About this file

This document contains a disposal and recycling data sheet template for contractors working on construction projects for the U.S. Army and Air Force in Japan, as well as a pre-solicitation notice for a Multiple Award Construction Contract.

The data sheet template requires contractors to provide project details including the name, start and end dates, and contact information. It specifies the types and amounts of materials recycled from the project, including concrete, metals, asphalt, wood, and others. Contractors must submit the completed form before final inspection and note the recycling methods and disposal of any other wastes.

The pre-solicitation notice is for a Multiple Award Construction Contract to support U.S. Army installations on Honshu Island and Yokota Air Base in Japan. Draft solicitation documents are available for prospective offerors to prepare proposals in advance of a formal Request for Proposal. The notice provides points of contact at the Army and Air Force for any questions. Final proposals will be due at a later date once the full solicitation is released.

View the file

Other files

File Type Posted
20 RFP AtcJ3d12_B907WaterFlowTR.pdf PDF
23 RFP Atch J4a(PPQCoverletter).pdf PDF
10 RFP AtcJ3d2_EnvProtection.pdf PDF
3 Atc J2a ArmyGP.pdf PDF
1 Solicitation Amendment - FA520919RA0060007.pdf PDF
28 Atch J7b Question No. 33 Fire Alarm B907 Annex.pdf PDF
29 Atch J7c Question No. 40 AMRS spec.pdf PDF
21 RFP AtcJ3d13_B907LeadPaintReport.pdf PDF
4 Atc J2b AFGP.pdf PDF
27 Atch J7a Question No. 48 Geotechnical Investigation Report for B906.pdf PDF
18 RFP AtcJ3d10_B907AnnexConceptPlan.pdf PDF
15 RFP AtcJ3d7_B906AsBuilt.pdf PDF
6 RFP AtcJ3b(SOW Addendum).pdf PDF
19 RFP AtcJ3d11_B907AnnexConceptPlan(Com).pdf PDF
17 RFP AtcJ3d9_B907AnnexDemoPlan.pdf PDF
26 RFP Atch J6 QAs - FA520919RA006.pdf PDF
24 RFP Atch J4b(PPQ).docx DOCX document
12 RFP AtcJ3d4_B907AnnexAsBuilt.pdf PDF
22 RFP AtcJ3d14_AbestosSurveyReport.pdf PDF
30 Atch J7d Question No. 38 MACC Mock Project Comm.jpg JPG image
14 RFP AtcJ3d6_B907AnnexAsBuild (Arch).pdf PDF
5 RFP AtcJ3a MockSOW.pdf PDF
13 RFP AtcJ3d5_B907AnnexAsBuilt(Elec).pdf PDF
2 Atc J1 Other Req 30 Apr 21.pdf PDF
31 RFP Atch J6a QAs_Added by Amendment 0006.pdf PDF
7.RFP AtcJ3c1(MockSectionB).xlsx XLSX spreadsheet
16 RFP AtcJ3d8_B907AsBuilt (Sprinkler).pdf PDF
8.RFP AtcJ3c2(TaxExemp_Mock).docx DOCX document
25 RFP Atch J5 EnvelopeLabel(OF-17).pdf PDF
9 RFP AtcJ3d1_Spec15011.pdf PDF
1. Draft RFP - Conformed Amendment FA520919RA0060005.pdf PDF
20 RFP AtcJ3d12_B907WaterFlowTR.pdf PDF
21 RFP AtcJ3d13_B907LeadPaintReport.pdf PDF
28 Question No. 33 Fire Alarm B907 Annex.pdf PDF
18 RFP AtcJ3d10_B907AnnexConceptPlan.pdf PDF
23 RFP Atch J4a(PPQCoverletter).pdf PDF
13 RFP AtcJ3d5_B907AnnexAsBuilt(Elec).pdf PDF
25 EnvelopeLabel(OF-17).pdf PDF
22 RFP AtcJ3d14_AbestosSurveyReport.pdf PDF
12 RFP AtcJ3d4_B907AnnexAsBuilt.pdf PDF
3 Atc J2a ArmyGP.pdf PDF
24 RFP Atch J4b(PPQ).docx DOCX document
4 Atc J2b AFGP.pdf PDF
2 Atc J1 Other Req 10 Apr 20.pdf PDF
17 RFP AtcJ3d9_B907AnnexDemoPlan.pdf PDF
10 RFP AtcJ3d2_EnvProtection.pdf PDF
26 QAs - FA520919RA006.pdf PDF
30 Question No. 38 MACC Mock Project Comm.jpg JPG image
29 Question No. 40 AMRS spec.pdf PDF
8.RFP AtcJ3c2(TaxExemp_Mock).docx DOCX document
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Disposal and Recycling Data Sheet
Project NumberName of Contractor
Title of ProjectName of Project Manager
Date Project StartedPhone Number of Contractor
Date of Final InspectionName of Inspector/Office Symbol
Date of SubmissionPhone Number of Inspector
ItemsConcrete DebrisRecycle AmountMetalsRecycle AmountAsphalt DebrisRecycle AmountWoodRecycle AmountOthers (soil not included)Recycle Amount
Generated Weight (ton)
Volume (m3)
Recycle Rate (%)
Remarks
1. Fill out and submit this form to CE Environmental through government representative before final inspection is completed.
2. Specify method of recycling in "Remarks".
3. If any other wastes are recycled, list them below.
4. Specify how the waste get disposed of (incinerated, landfilled etc.)

Sheet2

Sheet3

File details come from the government source that posted it. Updated .