Attach 1.Spec3.02 41 00.09R0007.pdf

PDF 17 KB Posted

Attached to
Replace/Construct Decorative Blocks Walls and Chain-Link Fence, Various U. S. Military Installations on Okinawa, Japan
Solicitation number
FA5270-09-R-0007
Issued by

About this file

Specification FA5270-09-R-0007 LXEZ 09-2663 Construct Decorative Block Walls and Chain-Link Fence Various Locations Okinawa Japan

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. FA5270-09-R-0007

02 41 00-1

LXEZ 09-2663

DIVISION 2 – SITE WORK

SECTION 02 41 00

DEMOLITION AND REMOVAL

PART 1 GENERAL

1.1 REFERENCES:

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. The most current editions shall be used.

CODE OF FEDERAL REGULATIONS (CFR)

29 CFR 1910 (2009) Occupational Safety and Heath Standards

29 CFR 1926 (2009) Safety and Heath Regulations for Construction

ENGINEERING MANUALS (EM)

EM-385-1-1 (2008) U.S. army Corps of Engineer Safety And Health Requirements Manual

JAPAN ENVIRONMENTAL GOVERNING STANDARDS

JEGS (June 2009) Japan Environmental Governing Standards (JEGS), All Chapters

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 241 (2004) Safeguarding Construction, Alteration, and Demolition

Operations

AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE0

ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations

1.2 GENERAL REQUIREMENTS:

a. Demolition and Removal: Do not begin demolition and removal until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations on any parts of the buildings or at the project sites. Store materials that cannot be removed daily in areas specified by the Contracting Officer.

1.3 SUBMITTALS:

Submit proposed demolition and removal procedures to the Contracting Officer for approval before work is started (see AF Form 66). Include procedures for coordination with

02 41 00-2

LXEZ 09-2663

other work in progress, a disconnection schedule of utility services, a detailed description of methods equipment to be used for each operation and of the sequence of operations.

1.4 REGULATORY AND SAFETY REQUIREMENTS:

Comply with local hauling and disposal regulations. In addition to the requirements of the “Contract Clauses” conform to the safety requirements contained in ASSE/SAFE A10.6.

1.5 DUST AND DEBRIS CONTROL:

Prevent the spread of dust and debris at the project sites and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to flooding or pollution. Vacuum and dust the work area daily.

Sweep pavements as often as necessary to control the spread of debris that may result in foreign object damage potential to tenant.

1.6 ENVIRONMENTAL PROTECTION PLAN:

Comply with all the requirements specified in Section 01010, “General Requirements.”

a. Existing Work: Protect existing work which is to remain the property of Government. Repair items which are to remain and which are damaged during performance of the work to their original condition, or replace with new.

b. Facilities: Protect electrical and mechanical services and utilities.

c. Environmental Protection Requirements: Provide and maintain environmental protective measures for the removal and disposal of hazardous materials encountered if any.

1.7 BURNING:

Burning will not be permitted.

PART 2 EXECUTION

2.1 EXISTING SRUCTURES AND UTILITIES:

a. Structures: Demolish and removed existing fence, asphalt pavement, and other structures to the extent as require in each delivery order.

b. Utilities: Termination method of existing utilities shall be approved by the Contracting

Officer. When utility lines are encountered that are not indicated on the drawings, notify the Contracting Officer immediately.

2.2 FILLING AND PATCHING OF HOLES :

Where removals leave holes and damaged surfaces exposed in the finished work, patch and repair these holes and damaged surfaces to match adjacent finished surfaces. Holes and depressions caused by excavation or left as a result of removal of existing chain link fence and accessories shall be completely filled with approved materials.

02 41 00-3

LXEZ 09-2663

2.3 DISPOSITION OF MATERIAL:

a. Title to Materials: Except where specified in other sections, all materials removed, and not reused, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition, and materials to be removed, is vested in the Contractor upon issuance of the Notice to Proceed and actual removal. The Government will not be responsible for the condition or loss of, or damage to, such property after notice to proceed. Materials shall not be viewed by prospective purchasers or sold on the site.

1. Unsalvageable Materials: Concrete, asphalt and other non-combustible materials other than structures permitted to remain in place, may be recycled if permitted by the laws of Japan or shall be transported, treated and disposed of in accordance with the laws of Japan and the applicable provisions of JEGS. Before transport of items for recycling, treatment, disposal, or a combination thereof, the Contractor shall submit to the Government its disposal plans with appropriate documentation of licenses. Permits, and other authorizations necessary to achieve the Contractor’s intended plans for approval of the Contracting Officer Representative.

2. Only unsalvageable metals or removed chain link fence can be transported to Kadena

Recycling Center at Bldg. 3140, telephone number 634-2600/0448.

2.4 CLEAN-UP:

a. Debris and Rubbish: Debris and Rubbish shall be removed from the Government property daily. Do not allow accumulation in the building or site.

b. Debris Control: Debris shall be removed and transported in a manner as to prevent spillage on streets and adjacent areas.

***END OF SECTION ***