Amendment_0001.pdf
PDF 101 KB Posted
- Attached to
- Cryogenics Plant Removal and Installation Federal contract opportunity
- Solicitation number
- FA5270-15-Q-A047
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A_with_Attachment.pdf | ||
| Q A_Doc.pdf | ||
| Revised_Cryo_Plant_Demo_Removal_SOW.pdf | ||
| Cold_Box_and_Roof.pdf | ||
| Compressor_and_Chiller.pdf | ||
| Attachment_1_Whole_Plant_Layout.pdf | ||
| Attachment_6_Cold_Box_Base_Plate_plan.pdf | ||
| Attachment_4_Electrical _entire_plant.pdf | ||
| Attachment_5_Top_down_anchoring_plan_-_all_components.pdf | ||
| Attachment_3_Plant_Piping_and_Instrument_Schematic.pdf | ||
| Attachment_2__Cold_Box_Mass.pdf | ||
| Full_Solicitation.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001
15 July 2015
Solicitation No. – FA5270-15-Q-A047
Amendment No. 0001
Requirement: Cryogenics Plant
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation as amended by signing this document and returning 1 copy with proposal. FAILURE OF
YOUR ACKNOWLDEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS
PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
The purpose of this amendment is to:
(1) Remove the below text from the PWS:
(a) Section 5.01 *Remove* "The government will also remove the roof cap from building 720 to facilitate crane removal of the two old plant cold boxes. Their heights and weight mass are less than the new cold box listed above. The government will extend the roof to enclose the new coldbox. The government will not replace the roof cap in Project No: LXEZ 16-1367 until the new cold box is affixed in place with the anchor points attached."
(2) Add the following text to the PWS:
(a) Section 1.01 *Add* "The contractor shall be responsible for the removal of the roof cap, roof connections, roof anchors, and rainwater downspouts at the top of the cold box of Building 720.
Removal of the roof cap should aid the contractor in removal of the two old cold box plants."
(b) Section 3.09 *Add* "Once the new cold box is affixed in place with the anchor points attached, the contractor shall be responsible for the placement of the new roof cap, roof connections, roof anchors, and rainwater downspouts at the top of the cold box of Building 720.
Before placement by the contractor, the new roof cap will be extended by the Government in order to accommodate the new cold box."
(3) Add pictures of the buliding that the work is to be performed.
(4) Post a question and answer from the pre proposal site visit on July 8th 2015.
(5) Extend the solicitation due date to 4:00 PM Japan Standard Time August 5th 2015.
(6) All other terms and conditions remain unchanged.
NAME AND TITLE OF SIGNER
Amendment 0001