We received six (6) more questions in response to this solicitation. This posting includes the questions asked and the Government's response for each.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

PACIFIC AIR FORCES

Solicitation FA520919BA003 Demolition of 16 Family Housing Buildings Six (6) Questions Received 30 August 2019

The 374th Contracting Squadron, Yokota AB Japan has received one (6) questions in response to its solicitation FA520919BA003, a full and open requirement for the demolition of 16 Family housing buildings, Kanagawa-ken, Japan.

Question 1: Regarding performance bond, what type of form would be acceptable?

(Such as bond issued by banks, bond issued by insurance companies, certified check, cash or others).

Answer: The Contractor shall furnish all executed performance bonds using Standard Form 25 supported by corporate sureties, either or both of Banks or Insurance Companies in accordance with FAR 52.228-15.

Question 2: Shall Project Manager/Quality Control Manager/Site Safety and Health Officer be permanently present at the job site? Also, shall the Site Manager be a college graduate or technical school/vocational school graduate, who has majored in architecture and be permanently present at the job site?

Answer: No. Only Site Manger shall be permanently present. No school graduate license but we need specific license. See section 01 11 01 para 1.9.5 (ESB Yamamoto)

Question 3: Would it be acceptable to replace interpreters during the course of construction, instead of assigning the same individual throughout the entire construction period, as long as the substitutional interpreter has the sufficient capability?

Answer: Yes. Interpreters can replace during construction as long as they have sufficient capability. (ESB Yamamoto)

Question 4: Shall the construction schedule be prepared with Primavera?

Answer: Work Schedule format is not limited however following information must be included as section 01 11 01 para 1.12.1, No.5 (ESB Yamamoto)

Question 5: Are water and electricity provided by the government to the contractor for project use on the site?

Answer: Yes. See section 01 11 01, para1.6. (ESB Yamamoto)

Question 6: Shall the gas in the air conditioner removed on the job site and then disposed of?

Or shall the gas be blocked on the site, transported to the factory and then removed?

Answer: See section 01 74 19. para 1.7.1, Both methods are okay however contractor must submit receipt which shows disposed of in accordance with local regulation. (ESB Yamamoto)

For further questions or concerns regarding this question and answer please send responses with a subject heading of Solicitation FA520919BA003 Demolition of 16 Family Housing Buildings Questions to Eric W. Moses, 374 CONS/PKAA; Yokota Air Force Base, email address:

eric.moses.1@us.af.mil AND Mr. Gary S. Scullin gary.scullin.1@us.af.mil by 9 September 2019, 4:00 pm (Local Time). Telephone responses will not be accepted.

Future information about this acquisition, including issuance of a solicitation and/or applicable amendments, will be issued through FedBizOpps. Interested parties are responsible for ensuring they have the most up-to-date information regarding this acquisition.

Please note: All contractors doing business with the Federal Government must be registered in the System for Award Management (SAM) database. The website for registration is www.sam.gov.

mailto:eric.moses.1@us.af.mil mailto:gary.scullin.1@us.af.mil http://www.sam.gov/

File details come from the government source that posted it.