About this file

This notice is for a solicitation for Simplified Acquisition of Base Engineering Requirements (SABER), an indefinite-delivery/indefinite-quantity contract with a 5-year basic period plus a 2-year option. The SABER program will provide a broad range of maintenance, repair, and minor construction work at Yokota Air Base and off-base sites in Japan. The minimum guaranteed amount is 500,000 Japanese yen, and the maximum aggregate contract value including all options is 49,000,000 US dollars. The pre-proposal conference will be held on February 19, 2020 at 1330 hours including a site visit. Questions are due by February 11 and 26, and past performance questionnaires are due by March 4. Proposals are due by March 9. The specifications and drawings for the basic contract and a mock project are provided on CD. Registration in SAM is required, and the contractor must be authorized to operate in Japan.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Atch J-3 SABER UPG Rev1-1 20200302.xlsx XLSX spreadsheet
STATEMENT OF OBJECTIVES (SOO)_20200302-Amend 02.doc DOC document
FA520920R00080002 SF 30.pdf PDF
Atch J-7 Section L-100 rev1.docx DOCX document
Atch Arch sketch Amend 1.pdf PDF
Atch J-6 STATEMENT OF OBJECTIVES (SOO)_20200213.pdf PDF
1. FA520920R0008.pdf PDF
Atch J-4 Coefficient Pricing Schedule Guide.pdf PDF
Atch J-8 Section M-100.pdf PDF
Atch J-5 Past Performance Cov Ltr.pdf PDF
Atch J-7 Section L-100.pdf PDF
Atch J-6b SUBMITTAL FORM_SPECSINTACT.xlsx XLSX spreadsheet
Atch J-2 SABER SPEC TOC.pdf PDF
Atch J-3 SABER UPG.xlsx XLSX spreadsheet
Atch J-8 Section M-100.docx DOCX document
Atch J-4a Coefficient Pricing Schedule.xlsx XLSX spreadsheet
Atch J-5 Past Performance Cov Ltr.doc DOC document
Atch J-1 SABER Other Req 4 Feb.docx DOCX document
Atch J-6 STATEMENT OF OBJECTIVES (SOO).pdf PDF
Atch J-7 Section L-100.docx DOCX document
Atch J-5a Past Performance Questionnaire.docx DOCX document
Atch J-4 Coefficient Pricing Schedule Guide.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

DOCUMENT TYPE DESCRIPTION PAGE(S) DATE

Attachment J-1 Other Contract Requirements 11 N/A

Attachment J-2 Specification Table of Contents 5 N/A

Attachment J-2a Contract Specifications for SABER 4051 7 Jan 20

Attachment J-3 Unit Price Guide (UPG) 1 File 26 Dec 19

Attachment J-4 Coefficient Pricing Schedule Guide 3 8 Jan 20

Attachment J-4a Coefficient Pricing Schedule 1 N/A

Attachment J-5 Past Performance Evaluation Cover Letter 1 8 Jan 20

Attachment J-5a Past Performance Questionnaire 5 N/A

Attachment J-6 Seed Project Statement of Objectives (SOO) 6 13 Feb 20 *Revised by Amendment 0001 dated 14 Feb 20

Attachment J-6a Seed Project Sketch Drawings & Documents 18 Files N/A * Revised by Amendment 0001 dated 14 Feb 20

Attachment J-6b Sample Material Submittal Register 1 N/A

Attachment J-7 Section L-100 Proposal Preparation Instruction 5 14 Jan 20

Attachment J-8 Section M-100 Basis for Contract Award 3 14 Jan 20

Note 1: Attachment J-1 and 4 will physically be incorporated in the resultant contract as a part of the contract.

Note 2: Attachment J-5 thru 8 will physically be removed from the resultant contract.

FA520920R00080001

IDCode:
Page: 1
Pages: 2
AmendNo: 0001
EffDate: 2/14/2020
ReqNo: A005577
ProjNo: SABER
IssCode: FA5209
AdmCode:
IssuedBy: FA5209 374 CONS LGC

APO AP 96328-5228

UNIT 5228

APO, AP 96328-5228

United States Hiroshi Yoshikawa, Telephone: 225-5553 Email: hiroshi.yoshikawa.jp@us.af.mil

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA520920R0008
SolDate: 2/7/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt:
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript: The purpose of Amendment 0001 is to revise the Statement of Objectives (SOO) of Atch J-6 and Arch Sketch of Atch J-6a Drawings & Documents for Mock.

2 Attachments:

1. Revised Atch J-6 SOO dated 13 Feb 20

2. Revised Arch Sketch under Atch J-6a

ContNameTitle:
CoNameTitle: NAMIKO KANEKO, Contracting Officer

Email: namiko.kaneko.jp@us.af.mil Telephone: 225-5447

ContDate:
CODate:

File details come from the government source that posted it. Updated .