Atch J-4 Coefficient Pricing Schedule Guide.docx

DOCX document 25 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA520920R0008
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document includes a solicitation for a Simplified Acquisition of Base Engineering Requirements (SABER) indefinite-delivery/indefinite-quantity contract by the Department of the Air Force Pacific Air Forces. The SABER program will provide maintenance, repair, and minor construction work at Yokota Air Base and other off-base sites in Japan over a seven-year period consisting of a five-year basic contract and a two-year option. The maximum contract value is 49,000,000 USD. A pre-proposal conference will be held on February 19, 2020 with a site visit and mock project. Questions are due by February 11 and 26, 2020. Past performance questionnaires are due by March 4, 2020 and proposals are due by March 9, 2020. The contract will require work in both restricted and unrestricted areas as well as during standard and non-standard hours. Pricing will be based on unit prices with adjustment coefficients applied for different project values, locations, and work hours.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Atch J-3 SABER UPG Rev1-1 20200302.xlsx XLSX spreadsheet
FA520920R00080002 SF 30.pdf PDF
Atch J-7 Section L-100 rev1.docx DOCX document
STATEMENT OF OBJECTIVES (SOO)_20200302-Amend 02.doc DOC document
Atch J-6 STATEMENT OF OBJECTIVES (SOO)_20200213.pdf PDF
FA520920R00080001 SF 30.pdf PDF
Atch Arch sketch Amend 1.pdf PDF
1. FA520920R0008.pdf PDF
Atch J-7 Section L-100.pdf PDF
Atch J-4 Coefficient Pricing Schedule Guide.pdf PDF
Atch J-8 Section M-100.pdf PDF
Atch J-5 Past Performance Cov Ltr.pdf PDF
Atch J-6b SUBMITTAL FORM_SPECSINTACT.xlsx XLSX spreadsheet
Atch J-2 SABER SPEC TOC.pdf PDF
Atch J-5 Past Performance Cov Ltr.doc DOC document
Atch J-1 SABER Other Req 4 Feb.docx DOCX document
Atch J-6 STATEMENT OF OBJECTIVES (SOO).pdf PDF
Atch J-7 Section L-100.docx DOCX document
Atch J-5a Past Performance Questionnaire.docx DOCX document
Atch J-3 SABER UPG.xlsx XLSX spreadsheet
Atch J-8 Section M-100.docx DOCX document
Atch J-4a Coefficient Pricing Schedule.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA520920R0008 COEFFICIENT PRICING SCHEDULE Attachment J-4 This attachment, in its completed form, must be submitted with your proposal.

The coefficients you list in Attachment J-4a will be the co-efficients of record, as well as being utilized to compute the Total Price (TEP).

8 Jan 20

SECTION B - COEFFICIENTS PRICING SCHEDULE

A. The applicable coefficient is applied to the total contract price as shown within attachment J-3, SABER, Unit Price Guide (UPG), summary tab. The coefficient is to compensate the contractor for the indirect costs associated with performance as well as profit.

B. The coefficients (no more than three (3) decimal places) are factors applied to the UPG to calculate the overall task order pricing. The coefficients may include standard and non-standard hours, range or isolated site work, or work in Kanto plain or outside Kanto plain.

C. The task order pricing and related modification pricing will be based on the UPG that has been established following four (4) Pricing Books and Construction Cost Index provided by Tokyo governed by Ministry of Land, Infrastructure, Transport and Tourism. Any non-priced items will be added on to the total task order and/or modification price for a unit of work. Pricing for any task order and/or modification will incorporate pre-priced items calculated utilizing the UPG incorporated within the contract and any negotiated non-priced items as applicable.

D. The categories of pricing coefficients in this contract are based on a combination of project value and standard and nonstandard work hours. If a task order includes work that has more than one pricing coefficient category, the work will be prorated and the applicable coefficient applied to its portion of the direct costs.

E. Coefficients are to remain unchanged throughout the life of the contract, including the base period of performance and any option periods exercised by the Government.

F. The offeror must include a coefficient cost for work to be performed in restricted and unrestricted areas, during standard and non-standard working hours; the appropriate coefficient will be applied to each task order issued under the contract.

G. Please enter all proposed coefficients into Attachment J-4a, Coefficient Pricing Schedule, the following sample of Coefficient Pricing Schedule will be executed automatically created by excel format.

Sample of Diagram I: Coefficient Pricing Schedule

Estimated Program Amount/year (EPA/Y): ¥778,079,400 ($7,000,000.00) Exchange rate by FY20 ¥111.1542/$1.00)

Project Value
% of Work for Project Value

(A)

Time/Location of Work
% of Work for Time/Location

(B) Combined Percent of Work (A)x(B)=(C) Estimated Value of Work (EPA/Y)x(C)

Offeror’s Price Coefficient**
Total Price per Coefficient Type
up to JPY5,000,000
20%
SH/KP
85%
17.00%
¥132,273,498
0.73
¥96,559,654
NSH/KP
12%
2.40%
¥18,673,905.6
0.80
¥14,939,124
SH/OKP
2%
0.40%
¥3,112,317.6
0.85
¥2,645,470
NSH/OKP
1%
0.20%
¥1,556,158.8
0.87
¥1,353,858
JPY5,000,001 to JPY75,000,000
55%
SH/KP
85%
46.75%
¥363,752,119.5
0.68
¥247,351,441
NSH/KP
12%
6.60%
¥51,353,240.4
0.75
¥38,514,930
SH/OKP
2%
1.10%
¥8,558,873.4
0.81
¥6,932,687
NSH/OKP
1%
0.55%
¥4,279,436.7
0.83
¥3,551,932
JPY75,000,001 to JPY300,000,000
20%
SH/KP
85%
17.00%
¥132,273,498
0.73
¥96,559,654
NSH/KP
12%
2.40%
¥18,673,905.6
0.80
¥14,939,124
SH/OKP
2%
0.40%
¥3,112,317.6
0.85
¥2,645,470
NSH/OKP
1%
0.20%
¥1,556,158.8
0.87
¥1,353,858
JPY300,000,001 and above
5%
SH/KP
85%
4.25%
¥33,068,374.5
0.78
¥25,793,332
NSH/KP
12%
0.60%
¥4,668,476.4
0.82
¥3,828,151
SH/OKP
2%
0.10%
¥778,079.4
0.89
¥692,491
NSH/OKP
1%
0.05%
¥389,039.7
0.90
¥350,136
Annual Totals
100%
-
-
100%
¥778,079,400
Variable
¥558,011,312
Multiplied for one 5-year Base period and one two-year Option period
x 7 years
Mock Project Proposal
¥60,000,000
Offeror’s Proposed Total Evaluated Price (TEP)
¥3,966,079,184

*NOTE: Price Coefficients used in this example are fictitious and have been included only to illustrate the evaluation process. They are not to be considered an indication of expected values.

**NOTE: The abbreviation letters are specified as follows in the “Time/Location of Work”:

SH: Standard Hour NSH: Non-Standard Hour KP: Kanto Plain OKP: Outside Kanto Plain

1. The majority of projects will be performed at Yokota Air Base but may expand throughout Japan. Off-base sites may include, but are not limited to, the following: a) geographical separated units (GFUs): Narita Air Terminal, Tama Service Annex, Fuchu C.S., Momote Annex, Owada C.S. and Tokorozawa Transmitter Site; b) remote sites: Chitose Auxiliary Annex (Hokkaido) and Itazuke Auxiliary Airfield (Fukuoka).

2. All work in controlled areas will require escorts at all times by either Government personnel or Contracting Officer approved contractor personnel. No contractor personnel shall be out of line of sight of the escort at any time the contractor or subcontractor(s) are within a controlled area. There are no exceptions to this policy and this shall be the contractor’s policy under the terms of the contract.

File details come from the government source that posted it. Updated .