Atch J-3 SABER UPG.xlsx
XLSX spreadsheet 2 MB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA520920R0008
About this file
This notice is for a solicitation seeking proposals for a Simplified Acquisition of Base Engineering Requirements (SABER) indefinite-delivery/indefinite-quantity contract to provide maintenance, repair, and minor construction work at Yokota Air Base and off-base sites in Japan over a potential seven-year period. The minimum guaranteed amount is 500,000 Japanese yen, and the maximum aggregate amount including options is 49 billion Japanese yen. Proposals are due by March 9, 2020 following a pre-proposal conference on February 19, 2020. Offerors must submit past performance questionnaires by March 4, 2020 and register in the System for Award Management. Work will be performed in Japan in accordance with Defense Federal Acquisition Regulation Supplement requirements.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)
Based on Unit Price Guides (UPG)
| SABER BASIC CONTRACT NO. | PURCHASE REQUEST NUMBER | CONTRACTOR | |||||
| FA5209-20-R-0008 | F4G3A3XXXXXXX | XXXXXXXX Corporation | |||||
| PROJECT NO. & TITLE | TOTAL COST ESTIMATE | ||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | ***** | /***** | |||||
| LINE | |||||||
| NO. | ITEM | DIRECT CONSTRUCTION COST | INDIRECT CONSTRUCTION COST | RATE | LINE |
TOTAL
CONDITION %
| (1) | (2) | (3) | (4) | (5) | (6) | ||||||
| DIRECT CONSTRUCTION COST | (P) | ||||||||||
| 1. Civil Work Sub Total | ¥13,165 | - | - | - | ¥13,165 | ||||||
| 2. Architectural Work Sub Total | ¥2,025 | - | - | - | ¥2,025 | ||||||
| 3. Mechanical Work Sub Total | ¥47,130 | - | - | - | ¥47,130 | ||||||
| 4. Electrical Work Sub Total | ¥57,802 | - | - | - | ¥57,802 | ||||||
| 4. Communication Work Sub Total | ¥17,500 | - | - | - | ¥17,500 | ||||||
| Direct Cost Sub_Total | ¥137,622 | ||||||||||
| CONSTRUCTION COST INDEX | - | ||||||||||
| 1. Common Temporary Construction Costs | - | (Kr) | ≤¥5M | 6.07% | ¥8,354 | ||||||
| 2. Field Management Expenses | - | (Jo) | ≤¥5M | 26.86% | ¥39,209 | ||||||
| Common Construction Cost Sub_Total | ¥47,563 | ||||||||||
| 3. General Expenses | - | (Gp) | ≤¥5M | 11.26% | ¥20,852 | ||||||
| General Expenses Sub_Total | ¥20,852 | ||||||||||
| DESIGN COST | - | All amount | 20.00% | ¥41,207 | |||||||
| Design Sub_Total | ¥41,207 | ||||||||||
| Total Contract Price | ¥247,244 | ||||||||||
| SABER CO-FFICIENT & CONDITION | Estimate Value | Location & Time | Co-efficient | - | |||||||
| * SH: Standard Hour, NSH: None Standard Hour | ≤¥5M | Kanto SH | ERROR:#VALUE! | - | |||||||
| TOTAL CONTRACT PRICE | ***** | ||||||||||
| FOREIGN EXCHANGE RATE ¥/$: | ¥111.1542 | /$1.00 | ***** | ||||||||
| Estimating Reference: Unit Price Guides (UPG) is based on Accumulation Data (SEKISAN SHIRYO), Building Construction Unit Price (KENCHIKU SEKO TANKA), Civil Engineering Unit Price (DOBOKU SEKO TANKA) and Construction Unit Price (KENSETSU BUKKA). | |||||||||||
| ESTIMATOR: | Ms/Mr. XXXXXX | DATE: | XX Nov 19 | >> | CHECKER: | Ms/Mr. XXXXXX | DATE: | XX Nov 19 |
Co-efficient will provide at Co-efficient Tab Manual input by 374 CES Engineer
Civil
CIVIL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | TOTAL COST ESTIMATE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | ¥13,165 | /$118.44 | ||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | ||
| Section | Suffix | |||||||||
| Div02 | 02 00 00 | 050120-02 | 02 00 00 050120-02 | H= 10M,3 MONTH | m2 | 5 | ¥2,633 | TEXT | ¥13,165.13 | |
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| CIVIL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE) |
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | |||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | |
| Section | Fuffix | ||||||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| CIVIL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE) |
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | |||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | |
| Section | Fuffix | ||||||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- |
Engineer input Division#, Section and Suffix.
Free space for Engineer
Arch
ARCHITECTURL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | TOTAL COST ESTIMATE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | ¥2,025 | /$18.22 | ||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | ||
| Section | Suffix | |||||||||
| Div03 | 03 11 13.00 | 010300-02 | 03 11 13.00 010300-02 | CHAMPER STRIP | m | 5 | ¥405 | TEXT | ¥2,025.40 | |
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| ARCHITECTURL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE) |
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | |||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | |
| Section | Fuffix | ||||||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| ARCHITECTURL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE) |
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | |||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | |
| Section | Fuffix | ||||||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- |
Engineer input Division#, Section and Suffix.
Free space for Engineer
Mech
MECHANICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | TOTAL COST ESTIMATE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | ¥47,130 | /$424. | ||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | ||
| Section | Suffix | |||||||||
| Div04 | 04 23 01 | 060100-03 | 04 23 01 060100-03 | 150MM THICK | m2 | 5 | ¥9,426 | TEXT | ¥47,129.59 | |
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| MECHANICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE) |
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | |||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | |
| Section | Fuffix | ||||||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| MECHANICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE) |
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | |||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | |
| Section | Fuffix | ||||||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- |
Engineer input Division#, Section and Suffix.
Free space for Engineer
Elec
ELECTRICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | TOTAL COST ESTIMATE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | ¥57,802 | /$520.02 | ||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | ||
| Section | Suffix | |||||||||
| Div05 | 05 30 00 | 010120-05 | 05 30 00 010120-05 | GRADE 3, 0.6MM | m2 | 5 | ¥11,560 | TEXT | ¥57,801.91 | |
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| ELECTRICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE) |
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | |||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | |
| Section | Fuffix | ||||||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| ELECTRICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE) |
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | |||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | |
| Section | Fuffix | ||||||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- |
Engineer input Division#, Section and Suffix.
Free space for Engineer
Comm
COMMUNICATION COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | TOTAL COST ESTIMATE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | ¥17,500 | /$157.44 | ||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | ||
| Section | Suffix | |||||||||
| Div27 | 27 05 28.36 40 | 031000-01 | 27 05 28.36 40 031000-01 | 2 LAN OUTPUT JACK | ea | 5 | ¥3,500 | TEXT | ¥17,500.00 | |
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| 0 | -- | -- | -- | -- | ||||||
| COMMUNICATION COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE) |
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | |||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | |
| Section | Fuffix | ||||||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| COMMUNICATION COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE) |
Based on Unit Price Guides (UPG)
| PROJECT NO. & TITLE | |||||||||
| Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan | |||||||||
| Division | UPG No. | UPG No. | Description | U/M | Qty. | Unit Price | Remarks | Line Total | |
| Section | Fuffix | ||||||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- | |||||
| 0 | -- | -- | -- | -- |
Engineer input Division#, Section and Suffix.
Free space for Engineer
Coefficient
| FY20 Co-efficient Tabel | ||||||||||
| Project Value | Estimated Percentage of Project Value/Year | Time / Location of work | Estimated Percentage of Work/Year | Combined Estimated % Value&Work/Year | Offeror’s Priced Coefficient | Coefficient for Summary | ||||
| up to Y5,000,000 | ¥0 | ¥5,000,000 | ≤¥5M | 20% | Standard Hours / Kanto Plain | Kanto SH | 85% | 17.00% | 1XXX.XXX% | ERROR:#VALUE! |
| None-Standard Hours / Kanto Plain | Kanto NSH | 12% | 2.40% | 2XXX.XXX% | ERROR:#VALUE! | |||||
| Standard Hours / Outside of Kanto Plain | Outside SH | 2% | 0.40% | 3XXX.XXX% | ERROR:#VALUE! | |||||
| None-Standard Hours / Outside of Kanto Plain | Outside NSH | 1% | 0.20% | 4XXX.XXX% | ERROR:#VALUE! | |||||
| Y5,000,001 to Y75,000,000 | ¥5,000,001 | ¥75,000,000 | >¥5M-≤75M | 55% | Standard Hours / Kanto Plain | Kanto SH | 85% | 46.75% | 5XXX.XXX% | ERROR:#VALUE! |
| None-Standard Hours / Kanto Plain | Kanto NSH | 12% | 6.60% | 6XXX.XXX% | ERROR:#VALUE! | |||||
| Standard Hours / Outside of Kanto Plain | Outside SH | 2% | 1.10% | 7XXX.XXX% | ERROR:#VALUE! | |||||
| None-Standard Hours / Outside of Kanto Plain | Outside NSH | 1% | 0.55% | 8XXX.XXX% | ERROR:#VALUE! | |||||
| Y75,000,001 to Y300,000,000 | ¥75,000,001 | ¥300,000,000 | >¥75M-≤300M | 20% | Standard Hours / Kanto Plain | Kanto SH | 85% | 17.00% | 9XXX.XXX% | ERROR:#VALUE! |
| None-Standard Hours / Kanto Plain | Kanto NSH | 12% | 2.40% | 10XXX.XXX% | ERROR:#VALUE! | |||||
| Standard Hours / Outside of Kanto Plain | Outside SH | 2% | 0.40% | 11XXX.XXX% | ERROR:#VALUE! | |||||
| None-Standard Hours / Outside of Kanto Plain | Outside NSH | 1% | 0.20% | 12XXX.XXX% | ERROR:#VALUE! | |||||
| Y300,000,001 and above | ¥300,000,001 | ¥10,000,000,000 | >¥300M | 5% | Standard Hours / Kanto Plain | Kanto SH | 85% | 4.25% | 13XXX.XXX% | ERROR:#VALUE! |
| None-Standard Hours / Kanto Plain | Kanto NSH | 12% | 0.60% | 14XXX.XXX% | ERROR:#VALUE! | |||||
| Standard Hours / Outside of Kanto Plain | Outside SH | 2% | 0.10% | 15XXX.XXX% | ERROR:#VALUE! | |||||
| None-Standard Hours / Outside of Kanto Plain | Outside NSH | 1% | 0.05% | 16XXX.XXX% | ERROR:#VALUE! |
Enter Contractor's Coefficient.
Note: This coefficient will be used entire life of this SABER contract.
Cost Structure
| Construction Cost Structure (Except Direct Construction Cost) | ||||||
| Construction Cost Item | Conditions & Terms | Rate | Remarks | |||
| Common Construction Cost | Common Temporary (CT) | Less than 5,000,000 yen | ≤¥5M | 6.07% | ||
| Kr: Common Temporary Fee Rate | Between 5,000,001 yen and 2,000,000,000 yen | >5M-≤¥2B | 6.07% | Kr=11.74*P^(-0.0774) | 0.0607 | |
| P: Direct Construction Cost (1,000yen) | More than 2,000,000,001 yen | >¥2B | 3.82% | |||
| Field Management (FM) | Less than 5,000,000 yen | ≤¥5M | 26.86% | |||
| Jo: Field Management Fee Rate | Between 5,000,001 yen and 2,000,000,000 yen | >5M-≤¥2B | 26.86% | Jo=184.58*Np^(-0.2263) | 0.2686 | |
| Np: Net Construction Cost (1,000yen) | More than 2,000,000,001 yen | >¥2B | 6.92% | |||
| General Management Cost Percentage (Gp) | Gp: General Management Cost Percentage | Less than 5,000,000 yen | ≤¥5M | 11.26% | ||
| Cp: Construction Cost (1,000yen) | Between 5,000,001 yen and 3,000,000,000 yen | >5M-≤¥3B | 11.26% | Gp=15.065-1.028×log (Cp) | 0.1126 | |
| More than 3,000,000,001 yen | >¥3B | 8.41% | ||||
| Total Construction Cost | Direct Cost + Indirect Cost | |||||
| Total Contract Price | Total Contract Price=Total Construction Cost + Design Fee 20% | 20% |
| D_04 |
| D_05 |
| D_06 |
| D_07 |
| D_08 |
| D_09 |
| D_10 |
| D_05 |
| D_06 |
| D_13 |
| D_14 |
| D_07 |
| D_08 |
| D_09 |
| D_18 |
| D_10 |
| D_11 |
| D_12 |
| D_13 |
| D_14 |
| D_14 |
| D_16 |
| D_17 |
| D_18 |
| D_19 |
| D_21 |
| D_22 |
| D_22 |
| D_23 |
| D_24 |
| D_23 |
| D_26 |
| D_27 |
| D_25 |
| D_23 |
| D_26 |
| D_27 |
| D_25 |
| D_23 |
| D_26 |
| D_27 |
| D_25 |
| D_23 |
| D_26 |
| D_27 |
| D_25 |
| D_23 |
| D_26 |
| D_27 |
| D_25 |
| D_23 |
| D_26 |
| D_28 |
| D_25 |
| D_23 |
| D_26 |
| D_31 |
| D_25 |
| D_23 |
| D_32 |
| D_33 |
| D_34 |
| D_40 |
Index Structure Division Index for Calculation (if added new Division. Need to add program to each Category GCE list.)
| Div02 |
| Div03 |
| Div04 |
| Div05 |
| Div06 |
| Div07 |
| Div08 |
| Div09 |
| Div10 |
| Div11 |
| Div12 |
| Div13 |
| Div14 |
| Div21 |
| Div22 |
| Div23 |
| Div24 |
| Div25 |
| Div26 |
| Div27 |
| Div28 |
| Div31 |
| Div32 |
| Div33 |
| Div34 |
| Div40 |
The highlighted area is available to add or edit. ハイライトされたエリアには追加および変更可能エリアです。そのまま各カテゴリーのGCE Listのドロップダウンメニューに追加されます。
Index
INDEX
| DIVISION | SECTION | TITLE |
| DIVISION 00 | PROCUREMENT AND CONTRACTING REQUIREMENTS | |
| 00 01 15 | LIST OF DRAWINGS | |
| 00 22 13 | SUPPLEMENTARY INSTRUCTIONS TO BIDDERS | |
| 00 31 10 | METRIC MEASUREMENTS | |
| 00 41 00 | BID SCHEDULES |
| DIVISION 01 | GENERAL REQUIREMENTS | ||
| 01 11 00 | SUMMARY OF WORK | Yoshida | |
| 01 14 00 | WORK RESTRICTIONS | ||
| 01 20 00.00 20 | PRICE AND PAYMENT PROCEDURES | ||
| 01 20 01.00 10 | COST AND PERFORMANCE REPORT | ||
| 01 22 00.00 10 | MEASUREMENT AND PAYMENT | ||
| 01 30 00 | ADMINISTRATIVE REQUIREMENTS | ||
| 01 32 01.00 10 | PROJECT SCHEDULE | ||
| 01 32 16.00 20 | CONSTRUCTION PROGRESS DOCUMENTATION | ||
| 01 32 17.00 20 | NETWORK ANALYSIS SCHEDULES (NAS) | ||
| 01 33 00 | SUBMITTAL PROCEDURES | Yoshida | |
| 01 33 23.33 | AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS | ||
| 01 33 29 | LEED(TM) DOCUMENTATION | ||
| 01 35 13 | SPECIAL PROJECT PROCEDURES | ||
| 01 35 26 | GOVERNMENTAL SAFETY REQUIREMENTS | ||
| 01 35 29.13 | HEALTH, SAFETY, AND EMERGENCY RESPONSEPROCEDURES FOR CONTAMINATED SITES | ||
| 01 35 40.00 20 | ENVIRONMENTAL MANAGEMENT | ||
| 01 35 45.00 10 | CHEMICAL DATA QUALITY CONTROL | ||
| 01 42 00 | SOURCES FOR REFERENCE PUBLICATIONS | ||
| 01 45 00.00 10 | QUALITY CONTROL | ||
| 01 45 00.00 20 | QUALITY CONTROL | ||
| 01 45 00.00 40 | QUALITY CONTROL | ||
| 01 45 00.10 10 | QUALITY CONTROL SYSTEM (QCS) | ||
| 01 45 00.10 20 | QUALITY CONTROL FOR MINOR CONSTRUCTION | ||
| 01 45 35 | SPECIAL INSPECTION FOR SEISMIC-RESISTING SYSTEMS | ||
| 01 50 00 | TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS | ||
| 01 57 16 | TEMPORARY PEST CONTROL | ||
| 01 57 19.00 20 | TEMPORARY ENVIRONMENTAL CONTROLS | ||
| 01 57 19.01 20 | SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS | ||
| 01 57 19.02 | TEMPORARY ENVIRONMENTAL CONTROLS (GTMO) | ||
| 01 57 20.00 10 | ENVIRONMENTAL PROTECTION | Yoshida | |
| 01 57 23 | TEMPORARY STORM WATER POLLUTION CONTROL | ||
| 01 58 00 | PROJECT IDENTIFICATION | ||
| 01 62 35 | RECYCLED / RECOVERED MATERIALS | ||
| 01 73 19 | INSTALLATION OF GOVERNMENT-FURNISHED MEDICAL EQUIPMENT | ||
| 01 74 19 | CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT | ||
| 01 75 00 | STARTING AND ADJUSTING | ||
| 01 78 00 | CLOSEOUT SUBMITTALS | Yoshida | |
| 01 78 23.33 | OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL SYSTEMS | ||
| 01 78 23 | OPERATION AND MAINTENANCE DATA | Nishimura S | |
| 01 83 00.07 40 | RELIABILITY CENTERED ACCEPTANCE FOR FACILITY SHELLS | ||
| 01 83 13.07 40 | RELIABILITY CENTERED ACCEPTANCE FOR SUPERSTRUCTURE PERFORMANCE REQUIREMENTS | ||
| 01 86 12.07 40 | RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS | ||
| 01 86 26.07 40 | RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS |
| DIVISION 02 | EXISTING CONDITIONS | |||
| 02 01 50 | OPERATION, MAINTENANCE, AND PROCESS MONITORINGFOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS | |||
| 02 32 00 | SUBSURFACE DRILLING, SAMPLING, AND TESTING | |||
| 02 35 27 | SOIL-BENTONITE (S-B) SLURRY TRENCH | |||
| 02 41 00 | [DEMOLITION][ AND ][DECONSTRUCTION] | |||
| 02 42 51 | CARPET REMOVAL AND RECLAMATION | |||
| 02 42 91 | REMOVAL AND SALVAGE OF HISTORIC BUILDING MATERIAL | |||
| 02 51 13 | PRECIPITATION/COAGULATION/FLOCCULATION WATERTREATMENT | |||
| 02 53 13 | REMEDIATION OF CONTAMINATED SOILS AND SLUDGES BY INCINERATION | |||
| 02 53 16 | REMEDIATION OF CONTAMINATED SOILS BY THERMAL DESORPTION | |||
| 02 54 20 | BIOREMEDIATION OF SOILS USING LANDFARMING SYSTEMS | |||
| 02 54 21 | BIOREMEDIATION OF SOILS USING WINDROW COMPOSTING | |||
| 02 54 23 | SOIL WASHING THROUGH SEPARATION/SOLUBILIZATION | |||
| 02 55 00 | SOLIDIFICATION/STABILIZATION (S/S) OFCONTAMINATED MATERIAL | |||
| 02 56 13 | WASTE CONTAINMENT GEOMEMBRANE | |||
| 02 56 14 | CLAY BARRIER LAYER | |||
| 02 56 15 | GEOSYNTHETIC CLAY LINER (GCL) | |||
| 02 61 13 | EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL | |||
| 02 61 23 | REMOVAL AND DISPOSAL OF PCB CONTAMINATED SOILS | Kato | ||
| 02 62 16 | COMMISSIONING AND DEMONSTRATION FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS | |||
| 02 65 00 | UNDERGROUND STORAGE TANK REMOVAL | |||
| 02 66 00 | SELECT FILL AND TOPSOIL FOR LANDFILL COVER | |||
| 02 66 10 | TEST FILL | |||
| 02 81 00 | TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS | |||
| 02 82 14.00 10 | ASBESTOS HAZARD CONTROL ACTIVITIES | |||
| 02 82 16.00 20 | ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS | Masuda | ||
| 02 82 16.00 21 | ASBESTOS BULK SAMPLING | Masuda | ||
| 02 82 33.13 20 | REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD | |||
| 02 83 13.00 20 | LEAD IN CONSTRUCTION | |||
| 02 83 19.00 10 | LEAD BASED PAINT HAZARD ABATEMENT, TARGETHOUSING & CHILD OCCUPIED FACILITIES | Seo | ||
| 02 84 16 | HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND MERCURY | Kurata | ||
| 02 84 33 | REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs) | Kurata | ||
| 02 85 00.00 20 | MOLD REMEDIATION | |||
| DIVISION 03 | CONCRETE | |||
| 03 01 30.71 | CONCRETE REHABILITATION | Ozawa | ||
| 03 01 30 | RESTORATION OF CONCRETE IN HISTORIC STRUCTURES | |||
| 03 01 32 | CONCRETE REHABILITATION FOR CIVIL WORKS | |||
| 03 11 13.00 10 | STRUCTURAL CAST-IN-PLACE CONCRETE FORMING | Shimizu | ||
| 03 15 00.00 10 | CONCRETE ACCESSORIES | |||
| 03 20 00.00 10 | CONCRETE REINFORCING | Ozawa | ||
| 03 23 00 | STEEL STRESSING TENDONS AND ACCESSORIES FOR PRESTRESSED CONCRETE | |||
| 03 30 00.00 10 | CAST-IN-PLACE CONCRETE (CONCRETE FOR BUILDING CONSTRUCTION から変更? 03 30 00と統一?CEPMM西村) | |||
| 03 30 00 | CAST-IN-PLACE CONCRETE | Shimizu | ||
| 03 30 53 | MISCELLANEOUS CAST-IN-PLACE CONCRETE | ohyama | ||
| 03 31 01.00 10 | CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS | |||
| 03 31 29 | MARINE CONCRETE | |||
| 03 33 00 | CAST-IN-PLACE ARCHITECTURAL CONCRETE | |||
| 03 30 01 | CONCRETE FOR MINOR STRUCTURE | Masuda | ||
| 03 35 00.00 10 | CONCRETE FINISHING | |||
| 03 37 00 | PREPLACED-AGGREGATE CONCRETE | |||
| 03 37 13 | SHOTCRETE | Masuda | ||
| 03 37 23 | ROLLER-COMPACTED CONCRETE FOR MASS CONCRETE CONSTRUCTION | |||
| 03 37 29 | CONCRETE FOR CONCRETE CUTOFF WALLS | |||
| 03 39 00.00 10 | CONCRETE CURING | |||
| 03 40 00.00 10 | PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION | |||
| 03 41 16 | PRECAST CONCRETE SLABS (MAX. SPAN 8'- 0" O.C.) | |||
| 03 41 33 | PRECAST STRUCTURAL PRETENSIONED CONCRETE | |||
| 03 45 00 | PRECAST ARCHITECTURAL CONCRETE | |||
| 03 45 33 | PRECAST[ PRESTRESSED] STRUCTURAL CONCRETE | |||
| 03 47 13 | TILT-UP CONCRETE | |||
| 03 51 01 | PRECAST ROOF DECKS | |||
| 03 52 00 | LIGHTWEIGHT CONCRETE ROOF INSULATION | |||
| 03 52 16.19 | LIGHTWEIGHT INSULATING CONCRETE OVERLAY | |||
| 03 52 16 | LIGHTWEIGHT INSULATING CONCRETE | |||
| 03 53 14.00 20 | LIGHT REFLECTIVE NONFERROUS METALLIC AGGREGATE FLOOR SYSTEM | |||
| 03 55 16 | GYPSUM CONCRETE FLOOR PLANKS | |||
| 03 62 16 | METALLIC NON-SHRINK GROUTING | |||
| 03 70 00 | MASS CONCRETE | |||
| DIVISION 04 | MASONRY | |||
| 04 01 20 | REHABILITATION OF REINFORCED AND UNREINFORCED MASONRY WALLS USING FRP COMPOSITE STRUCTURAL REPOINTING | |||
| 04 01 21 | REHABILITATION OF REINFORCED AND UNREINFORCED MASONRY WALLS USING SURFACE APPLIED FRP COMPOSITES | |||
| 04 01 40 | RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES | |||
| 04 20 00 | MASONRY | Ozawa | ||
| 04 21 13.13 | NONBEARING MASONRY VENEER/STEEL STUD WALLS | |||
| 04 21 26 | GLAZED STRUCTURAL CLAY TILE AND PREFACED CONCRETE MASONRY UNITS | |||
| 04 23 00 | GLASS MASONRY UNITS | Ozawa | ||
| 04 23 01 | REINFORCED MASONRY | Masuda | ||
| DIVISION 05 | METALS | |||
| 05 05 23.13 10 | ULTRASONIC INSPECTION OF WELDMENTS | D_36 | ||
| 05 05 23 | WELDING, STRUCTURAL | D_37 | ||
| 05 12 00 | STRUCTURAL STEEL | Ozawa | ||
| 05 14 00.13 | WELDING STRUCTURAL ALUMINUM FRAMING | |||
| 05 21 13 | DEEP LONGSPAN STEEL JOIST FRAMING | |||
| 05 21 16 | LONGSPAN STEEL JOIST FRAMING | |||
| 05 21 19 | OPEN WEB STEEL JOIST FRAMING | |||
| 05 21 23 | STEEL JOIST GIRDER FRAMING | |||
| 05 30 00 | STEEL DECKS | OZAWA | ||
| 05 40 00 | COLD-FORMED METAL FRAMING | Shimizu | ||
| 05 50 13 | MISCELLANEOUS METAL FABRICATIONS | Shimizu | ||
| 05 50 14 | STRUCTURAL METAL FABRICATIONS | |||
| 05 50 15 | CIVIL WORKS FABRICATIONS | |||
| 05 51 00 | METAL STAIRS | |||
| 05 51 33 | METAL LADDERS | |||
| 05 52 00 | METAL RAILINGS | |||
| 05 59 10 | ROLLING COVER FOR AVIATION REFUELING VAULTS | |||
| 05 59 13 | FABRICATION OF HYDRAULIC STEEL STRUCTURES | |||
| 05 72 00 | DECORATIVE METAL SPECIALTIES | |||
| DIVISION 06 | WOOD, PLASTICS, AND COMPOSITES | |||
| 06 10 00 | ROUGH CARPENTRY | Masuda | ||
| 06 13 33 | PIER TIMBERWORK | |||
| 06 18 00 | GLUED-LAMINATED CONSTRUCTION | |||
| 06 20 00 | FINISH CARPENTRY | Masuda | ||
| 06 41 16.00 10 | LAMINATE CLAD ARCHITECTURAL CASEWORK | |||
| 06 61 16 | SOLID POLYMER (SOLID SURFACING) FABRICATIONS | |||
| 06 71 33 | FIBERGLASS REINFORCED PLASTIC (FRP) LADDERS | |||
| 06 73 01 | FIBERGLASS REINFORCED PLASTIC (FRP) GRATING | |||
| 06 82 14 | FIBERGLASS REINFORCED PLASTIC (FRP) PIPE ANDTUBE RAILINGS | |||
| DIVISION 07 | THERMAL AND MOISTURE PROTECTION | |||
| 07 11 13 | BITUMINOUS DAMPPROOFING | |||
| 07 12 00 | BUILT-UP BITUMINOUS WATERPROOFING | MASUDA | ||
| 07 13 53 | ELASTOMERIC SHEET WATERPROOFING | |||
| 07 13 53 | SHEET APPLIED MEMBRANE ROOFING | MASUDA | ||
| 07 14 00 | FLUID-APPLIED WATERPROOFING | MASUDA | ||
| 07 16 19 | METALLIC OXIDE WATERPROOFING | |||
| 07 17 00 | BENTONITE WATERPROOFING | |||
| 07 19 00 | WATER REPELLENTS | |||
| 07 21 13 | BOARD AND BLOCK INSULATION | |||
| 07 21 16 | MINERAL FIBER BLANKET INSULATION | Masuda | ||
| 07 21 23 | LOOSE FILL THERMAL INSULATION | Masuda | ||
| 07 22 00 | ROOF INSULATION | Masuda | ||
| 07 24 00 | EXTERIOR INSULATION AND FINISH SYSTEMS | OZAWA | ||
| 07 31 13 | ASPHALT SHINGLES | |||
| 07 31 13.1 | ASPHALT AND METAL SHINLES | Masuda | ||
| 07 31 26 | SLATE ROOFING | |||
| 07 32 13 | ROOF TILES | |||
| 07 32 14 | CLAY TILE ROOFING REPLACEMENT OR REPAIR | |||
| 07 41 13 | METAL ROOF PANELS | |||
| 07 41 13 | METAL ROOF AND WALL PANELS | Hibino | ||
| 07 41 63 | FABRICATED ROOF PANEL ASSEMBLIES | |||
| 07 42 13 | METAL WALL PANELS | |||
| 07 42 63 | FABRICATED WALL PANEL ASSEMBLIES | |||
| 07 51 13.1 | BUILT-UP ASPHALT ROOFING (AGGREGATE SURFACED) | OZAWA | ||
| 07 51 13.2 | BUILT-UP ASPHALT ROOFING (MINERAL SURFACED) | Masuda | ||
| 07 52 00 | MODIFIED BITUMINOUS MEMBRANE ROOFING | |||
| 07 52 01 | MEMBRANE WATERPROOFING | MASUDA | ||
| 07 53 23 | ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING | OZAWA | ||
| 07 54 19 | POLYVINYL-CHLORIDE (PVC) ROOFING | |||
| 07 55 00 | PROTECTED MEMBRANE ROOFING (PMR) | |||
| 07 56 00 | WATERPROOF COATING SYSTEM | Masuda | ||
| 07 57 13 | SPRAYED POLYURETHANE FOAM (SPF) ROOFING | OZAWA | ||
| 07 60 00 | FLASHING AND SHEET METAL | OZAWA | ||
| 07 61 01 | COPPER ROOF SYSTEM | |||
| 07 61 14.00 20 | STEEL STANDING SEAM ROOFING | |||
| 07 61 15.00 20 | ALUMINUM STANDING SEAM ROOFING | |||
| 07 62 10 | COPPER SHEET METAL FLASHING | |||
| 07 72 00 | ROOF VENTILATORS, GRAVITY-TYPE | |||
| 07 81 00 | SPRAY-APPLIED FIREPROOFING | |||
| 07 84 0 | FIRESTOPPING | Ozawa | ||
| 07 92 00 | JOINT SEALANTS | Masuda | ||
| DIVISION 08 | OPENINGS | |||
| 08 11 13 | STEEL DOORS AND FRAMES | Masuda | ||
| 08 11 16 | ALUMINUM DOORS AND FRAMES | Masuda | ||
| 08 11 69 | METAL STORM DOORS | |||
| 08 11 73 | SLIDING FIRE DOORS | |||
| 08 13 73 | SLIDING METAL DOORS | |||
| 08 14 00 | WOOD DOORS | Masuda | ||
| 08 22 20 | FIBERGLASS REINFORCED PLASTIC (FRP) DOORS ANDFRAMES | |||
| 08 32 13 | ALUMINUM SLIDING GLASS DOORS | |||
| 08 33 13 | METAL ROLLING COUNTER DOORS | |||
| 08 33 23 | OVERHEAD COILING DOORS | Ozawa | ||
| 08 34 01 | FORCED ENTRY RESISTANT COMPONENTS | |||
| 08 34 02 | BULLET-RESISTANT COMPONENTS | |||
| 08 34 16.10 | STEEL SLIDING HANGAR DOORS | Masuda | ||
| 08 34 16.20 | VERTICAL LIFT FABRIC DOORS | |||
| 08 34 16 | CORROSION CONTROL HANGAR DOORS | |||
| 08 34 19.10 20 | ROLLING SERVICE [AND FIRE] DOORS | Masuda | ||
| 08 34 49.00 20 | HEMP SHIELDED DOOR | |||
| 08 34 53 | SECURITY DOORS AND FRAMES | |||
| 08 34 59 | VAULT DOORS AND DAY GATES | Shimizu | ||
| 08 34 63 | DETENTION HOLLOW METAL FRAMES, DOORS, AND DOORFRAMES | |||
| 08 34 73 | SOUND CONTROL DOOR ASSEMBLIES | |||
| 08 36 13 | SECTIONAL OVERHEAD DOORS | |||
| 08 36 19 | VERTICAL LIFT DOORS | |||
| 08 39 53 | BLAST RESISTANT DOORS (OVAL ARCH MAGAZINES) | |||
| 08 39 54 | BLAST RESISTANT DOORS | |||
| 08 41 13 | ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS | |||
| 08 44 00 | CURTAIN WALL AND GLAZED ASSEMBLIES | |||
| 08 51 13 | ALUMINUM WINDOWS | Shimizu | ||
| 08 51 23 | STEEL WINDOWS | |||
| 08 51 69.10 | ALUMINUM STORM WINDOWS | |||
| 08 52 00 | WOOD WINDOWS | MASUDA | ||
| 08 52 70 | WOOD WINDOWS - REPAIR AND REHABILITATION | |||
| 08 53 00 | PLASTIC WINDOWS | |||
| 08 56 46.10 20 | RADIO FREQUENCY SHIELDED ENCLOSURES,DEMOUNTABLE TYPE | |||
| 08 56 46.20 20 | RADIO FREQUENCY SHIELDED ENCLOSURES, WELDED TYPE | |||
| 08 56 53 | BLAST RESISTANT TEMPERED GLASS WINDOWS | |||
| 08 56 63 | DETENTION AND SECURITY WINDOWS | |||
| 08 62 00 | SKYLIGHTS | |||
| 08 71 00 | DOOR HARDWARE | Shimizu | ||
| 08 71 63.10 | ELECTRICAL LOCKING CONTROL FOR BRIGS | |||
| 08 71 63 | DETENTION HARDWARE | |||
| 08 81 00 | GLAZING | Shimizu | ||
| 08 87 16 | FRAGMENT RETENTION FILM FOR GLASS | |||
| 08 88 53 | DETENTION AND SECURITY GLAZING | |||
| 08 91 00 | METAL [WALL] [AND] [DOOR] LOUVERS | MASUDA | ||
| DIVISION 09 | FINISHES | |||
| 09 06 90 | COLOR SCHEDULE | |||
| 09 22 00 | SUPPORTS FOR PLASTER AND GYPSUM BOARD | Shimizu | ||
| 09 22 36 | FURRING AND LATHING | Masuda | ||
| 09 23 00 | GYPSUM PLASTERING | |||
| 09 23 82 | FIREPROOF GYPSUM PLASTERING | |||
| 09 24 23 | PLASTER AND STUCCO | Masuda | ||
| 09 26 00 | VENEER PLASTER | |||
| 09 29 00 | GYPSUM BOARD | Masuda | ||
| 09 30 00 | CERAMIC TILE, QUARRY TILE, AND PAVER TILE | Masuda | ||
| 09 35 16 | CHEMICAL-RESISTANT QUARRY TILE | |||
| 09 51 00 | ACOUSTICAL CEILINGS | Shimizu | ||
| 09 64 29 | WOOD STRIP FLOORING | Shimizu | ||
| 09 64 00 | PORTABLE (DEMOUNTABLE) WOOD FLOORING | |||
| 09 64 23 | WOOD PARQUET FLOORING | |||
| 09 64 29 | WOOD STRIP FLOORING | |||
| 09 64 66 | WOOD ATHLETIC FLOORING | |||
| 09 65 00 | RESILIENT FLOORING | Shimizu | ||
| 09 65 36 | STATIC-CONTROL RESILIENT FLOORING | |||
| 09 65 66 | RESILIENT ATHLETIC FLOORING | |||
| 09 66 13 | PORTLAND CEMENT TERRAZZO | |||
| 09 66 16 | TERRAZZO TILE | |||
| 09 66 23 | RESINOUS TERRAZZO FLOORING | |||
| 09 67 23.13 | STANDARD RESINOUS FLOORING | |||
| 09 67 23.14 | CHEMICAL RESISTIVE RESINOUS FLOORING | SEO | ||
| 09 67 23.15 | FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM | |||
| 09 67 23.16 | FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM | |||
| 09 68 00 | CARPET | Masuda | ||
| 09 68 01 | CARPET TILE | Masuda | ||
| 09 69 13 | RIGID GRID ACCESS FLOORING | Masuda | ||
| 09 69 19 | STRINGERLESS ACCESS FLOORING | |||
| 09 72 00 | WALL COVERINGS | Seo | ||
| 09 83 13 | ACOUSTICAL WALL TREATMENT | |||
| 09 90 00 | PAINTS AND COATINGS | Seo | ||
| 09 96 00 | HIGH-PERFORMANCE COATINGS | |||
| 09 96 59 | HIGH-BUILD GLAZE COATINGS | |||
| 09 97 01.00 10 | METALLIZING: HYDRAULIC STRUCTURES | |||
| 09 97 02 | PAINTING: HYDRAULIC STRUCTURES | |||
| 09 97 13.00 40 | STEEL COATINGS | |||
| 09 97 13.15 | EPOXY/FLUOROPOLYURETHANE INTERIOR COATING OFWELDED STEEL PETROLEUM FUEL TANKS | |||
| 09 97 13.16 | INTERIOR COATING OF WELDED STEEL WATER TANKS | |||
| 09 97 13.17 | THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL PETROLEUM FUEL TANKS | |||
| 09 97 13.25 | MAINTENANCE, REPAIR, AND COATING OF TALLANTENNA TOWERS | |||
| 09 97 13.26 | COATING OF STEEL WATERFRONT STRUCTURES | |||
| 09 97 13.27 | EXTERIOR COATING OF STEEL STRUCTURES | |||
| 09 97 13.28 | PROTECTION OF BURIED STEEL PIPING AND STEEL BULKHEAD TIE RODS | |||
| 09 97 23.13 | INTERIOR LINING FOR CONCRETE STORAGE TANKS (FORPETROLEUM FUELS) | |||
| 09 97 23.16 | LINSEED OIL PROTECTION OF CONCRETE SURFACES | |||
| 09 97 23 | METALLIC TYPE CONDUCTIVE/SPARK RESISTANTCONCRETE FLOOR FINISH | |||
| 09 97 30 | PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING | |||
| DIVISION 10 | SPECIALTIES | |||
| 10 10 00 | VISUAL COMMUNICATIONS SPECIALTIES | |||
| 10 14 10 | SIGNAGE | Masuda | ||
| 10 21 13 | TOILET COMPARTMENTS | |||
| 10 21 13 | TOPILET PARTITION | Masuda | ||
| 10 21 23.16 | CUBICLE TRACK AND HARDWARE | |||
| 10 22 13 | WIRE MESH PARTITIONS | |||
| 10 22 19 | DEMOUNTABLE MOVABLE PARTITIONS | |||
| 10 22 26.13 | ACCORDION FOLDING PARTITIONS | |||
| 10 22 26.23 | COILING PARTITIONS | |||
| 10 22 39 | FOLDING PANEL PARTITIONS | |||
| 10 22 43 | SLIDING PARTITIONS | |||
| 10 26 13 | WALL AND CORNER GUARDS | |||
| 10 28 13 | TOILET AND BATH ACCESSORIES | Masuda | ||
| 10 44 16 | FIRE EXTINGUISHERS | |||
| 10 51 13 | METAL LOCKERS | |||
| 10 53 00 | AWNINGS | Masuda | ||
| 10 56 13 | STEEL SHELVING | Masuda | ||
| 10 71 13.13 | STORM SHUTTERS | |||
| DIVISION 11 | EQUIPMENT | |||
| 11 05 40 | COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT | |||
| 11 06 40.13 | FOODSERVICE EQUIPMENT SCHEDULE | |||
| 11 13 10 | DOCK LEVELERS | |||
| 11 24 27 | AIR STRIPPER | |||
| 11 27 13 | RADIOGRAPHIC DARKROOM EQUIPMENT | |||
| 11 31 13 | ELECTRIC KITCHEN EQUIPMENT | |||
| 11 41 11 | REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT | |||
| 11 42 00 | FOOD PREPARATION EQUIPMENT | |||
| 11 44 00 | FOOD COOKING EQUIPMENT | |||
| 11 46 00 | FOOD DISPENSING EQUIPMENT | |||
| 11 47 00 | ICE MACHINES | |||
| 11 48 00 | CLEANING AND DISPOSAL EQUIPMENT | |||
| 11 53 00 | LABORATORY EQUIPMENT AND FUMEHOODS | |||
| 11 68 13 | PLAYGROUND EQUIPMENT | Yoshida | ||
| 11 70 00 | GENERAL REQUIREMENTS FOR MEDICAL AND DENTALEQUIPMENT | |||
| 11 71 00 | WARMING CABINETS, STERILIZERS, AND ASSOCIATEDEQUIPMENT | |||
| 11 72 13 | MEDICAL EQUIPMENT, MISCELLANEOUS | |||
| 11 74 00 | DENTAL EQUIPMENT | |||
| 11 82 20 | INCINERATORS, GENERAL PURPOSE | Nishimura S | ||
| 11 82 21 | MEDICAL WASTE INCINERATORS | |||
| DIVISION 12 | FURNISHINGS | |||
| 12 21 00 | WINDOW BLINDS | |||
| 12 22 00 | CURTAINS AND DRAPES | |||
| 12 24 13 | ROLLER WINDOW SHADES | |||
| 12 24 13 | SOLAR CONTROL FILM (THERMAL FILM) | Masuda | ||
| 12 31 00 | MANUFACTURED METAL CASEWORK | |||
| 12 32 00 | MANUFACTURED WOOD CASEWORK | |||
| 12 34 00 | MANUFACTURED PLASTIC CASEWORK | |||
| 12 35 20 | FOODSERVICE CASEWORK, COUNTERTOPS, ANDACCESSORIES | |||
| 12 35 70 | MEDICAL AND DENTAL CASEWORK | |||
| 12 36 00.00 20 | MANUFACTURED VANITIES | |||
| 12 36 00 | COUNTERTOPS | |||
| 12 36 01 | CABINETS AND COUNTERTOPS | Masuda | ||
| 12 48 13.13 | ENTRANCE FLOOR MATS | |||
| 12 50 00 | FURNITURE SYSTEMS | |||
| 12 55 00 | DETENTION FURNITURE AND ACCESSORIES | |||
| 12 65 00 | FIXED SEATING | |||
| 12 93 00 | SITE FURNISHINGS | |||
| DIVISION 13 | SPECIAL CONSTRUCTION | |||
| 13 17 43 | HYDROTHERAPY EQUIPMENT | |||
| 13 21 26 | COLD-STORAGE ROOMS (PREFABRICATED PANEL TYPE) | Nishimura S | ||
| 13 21 48 | PREFABRICATED AUDIOMETRIC ROOMS | |||
| 13 27 54.00 10 | ELECTROMAGNETIC (EM) SHIELDING | |||
| 13 34 19.1 | METAL BUILDING SYSTEMS (RIGID FRAME) | Masuda | ||
| 13 34 19.2 | METAL BUILDING SYSTEMS (STRAIGHT WALL) | Masuda | ||
| 13 48 00.00 10 | SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT | Nishimura S | ||
| 13 48 00 | SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT | Nishimura S | ||
| 13 49 19 | X-RAY SHIELDING | |||
| DIVISION 14 | Conveying Equipment | |||
| 14 21 00.00 20 | ELECTRIC TRACTION ELEVATORS | Ozawa | ||
| 14 21 13 | ELECTRIC TRACTION FREIGHT ELEVATORS | HLD | ||
| 14 21 23 | ELECTRIC TRACTION PASSENGER ELEVATORS | HLD | ||
| 14 24 00 | HYDRAULIC ELEVATORS | HLD | ||
| 14 92 00 | PNEUMATIC-TUBE SYSTEM | |||
| DIVISION 21 | FIRE SUPPRESSION | |||
| 21 12 00 | STANDPIPE SYSTEMS | Mazshita | ||
| 21 13 00.00 40 | FIRE-SUPPRESSION SPRINKLER SYSTEMS | Mazshita | ||
| 21 13 13.00 | WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION | Mazshita | ||
| 21 13 17.00 10 | DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION | Mazshita | ||
| 21 13 18.00 10 | PREACTION AND DELUGE SPRINKLER SYSTEMS, FIREPROTECTION | Mazshita | ||
| 21 21 00 | FIRE EXTINGUISHING SPRINKLER SYSTEMS (RESIDENTIAL) | Mazshita | ||
| 21 21 01.00 20 | CARBON DIOXIDE FIRE EXTINGUISHING (HIGHPRESSURE) | |||
| 21 21 02.00 20 | CARBON DIOXIDE FIRE EXTINGUISHING (LOW PRESSURE) | |||
| 21 22 00.00 20 | HALON 1301 FIRE EXTINGUISHING | |||
| 21 22 00.00 40 | CLEAN AGENT FIRE EXTINGUISHING SYSTEMS | |||
| 21 23 00.00 20 | WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET | Mazshita | ||
| 21 30 00 | FIRE PUMPS | Mazshita | ||
| DIVISION 22 | PLUMBING | |||
| 22 00 00 | PLUMBING, GENERAL PURPOSE | Nishimura S | ||
| 22 05 48.00 20 | MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL | Nishimura S | ||
| 22 07 19.00 40 | PLUMBING PIPING INSULATION | Nishimura S | ||
| 22 10 00.00 10 | VERTICAL PUMPS, AXIAL-FLOW AND MIXED-FLOWIMPELLER-TYPE | Orito | ||
| 22 11 23.00 10 | SUBMERSIBLE PUMP, AXIAL-FLOW AND MIXED-FLOW TYPE | Orito | ||
| 22 13 29 | SANITARY SEWERAGE PUMPS | Orito | ||
| 22 14 29.00 40 | SUMP PUMPS | Orito | ||
| 22 15 09.00 40 | GENERAL SERVICE COMPRESSED-AIR SYSTEMS CLEANING PROCEDURES | Orito | ||
| 22 15 13.16 40 | HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS, AND VALVES, STAINLESS | Orito | ||
| 22 15 14.00 40 | GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE | Orito | ||
| 22 15 19.19 20 | NONLUBRICATED ROTARY SCREW AIR COMPRESSORS (100 HP AND LARGER) | Orito | ||
| 22 31 00 | WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE) | Nishimura S | ||
| DIVISION 23 | HEATING, VENTILATING, AND AIR CONDITIONING | |||
| 23 00 00 | AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS | Nishimura S | ||
| 23 01 30.41 | HVAC SYSTEM CLEANING | Nishimura S | ||
| 23 03 00.00 20 | BASIC MECHANICAL MATERIALS AND METHODS | Nishimura S | ||
| 23 05 15 | COMMON PIPING FOR HVAC | Nishimura S | ||
| 23 05 48.00 40 | VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT | Nishimura S | ||
| 23 05 93 | TESTING, ADJUSTING, AND BALANCING FOR HVAC | Nishimura S | ||
| 23 07 00 | THERMAL INSULATION FOR MECHANICAL SYSTEMS | Nishimura S | ||
| 23 08 00.00 10 | COMMISSIONING OF HVAC SYSTEMS | Nishimura S | ||
| 23 09 13.34 40 | CONTROL VALVES, SELF-CONTAINED | Nishimura S | ||
| 23 09 23.13 20 | BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC | Nishimura S | ||
| 23 09 23 | LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS | Nishimura S | ||
| 23 09 33.00 40 | ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC | Nishimura S | ||
| 23 09 53.00 20 | SPACE TEMPERATURE CONTROL SYSTEMS | Nishimura S | ||
| 23 11 25 | FACILITY GAS PIPING | Nishimura S | ||
| 23 21 13.00 20 | LOW TEMPERATURE WATER (LTW) HEATING SYSTEM | Nishii | ||
| 23 21 13.23 20 | [HIGH][MEDIUM] TEMPERATURE WATER SYSTEM WITHIN BUILDINGS | Nishii | ||
| 23 22 13.35 40 | STEAM TRAPS | Nishii | ||
| 23 22 23.00 40 | STEAM CONDENSATE PUMPS | Nishii | ||
| 23 22 25.00 40 | STEAM VALVES | Nishii | ||
| 23 22 26.00 20 | STEAM SYSTEM AND TERMINAL UNITS | Nishii | ||
| 23 23 00 | REFRIGERANT PIPING | Nishii | ||
| 23 31 13.00 40 | METAL DUCTS | Nishii | ||
| 23 34 23.00 40 | HVAC POWER VENTILATORS | Nishii | ||
| 23 35 19.00 20 | INDUSTRIAL VENTILATION AND EXHAUST | Nishii | ||
| 23 36 00.00 40 | AIR TERMINAL UNITS | Nishii | ||
| 23 37 13.00 40 | DIFFUSERS, REGISTERS, AND GRILLS | Nishii | ||
| 23 52 00 | HEATING BOILERS | Nishimura S | ||
| 23 64 10 | WATER CHILLERS, VAPOR COMPRESSION TYPE | Nishii | ||
| 23 64 26 | CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS | Nishii | ||
| 23 69 00.00 20 | REFRIGERATION EQUIPMENT FOR COLD STORAGE | Orito | ||
| 23 70 02.00 10 | CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL FIRED | Nishimura S | ||
| 23 70 03.00 10 | HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM | NIshii | ||
| 23 72 00.00 10 | ENERGY RECOVERY SYSTEMS | Nishimura S | ||
| 23 73 13.00 40 | MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS | Orito | ||
| 23 74 33.00 40 | PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP AIR-CONDITIONERS | Orito | ||
| 23 81 00.00 20 | UNITARY AIR CONDITIONING EQUIPMENT | Orito | ||
| 23 81 23.00 20 | COMPUTER ROOM AIR CONDITIONING UNITS | Orito | ||
| 23 82 00.00 20 | TERMINAL HEATING AND COOLING UNITS | Orito | ||
| 23 82 01.00 10 | WARM AIR HEATING SYSTEMS | Orito | ||
| 23 82 02.00 10 | UNITARY HEATING AND COOLING EQUIPMENT | Orito | ||
| 23 82 16.00 40 | AIR COILS | Orito | ||
| 23 82 19.00 40 | FAN COIL UNITS | Orito | ||
| 23 82 23.00 40 | UNIT VENTILATORS | Orito | ||
| 23 82 43.00 40 | ELECTRIC DUCT HEATERS | Orito | ||
| 23 82 46.00 40 | ELECTRIC UNIT HEATERS | Orito | ||
| 23 83 00.00 20 | ELECTRIC SPACE HEATING EQUIPMENT | Orito | ||
| DIVISION 25 | INTEGRATED AUTOMATION | |||
| 25 10 10 | LONWORKS UTILITY MONITORING AND CONTROL SYSTEM (UMCS) | Nishimura S | ||
| DIVISION 26 | ELECTRICAL | |||
| 26 00 00.00 20 | BASIC ELECTRICAL MATERIALS AND METHODS | Kurata | ||
| 26 05 00.00 40 | COMMON WORK RESULTS FOR ELECTRICAL | Kurata | ||
| 26 05 13.00 40 | MEDIUM-VOLTAGE CABLES | Kurata | ||
| 26 05 19.00 10 | INSULATED WIRE AND CABLE | Kurata | ||
| 26 05 48.00 10 | SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT | |||
| 26 05 70.00 40 | HIGH VOLTAGE OVERCURRENT PROTECTIVE DEVICES | Kurata | ||
| 26 05 71.00 40 | LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES | Kurata | ||
| 26 09 23.00 40 | LIGHTING CONTROL DEVICES | Kurata | ||
| 26 12 19.00 40 | PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS | Yoshizawa | ||
| 26 12 19.10 | THREE-PHASE PAD-MOUNTED TRANSFORMERS | Yoshizawa | ||
| 26 12 19.20 | SINGLE-PHASE PAD-MOUNTED TRANSFORMERS | Yoshizawa | ||
| 26 18 23.00 40 | MEDIUM-VOLTAGE SURGE ARRESTERS | |||
| 26 20 00 | INTERIOR DISTRIBUTION SYSTEM | Naraoka | ||
| 26 23 00.00 40 | SWITCHBOARDS AND SWITCHGEAR | Ogino | ||
| 26 23 00 | SWITCHBOARDS AND SWITCHGEAR | Ogino | ||
| 26 24 16.00 40 | PANELBOARDS | Ogino | ||
| 26 24 19.00 40 | MOTOR CONTROL CENTERS | Ogino | ||
| 26 27 13.10 30 | ELECTRIC METERS | Kurata | ||
| 26 27 14.00 20 | ELECTRICITY METERING | Kurata | ||
| 26 28 00.00 10 | MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDS | Ogino | ||
| 26 28 21.00 40 | AUTOMATIC TRANSFER SWITCHES | |||
| 26 29 01.00 10 | ELECTRIC MOTORS, 3-PHASE VERTICAL INDUCTION TYPE | |||
| 26 29 02.00 10 | ELECTRIC MOTORS, 3-PHASE VERTICAL SYNCHRONOUS TYPE | |||
| 26 29 23 | VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS | |||
| 26 32 13.00 20 | SINGLE OPERATION GENERATOR SETS | |||
| 26 32 14.00 10 | DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY APPLICATIONS | Shibata | ||
| 26 32 15.00 10 | DIESEL-GENERATOR SET STATIONARY 100-2500 KW,WITH AUXILIARIES | |||
| 26 36 00.00 10 | AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH | Shibata | ||
| 26 36 23.00 20 | AUTOMATIC TRANSFER SWITCHES | |||
| 26 42 22.00 20 | CATHODIC PROTECTION SYSTEM FOR STEEL WATER TANKS | Orito | ||
| 26 51 00.00 40 | INTERIOR LIGHTING | Naraoka | ||
| 26 51 00 | INTERIOR LIGHTING | |||
| 26 52 00.00 40 | EMERGENCY LIGHTING | Naraoka | ||
| 26 53 00.00 40 | EXIT SIGNS | Kato | ||
| 26 55 53.00 40 | SECURITY LIGHTING | Kato | ||
| 26 56 00 | EXTERIOR LIGHTING | Ogino | ||
| 26 56 13.00 40 | LIGHTING POLES AND STANDARDS | Ogino | ||
| 26 56 19.00 40 | ROADWAY LIGHTING | Kato | ||
| 26 56 20.00 10 | AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS | Ogino | ||
| 26 56 23.00 40 | AREA LIGHTING | |||
| 26 56 36.00 40 | FLOOD LIGHTING | Kato | ||
| 26 60 13.00 40 | LOW-VOLTAGE MOTORS | |||
| DIVISION 27 | COMMUNICATIONS | |||
| 27 05 28.36 40 | CABLE TRAYS FOR COMMUNICATIONS SYSTEMS | Kato | ||
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | |||
| 28 05 26.00 40 | GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY | Yoshizawa | ||
| 28 31 33.00 10 | FIRE ALARM REPORTING SYSTEM, RADIO TYPE | Yoshizawa | ||
| 28 31 63.00 20 | ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEM | Yoshizawa | ||
| 28 31 74.00 20 | INTERIOR FIRE DETECTION AND ALARM SYSTEM | Yoshizawa | ||
| DIVISION 31 | EARTHWORK | |||
| 31 00 00 | EARTHWORK | ohyama | ||
| 31 05 19 | GEOTEXTILE | |||
| 31 05 20 | GEOSYNTHETIC DRAINAGE LAYER | |||
| 31 05 21 | GEOGRID SOIL REINFORCEMENT | |||
| 31 05 22 | GEOTEXTILES USED AS FILTERS | |||
| 31 10 00 | CLEARING FOR CIVIL WORKS | |||
| 31 11 00 | CLEARING AND GRUBBING | |||
| 31 21 00 | PIPING; OFF-GAS | |||
| 31 21 13 | RADON MITIGATION | |||
| 31 23 00.00 20 | EXCAVATION AND FILL | ohyama | ||
| 31 31 16.19 | TERMITE CONTROL BARRIER SYSTEM | |||
| 31 31 16.20 | BASALTIC TERMITE BARRIER | |||
| 31 31 16.21 | MESH TERMITE BARRIER | |||
| 31 31 16 | SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL | |||
| 31 32 11 | SOIL SURFACE EROSION CONTROL | |||
| 31 32 23 | FOUNDATION DRILLING AND GROUTING | |||
| 31 32 39 | BIOENGINEERING PRACTICES FOR STREAM BANK AND SHORELINE STABILIZATION | |||
| 31 36 00 | WIRE MESH GABIONS[ AND MATTRESSES] | |||
| 31 41 16 | METAL SHEET PILING | |||
| 31 60 00 | FOUNDATION PREPARATION | |||
| 31 62 13.13 | CAST-IN-PLACE CONCRETE PILES | |||
| 31 62 13.20 | PRECAST/PRESTRESSED CONCRETE PILES | |||
| 31 62 13.24 | CONCRETE CYLINDER PILES | |||
| 31 62 13.26 | PRESSURE-INJECTED FOOTINGS | |||
| 31 62 16.16 | STEEL H-PILES | |||
| 31 62 19.13 | WOOD MARINE PILES | |||
| 31 62 19 | TIMBER PILES | |||
| 31 62 21 | PILING: COMPOSITE, WOOD AND CAST IN-PLACECONCRETE | |||
| 31 62 23.13 | CAST-IN-PLACE CONCRETE PILES, STEEL CASING | |||
| 31 63 16 | AUGER CAST GROUT PILES | |||
| 31 63 26 | DRILLED CAISSONS | |||
| 31 63 29 | DRILLED CONCRETE PIERS AND SHAFTS | |||
| 31 68 13 | SOIL AND ROCK ANCHORS | |||
| 31 73 00 | TUNNEL AND SHAFT GROUTING | |||
| DIVISION 32 | EXTERIOR IMPROVEMENTS | |||
| 32 01 11.51 | RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS | ohyama | ||
| 32 01 11.52 | RUNWAY RUBBER REMOVAL | ohyama | ||
| 32 01 13 | BITUMINOUS SEAL AND FOG COATS | ohyama | ||
| 32 01 16.17 | COLD MILLING OF BITUMINOUS PAVEMENTS | |||
| 32 01 17.16 | SEALING OF CRACKS IN BITUMINOUS PAVEMENTS | |||
| 32 01 17.62 | STRESS-ABSORBING MEMBRANE INTERLAYER | |||
| 32 01 17 | COLD-MIX RECYCLING | |||
| 32 01 19.61 | RESEALING OF JOINTS IN RIGID PAVEMENT | ohyama | ||
| 32 01 19 | FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS | |||
| 32 01 22 | BITUMINOUS REJUVENATION | |||
| 32 01 24 | HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS | |||
| 32 01 25 | HEATER SCARIFYING OF BITUMINOUS PAVEMENTS | |||
| 32 01 26.71 | GROOVING FOR AIRFIELD PAVEMENTS | ohyama | ||
| 32 01 29.61 | PARTIAL DEPTH PATCHING OF RIGID PAVING | ohyama | ||
| 32 01 29.62 | SLABJACKING RIGID PAVEMENTS | |||
| 32 05 33 | LANDSCAPE ESTABLISHMENT | Yoshida | ||
| 32 10 00 | [PERVIOUS] BITUMINOUS CONCRETE PAVEMENT | |||
| 32 11 10 | DRAINAGE LAYER | |||
| 32 11 16.13 | SAND-CLAY [BASE] [SUBBASE] COURSE | |||
| 32 11 16.16 | [BASE COURSE FOR RIGID] [AND SUBBASE COURSE FORFLEXIBLE] [SUBBASE COURSE FOR PERVIOUS] PAVING | |||
| 32 11 16 | [BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE] PAVING | ohyama | ||
| 32 11 23 | AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASECOURSE | |||
| 32 11 24 | GRADED CRUSHED AGGREGATE BASE COURSE FOR [PERVIOUS][FLEXIBLE] PAVEMENT | ohyama | ||
| 32 11 26.16 | BITUMINOUS CONCRETE BASE COURSE | |||
| 32 11 26 | BITUMINOUS BASE COURSE | |||
| 32 11 27 | BITUMINOUS-STABILIZED BASE COURSE, SUBBASE, ORSUBGRADE | |||
| 32 11 29 | LIME-[STABILIZED][MODIFIED] SUBGRADE | |||
| 32 11 30 | LIME TREATED SUBGRADE [LIME MODIFIED SOILS] | |||
| 32 11 33 | CEMENT STABILIZED [BASE] [SUBBASE] COURSE ATAIRFIELDS AND ROADS | |||
| 32 11 34 | PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE | |||
| 32 11 36.13 | LEAN CONCRETE BASE COURSE | |||
| 32 12 10 | BITUMINOUS TACK AND PRIME COATS | ohyama | ||
| 32 12 11 | BITUMINOUS SURFACE TREATMENT | |||
| 32 12 15 | HOT-MIX ASPHALT (HMA) FOR AIRFIELDS | |||
| 32 12 16 | HOT-MIX ASPHALT (HMA) FOR ROADS | |||
| 32 12 17 | HOT MIX BITUMINOUS PAVEMENT | ohyama | ||
| 32 12 18 | RESIN MODIFIED PAVEMENT SURFACING MATERIAL | |||
| 32 12 19 | BITUMINOUS BINDER AND WEARING COURSES (CENTRAL-PLANT COLD-MIX) | |||
| 32 12 21 | BITUMINOUS ROAD-MIX SURFACE COURSE | |||
| 32 12 22.00 10 | POLYMER CONCRETE- MICRO-OVERLAY (PCMO) FOR FUELAND ABRASION RESISTANT WEARING SURFACES | |||
| 32 12 36.19 | COAL TAR SEAL COAT WITH UNVULCANIZED RUBBER | |||
| 32 12 37 | FUEL-RESISTANT (COAL TAR) SEALER | |||
| 32 12 43.16 | POROUS FRICTION COURSE FOR AIRFIELDS AND ROADS | |||
| 32 13 11 | CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS | ohyama | ||
| 32 13 13.06 | [PERVIOUS] PORTLAND CEMENT CONCRETE PAVEMENTFOR ROADS AND SITE FACILITIES | |||
| 32 13 15.20 | CONCRETE PAVEMENT FOR CONTAINMENT DIKES | |||
| 32 13 16.16 | ROLLER COMPACTED CONCRETE (RCC) PAVEMENT | |||
| 32 13 17 | STONE MATRIX ASPHALT (SMA) FOR AIRFIELDPAVEMENTS | |||
| 32 13 73 | COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS | |||
| 32 15 00 | AGGREGATE SURFACE COURSE | |||
| 32 16 13 | CONCRETE SIDEWALKS AND CURBS AND GUTTERS | ohyama | ||
| 32 16 15 | CONCRETE BLOCK PAVEMENTS | |||
| 32 17 23.00 20 | PAVEMENT MARKINGS | ohyama | ||
| 32 17 24.00 10 | PAVEMENT MARKINGS | |||
| 32 18 16.13 | PLAYGROUND PROTECTIVE SURFACING | Yoshida | ||
| 32 31 13.53 | HIGH-SECURITY CHAIN LINK FENCES AND GATES | |||
| 32 31 13 | CHAIN LINK FENCES AND GATES | Yoshida | ||
| 32 31 26 | WIRE FENCES AND GATES | |||
| 32 32 23 | SEGMENTAL CONCRETE BLOCK RETAINING WALL | |||
| 32 84 23 | UNDERGROUND SPRINKLER SYSTEMS | |||
| 32 84 24 | IRRIGATION SPRINKLER SYSTEMS | |||
| 32 92 19 | SEEDING | Yoshida | ||
| 32 92 23 | SODDING | Yoshida | ||
| 32 93 00 | EXTERIOR PLANTS | Yoshida | ||
| 32 96 00 | TRANSPLANTING EXTERIOR PLANTS | Yoshida | ||
| DIVISION 33 | UTILITIES | |||
| 33 01 50.01 | CLEANING FUEL STORAGE TANKS | |||
| 33 01 99 | SLIP LINING OF EXISTING PIPING | |||
| 33 05 16 | CONCRETE POLES | |||
| 33 05 23.13 | UTILITY HORIZONTAL DIRECTIONAL DRILLING | |||
| 33 05 23.19 | TRENCHLESS EXCAVATION USING MICROTUNNELING | |||
| 33 08 53 | AVIATION FUEL DISTRIBUTION SYSTEM START-UP | |||
| 33 08 55 | COMMISSIONING OF FUEL FACILITY SYSTEMS | |||
| 33 09 53 | AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM | |||
| 33 09 54 | AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (TYPE [IV][V]) | |||
| 33 09 55 | AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (CUT-N-COVER TANKS) | |||
| 33 11 00 | WATER DISTRIBUTION | ohyama | ||
| 33 11 23 | NATURAL GAS AND LIQUID PETROLEUM PIPING | |||
| 33 12 33.00 30 | WATER METERS | |||
| 33 16 13.16 | WIRE-WOUND CIRCULAR PRESTRESSED-CONCRETE WATER TANK | |||
| 33 16 15 | WATER STORAGE STEEL TANKS | |||
| 33 20 00 | WATER WELLS | |||
| 33 24 00.00 20 | [EXTRACTION] [MONITORING] WELLS | |||
| 33 24 13 | GROUNDWATER MONITORING WELLS | |||
| 33 26 00.00 10 | RELIEF WELLS | |||
| 33 30 00 | SANITARY SEWERS | ohyama | ||
| 33 32 13.13 | PACKAGED SEWAGE LIFT STATIONS, WET WELL TYPE | |||
| 33 32 13.14 | PACKAGED SEWAGE LIFT STATIONS, GRINDER PUMP TYPE | |||
| 33 34 00 | FORCE MAINS AND INVERTED SIPHONS; SEWER | |||
| 33 34 13 | SIPHONS, DOSING | |||
| 33 40 00 | STORM DRAINAGE UTILITIES | ohyama | ||
| 33 45 00.00 10 | SPEED REDUCERS FOR STORM WATER PUMPS | |||
| 33 46 13 | FOUNDATION DRAINAGE SYSTEM | |||
| 33 46 16 | SUBDRAINAGE SYSTEM | |||
| 33 47 13 | POND AND RESERVOIR LINERS | |||
| 33 51 13.00 30 | NATURAL-GAS METERING | |||
| 33 51 15 | NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION | |||
| 33 52 10 | SERVICE PIPING, FUEL SYSTEMS | Orito | ||
| 33 52 43.11 | AVIATION FUEL MECHANICAL EQUIPMENT | |||
| 33 52 43.12 | AVIATION FUEL PANTOGRAPHS | |||
| 33 52 43.13 | AVIATION FUEL PIPING | |||
| 33 52 43.14 | AVIATION FUEL CONTROL VALVES | |||
| 33 52 43.23 | AVIATION FUEL PUMPS | |||
| 33 52 43.28 | FILTER SEPARATOR, AVIATION FUELING SYSTEM | |||
| 33 52 43 | AVIATION FUEL DISTRIBUTION (NON-HYDRANT) | |||
| 33 52 80 | LIQUID FUELS PIPELINE COATING SYSTEMS |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .