Q A_with_Attachment.pdf

PDF 946 KB Posted

Attached to
Cryogenics Plant Removal and Installation Federal contract opportunity
Solicitation number
FA5270-15-Q-A047
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to Cryogenics Plant Removal and Installation, newest first.
File Type Posted
Q A_Doc.pdf PDF
Revised_Cryo_Plant_Demo_Removal_SOW.pdf PDF
Cold_Box_and_Roof.pdf PDF
Compressor_and_Chiller.pdf PDF
Amendment_0001.pdf PDF
Attachment_1_Whole_Plant_Layout.pdf PDF
Attachment_6_Cold_Box_Base_Plate_plan.pdf PDF
Attachment_5_Top_down_anchoring_plan_-_all_components.pdf PDF
Attachment_3_Plant_Piping_and_Instrument_Schematic.pdf PDF
Attachment_2__Cold_Box_Mass.pdf PDF
Attachment_4_Electrical _entire_plant.pdf PDF
Full_Solicitation.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ#: FA5270-15-Q-A047

Questions and Answers for Cryogenics Plant Removal and Installation

1. Who is responsible to drive the anchors to the anchor points?

Answer: Another contractor is responsible for installing base plate and anchor points for new production plant equipment.

2. Japanese crane is installed Auto Moment Limiter (Green Indicator = safe, Yellow Indicator = warning, and Red Indicator = not safe ) to prevent fall-over. Based on the lifting span and the weight of the cold box, and if we were required to operate within "Green Indication", we would be required to bring a 200-ton (or similar sized) crane. If we submit a critical lift plan, will you allow us to operate within "Yellow Indication" (or with a smaller sized crane) ?

Answer: As long as it is safe and will not injure personnel.

3. Could you please provide us with the as-built drawings for the existing piping, if available? Please also provide the location of the connection point and the size/material of existing pipe.

Answer: There is no as-built drawing for the current piping; all piping needed for install will accompany new equipment.

4. In section 1.04, it states not begin demolition of old plants until a notice to proceed (NTP) is received from the Contracting Officer. Please advise whether or not Freon is contained inside the old plants when we receive NTP.

Answer: Freon (R-22) will be removed via a third party prior to work being conducted.

5. Who is responsible to deliver the equipment from Bldg. 706 Camp Kinser to Bldg. 720 Kadena Air Base?

Answer: Equipment is arriving via TMO to Bldg 720

6. In section B-2 of the PWS, it states that if scrap metal with lead-based paint is not recycled, the paint needs to removed. Please advise whether or not sampling for lead is required prior to removal and disposal.

Answer: Sampling will not be required.

7. In section 3.05, it states to route and connect all electrical conduits and pull wiring from all equipment to main power control panel. Could youplease provide us with the as-built drawings for the existing electrical plan, if available?

Answer: See attachment below.

8. Please advise whether or not asbestos is contained in the lagging materials of the existing pipes.

RFQ#: FA5270-15-Q-A047

Answer: It is unknown whether or not asbestos is containg in the lagging materials of the existing pipes.

MCTAGUE, KILE J A1C USAF

CONTRACT SPECIALIST

Q&A 2 Doc