This document is a Question and Answer (Q&A) session related to Solicitation No. FA520924Q0043 for the Chiller Replacement at Bldg. 3000 and Bldg. 3006, Yokota Air Base, Japan. The key details are:
The solicitation is for the replacement of chillers at two buildings on Yokota Air Base in Japan. The contractor must possess a valid plumbing construction work business license/permission issued by the Prefectural Government or Government of Japan. Drawings will be provided upon request and contract award. The existing chiller manufacturer is Mitsubishi Electric Corporation. The project will require replacement of some chilled and condensing lines, as well as valves, gauges, and instrumentation. No performance bond is required, and this is not a construction project. A site visit is scheduled for 10 Jul 2024, and offers are due by 23 Jul 2024, 11:00 AM Japan Standard Time. The contracting agency is the Department of the Air Force Pacific Air Forces.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Unclassified Information
Question & Answer (2) As of 08 Jul 2024
Solicitation No. FA520924Q0043
Chiller Replacement at Bldg. 3000 and Bldg. 3006, Yokota Air Base, Japan
No. 1
Question: Our company does not have plumbing work in its license. Would it be possible for us to submit a quotation and be considered for award?
Answer: In accordance with Standard Form (SF) 1449, Addenda to FAR 52.212-1, paragraph 2(m)B.3(a), the offeror shall provide a proof of valid plumbing construction work business (建設業許可:管工事業) licensure/permission authorized and issued by the Prefectural Government or the Government of Japan.
No. 2
Question: If one of our subcontractors has plumbing work in its license, would it be possible for us to submit a quotation with a subcontractor's license and be considered for award?
Answer: No. The offeror, i.e., the Prime Contractor, must possess the plumbing construction work business (建設業許可:管工事業) licensure/permission. The Government of Japan requires all companies to be registered in the country.
No. 3
Question: Would the Government be able to disclose the drawings related to this project?
Answer: Drawings are available upon request to the Contract Specialist and/or the Contracting Officer. The drawings will be also provided to the Contractor upon contract award. The Contractor shall verify accuracy and currency.
No. 4 (Updated)
Question: Would the Government be able to provide the part number of an existing chiller?
Answer: The offerors will be able to obtain the part number of an existing chiller during the site visit. The same information will be also provided in the Q&A document and/or in the site visit minutes.
The manufacturer of the existing units is Mitsubishi Electric Corporation (三菱電機株式会社).
Please see the pictures of the data plates for each building in the Appendices (Appendix A for Bldg.
3000 and Appendix B for Bldg. 3006) in this document. The offerors will be able to confirm the part number of an existing chiller during the site visit as well.
No. 5
Question: Does this project require a replacement of piping or ducts along with the chiller replacement?
Answer: Portion of chilled and condensing lines must be replaced by the Contractor.
No. 6
Question: Does this project require a replacement of any valves, gauges, or instrumentation along with the chiller replacement?
Answer: Yes, the Contractor must replace any valves, gauges, or instrumentation in accordance with commercial practice.
No. 7
Question: Does this project include power off or special control or notification to the alarm or disaster prevention center?
Answer: No notification to the alarm or disaster prevention center will be required.
No. 8 (New)
Question: Will the Government clarify the magnitude of construction before the bid due date?
Answer: No, the magnitude of construction will not be applied. This requirement is not a construction project.
No. 9 (New)
Question: Is there any information for the performance bond requirement?
Answer: No, this solicitation does not include the performance bond requirement. This requirement is not a construction project.
== End of Q&A Sessions ==
Appendix A: Pictures of Data Plates (Bldg. 3000)
== End of Appendix A ==
Appendix B: Pictures of Data Plates (Bldg. 3006)
== End of Appendix B ==
| No. 1 |
| Question: |
| Answer: |
| No. 2 |
| Question: |
| Answer: |
| No. 3 |
| Question: |
| Answer: |
| No. 4 |
| Question: |
| Answer: |
| No. 5 |
| Question: |
| Answer: |
| No. 6 |
| Question: |
| Answer: |
| No. 7 |
| Question: |
| Answer: |
| No. 8 |
| Question: |
| Answer: |
| No. 9 |
| Question: |
| Answer: |
File details come from the government source that posted it. Updated .