Atch J-3 SABER UPG.xlsx

XLSX spreadsheet 2 MB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA520920R0008
Issued by
Department of the Air Force Pacific Air Forces

About this file

This notice is for a solicitation seeking proposals for a Simplified Acquisition of Base Engineering Requirements (SABER) indefinite-delivery/indefinite-quantity contract to provide maintenance, repair, and minor construction work at Yokota Air Base and off-base sites in Japan over a potential seven-year period. The minimum guaranteed amount is 500,000 Japanese yen, and the maximum aggregate amount including options is 49 billion Japanese yen. Proposals are due by March 9, 2020 following a pre-proposal conference on February 19, 2020. Offerors must submit past performance questionnaires by March 4, 2020 and register in the System for Award Management. Work will be performed in Japan in accordance with Defense Federal Acquisition Regulation Supplement requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
STATEMENT OF OBJECTIVES (SOO)_20200302-Amend 02.doc DOC document
Atch J-3 SABER UPG Rev1-1 20200302.xlsx XLSX spreadsheet
FA520920R00080002 SF 30.pdf PDF
Atch J-7 Section L-100 rev1.docx DOCX document
FA520920R00080001 SF 30.pdf PDF
Atch Arch sketch Amend 1.pdf PDF
Atch J-6 STATEMENT OF OBJECTIVES (SOO)_20200213.pdf PDF
1. FA520920R0008.pdf PDF
Atch J-4 Coefficient Pricing Schedule Guide.pdf PDF
Atch J-8 Section M-100.pdf PDF
Atch J-5 Past Performance Cov Ltr.pdf PDF
Atch J-7 Section L-100.pdf PDF
Atch J-8 Section M-100.docx DOCX document
Atch J-4a Coefficient Pricing Schedule.xlsx XLSX spreadsheet
Atch J-6b SUBMITTAL FORM_SPECSINTACT.xlsx XLSX spreadsheet
Atch J-2 SABER SPEC TOC.pdf PDF
Atch J-5 Past Performance Cov Ltr.doc DOC document
Atch J-1 SABER Other Req 4 Feb.docx DOCX document
Atch J-6 STATEMENT OF OBJECTIVES (SOO).pdf PDF
Atch J-7 Section L-100.docx DOCX document
Atch J-5a Past Performance Questionnaire.docx DOCX document
Atch J-4 Coefficient Pricing Schedule Guide.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

SABER BASIC CONTRACT NO.PURCHASE REQUEST NUMBERCONTRACTOR
FA5209-20-R-0008F4G3A3XXXXXXXXXXXXXXX Corporation
PROJECT NO. & TITLETOTAL COST ESTIMATE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan*****/*****
LINE
NO.ITEMDIRECT CONSTRUCTION COSTINDIRECT CONSTRUCTION COSTRATELINE

TOTAL

CONDITION %

(1)(2)(3)(4)(5)(6)
DIRECT CONSTRUCTION COST(P)
1. Civil Work Sub Total¥13,165---¥13,165
2. Architectural Work Sub Total¥2,025---¥2,025
3. Mechanical Work Sub Total¥47,130---¥47,130
4. Electrical Work Sub Total¥57,802---¥57,802
4. Communication Work Sub Total¥17,500---¥17,500
Direct Cost Sub_Total¥137,622
CONSTRUCTION COST INDEX-
1. Common Temporary Construction Costs-(Kr)≤¥5M6.07%¥8,354
2. Field Management Expenses-(Jo)≤¥5M26.86%¥39,209
Common Construction Cost Sub_Total¥47,563
3. General Expenses-(Gp)≤¥5M11.26%¥20,852
General Expenses Sub_Total¥20,852
DESIGN COST-All amount20.00%¥41,207
Design Sub_Total¥41,207
Total Contract Price¥247,244
SABER CO-FFICIENT & CONDITIONEstimate ValueLocation & TimeCo-efficient-
* SH: Standard Hour, NSH: None Standard Hour≤¥5MKanto SHERROR:#VALUE!-
TOTAL CONTRACT PRICE*****
FOREIGN EXCHANGE RATE ¥/$:¥111.1542/$1.00*****
Estimating Reference: Unit Price Guides (UPG) is based on Accumulation Data (SEKISAN SHIRYO), Building Construction Unit Price (KENCHIKU SEKO TANKA), Civil Engineering Unit Price (DOBOKU SEKO TANKA) and Construction Unit Price (KENSETSU BUKKA).
ESTIMATOR:Ms/Mr. XXXXXXDATE:XX Nov 19>>CHECKER:Ms/Mr. XXXXXXDATE:XX Nov 19

Co-efficient will provide at Co-efficient Tab Manual input by 374 CES Engineer

Civil

CIVIL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLETOTAL COST ESTIMATE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan¥13,165/$118.44
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionSuffix
Div0202 00 00050120-0202 00 00 050120-02H= 10M,3 MONTHm25¥2,633TEXT¥13,165.13
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
CIVIL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionFuffix
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
CIVIL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionFuffix
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------

Engineer input Division#, Section and Suffix.

Free space for Engineer

Arch

ARCHITECTURL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLETOTAL COST ESTIMATE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan¥2,025/$18.22
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionSuffix
Div0303 11 13.00010300-0203 11 13.00 010300-02CHAMPER STRIPm5¥405TEXT¥2,025.40
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
ARCHITECTURL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionFuffix
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
ARCHITECTURL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionFuffix
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------

Engineer input Division#, Section and Suffix.

Free space for Engineer

Mech

MECHANICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLETOTAL COST ESTIMATE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan¥47,130/$424.
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionSuffix
Div0404 23 01060100-0304 23 01 060100-03150MM THICKm25¥9,426TEXT¥47,129.59
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
MECHANICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionFuffix
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
MECHANICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionFuffix
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------

Engineer input Division#, Section and Suffix.

Free space for Engineer

Elec

ELECTRICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLETOTAL COST ESTIMATE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan¥57,802/$520.02
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionSuffix
Div0505 30 00010120-0505 30 00 010120-05GRADE 3, 0.6MMm25¥11,560TEXT¥57,801.91
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
ELECTRICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionFuffix
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
ELECTRICAL COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionFuffix
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------

Engineer input Division#, Section and Suffix.

Free space for Engineer

Comm

COMMUNICATION COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLETOTAL COST ESTIMATE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan¥17,500/$157.44
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionSuffix
Div2727 05 28.36 40031000-0127 05 28.36 40 031000-012 LAN OUTPUT JACKea5¥3,500TEXT¥17,500.00
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
COMMUNICATION COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionFuffix
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
COMMUNICATION COST PROPOSAL / GOVERNMENT COST ESTIMATE (GCE)

Based on Unit Price Guides (UPG)

PROJECT NO. & TITLE
Mock Project No. ZNRE 10-1238, Renovate Office and Conference Room, B-620, Yokota Air Base, Japan
DivisionUPG No.UPG No.DescriptionU/MQty.Unit PriceRemarksLine Total
SectionFuffix
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------
0--------

Engineer input Division#, Section and Suffix.

Free space for Engineer

Coefficient

FY20 Co-efficient Tabel
Project ValueEstimated Percentage of Project Value/YearTime / Location of workEstimated Percentage of Work/YearCombined Estimated % Value&Work/YearOfferor’s Priced CoefficientCoefficient for Summary
up to Y5,000,000¥0¥5,000,000≤¥5M20%Standard Hours / Kanto PlainKanto SH85%17.00%1XXX.XXX%ERROR:#VALUE!
None-Standard Hours / Kanto PlainKanto NSH12%2.40%2XXX.XXX%ERROR:#VALUE!
Standard Hours / Outside of Kanto PlainOutside SH2%0.40%3XXX.XXX%ERROR:#VALUE!
None-Standard Hours / Outside of Kanto PlainOutside NSH1%0.20%4XXX.XXX%ERROR:#VALUE!
Y5,000,001 to Y75,000,000¥5,000,001¥75,000,000>¥5M-≤75M55%Standard Hours / Kanto PlainKanto SH85%46.75%5XXX.XXX%ERROR:#VALUE!
None-Standard Hours / Kanto PlainKanto NSH12%6.60%6XXX.XXX%ERROR:#VALUE!
Standard Hours / Outside of Kanto PlainOutside SH2%1.10%7XXX.XXX%ERROR:#VALUE!
None-Standard Hours / Outside of Kanto PlainOutside NSH1%0.55%8XXX.XXX%ERROR:#VALUE!
Y75,000,001 to Y300,000,000¥75,000,001¥300,000,000>¥75M-≤300M20%Standard Hours / Kanto PlainKanto SH85%17.00%9XXX.XXX%ERROR:#VALUE!
None-Standard Hours / Kanto PlainKanto NSH12%2.40%10XXX.XXX%ERROR:#VALUE!
Standard Hours / Outside of Kanto PlainOutside SH2%0.40%11XXX.XXX%ERROR:#VALUE!
None-Standard Hours / Outside of Kanto PlainOutside NSH1%0.20%12XXX.XXX%ERROR:#VALUE!
Y300,000,001 and above¥300,000,001¥10,000,000,000>¥300M5%Standard Hours / Kanto PlainKanto SH85%4.25%13XXX.XXX%ERROR:#VALUE!
None-Standard Hours / Kanto PlainKanto NSH12%0.60%14XXX.XXX%ERROR:#VALUE!
Standard Hours / Outside of Kanto PlainOutside SH2%0.10%15XXX.XXX%ERROR:#VALUE!
None-Standard Hours / Outside of Kanto PlainOutside NSH1%0.05%16XXX.XXX%ERROR:#VALUE!

Enter Contractor's Coefficient.

Note: This coefficient will be used entire life of this SABER contract.

Cost Structure

Construction Cost Structure (Except Direct Construction Cost)
Construction Cost ItemConditions & TermsRateRemarks
Common Construction CostCommon Temporary (CT)Less than 5,000,000 yen≤¥5M6.07%
Kr: Common Temporary Fee RateBetween 5,000,001 yen and 2,000,000,000 yen>5M-≤¥2B6.07%Kr=11.74*P^(-0.0774)0.0607
P: Direct Construction Cost (1,000yen)More than 2,000,000,001 yen>¥2B3.82%
Field Management (FM)Less than 5,000,000 yen≤¥5M26.86%
Jo: Field Management Fee RateBetween 5,000,001 yen and 2,000,000,000 yen>5M-≤¥2B26.86%Jo=184.58*Np^(-0.2263)0.2686
Np: Net Construction Cost (1,000yen)More than 2,000,000,001 yen>¥2B6.92%
General Management Cost Percentage (Gp)Gp: General Management Cost PercentageLess than 5,000,000 yen≤¥5M11.26%
Cp: Construction Cost (1,000yen)Between 5,000,001 yen and 3,000,000,000 yen>5M-≤¥3B11.26%Gp=15.065-1.028×log (Cp)0.1126
More than 3,000,000,001 yen>¥3B8.41%
Total Construction CostDirect Cost + Indirect Cost
Total Contract PriceTotal Contract Price=Total Construction Cost + Design Fee 20%20%
D_04
D_05
D_06
D_07
D_08
D_09
D_10
D_05
D_06
D_13
D_14
D_07
D_08
D_09
D_18
D_10
D_11
D_12
D_13
D_14
D_14
D_16
D_17
D_18
D_19
D_21
D_22
D_22
D_23
D_24
D_23
D_26
D_27
D_25
D_23
D_26
D_27
D_25
D_23
D_26
D_27
D_25
D_23
D_26
D_27
D_25
D_23
D_26
D_27
D_25
D_23
D_26
D_28
D_25
D_23
D_26
D_31
D_25
D_23
D_32
D_33
D_34
D_40

Index Structure Division Index for Calculation (if added new Division. Need to add program to each Category GCE list.)

Div02
Div03
Div04
Div05
Div06
Div07
Div08
Div09
Div10
Div11
Div12
Div13
Div14
Div21
Div22
Div23
Div24
Div25
Div26
Div27
Div28
Div31
Div32
Div33
Div34
Div40

The highlighted area is available to add or edit. ハイライトされたエリアには追加および変更可能エリアです。そのまま各カテゴリーのGCE Listのドロップダウンメニューに追加されます。

Index

INDEX

DIVISIONSECTIONTITLE
DIVISION 00PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15LIST OF DRAWINGS
00 22 13SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
00 31 10METRIC MEASUREMENTS
00 41 00BID SCHEDULES
DIVISION 01GENERAL REQUIREMENTS
01 11 00SUMMARY OF WORKYoshida
01 14 00WORK RESTRICTIONS
01 20 00.00 20PRICE AND PAYMENT PROCEDURES
01 20 01.00 10COST AND PERFORMANCE REPORT
01 22 00.00 10MEASUREMENT AND PAYMENT
01 30 00ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10PROJECT SCHEDULE
01 32 16.00 20CONSTRUCTION PROGRESS DOCUMENTATION
01 32 17.00 20NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00SUBMITTAL PROCEDURESYoshida
01 33 23.33AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS
01 33 29LEED(TM) DOCUMENTATION
01 35 13SPECIAL PROJECT PROCEDURES
01 35 26GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13HEALTH, SAFETY, AND EMERGENCY RESPONSEPROCEDURES FOR CONTAMINATED SITES
01 35 40.00 20ENVIRONMENTAL MANAGEMENT
01 35 45.00 10CHEMICAL DATA QUALITY CONTROL
01 42 00SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10QUALITY CONTROL
01 45 00.00 20QUALITY CONTROL
01 45 00.00 40QUALITY CONTROL
01 45 00.10 10QUALITY CONTROL SYSTEM (QCS)
01 45 00.10 20QUALITY CONTROL FOR MINOR CONSTRUCTION
01 45 35SPECIAL INSPECTION FOR SEISMIC-RESISTING SYSTEMS
01 50 00TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 16TEMPORARY PEST CONTROL
01 57 19.00 20TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.02TEMPORARY ENVIRONMENTAL CONTROLS (GTMO)
01 57 20.00 10ENVIRONMENTAL PROTECTIONYoshida
01 57 23TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00PROJECT IDENTIFICATION
01 62 35RECYCLED / RECOVERED MATERIALS
01 73 19INSTALLATION OF GOVERNMENT-FURNISHED MEDICAL EQUIPMENT
01 74 19CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 75 00STARTING AND ADJUSTING
01 78 00CLOSEOUT SUBMITTALSYoshida
01 78 23.33OPERATION AND MAINTENANCE MANUALS FOR AVIATION FUEL SYSTEMS
01 78 23OPERATION AND MAINTENANCE DATANishimura S
01 83 00.07 40RELIABILITY CENTERED ACCEPTANCE FOR FACILITY SHELLS
01 83 13.07 40RELIABILITY CENTERED ACCEPTANCE FOR SUPERSTRUCTURE PERFORMANCE REQUIREMENTS
01 86 12.07 40RELIABILITY CENTERED ACCEPTANCE FOR MECHANICAL SYSTEMS
01 86 26.07 40RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS
DIVISION 02EXISTING CONDITIONS
02 01 50OPERATION, MAINTENANCE, AND PROCESS MONITORINGFOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS
02 32 00SUBSURFACE DRILLING, SAMPLING, AND TESTING
02 35 27SOIL-BENTONITE (S-B) SLURRY TRENCH
02 41 00[DEMOLITION][ AND ][DECONSTRUCTION]
02 42 51CARPET REMOVAL AND RECLAMATION
02 42 91REMOVAL AND SALVAGE OF HISTORIC BUILDING MATERIAL
02 51 13PRECIPITATION/COAGULATION/FLOCCULATION WATERTREATMENT
02 53 13REMEDIATION OF CONTAMINATED SOILS AND SLUDGES BY INCINERATION
02 53 16REMEDIATION OF CONTAMINATED SOILS BY THERMAL DESORPTION
02 54 20BIOREMEDIATION OF SOILS USING LANDFARMING SYSTEMS
02 54 21BIOREMEDIATION OF SOILS USING WINDROW COMPOSTING
02 54 23SOIL WASHING THROUGH SEPARATION/SOLUBILIZATION
02 55 00SOLIDIFICATION/STABILIZATION (S/S) OFCONTAMINATED MATERIAL
02 56 13WASTE CONTAINMENT GEOMEMBRANE
02 56 14CLAY BARRIER LAYER
02 56 15GEOSYNTHETIC CLAY LINER (GCL)
02 61 13EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
02 61 23REMOVAL AND DISPOSAL OF PCB CONTAMINATED SOILSKato
02 62 16COMMISSIONING AND DEMONSTRATION FOR SOIL VAPOR EXTRACTION (SVE) SYSTEMS
02 65 00UNDERGROUND STORAGE TANK REMOVAL
02 66 00SELECT FILL AND TOPSOIL FOR LANDFILL COVER
02 66 10TEST FILL
02 81 00TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 14.00 10ASBESTOS HAZARD CONTROL ACTIVITIES
02 82 16.00 20ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALSMasuda
02 82 16.00 21ASBESTOS BULK SAMPLINGMasuda
02 82 33.13 20REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
02 83 13.00 20LEAD IN CONSTRUCTION
02 83 19.00 10LEAD BASED PAINT HAZARD ABATEMENT, TARGETHOUSING & CHILD OCCUPIED FACILITIESSeo
02 84 16HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND MERCURYKurata
02 84 33REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)Kurata
02 85 00.00 20MOLD REMEDIATION
DIVISION 03CONCRETE
03 01 30.71CONCRETE REHABILITATIONOzawa
03 01 30RESTORATION OF CONCRETE IN HISTORIC STRUCTURES
03 01 32CONCRETE REHABILITATION FOR CIVIL WORKS
03 11 13.00 10STRUCTURAL CAST-IN-PLACE CONCRETE FORMINGShimizu
03 15 00.00 10CONCRETE ACCESSORIES
03 20 00.00 10CONCRETE REINFORCINGOzawa
03 23 00STEEL STRESSING TENDONS AND ACCESSORIES FOR PRESTRESSED CONCRETE
03 30 00.00 10CAST-IN-PLACE CONCRETE (CONCRETE FOR BUILDING CONSTRUCTION から変更? 03 30 00と統一?CEPMM西村)
03 30 00CAST-IN-PLACE CONCRETEShimizu
03 30 53MISCELLANEOUS CAST-IN-PLACE CONCRETEohyama
03 31 01.00 10CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
03 31 29MARINE CONCRETE
03 33 00CAST-IN-PLACE ARCHITECTURAL CONCRETE
03 30 01CONCRETE FOR MINOR STRUCTUREMasuda
03 35 00.00 10CONCRETE FINISHING
03 37 00PREPLACED-AGGREGATE CONCRETE
03 37 13SHOTCRETEMasuda
03 37 23ROLLER-COMPACTED CONCRETE FOR MASS CONCRETE CONSTRUCTION
03 37 29CONCRETE FOR CONCRETE CUTOFF WALLS
03 39 00.00 10CONCRETE CURING
03 40 00.00 10PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION
03 41 16PRECAST CONCRETE SLABS (MAX. SPAN 8'- 0" O.C.)
03 41 33PRECAST STRUCTURAL PRETENSIONED CONCRETE
03 45 00PRECAST ARCHITECTURAL CONCRETE
03 45 33PRECAST[ PRESTRESSED] STRUCTURAL CONCRETE
03 47 13TILT-UP CONCRETE
03 51 01PRECAST ROOF DECKS
03 52 00LIGHTWEIGHT CONCRETE ROOF INSULATION
03 52 16.19LIGHTWEIGHT INSULATING CONCRETE OVERLAY
03 52 16LIGHTWEIGHT INSULATING CONCRETE
03 53 14.00 20LIGHT REFLECTIVE NONFERROUS METALLIC AGGREGATE FLOOR SYSTEM
03 55 16GYPSUM CONCRETE FLOOR PLANKS
03 62 16METALLIC NON-SHRINK GROUTING
03 70 00MASS CONCRETE
DIVISION 04MASONRY
04 01 20REHABILITATION OF REINFORCED AND UNREINFORCED MASONRY WALLS USING FRP COMPOSITE STRUCTURAL REPOINTING
04 01 21REHABILITATION OF REINFORCED AND UNREINFORCED MASONRY WALLS USING SURFACE APPLIED FRP COMPOSITES
04 01 40RESTORATION AND CLEANING OF MASONRY IN HISTORIC STRUCTURES
04 20 00MASONRYOzawa
04 21 13.13NONBEARING MASONRY VENEER/STEEL STUD WALLS
04 21 26GLAZED STRUCTURAL CLAY TILE AND PREFACED CONCRETE MASONRY UNITS
04 23 00GLASS MASONRY UNITSOzawa
04 23 01REINFORCED MASONRYMasuda
DIVISION 05METALS
05 05 23.13 10ULTRASONIC INSPECTION OF WELDMENTSD_36
05 05 23WELDING, STRUCTURALD_37
05 12 00STRUCTURAL STEELOzawa
05 14 00.13WELDING STRUCTURAL ALUMINUM FRAMING
05 21 13DEEP LONGSPAN STEEL JOIST FRAMING
05 21 16LONGSPAN STEEL JOIST FRAMING
05 21 19OPEN WEB STEEL JOIST FRAMING
05 21 23STEEL JOIST GIRDER FRAMING
05 30 00STEEL DECKSOZAWA
05 40 00COLD-FORMED METAL FRAMINGShimizu
05 50 13MISCELLANEOUS METAL FABRICATIONSShimizu
05 50 14STRUCTURAL METAL FABRICATIONS
05 50 15CIVIL WORKS FABRICATIONS
05 51 00METAL STAIRS
05 51 33METAL LADDERS
05 52 00METAL RAILINGS
05 59 10ROLLING COVER FOR AVIATION REFUELING VAULTS
05 59 13FABRICATION OF HYDRAULIC STEEL STRUCTURES
05 72 00DECORATIVE METAL SPECIALTIES
DIVISION 06WOOD, PLASTICS, AND COMPOSITES
06 10 00ROUGH CARPENTRYMasuda
06 13 33PIER TIMBERWORK
06 18 00GLUED-LAMINATED CONSTRUCTION
06 20 00FINISH CARPENTRYMasuda
06 41 16.00 10LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16SOLID POLYMER (SOLID SURFACING) FABRICATIONS
06 71 33FIBERGLASS REINFORCED PLASTIC (FRP) LADDERS
06 73 01FIBERGLASS REINFORCED PLASTIC (FRP) GRATING
06 82 14FIBERGLASS REINFORCED PLASTIC (FRP) PIPE ANDTUBE RAILINGS
DIVISION 07THERMAL AND MOISTURE PROTECTION
07 11 13BITUMINOUS DAMPPROOFING
07 12 00BUILT-UP BITUMINOUS WATERPROOFINGMASUDA
07 13 53ELASTOMERIC SHEET WATERPROOFING
07 13 53SHEET APPLIED MEMBRANE ROOFINGMASUDA
07 14 00FLUID-APPLIED WATERPROOFINGMASUDA
07 16 19METALLIC OXIDE WATERPROOFING
07 17 00BENTONITE WATERPROOFING
07 19 00WATER REPELLENTS
07 21 13BOARD AND BLOCK INSULATION
07 21 16MINERAL FIBER BLANKET INSULATIONMasuda
07 21 23LOOSE FILL THERMAL INSULATIONMasuda
07 22 00ROOF INSULATIONMasuda
07 24 00EXTERIOR INSULATION AND FINISH SYSTEMSOZAWA
07 31 13ASPHALT SHINGLES
07 31 13.1ASPHALT AND METAL SHINLESMasuda
07 31 26SLATE ROOFING
07 32 13ROOF TILES
07 32 14CLAY TILE ROOFING REPLACEMENT OR REPAIR
07 41 13METAL ROOF PANELS
07 41 13METAL ROOF AND WALL PANELSHibino
07 41 63FABRICATED ROOF PANEL ASSEMBLIES
07 42 13METAL WALL PANELS
07 42 63FABRICATED WALL PANEL ASSEMBLIES
07 51 13.1BUILT-UP ASPHALT ROOFING (AGGREGATE SURFACED)OZAWA
07 51 13.2BUILT-UP ASPHALT ROOFING (MINERAL SURFACED)Masuda
07 52 00MODIFIED BITUMINOUS MEMBRANE ROOFING
07 52 01MEMBRANE WATERPROOFINGMASUDA
07 53 23ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFINGOZAWA
07 54 19POLYVINYL-CHLORIDE (PVC) ROOFING
07 55 00PROTECTED MEMBRANE ROOFING (PMR)
07 56 00WATERPROOF COATING SYSTEMMasuda
07 57 13SPRAYED POLYURETHANE FOAM (SPF) ROOFINGOZAWA
07 60 00FLASHING AND SHEET METALOZAWA
07 61 01COPPER ROOF SYSTEM
07 61 14.00 20STEEL STANDING SEAM ROOFING
07 61 15.00 20ALUMINUM STANDING SEAM ROOFING
07 62 10COPPER SHEET METAL FLASHING
07 72 00ROOF VENTILATORS, GRAVITY-TYPE
07 81 00SPRAY-APPLIED FIREPROOFING
07 84 0FIRESTOPPINGOzawa
07 92 00JOINT SEALANTSMasuda
DIVISION 08OPENINGS
08 11 13STEEL DOORS AND FRAMESMasuda
08 11 16ALUMINUM DOORS AND FRAMESMasuda
08 11 69METAL STORM DOORS
08 11 73SLIDING FIRE DOORS
08 13 73SLIDING METAL DOORS
08 14 00WOOD DOORSMasuda
08 22 20FIBERGLASS REINFORCED PLASTIC (FRP) DOORS ANDFRAMES
08 32 13ALUMINUM SLIDING GLASS DOORS
08 33 13METAL ROLLING COUNTER DOORS
08 33 23OVERHEAD COILING DOORSOzawa
08 34 01FORCED ENTRY RESISTANT COMPONENTS
08 34 02BULLET-RESISTANT COMPONENTS
08 34 16.10STEEL SLIDING HANGAR DOORSMasuda
08 34 16.20VERTICAL LIFT FABRIC DOORS
08 34 16CORROSION CONTROL HANGAR DOORS
08 34 19.10 20ROLLING SERVICE [AND FIRE] DOORSMasuda
08 34 49.00 20HEMP SHIELDED DOOR
08 34 53SECURITY DOORS AND FRAMES
08 34 59VAULT DOORS AND DAY GATESShimizu
08 34 63DETENTION HOLLOW METAL FRAMES, DOORS, AND DOORFRAMES
08 34 73SOUND CONTROL DOOR ASSEMBLIES
08 36 13SECTIONAL OVERHEAD DOORS
08 36 19VERTICAL LIFT DOORS
08 39 53BLAST RESISTANT DOORS (OVAL ARCH MAGAZINES)
08 39 54BLAST RESISTANT DOORS
08 41 13ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13ALUMINUM WINDOWSShimizu
08 51 23STEEL WINDOWS
08 51 69.10ALUMINUM STORM WINDOWS
08 52 00WOOD WINDOWSMASUDA
08 52 70WOOD WINDOWS - REPAIR AND REHABILITATION
08 53 00PLASTIC WINDOWS
08 56 46.10 20RADIO FREQUENCY SHIELDED ENCLOSURES,DEMOUNTABLE TYPE
08 56 46.20 20RADIO FREQUENCY SHIELDED ENCLOSURES, WELDED TYPE
08 56 53BLAST RESISTANT TEMPERED GLASS WINDOWS
08 56 63DETENTION AND SECURITY WINDOWS
08 62 00SKYLIGHTS
08 71 00DOOR HARDWAREShimizu
08 71 63.10ELECTRICAL LOCKING CONTROL FOR BRIGS
08 71 63DETENTION HARDWARE
08 81 00GLAZINGShimizu
08 87 16FRAGMENT RETENTION FILM FOR GLASS
08 88 53DETENTION AND SECURITY GLAZING
08 91 00METAL [WALL] [AND] [DOOR] LOUVERSMASUDA
DIVISION 09FINISHES
09 06 90COLOR SCHEDULE
09 22 00SUPPORTS FOR PLASTER AND GYPSUM BOARDShimizu
09 22 36FURRING AND LATHINGMasuda
09 23 00GYPSUM PLASTERING
09 23 82FIREPROOF GYPSUM PLASTERING
09 24 23PLASTER AND STUCCOMasuda
09 26 00VENEER PLASTER
09 29 00GYPSUM BOARDMasuda
09 30 00CERAMIC TILE, QUARRY TILE, AND PAVER TILEMasuda
09 35 16CHEMICAL-RESISTANT QUARRY TILE
09 51 00ACOUSTICAL CEILINGSShimizu
09 64 29WOOD STRIP FLOORINGShimizu
09 64 00PORTABLE (DEMOUNTABLE) WOOD FLOORING
09 64 23WOOD PARQUET FLOORING
09 64 29WOOD STRIP FLOORING
09 64 66WOOD ATHLETIC FLOORING
09 65 00RESILIENT FLOORINGShimizu
09 65 36STATIC-CONTROL RESILIENT FLOORING
09 65 66RESILIENT ATHLETIC FLOORING
09 66 13PORTLAND CEMENT TERRAZZO
09 66 16TERRAZZO TILE
09 66 23RESINOUS TERRAZZO FLOORING
09 67 23.13STANDARD RESINOUS FLOORING
09 67 23.14CHEMICAL RESISTIVE RESINOUS FLOORINGSEO
09 67 23.15FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 67 23.16FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00CARPETMasuda
09 68 01CARPET TILEMasuda
09 69 13RIGID GRID ACCESS FLOORINGMasuda
09 69 19STRINGERLESS ACCESS FLOORING
09 72 00WALL COVERINGSSeo
09 83 13ACOUSTICAL WALL TREATMENT
09 90 00PAINTS AND COATINGSSeo
09 96 00HIGH-PERFORMANCE COATINGS
09 96 59HIGH-BUILD GLAZE COATINGS
09 97 01.00 10METALLIZING: HYDRAULIC STRUCTURES
09 97 02PAINTING: HYDRAULIC STRUCTURES
09 97 13.00 40STEEL COATINGS
09 97 13.15EPOXY/FLUOROPOLYURETHANE INTERIOR COATING OFWELDED STEEL PETROLEUM FUEL TANKS
09 97 13.16INTERIOR COATING OF WELDED STEEL WATER TANKS
09 97 13.17THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL PETROLEUM FUEL TANKS
09 97 13.25MAINTENANCE, REPAIR, AND COATING OF TALLANTENNA TOWERS
09 97 13.26COATING OF STEEL WATERFRONT STRUCTURES
09 97 13.27EXTERIOR COATING OF STEEL STRUCTURES
09 97 13.28PROTECTION OF BURIED STEEL PIPING AND STEEL BULKHEAD TIE RODS
09 97 23.13INTERIOR LINING FOR CONCRETE STORAGE TANKS (FORPETROLEUM FUELS)
09 97 23.16LINSEED OIL PROTECTION OF CONCRETE SURFACES
09 97 23METALLIC TYPE CONDUCTIVE/SPARK RESISTANTCONCRETE FLOOR FINISH
09 97 30PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING
DIVISION 10SPECIALTIES
10 10 00VISUAL COMMUNICATIONS SPECIALTIES
10 14 10SIGNAGEMasuda
10 21 13TOILET COMPARTMENTS
10 21 13TOPILET PARTITIONMasuda
10 21 23.16CUBICLE TRACK AND HARDWARE
10 22 13WIRE MESH PARTITIONS
10 22 19DEMOUNTABLE MOVABLE PARTITIONS
10 22 26.13ACCORDION FOLDING PARTITIONS
10 22 26.23COILING PARTITIONS
10 22 39FOLDING PANEL PARTITIONS
10 22 43SLIDING PARTITIONS
10 26 13WALL AND CORNER GUARDS
10 28 13TOILET AND BATH ACCESSORIESMasuda
10 44 16FIRE EXTINGUISHERS
10 51 13METAL LOCKERS
10 53 00AWNINGSMasuda
10 56 13STEEL SHELVINGMasuda
10 71 13.13STORM SHUTTERS
DIVISION 11EQUIPMENT
11 05 40COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT
11 06 40.13FOODSERVICE EQUIPMENT SCHEDULE
11 13 10DOCK LEVELERS
11 24 27AIR STRIPPER
11 27 13RADIOGRAPHIC DARKROOM EQUIPMENT
11 31 13ELECTRIC KITCHEN EQUIPMENT
11 41 11REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT
11 42 00FOOD PREPARATION EQUIPMENT
11 44 00FOOD COOKING EQUIPMENT
11 46 00FOOD DISPENSING EQUIPMENT
11 47 00ICE MACHINES
11 48 00CLEANING AND DISPOSAL EQUIPMENT
11 53 00LABORATORY EQUIPMENT AND FUMEHOODS
11 68 13PLAYGROUND EQUIPMENTYoshida
11 70 00GENERAL REQUIREMENTS FOR MEDICAL AND DENTALEQUIPMENT
11 71 00WARMING CABINETS, STERILIZERS, AND ASSOCIATEDEQUIPMENT
11 72 13MEDICAL EQUIPMENT, MISCELLANEOUS
11 74 00DENTAL EQUIPMENT
11 82 20INCINERATORS, GENERAL PURPOSENishimura S
11 82 21MEDICAL WASTE INCINERATORS
DIVISION 12FURNISHINGS
12 21 00WINDOW BLINDS
12 22 00CURTAINS AND DRAPES
12 24 13ROLLER WINDOW SHADES
12 24 13SOLAR CONTROL FILM (THERMAL FILM)Masuda
12 31 00MANUFACTURED METAL CASEWORK
12 32 00MANUFACTURED WOOD CASEWORK
12 34 00MANUFACTURED PLASTIC CASEWORK
12 35 20FOODSERVICE CASEWORK, COUNTERTOPS, ANDACCESSORIES
12 35 70MEDICAL AND DENTAL CASEWORK
12 36 00.00 20MANUFACTURED VANITIES
12 36 00COUNTERTOPS
12 36 01CABINETS AND COUNTERTOPSMasuda
12 48 13.13ENTRANCE FLOOR MATS
12 50 00FURNITURE SYSTEMS
12 55 00DETENTION FURNITURE AND ACCESSORIES
12 65 00FIXED SEATING
12 93 00SITE FURNISHINGS
DIVISION 13SPECIAL CONSTRUCTION
13 17 43HYDROTHERAPY EQUIPMENT
13 21 26COLD-STORAGE ROOMS (PREFABRICATED PANEL TYPE)Nishimura S
13 21 48PREFABRICATED AUDIOMETRIC ROOMS
13 27 54.00 10ELECTROMAGNETIC (EM) SHIELDING
13 34 19.1METAL BUILDING SYSTEMS (RIGID FRAME)Masuda
13 34 19.2METAL BUILDING SYSTEMS (STRAIGHT WALL)Masuda
13 48 00.00 10SEISMIC PROTECTION FOR MECHANICAL EQUIPMENTNishimura S
13 48 00SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENTNishimura S
13 49 19X-RAY SHIELDING
DIVISION 14Conveying Equipment
14 21 00.00 20ELECTRIC TRACTION ELEVATORSOzawa
14 21 13ELECTRIC TRACTION FREIGHT ELEVATORSHLD
14 21 23ELECTRIC TRACTION PASSENGER ELEVATORSHLD
14 24 00HYDRAULIC ELEVATORSHLD
14 92 00PNEUMATIC-TUBE SYSTEM
DIVISION 21FIRE SUPPRESSION
21 12 00STANDPIPE SYSTEMSMazshita
21 13 00.00 40FIRE-SUPPRESSION SPRINKLER SYSTEMSMazshita
21 13 13.00WET PIPE SPRINKLER SYSTEM, FIRE PROTECTIONMazshita
21 13 17.00 10DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTIONMazshita
21 13 18.00 10PREACTION AND DELUGE SPRINKLER SYSTEMS, FIREPROTECTIONMazshita
21 21 00FIRE EXTINGUISHING SPRINKLER SYSTEMS (RESIDENTIAL)Mazshita
21 21 01.00 20CARBON DIOXIDE FIRE EXTINGUISHING (HIGHPRESSURE)
21 21 02.00 20CARBON DIOXIDE FIRE EXTINGUISHING (LOW PRESSURE)
21 22 00.00 20HALON 1301 FIRE EXTINGUISHING
21 22 00.00 40CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
21 23 00.00 20WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINETMazshita
21 30 00FIRE PUMPSMazshita
DIVISION 22PLUMBING
22 00 00PLUMBING, GENERAL PURPOSENishimura S
22 05 48.00 20MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROLNishimura S
22 07 19.00 40PLUMBING PIPING INSULATIONNishimura S
22 10 00.00 10VERTICAL PUMPS, AXIAL-FLOW AND MIXED-FLOWIMPELLER-TYPEOrito
22 11 23.00 10SUBMERSIBLE PUMP, AXIAL-FLOW AND MIXED-FLOW TYPEOrito
22 13 29SANITARY SEWERAGE PUMPSOrito
22 14 29.00 40SUMP PUMPSOrito
22 15 09.00 40GENERAL SERVICE COMPRESSED-AIR SYSTEMS CLEANING PROCEDURESOrito
22 15 13.16 40HIGH-PRESSURE COMPRESSED-AIR PIPING, PIPING COMPONENTS, AND VALVES, STAINLESSOrito
22 15 14.00 40GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSUREOrito
22 15 19.19 20NONLUBRICATED ROTARY SCREW AIR COMPRESSORS (100 HP AND LARGER)Orito
22 31 00WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)Nishimura S
DIVISION 23HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMSNishimura S
23 01 30.41HVAC SYSTEM CLEANINGNishimura S
23 03 00.00 20BASIC MECHANICAL MATERIALS AND METHODSNishimura S
23 05 15COMMON PIPING FOR HVACNishimura S
23 05 48.00 40VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENTNishimura S
23 05 93TESTING, ADJUSTING, AND BALANCING FOR HVACNishimura S
23 07 00THERMAL INSULATION FOR MECHANICAL SYSTEMSNishimura S
23 08 00.00 10COMMISSIONING OF HVAC SYSTEMSNishimura S
23 09 13.34 40CONTROL VALVES, SELF-CONTAINEDNishimura S
23 09 23.13 20BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVACNishimura S
23 09 23LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMSNishimura S
23 09 33.00 40ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVACNishimura S
23 09 53.00 20SPACE TEMPERATURE CONTROL SYSTEMSNishimura S
23 11 25FACILITY GAS PIPINGNishimura S
23 21 13.00 20LOW TEMPERATURE WATER (LTW) HEATING SYSTEMNishii
23 21 13.23 20[HIGH][MEDIUM] TEMPERATURE WATER SYSTEM WITHIN BUILDINGSNishii
23 22 13.35 40STEAM TRAPSNishii
23 22 23.00 40STEAM CONDENSATE PUMPSNishii
23 22 25.00 40STEAM VALVESNishii
23 22 26.00 20STEAM SYSTEM AND TERMINAL UNITSNishii
23 23 00REFRIGERANT PIPINGNishii
23 31 13.00 40METAL DUCTSNishii
23 34 23.00 40HVAC POWER VENTILATORSNishii
23 35 19.00 20INDUSTRIAL VENTILATION AND EXHAUSTNishii
23 36 00.00 40AIR TERMINAL UNITSNishii
23 37 13.00 40DIFFUSERS, REGISTERS, AND GRILLSNishii
23 52 00HEATING BOILERSNishimura S
23 64 10WATER CHILLERS, VAPOR COMPRESSION TYPENishii
23 64 26CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMSNishii
23 69 00.00 20REFRIGERATION EQUIPMENT FOR COLD STORAGEOrito
23 70 02.00 10CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL FIREDNishimura S
23 70 03.00 10HEATING AND UTILITIES SYSTEMS, CENTRAL STEAMNIshii
23 72 00.00 10ENERGY RECOVERY SYSTEMSNishimura S
23 73 13.00 40MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITSOrito
23 74 33.00 40PACKAGED, OUTDOOR, HEATING AND COOLING MAKEUP AIR-CONDITIONERSOrito
23 81 00.00 20UNITARY AIR CONDITIONING EQUIPMENTOrito
23 81 23.00 20COMPUTER ROOM AIR CONDITIONING UNITSOrito
23 82 00.00 20TERMINAL HEATING AND COOLING UNITSOrito
23 82 01.00 10WARM AIR HEATING SYSTEMSOrito
23 82 02.00 10UNITARY HEATING AND COOLING EQUIPMENTOrito
23 82 16.00 40AIR COILSOrito
23 82 19.00 40FAN COIL UNITSOrito
23 82 23.00 40UNIT VENTILATORSOrito
23 82 43.00 40ELECTRIC DUCT HEATERSOrito
23 82 46.00 40ELECTRIC UNIT HEATERSOrito
23 83 00.00 20ELECTRIC SPACE HEATING EQUIPMENTOrito
DIVISION 25INTEGRATED AUTOMATION
25 10 10LONWORKS UTILITY MONITORING AND CONTROL SYSTEM (UMCS)Nishimura S
DIVISION 26ELECTRICAL
26 00 00.00 20BASIC ELECTRICAL MATERIALS AND METHODSKurata
26 05 00.00 40COMMON WORK RESULTS FOR ELECTRICALKurata
26 05 13.00 40MEDIUM-VOLTAGE CABLESKurata
26 05 19.00 10INSULATED WIRE AND CABLEKurata
26 05 48.00 10SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 05 70.00 40HIGH VOLTAGE OVERCURRENT PROTECTIVE DEVICESKurata
26 05 71.00 40LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICESKurata
26 09 23.00 40LIGHTING CONTROL DEVICESKurata
26 12 19.00 40PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERSYoshizawa
26 12 19.10THREE-PHASE PAD-MOUNTED TRANSFORMERSYoshizawa
26 12 19.20SINGLE-PHASE PAD-MOUNTED TRANSFORMERSYoshizawa
26 18 23.00 40MEDIUM-VOLTAGE SURGE ARRESTERS
26 20 00INTERIOR DISTRIBUTION SYSTEMNaraoka
26 23 00.00 40SWITCHBOARDS AND SWITCHGEAROgino
26 23 00SWITCHBOARDS AND SWITCHGEAROgino
26 24 16.00 40PANELBOARDSOgino
26 24 19.00 40MOTOR CONTROL CENTERSOgino
26 27 13.10 30ELECTRIC METERSKurata
26 27 14.00 20ELECTRICITY METERINGKurata
26 28 00.00 10MOTOR CONTROL CENTERS, SWITCHBOARDS AND PANELBOARDSOgino
26 28 21.00 40AUTOMATIC TRANSFER SWITCHES
26 29 01.00 10ELECTRIC MOTORS, 3-PHASE VERTICAL INDUCTION TYPE
26 29 02.00 10ELECTRIC MOTORS, 3-PHASE VERTICAL SYNCHRONOUS TYPE
26 29 23VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 13.00 20SINGLE OPERATION GENERATOR SETS
26 32 14.00 10DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY APPLICATIONSShibata
26 32 15.00 10DIESEL-GENERATOR SET STATIONARY 100-2500 KW,WITH AUXILIARIES
26 36 00.00 10AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCHShibata
26 36 23.00 20AUTOMATIC TRANSFER SWITCHES
26 42 22.00 20CATHODIC PROTECTION SYSTEM FOR STEEL WATER TANKSOrito
26 51 00.00 40INTERIOR LIGHTINGNaraoka
26 51 00INTERIOR LIGHTING
26 52 00.00 40EMERGENCY LIGHTINGNaraoka
26 53 00.00 40EXIT SIGNSKato
26 55 53.00 40SECURITY LIGHTINGKato
26 56 00EXTERIOR LIGHTINGOgino
26 56 13.00 40LIGHTING POLES AND STANDARDSOgino
26 56 19.00 40ROADWAY LIGHTINGKato
26 56 20.00 10AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDSOgino
26 56 23.00 40AREA LIGHTING
26 56 36.00 40FLOOD LIGHTINGKato
26 60 13.00 40LOW-VOLTAGE MOTORS
DIVISION 27COMMUNICATIONS
27 05 28.36 40CABLE TRAYS FOR COMMUNICATIONS SYSTEMSKato
DIVISION 28ELECTRONIC SAFETY AND SECURITY
28 05 26.00 40GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITYYoshizawa
28 31 33.00 10FIRE ALARM REPORTING SYSTEM, RADIO TYPEYoshizawa
28 31 63.00 20ANALOG/ADDRESSABLE INTERIOR FIRE ALARM SYSTEMYoshizawa
28 31 74.00 20INTERIOR FIRE DETECTION AND ALARM SYSTEMYoshizawa
DIVISION 31EARTHWORK
31 00 00EARTHWORKohyama
31 05 19GEOTEXTILE
31 05 20GEOSYNTHETIC DRAINAGE LAYER
31 05 21GEOGRID SOIL REINFORCEMENT
31 05 22GEOTEXTILES USED AS FILTERS
31 10 00CLEARING FOR CIVIL WORKS
31 11 00CLEARING AND GRUBBING
31 21 00PIPING; OFF-GAS
31 21 13RADON MITIGATION
31 23 00.00 20EXCAVATION AND FILLohyama
31 31 16.19TERMITE CONTROL BARRIER SYSTEM
31 31 16.20BASALTIC TERMITE BARRIER
31 31 16.21MESH TERMITE BARRIER
31 31 16SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
31 32 11SOIL SURFACE EROSION CONTROL
31 32 23FOUNDATION DRILLING AND GROUTING
31 32 39BIOENGINEERING PRACTICES FOR STREAM BANK AND SHORELINE STABILIZATION
31 36 00WIRE MESH GABIONS[ AND MATTRESSES]
31 41 16METAL SHEET PILING
31 60 00FOUNDATION PREPARATION
31 62 13.13CAST-IN-PLACE CONCRETE PILES
31 62 13.20PRECAST/PRESTRESSED CONCRETE PILES
31 62 13.24CONCRETE CYLINDER PILES
31 62 13.26PRESSURE-INJECTED FOOTINGS
31 62 16.16STEEL H-PILES
31 62 19.13WOOD MARINE PILES
31 62 19TIMBER PILES
31 62 21PILING: COMPOSITE, WOOD AND CAST IN-PLACECONCRETE
31 62 23.13CAST-IN-PLACE CONCRETE PILES, STEEL CASING
31 63 16AUGER CAST GROUT PILES
31 63 26DRILLED CAISSONS
31 63 29DRILLED CONCRETE PIERS AND SHAFTS
31 68 13SOIL AND ROCK ANCHORS
31 73 00TUNNEL AND SHAFT GROUTING
DIVISION 32EXTERIOR IMPROVEMENTS
32 01 11.51RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTSohyama
32 01 11.52RUNWAY RUBBER REMOVALohyama
32 01 13BITUMINOUS SEAL AND FOG COATSohyama
32 01 16.17COLD MILLING OF BITUMINOUS PAVEMENTS
32 01 17.16SEALING OF CRACKS IN BITUMINOUS PAVEMENTS
32 01 17.62STRESS-ABSORBING MEMBRANE INTERLAYER
32 01 17COLD-MIX RECYCLING
32 01 19.61RESEALING OF JOINTS IN RIGID PAVEMENTohyama
32 01 19FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
32 01 22BITUMINOUS REJUVENATION
32 01 24HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS
32 01 25HEATER SCARIFYING OF BITUMINOUS PAVEMENTS
32 01 26.71GROOVING FOR AIRFIELD PAVEMENTSohyama
32 01 29.61PARTIAL DEPTH PATCHING OF RIGID PAVINGohyama
32 01 29.62SLABJACKING RIGID PAVEMENTS
32 05 33LANDSCAPE ESTABLISHMENTYoshida
32 10 00[PERVIOUS] BITUMINOUS CONCRETE PAVEMENT
32 11 10DRAINAGE LAYER
32 11 16.13SAND-CLAY [BASE] [SUBBASE] COURSE
32 11 16.16[BASE COURSE FOR RIGID] [AND SUBBASE COURSE FORFLEXIBLE] [SUBBASE COURSE FOR PERVIOUS] PAVING
32 11 16[BASE COURSE FOR RIGID][ AND ][SUBBASES FOR FLEXIBLE] PAVINGohyama
32 11 23AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASECOURSE
32 11 24GRADED CRUSHED AGGREGATE BASE COURSE FOR [PERVIOUS][FLEXIBLE] PAVEMENTohyama
32 11 26.16BITUMINOUS CONCRETE BASE COURSE
32 11 26BITUMINOUS BASE COURSE
32 11 27BITUMINOUS-STABILIZED BASE COURSE, SUBBASE, ORSUBGRADE
32 11 29LIME-[STABILIZED][MODIFIED] SUBGRADE
32 11 30LIME TREATED SUBGRADE [LIME MODIFIED SOILS]
32 11 33CEMENT STABILIZED [BASE] [SUBBASE] COURSE ATAIRFIELDS AND ROADS
32 11 34PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE
32 11 36.13LEAN CONCRETE BASE COURSE
32 12 10BITUMINOUS TACK AND PRIME COATSohyama
32 12 11BITUMINOUS SURFACE TREATMENT
32 12 15HOT-MIX ASPHALT (HMA) FOR AIRFIELDS
32 12 16HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 17HOT MIX BITUMINOUS PAVEMENTohyama
32 12 18RESIN MODIFIED PAVEMENT SURFACING MATERIAL
32 12 19BITUMINOUS BINDER AND WEARING COURSES (CENTRAL-PLANT COLD-MIX)
32 12 21BITUMINOUS ROAD-MIX SURFACE COURSE
32 12 22.00 10POLYMER CONCRETE- MICRO-OVERLAY (PCMO) FOR FUELAND ABRASION RESISTANT WEARING SURFACES
32 12 36.19COAL TAR SEAL COAT WITH UNVULCANIZED RUBBER
32 12 37FUEL-RESISTANT (COAL TAR) SEALER
32 12 43.16POROUS FRICTION COURSE FOR AIRFIELDS AND ROADS
32 13 11CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTSohyama
32 13 13.06[PERVIOUS] PORTLAND CEMENT CONCRETE PAVEMENTFOR ROADS AND SITE FACILITIES
32 13 15.20CONCRETE PAVEMENT FOR CONTAINMENT DIKES
32 13 16.16ROLLER COMPACTED CONCRETE (RCC) PAVEMENT
32 13 17STONE MATRIX ASPHALT (SMA) FOR AIRFIELDPAVEMENTS
32 13 73COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 15 00AGGREGATE SURFACE COURSE
32 16 13CONCRETE SIDEWALKS AND CURBS AND GUTTERSohyama
32 16 15CONCRETE BLOCK PAVEMENTS
32 17 23.00 20PAVEMENT MARKINGSohyama
32 17 24.00 10PAVEMENT MARKINGS
32 18 16.13PLAYGROUND PROTECTIVE SURFACINGYoshida
32 31 13.53HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 31 13CHAIN LINK FENCES AND GATESYoshida
32 31 26WIRE FENCES AND GATES
32 32 23SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 84 23UNDERGROUND SPRINKLER SYSTEMS
32 84 24IRRIGATION SPRINKLER SYSTEMS
32 92 19SEEDINGYoshida
32 92 23SODDINGYoshida
32 93 00EXTERIOR PLANTSYoshida
32 96 00TRANSPLANTING EXTERIOR PLANTSYoshida
DIVISION 33UTILITIES
33 01 50.01CLEANING FUEL STORAGE TANKS
33 01 99SLIP LINING OF EXISTING PIPING
33 05 16CONCRETE POLES
33 05 23.13UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 05 23.19TRENCHLESS EXCAVATION USING MICROTUNNELING
33 08 53AVIATION FUEL DISTRIBUTION SYSTEM START-UP
33 08 55COMMISSIONING OF FUEL FACILITY SYSTEMS
33 09 53AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM
33 09 54AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (TYPE [IV][V])
33 09 55AVIATION FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (CUT-N-COVER TANKS)
33 11 00WATER DISTRIBUTIONohyama
33 11 23NATURAL GAS AND LIQUID PETROLEUM PIPING
33 12 33.00 30WATER METERS
33 16 13.16WIRE-WOUND CIRCULAR PRESTRESSED-CONCRETE WATER TANK
33 16 15WATER STORAGE STEEL TANKS
33 20 00WATER WELLS
33 24 00.00 20[EXTRACTION] [MONITORING] WELLS
33 24 13GROUNDWATER MONITORING WELLS
33 26 00.00 10RELIEF WELLS
33 30 00SANITARY SEWERSohyama
33 32 13.13PACKAGED SEWAGE LIFT STATIONS, WET WELL TYPE
33 32 13.14PACKAGED SEWAGE LIFT STATIONS, GRINDER PUMP TYPE
33 34 00FORCE MAINS AND INVERTED SIPHONS; SEWER
33 34 13SIPHONS, DOSING
33 40 00STORM DRAINAGE UTILITIESohyama
33 45 00.00 10SPEED REDUCERS FOR STORM WATER PUMPS
33 46 13FOUNDATION DRAINAGE SYSTEM
33 46 16SUBDRAINAGE SYSTEM
33 47 13POND AND RESERVOIR LINERS
33 51 13.00 30NATURAL-GAS METERING
33 51 15NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION
33 52 10SERVICE PIPING, FUEL SYSTEMSOrito
33 52 43.11AVIATION FUEL MECHANICAL EQUIPMENT
33 52 43.12AVIATION FUEL PANTOGRAPHS
33 52 43.13AVIATION FUEL PIPING
33 52 43.14AVIATION FUEL CONTROL VALVES
33 52 43.23AVIATION FUEL PUMPS
33 52 43.28FILTER SEPARATOR, AVIATION FUELING SYSTEM
33 52 43AVIATION FUEL DISTRIBUTION (NON-HYDRANT)
33 52 80LIQUID FUELS PIPELINE COATING SYSTEMS

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .