unscheduled Maintenance Data and paragraph 1.4.
of the Performance-Based Work Statement (PWS).
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 2
Performance Period: 1 Oct 18- 30 Sep 19
Total amount of this CLIN is NOT TO EXCEED Y7,563,501
2003 1 Lot Acquisition of Parts and Supplies
FFP
The contractor shall obtain permits, tests, analyses, material, parts and supplies per
PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for permits, tests, analyses, material, parts and supplies only -overhead, profit and
G&A are not allowed. Approval required prior to purchase.
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 2
Performance Period: 1 Oct 18- 30 Sep 19
Total amount of this CLIN is NOT TO EXCEED Y42,401,364.00
2004 12 Months Schedule Maintenance for Bldg. 90
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
OPTION YEAR 2
Performance Period: 1 Oct 18- 30 Sep 19
2005 12 Months Schedule Maintenance for Bldg. 428
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
2006 12 Months Schedule Maintenance for Bldg. 626
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
2007 12 Months Schedule Maintenance for Bldg. 731
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
2008 12 Months Schedule Maintenance for Bldg. 850
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
2009 12 Months Schedule Maintenance for Bldg. 853
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
2010 12 Months Schedule Maintenance for Bldg. 859
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
2011 12 Months Schedule Maintenance for Bldg. 910
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
2012 12 Months Schedule Maintenance for Bldg. 912
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
2013 12 Months Schedule Maintenance for Bldg. 920
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
3001 1 Lot Unscheduled Maintenance (Duty hours)
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to perform unscheduled and maintenance service calls during normal duty hours, based on Appendix 2c and 2d - Unscheduled Maintenance Data and paragraph 1.4.
of the Performance-Based Work Statement (PWS).
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 3
Performance Period: 1 Oct 19- 30 Sep 20
Total amount of this CLIN is NOT TO EXCEED Y5,739,335.00
3002 1 Lot Unscheduled Maintenance (Non Duty-Hours)
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to perform unscheduled and maintenance service calls during Non- duty hours, based on Appendix 2c and 2d - Unscheduled Maintenance Data and paragraph 1.4.
of the Performance-Based Work Statement (PWS).
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 3
Performance Period: 1 Oct 19- 30 Sep 20
Total amount of this CLIN is NOT TO EXCEED Y7,916,716.00
3003 1 Lot Acquisition of Parts and Supplies
FFP
The contractor shall obtain permits, tests, analyses, material, parts and supplies per
PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for permits, tests, analyses, material, parts and supplies only -overhead, profit and
G&A are not allowed. Approval required prior to purchase.
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 3
Performance Period: 1 Oct 19- 30 Sep 20
Total amount of this CLIN is NOT TO EXCEED Y44,381,508.00
3004 12 Months Schedule Maintenance for Bldg. 90
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
OPTION YEAR 3
Performance Period: 1 Oct 19- 30 Sep 20
3005 12 Months Schedule Maintenance for Bldg. 428
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
3006 12 Months Schedule Maintenance for Bldg. 626
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
3007 12 Months Schedule Maintenance for Bldg. 731
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
3008 12 Months Schedule Maintenance for Bldg. 850
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
3009 12 Months Schedule Maintenance for Bldg. 853
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
3010 12 Months Schedule Maintenance for Bldg. 859
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
3011 12 Months Schedule Maintenance for Bldg. 910
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
3012 12 Months Schedule Maintenance for Bldg. 912
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
3013 12 Months Schedule Maintenance for Bldg. 920
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
4001 1 Lot Unscheduled Maintenance (Duty hours)
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to perform unscheduled and maintenance service calls during normal duty hours, based on Appendix 2c and 2d - Unscheduled Maintenance Data and paragraph 1.4.
of the Performance-Based Work Statement (PWS).
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 4
Performance Period: 1 Oct 20- 30 Sep 21
Total amount of this CLIN is NOT TO EXCEED Y6,109,522.00
4002 1 Lot Unscheduled Maintenance (Non Duty-Hours)
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to perform unscheduled and maintenance service calls during Non- duty hours, based on Appendix 2c and 2d - Unscheduled Maintenance Data and paragraph 1.4.
of the Performance-Based Work Statement (PWS).
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 4
Performance Period: 1 Oct 20- 30 Sep 21
Total amount of this CLIN is NOT TO EXCEED Y8,427,344.00
4003 1 Lot Acquisition of Parts and Supplies
FFP
The contractor shall obtain permits, tests, analyses, material, parts and supplies per
PWS, Paragraph 1.3.4., 1.4.2., 1.4.5., and 1.4.6. The contractor shall be reimbursed for permits, tests, analyses, material, parts and supplies only -overhead, profit and
G&A are not allowed. Approval required prior to purchase.
NOTE: Contractors are not required to submit pricing for this CLIN. The amount is determined by the Government.
OPTION YEAR 4
Performance Period: 1 Oct 20- 30 Sep 21
Total amount of this CLIN is NOT TO EXCEED Y47,244,115.00
4004 12 Months Schedule Maintenance for Bldg. 90
FFP
The Contractor shall furnish all management, tools, equipment, and labor necessary to operate, maintain, and repair Medical Treatment Facilities. All performance is based on Appendix 2b - Technical Exhibits Workload information and paragraph
1.3. of the Performance-Based Work Statement (PWS).
OPTION YEAR 4
Performance Period: 1 Oct 20- 30 Sep 21
4005…