This is a Questions and Responses document for federal contract FA520926Q0005 addressing clarifications on a personal property moving and storage services contract for military installations.
The document addresses nine key inquiries regarding contract operations and requirements. Notable responses include: no pre-proposal briefing will be held; contractor personnel must obtain base passes for each military installation with documentation requirements varying by base; the ordering officer will provide at least one full workday notice prior to pickup dates, with contractors required to be available 0800-1700 hours; insurance requirements are detailed in FAR 28.307-2 and the Performance Work Statement (PWS) Part III; the Storage service applies when directed by the Contracting Officer based on necessity or cost-effectiveness, such as when service members deploy or go on Temporary Duty (TDY); key performance objectives include proper packing and loading, on-time pickup and delivery, timely documentation preparation, accurate invoicing, adequate facility maintenance, and protection of Government-Owned Containers; the government will provide truck scales; base pass validity hours can be adjusted to allow sufficient time for contractor departure after 2100-hour work completion; and damage claims procedures are documented in Attachment A-G6 (Direct Procurement Method Claims and Liability Procedures) on page 51 of the PWS. The 7-day pickup window applies to International Through Government Bill of Lading shipments but not Direct Procurement Method shipments, with all scheduling adjustments requiring Contracting Officer approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1_Policies Procedures Ltr.pdf | ||
| 3_Solicitation - FA520926Q0005.pdf | ||
| 6_Atch 3_PP Ref List.docx | DOCX document | |
| 7_Atch 4_PWS HHG Iwakuni.pdf | ||
| 5_Atch 2_PPQ - Iwakuni IDIQ Contract.pdf | ||
| 2_Notice to Offerors.pdf | ||
| 4_Atch 1_Exhibits_HHG-Iwakuni.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA520926Q0005
QUESTIONS AND RESPONSES
# Question Government Response 1 Will a pre-proposal briefing be conducted?
The government does not intend to hold a briefing.
2 What are the security and background check requirements for all contractor personnel who will be on-site?
To access a United States military installation, the contractor is required to obtain a base pass. The contractor is required to submit documents to each installation they require access to in order to gain a base pass for that base. The prime contractor is also responsible for obtaining base passes for their subcontractors. Documents vary from base to base but may include but not limited to;
certificate of residence, abstracts of family registers, photo ID and any applicable forms for the base.
3 When being awarded pickup services, is there any flexibility or grace period for scheduling adjustments based on the requested dates?
The ordering officer will normally provide the contractor with notice to commence services at least one full workday prior to the specified pickup date. Any oral orders will be confirmed in writing within two workdays following acceptance by the contractor.
Contractors are required to be available to receive orders between the hours of 0800 and 1700. There is no automatic grace period for scheduling adjustments once pickup services are awarded. The standard 7-day pickup window does not apply to Direct Procurement Method (DPM) shipments; however, it does apply to International Through Government Bill of Lading (ITGBL) shipments. Any scheduling adjustments must be coordinated with and approved by the ordering officer.
4 Could you please provide more detail on the insurance requirements, including minimum coverage amounts for liability and cargo?
Please review FAR 28.307-2 Liability for general insurance policies as well as Scope of work and Part III of the PWS
5 Regarding the STORAGE service, the solicitation states that it applies “when directed by the Contracting Officer
The STORAGE service will be utilized when directed by the Contracting Officer based on Government determination of necessity or cost-effectiveness. This service may be required in situations such as when Service members deploy or go on TDY and are required to vacate their quarters for a period
FA520926Q0005
QUESTIONS AND RESPONSES
of time, necessitating temporary storage of their personal property.
6 What are the key performance objectives that will be used to evaluate the contractor's performance?
1. Proper packing, Loading, Containerization of Personal Property for onward movements
2. On-time pickup, delivery of Personal Property 3. Timely pickup/return and proper preparation of documentation 4. Accurate invoicing of charges 5. Maintain adequate facilities and serviceable equipment 6.
Protection and accountability of Government Owned Containers (GOCs)
7 Would the provision of a truck scale be arranged by the government?
Yes, truck scale will be arranged by the government.
8 The solicitation indicates that all work must be completed by 2100 hours.
If base passes are only valid till 2100, that does not give sufficient time for workers to vacate the base. Will the base pass hours be adjusted?
To account for this requirement, base pass validity hours can be adjusted to provide contractors sufficient time to depart the installation after completing work by 2100 hours. Pass validity will be coordinated through the appropriate installation pass authority in conjunction with the Contracting Officer.
9 What is the process for filing a claim in the event of damage to a service member's property?
Please review Attachment A-G6 (DIRECT
PROCUREMENT METHOD (DPM)
CLAIMS AND LIABILITY
PROCEDURES) in the PWS (Page 51)