QA_FA520926Q0050_20260728.docx
DOCX document 48 KB Posted
- Solicitation number
- FA520926Q0050
About this file
This is a Question & Answer document for Solicitation No. FA520926Q0050, a Request for Quotation issued by the Department of the Air Force Pacific Air Forces for the procurement of five (5) mobile gate shacks for the 374th Security Forces Squadron at Yokota Air Base, Japan. The solicitation is not set aside for small business because the overseas location is not mandated to include small business set-asides under Revolutionary FAR Overhaul (RFO) 19.000(b)(1)(ii), and local Japanese contractors do not have small business designations or size standards.
The Q&A document addresses 28 questions regarding technical specifications and delivery terms. Key clarifications include: exterior walls must provide ballistic protection equivalent to UL 752 Level 3 (with 16mm structural steel acceptable if it meets or exceeds this standard); the generator requirement of 10-15 kW has been clarified as acceptable at 7 kVA; electrical components must be configured for 50/60 Hz and 100V for on-base power compatibility; trailers must accommodate each individual mobile structure with acceptable modifications including 2-5/16-inch couplers instead of 2-inch couplers and 3-axle trailers instead of 2-axle; documentation in English is required as operators are primarily English-speaking; and offerors may propose equivalent or superior solutions exceeding functional requirements. Delivery options include direct shipment to Yokota Air Base or shipment to the Tracy, California distribution facility (25600 South Chrisman Road, Tracy, CA 95304-5000). The offer due date is August 25, 2026, at 2:00 PM Japan Standard Time.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question & Answer As of 28 Jul 2026
Solicitation No. FA520926Q0050 Mobile Gate Shacks for 374th Security Forces Squadron, Yokota Air Base, Japan
No. 1
| Question: |
| In the hope of avoiding a potential pre-award protest, will you please share the Government’s market research that led to the designation of the subject solicitation as full and open competition vs. some form of set-aside opportunity (e.g., total small business, SDVOSB, etc.)? |
| Answer: |
| Although the Government cannot release an actual document as this is an active purchase, we can share our rationale. Yokota Air Base (AB) is an overseas location and not mandated to small business set asides, in accordance with Revolutionary FAR Overhaul (RFO) 19.000 (b)(1)(ii). Since our local Japanese contractors do not have small business designations or size standards (and quote on a lot of our projects), we did not set aside our requirement for only small business. If your company would like to submit a quote, we would be pleased to receive your offer. |
No. 2
| Question: |
| On Salient Characteristics, Section 2.1 Structural Requirements states ‘Exterior walls shall provide ballistic protection equivalent to UL 752 Level 3’. This ballistic protection is much lower than the NIJ Level III protection (3 shots from .44 Magnum vs at least 5 from 7.62mm rifle), which my company recommended during the Government’s market research. Can you verify if the requested UL 752 Level 3 protection is correct? |
| Answer: |
| It is correct. The UL 752 Level 3 protection does meet the Requiring Activity’s needs. The Government understands that UL 752 Level 3 is a lower protection level; however, UL 752 Level 3 is appropriate for our environment. |
No. 3
| Question: |
| Is there a specific local infrastructure requirement in Japan that necessitates the generator to be configured for 50/60 Hz and 100V? Since the HVAC system, lighting, and general electrical components are completely designed and integrated in the U.S., we wanted to confirm exactly which remaining components must be powered by the generator. To provide some context, procuring a U.S.-made item is the most effective solution for this project because it allows us to accommodate fully certified ballistic structures. A manufacturing option from Japan would unfortunately be unable to provide a structure with these specific ballistic ratings. |
| Answer: |
| It is the Government’s understanding that 50/60 Hz and 100V are the requirement for on base power. |
No. 4
| Question: |
| “Notice to Offerors” mentions a site visit in paragraph 1.c. Would you please provide details regarding the site visit? |
| Answer: |
| No site visit will be conducted for this requirement. The sentence regarding a site visit should have been deleted. The Notice to Offerors is updated to remove the sentence from paragraph 1.c. |
No. 5
| Question: |
| How many units are anticipated for this procurement? |
| Answer: |
| The requested quantity is five (5). Please refer to Standard Form (SF) 1449, page 3. |
No. 6
| Question: |
| Our company can ship the completed units to your distribution facility in Tracy, California, for onward shipment to Yokota AB, Japan by others. |
| Answer: |
| Shipment to Tracy, CA, is now acceptable. An amendment to this solicitation will be issued in order to accept both direct shipment to Yokota AB and shipment to Tracy, CA, for the Government’s transshipment to Yokota AB. At the time of submitting a quote, an offeror will need to provide both costs for direct shipment to Yokota AB and shipment to Tracy, CA, for fair price comparison. Instructions will be provided in the amendment. |
No. 7
| Question: |
| Page 3 of the subject Solicitation recites Contract Line Item Number (CLIN) 0002 as “Shipping and Handling (Direct Delivery to Yokota Air Base, Japan, via Commercial Carrier)” and Page 6 states “FOB: Destination” and lists the “Delivery Location” as “374th Security Forces Squadron (374 SFS) Bldg. 210, Yokota Air Base Fussa-shi, Tokyo 197-0001, Japan.” Will the Government alternatively accept delivery to its containerization point in Tracy, California, to eliminate the cost of direct commercial carrier shipment to Yokota Air Base? If so, will you please provide the complete physical delivery address and related details (i.e., point of contact, telephone number, hours of operation, etc.)? |
| Answer: |
| See the answer to question No. 6 above. |
If an offeror selects shipment to Tracy, the physical delivery address is:
| SW3225 - TRACY, CA |
| XU Def DIST DEPOT SAN JOAQUIN |
| CCP WHSE 30 |
| 25600 SOUTH CHRISMAN RD |
| TRACY, CA 95304-5000 |
| TEL: 209-839-4537 or 5028 / FAX: 209-839-4334 |
An offeror must confirm the shipping information/instruction in the solicitation amendment, which will be issued.
No. 8
| Question: |
| Salient Characteristics 2.1 Structural Requirements |
We use 16 mm thick structural steel for the guard booth construction, which provides ballistic protection exceeding the required UL 752 Level 3 standard.
The specification includes two requirements: “UL 752 Level 3 or higher” and “a minimum wall thickness of 3 inches (76.2 mm)”. Could you please advise which requirement should take precedence? Is 16 mm thick structural steel acceptable, as long as it meets or exceeds UL 752 Level 3 standard?
| Answer: |
| Yes, 16mm thick structural steel is acceptable as long as it meets or exceeds UL 752 Level 3 Standard. |
No. 9
| Question: |
| Salient Characteristics 2.5.2 Distribution & Wiring / 2.6 HVAC System |
For the electrical wiring, piping, and air-conditioning condenser ducting, may we assume that these will be installed through the wall panels? Alternatively, to maintain the ballistic protection of the walls, is it necessary to route them through the ceiling or floor instead?
| Answer: |
| If components are in the wall panels, it must not degrade the ballistic capabilities. If it will degrade, then it must go through the floor or ceiling |
No. 10
| Question: |
| Salient Characteristics 2.7 Trailer Requirements |
Regarding the stated trailer dimensions of “approximately 82 inches x 16 feet,” does this refer to the cargo bed dimensions, or the overall trailer dimensions?
| Answer: |
| It is essential that each unit is mounted on its own trailer. The trailer should be considered a part of each unit. It acts as a means for towing between locations and as an elevated platform for the user. |
No. 11
| Question: |
| Salient Characteristics 2.7 Trailer Requirements |
Regarding the specified “2-inch adjustable coupler,” due to load capacity requirements, we propose using a 2-5/16-inch coupler instead. Would this be acceptable?
| Answer: |
| Yes. |
No. 12
| Question: |
| Salient Characteristics 2.8 Trailer Electrical Requirements |
Does the Government accept the use of trailer lighting equipment that complies with Japanese road vehicle safety regulations?
| Answer: |
| Yes. |
No. 13
| Question: |
| Salient Characteristics 2.10 Documentation & Warranty |
Could you please confirm whether documentation provided in Japanese would be acceptable?
| Answer: |
| The operators of the system are primarily English speaking. |
No. 14
| Question: |
| Salient Characteristics 2.5.1 Power Compatibility |
Regarding the generator mentioned in section 2.5.3, are all internal outlets stepped down to 100V using a transformer?
| Answer: |
| The Government will provide answer upon internal confirmation. This Q&A will be updated. |
No. 15
| Question: |
| Salient Characteristics 2.5.2 Distribution & Wiring |
The second bullet mentions “Load center: Approx. 125A, 120/240V, 8-space or equivalent.” It lists 125A, but is that for 120V? Would it be 62.5A for 240V?
| Answer: |
| The Government will provide answer upon internal confirmation. This Q&A will be updated. |
No. 16
| Question: |
| Salient Characteristics 2.5.3 Generator Requirement, A. Output Capacity |
What is the maximum kW (or amperage) required?
| Answer: |
| The Government will provide answer upon internal confirmation. This Q&A will be updated. |
No. 17
| Question: |
| Salient Characteristics 2.5.3 Generator Requirement, B. Japanese Power Compatibility |
What is the generator’s fuel? (i.e., Gasoline, diesel, LP, etc.)
| Answer: |
| The Government will provide answer upon internal confirmation. This Q&A will be updated. |
No. 18
| Question: |
| Salient Characteristics 2.5.3 Generator Requirement, B. Japanese Power Compatibility |
The second bullet mentions “A complete conversion solution enabling safe connection to 100V, 50/60 Hz Japanese commercial power.” Should the outlet be stepped down to 100V, or should the 120/240V configuration be retained?
| Answer: |
| The Government will provide answer upon internal confirmation. This Q&A will be updated. |
No. 19
| Question: |
| Salient Characteristics 2.5.3 Generator Requirement, B. Japanese Power Compatibility |
Regarding “Automatic or manual transfer switches (ATS/MTS),” are you referring to switching the main input between the generator and an external power source?
| Answer: |
| The Government will provide answer upon internal confirmation. This Q&A will be updated. |
No. 20
| Question: |
| Salient Characteristics 2.5.3 Generator Requirement, C. Additional Generator Requirements |
Does the Government intend to load the materials onto a trailer and construct walls or similar structures?
| Answer: |
| No. |
No. 21
| Question: |
| Salient Characteristics 2.6 HVAC System |
What level of power consumption should be anticipated for the HVAC unit?
| Answer: |
| The Government will provide answer upon internal confirmation. This Q&A will be updated. |
No. 22
| Question: |
| Salient Characteristics 2.7 Trailer Requirements |
Does the specified trailer width of 82 inches refer to the trailer body width, with the wheels mounted outside the body?
| Answer: |
| Need to confirm the trailer dimensions. The trailer needs to support each individual mobile structure. |
No. 23
| Question: |
| Salient Characteristics 2.10 Documentation & Warranty |
Could you please confirm whether the required documentation may be submitted after contract award?
| Answer: |
| Yes, the Contractor shall provide the required documentation after contract award. |
No. 24
| Question: |
| Salient Characteristics 2.10 Documentation & Warranty |
The Government requires Level 3 ballistic protection in this solicitation. We plan to offer UL Level 5 ballistic protection with UL Level 9 ballistic glass, which exceeds the required protection level. Could you please confirm that this specification is acceptable?
| Answer: |
| Offerors may propose equivalent or superior solutions that meet or exceed the functional requirements as stated in Salient Characteristics 2.0. |
No. 25
| Question: |
| Salient Characteristics 2.10 Documentation & Warranty |
The required door dimensions are approx. 36” × 84” (approximately 90 cm × 210 cm). We plan to offer our standard armored door size of 59 cm × 182 cm. Armored structures generally utilize smaller door dimensions to maintain structural integrity and ballistic performance. Would our standard door dimensions be acceptable?
| Answer: |
| The Government will provide answer upon internal confirmation. This Q&A will be updated. |
No. 26
| Question: |
| Salient Characteristics 2.1 Structural Requirements |
The fifth bullet mentions “Roof and floor assemblies are not required to be ballistic rated.” We plan to prepare our proposal including ballistic protection for both the floor and roof. Would this enhanced specification be acceptable?
| Answer: |
| Offerors may propose equivalent or superior solutions that meet or exceed the functional requirements as stated in Salient Characteristics 2.0. |
No. 27
| Question: |
| Salient Characteristics 2.7 Trailer Requirements |
While the solicitation requires a 2-axle trailer, we plan to offer a 3-axle trailer with a higher load capacity. To provide greater load capacity and improved stability, would a 3-axle trailer be acceptable?
| Answer: |
| That is acceptable if it is known that we are requesting a trailer for each ballistic shack. Five (5) trailers in total. These are intended to be completely separate from each other and placed at dispersed sites. |
No. 28
| Question: |
| Salient Characteristics 2.5.3 Generator Requirement, A. Output Capacity |
While the solicitation requires output of 10–15 kW, we plan to offer a 7 kVA generator (approximately 165 kg), which is sufficient to operate the 2.5 kW HVAC system.
A generator capable of supplying 10–15 kW would typically require a rated capacity of approximately 12.5–19 kVA (depending on power factor) and weigh approximately 1.5–2.0 tons, making installation on the proposed trailer impractical.
Would our proposed 7 kVA generator be acceptable? If not, could you please clarify the intended application for the required 10–15 kW output?
If a generator of this capacity is mandatory, it would need to be installed separately from the proposed trailer, or alternatively accommodated in a dedicated GEN/UPS Portable Cabin.
| Answer: |
| Yes, your proposed generator is acceptable. |