IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION
CALL:
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
12b. CALENDAR DAYS
YES NO
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
FA520919BA003
0011353140 A-16-164
FA5209
FA5209 374 CONS LGC
UNIT 5228
APO AP 96328-5228
APO, AP 96328-5228
United States Eric Moses, Email: eric.moses.1@us.af.mil Telephone:
225-6687
FA5209 374 CONS LGC
UNIT 5228
APO AP 96328-5228
APO AP 96328-5228
United States
Eric Moses 225-6687
Project Title: Demolish 16 Army Family Housing Buildings
This project includes the demolition of sixteen (16) family housing buildings, three (3) playgrounds, and four (4) bus stops at Kanagawa-ken, Camp Zama, Japan.
1. Enter price in Japanese Yen (JPY) in Section B. Use typewriter or black ink.
2. Offerors should be System for Award Management (SAM) registered by the time and date set in block 13a of SF1442 IAW FAR 4.1102(a).
3. Award can only be made to a firm licensed and authorized to perform construction work in Japan IAW DFARS 252.225-7042.
4. Bid guarantee is required per FAR 52.228-1. See Section L for details.
5. Block 12a and block 18. "Performance and Payment Bonds" is replaced to read "Performance Bond". See Section I for details.
6. Offerors are urged and expected to attend the site visit per FAR 52.236-27 Alt I. See Section L for details.
7. Magnitude of the project: Between ¥111,593,800 and ¥557,969,000 IAW FAR 36.204(f)
8. Incurred Expenses. The government is not responsible for any costs incurred or associated with preparation of and submission of a bid in response to this solicitation.
10 720
FAR 52.211-10
1 2:00 PM
9/10/2019
AMOUNTS
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than theminimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to thiscontract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
Contracting Officer Email: gary.scullin.1@us.af.mil Telephone: DSN: 315-225-5426
FA520919BA003
Section A - Solicitation/Contract Form
Section B - Supplies or Services and Prices/Cost Additional Information/Notes Additional Information/Notes
This acquisition is unrestricted; however, this solicitation includes clauses authorized for the purpose of construction effort in Japan: FAR 52.236-7 (modified IAW AFFARS 5336.507, to read "Government of Japan" and DFARS 252.225-7042) under which offerors are required to be the firms that have been registered and hold construction contractor license under the law of Japan.
The Government has elected to include three (3) options governing seven (7) sites as identified in the CLIN descriptions as part of this solicitation. These options will be evaluated as part of the total price and used to determine the lowest price offered for this effort. Determinate on the overall funding all, some, or none of these options will be exercised at the time of award.
Item Supplies/Service Quantity Unit Unit Price Amount 0001 Project No. A-16-164, Demolish
Housing Unit 1072, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0002 Project No. A-16-164, Demolish Housing Unit 1073, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0003 Project No. A-16-164, Demolish Housing Unit 1074, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0004 Project No. A-16-164, Demolish Housing Unit 1075, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0005 Project No. A-16-164, Demolish Housing Unit 1076, Camp Zama.
Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0006 Project No. A-16-164, Demolish Housing Unit 1077, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0007 Project No. A-16-164, Demolish Housing Unit 1078, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0008 Project No. A-16-164, Demolish Housing Unit 1079, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0009 Project No. A-16-164, Demolish Housing Unit 1090, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0010 Project No. A-16-164, Demolish Housing Unit 1091, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0011 Project No. A-16-164, Demolish Housing Unit 1092, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
0012 Project No. A-16-164, Demolish Housing Unit 1093, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20
Firm Fixed Price 0013 Project No. A-16-164, Demolish
Housing Unit 1094, Camp Zama Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
Option Line Item
Project No. A-16-164, Demolish Housing Unit 1070, Camp Zama (OPTION 1: Includes CLIN 1001, 1002, and 1003) Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
Option Line Item
Project No. A-16-164, Demolish Housing Unit 1071, Camp Zama (OPTION 1: Includes CLIN 1001, 1002, and 1003) Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
Option Line Item
Project No. A-16-164, Demolish Housing Unit 1095, Camp Zama (OPTION 1: Includes CLIN 1001, 1002, and 1003) Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
Option Line Item
Project No. A-16-164, Demolish Playground 1076-1, Camp Zama (OPTION 2: Includes CLIN 2001, 2002, and 2003) Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
Option Line Item
Project No. A-16-164, Demolish Playground 1092-1, Camp Zama (OPTION 2: Includes CLIN 2001, 2002, and 2003) Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164
Signal Code: AA Program: C20 Firm Fixed Price
Option Line Item
Project No. A-16-164, Demolish Playground 1094-1, Camp Zama (OPTION 2: Includes CLIN 2001, 2002, and 2003) Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
Option Line Item
Project No. A-16-164, Demolish Bus Stop 1079-1, Camp Zama (OPTION 3:
Includes CLIN 3001, 3002, 3003, and 3004) Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
Option Line Item
Project No. A-16-164, Demolish Bus Stop 1094-2, Camp Zama (OPTION 3:
Includes CLIN 3001, 3002, 3003, and 3004) Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
Option Line Item
Project No. A-16-164, Demolish Bus Stop 1094-3, Camp Zama (OPTION 3:
Includes CLIN 3001, 3002, 3003, and 3004) Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
1.0 Lot
Option Line Item
Project No. A-16-164, Demolish Bus Stop 1095-1, Camp Zama (OPTION 3:
Includes CLIN 3001, 3002, 3003, and 3004) Product Service Code: P500 Standard Industry Classification (SIC) Code: 1795 Project Code: A-16-164 Signal Code: AA Program: C20 Firm Fixed Price
Section C - Description/Specifications/Statement of Work The contractor shall perform the services and supplies set forth in Section B in accordance with the contract specifications and drawings listed in Section J and other terms and conditions of this contract.
Requirements
CON: USAG-J DPW: WT5JY291300951
FEWR No: JH-00018-6J (Project No. A-16-164), Demolish 16 Army Family Housing Buildings, Phase 8 at Camp Zama (AFH No. 5)
Exchange rate $1=111.5938yen
Sites Under Project A-16-164
Basic:
Demolish Housing Unit 1072:
Demolish Housing Unit 1073:
Demolish Housing Unit 1074:
Demolish Housing Unit 1075:
Demolish Housing Unit 1076:
Demolish Housing Unit 1077:
Demolish Housing Unit 1078:
Demolish Housing Unit 1079:
Demolish Housing Unit 1090:
Demolish Housing Unit 1091:
Demolish Housing Unit 1092:
Demolish Housing Unit 1093:
Demolish Housing Unit 1094:
Option 1:
Demolish Housing Unit 1070: (Option 1) Demolish Housing Unit 1071: (Option 1) Demolish Housing Unit 1095: (Option 1)
Option 2:
Demolish Playground 1076-1: (Option 2) Demolish Playground 1092-1: (Option 2) Demolish Playground 1094-1: (Option 2)
Option 3:
Demolish Bus Stop 1079-1: (Option 3) Demolish Bus Stop 1094-2: (Option 3) Demolish Bus Stop -1094-3: (Option 3) Demolish Bus Stop -1095-1: (Option 3)
RM POC: Mr. Hiroko Yamamoto 263-5053 PR POC: Ms. Emiko Soeda 263-8786
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.246-12 Inspection of Construction. 1996-08 0001 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0002 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0003 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0004 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0005 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Email:
Telephone: DSN-263-5053
0006 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0007 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0008 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0009 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0010 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0011 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0012 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
0013 Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Option Line Item
Inspection and Acceptance Location
Both Destination Instructions: Headquarters will perform the final acceptance inspection.
DoDAAC: WT5JY2 Cage:
DunsNumber:
Duns4Number:
CountryCode: USA
W6CY USAG JAPAN
UNIT 45006
HOUSING DIV DPW
, APO AP 96343 5006
United States
OfficeCode:
Hiroko Yamamoto Telephone: DSN-263-5053 Email:
Section F - Deliveries or Performance The Notice to Proceed will be issued to the contractor within 60 calendar days after award of contract. Counting forward from the Notice to Proceed the Delivery Schedule from date of the lead time event to the completion of performance is 720 Calendar Days. This is the total performance time allotted for the total completion of all contract CLINS.
0001 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0002 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0003 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0004 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0005 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0006 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0007 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0008 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0009 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0010 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0011 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0012 Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
0013 Delivery Schedule Period of Performance From
30 SEP 2019
to
Option Line Item
Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
Option Line Item
Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
Option Line Item
Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
Option Line Item
Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
Option Line Item
Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
Option Line Item
Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
Option Line Item
Delivery Schedule Period of Performance From
30 SEP 2019
to
Option Line Item
Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
Option Line Item
Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
Option Line Item
Delivery Schedule Period of Performance From
30 SEP 2019
to
19 NOV 2021
FAR Clauses Incorporated by Full Text
52.211-10 Commencement, Prosecution, and Completion of Work. 1984-04 As prescribed in 11.404(b), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction. Commencement, Prosecution, and Completion of Work (Apr 1984).
The Contractor shall be required to:
(a)commence work under this contract within __10__ calendar days after the date the Contractor receives the notice to proceed, (b)prosecute the work diligently, and (c)complete the entire work ready for use not later than __720__ calendar days after the date the contractor receives the notice to proceed.
* The time stated for completion shall include final cleanup of the premises. * The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. 2018-12
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. 2018-12
As prescribed in 232.7004(b), use the following clause: WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause- Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization. Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF). Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system. Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall- (1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and (2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the Web Based Training link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order: (1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
__Construction Payment Invoice__
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
__Not Applicable__
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* | Field Name in WAWF || Data to be entered in WAWF ||
Pay Official DoDAAC || __HQ0671__ || Issue By DoDAAC || __FA5209__ || Admin DoDAAC || __FA5209__ || Inspect By DoDAAC || __ __ || Ship To Code || __ __ || Ship From Code || __ __ || Mark For Code || __ __ || Service Approver (DoDAAC) || __ __ || Service Acceptor (DoDAAC) || __FA5209__ || Accept at Other DoDAAC || __ __ || LPO DoDAAC || __ __ || DCAA Auditor DoDAAC || __ __ || Other DoDAAC(s) || __ __ |
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activitys WAWF point of contact.
Mr. Eric W. Moses, E-mail: eric.moses.1@us.af.mil Mr. Gary Scullin, E-mail: gary.scullin.1@us.af.mil Mr. Shuichi Terashima, E-mail: shuichi.terashima2.ln@mail.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed. (End of clause)
Section H - Special Contract Requirements
FAR Clauses Incorporated by Full Text
52.236-1 Performance of Work by the Contractor. 1984-04
As prescribed in 36.501(b), insert the following clause:
Performance of Work by the Contractor (Apr 1984) The Contractor shall perform on the site, and with its own organization, work equivalent to at least __twelve (12)__ percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
(End of clause)
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date 52.202-1 Definitions. 2013-11 52.203-5 Covenant Against Contingent Fees. 2014-05 52.203-6 Restrictions on Subcontractor Sales to the Government. 2006-09 52.203-7 Anti-Kickback Procedures. 2014-05 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper
Activity.
2014-05
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. 2014-05 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. 2010-10 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper.2011-05 52.204-9 Personal Identity Verification of Contractor Personnel. 2011-01 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. 2018-10 52.204-13 System for Award Management Maintenance. 2018-10 52.204-18 Commercial and Government Entity Code Maintenance. 2016-07 52.204-19 Incorporation by Reference of Representations and Certifications. 2014-12 52.209-6 Protecting the Government's Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment.
2015-10
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters.
2018-10
52.214-26 Audit and Records-Sealed Bidding. 2010-10 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data-
Modifications-Sealed Bidding.
2011-08
52.214-28 Subcontractor Certified Cost or Pricing Data-Modifications-Sealed Bidding.
2010-10
52.214-29 Order of Precedence-Sealed Bidding. 1986-01 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. 2011-08 52.225-13 Restrictions on Certain Foreign Purchases. 2008-06 52.225-14 Inconsistency between English Version and Translation of Contract. 2000-02 52.227-4 Patent Indemnity-Construction Contracts. 2007-12 52.228-2 Additional Bond Security. 1997-10 52.228-3 Workers' Compensation Insurance (Defense Base Act). 2014-07 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas. 1984-04 52.228-5 Insurance-Work on a Government Installation. 1997-01 52.228-11 Pledges of Assets. 2018-08 52.228-14 Irrevocable Letter of Credit. 2014-11 52.228-15 Performance and Payment Bonds-Construction. 2010-10 52.229-6 Taxes-Foreign Fixed-Price Contracts. 2013-02 52.232-5 Payments under Fixed-Price Construction Contracts. 2014-05 52.232-17 Interest. 2014-05 52.232-27 Prompt Payment for Construction Contracts. 2017-01 52.232-33 Payment by Electronic Funds Transfer-System for Award Management.2018-10 52.232-39 Unenforceability of Unauthorized Obligations. 2013-06 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. 2013-12 52.233-1 Disputes. 2014-05 52.233-3 Protest after Award. 1996-08 52.233-4 Applicable Law for Breach of Contract Claim. 2004-10 52.236-2 Differing Site Conditions. 1984-04 52.236-3 Site Investigation and Conditions Affecting the Work. 1984-04 52.236-5 Material and Workmanship. 1984-04 52.236-6 Superintendence by the Contractor. 1984-04 52.236-7 Permits and Responsibilities. 1991-11 52.236-8 Other Contracts. 1984-04 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements.
1984-04
52.236-10 Operations and Storage Areas. 1984-04
52.236-11 Use and Possession Prior to Completion. 1984-04 52.236-12 Cleaning Up. 1984-04 52.236-13 Accident Prevention. 1991-11 52.236-13 Alternate I Accident Prevention. - (Alternate I) 1991-11 52.236-14 Availability and Use of Utility Services. 1984-04 52.236-15 Schedules for Construction Contracts. 1984-04 52.236-17 Layout of Work. 1984-04 52.236-21 Alternate I Specifications and Drawings for Construction. - (Alternate I) 1997-02 52.236-26 Preconstruction Conference. 1995-02 52.242-13 Bankruptcy. 1995-07 52.242-14 Suspension of Work. 1984-04 52.243-4 Changes. 2007-06 52.244-6 Subcontracts for Commercial Items. 2019-01 52.246-21 Warranty of Construction. 1994-03 52.248-3 Value Engineering-Construction. 2015-10 52.249-10 Default (Fixed-Price Construction). 1984-04 52.253-1 Computer Generated Forms. 1991-01
DFARS Clauses Incorporated by Reference
Number Title Effective Date 252.201-7000 Contracting Officer's Representative 1991-12 252.203-7000 Requirements Relating to Compensation of Former DoD Officials 2011-09 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. 2013-09 252.204-7003 Control of Government Personnel Work Product. 1992-04 252.204-7004 Antiterrorism Awareness Training for Contractors. 2019-02 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident
Reporting.
2016-10
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. 2016-05 252.205-7000 Provision of Information to Cooperative Agreement Holders 1991-12 252.209-7004 Subcontracting with Firms that are Owned or Controlled by the
Government of a Country that is a State Sponsor of Terrorism.
2015-10
252.222-7002 Compliance with Local Labor Laws (Overseas). 1997-06 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. 2010-12 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous
Materials.
2014-09
252.223-7008 Prohibition of Hexavalent Chromium. 2013-06 252.225-7012 Preference for Certain Domestic Commodities. 2017-12 252.225-7041 Correspondence in English. 1997-06 252.225-7043 Antiterrorism/Force Protection for Defense Contractors Outside the
United States.
2015-06
252.225-7048 Export-Controlled Items. 2013-06 252.227-7032 Rights in Technical Data and Computer Software (Foreign). 1975-06 252.227-7033 Rights in Shop Drawings. 1966-04 252.229-7000 Invoices Exclusive of Taxes or Duties 1997-06 252.232-7008 Assignment of Claims (Overseas). 1997-06 252.232-7010 Levies on Contract Payments. 2006-12 252.233-7001 Choice of Law (Overseas). 1997-06 252.236-7000 Modification Proposals--Price Breakdown. 1991-12 252.243-7001 Pricing of Contract Modifications. 1991-12 252.243-7002 Requests for Equitable Adjustment. 2012-12 252.244-7000 Subcontracts for Commercial Items 2013-06 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military
Operations.
2010-10
FAR Clauses Incorporated by Full Text
52.211-12 Liquidated Damages-Construction. 2000-09
As prescribed in 11.503(b), insert the following clause in solicitations and contracts: Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of __Y53,961__ for the first date and__Y34,548__ for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause. (End of clause)
52.217-7 Option for Increased Quantity -- Separately Priced Line Item (Mar-1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 60 days of contract award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
52.236-21 Specifications and Drawings for Construction. 1997-02 As prescribed in 36.521 , insert the following clause: Specifications and Drawings for Construction (Feb 1997) (a) The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided. (b) Wherever in the specifications or upon the drawings the words "directed," "required," "ordered," "designated," "prescribed," or words of like import are used, it shall be understood that the "direction," "requirement," "order," "designation," or "prescription," of the Contracting Officer is intended and similarly the words "approved," "acceptable," "satisfactory," or words of like import shall mean "approved by," or "acceptable to," or "satisfactory to" the Contracting Officer, unless otherwise expressly stated. (c) Where "as shown," "as indicated," "as detailed," or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word "provided" as used herein shall be understood to mean "provide complete in place," that is "furnished and installed." (d) Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail (1)the proposed fabrication and assembly of structural elements, and (2)the installation (i.e.,fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract.
The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract. (e) If this contract requires shop drawings, the Contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the Contracting Officer without evidence of the Contractor's approval may be returned for resubmission. The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government's reasons therefor. Any work done before such approval shall be at the Contractor's risk. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with (f) of this clause. (f) If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If the Contracting Officer approves any such variation, the Contracting Officer shall issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued. (g) The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications.
Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer and one set will be returned to the Contractor.
52.252-2 Clauses Incorporated by Reference. 1998-02
As prescribed in 52.107(b), insert the following clause: Clauses Incorporated By Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/ these address
(es): __Hill AFB FARSite (valid until 1 Oct 2019), URL: http//farsite.hill.af.mil__ __Acquisition.GOV, URL: https:// www.acquisition.gov/browse/index/far__ __Defense Pricing and Contracting, URL: https://www.acq.osd.mil/dpap/dars/ dfarspgi/current/index.html__ (End of clause)
52.252-4 Alterations in Contract. 1984-04
As prescribed in 52.107(d), insert the following clause in solicitations and contracts in order to revise or supplement, as necessary, other parts of the contract, or parts of the solicitation that apply after contract award, except for any clause authorized for use with a deviation. Include clear identification of what is being altered. Alterations in Contract (Apr 1984) Portions of this contract are altered as follows: __Not Applicable__ (End of clause)
52.252-6 Authorized Deviations in Clauses. 1984-04
As prescribed in 52.107(f), insert the following clause in solicitations and contracts that include any FAR or supplemental clause with an authorized deviation. Whenever any FAR or supplemental clause is used with an authorized deviation, the contracting officer shall identify it by the same number, title, and date assigned to the clause when it is used without deviation, include regulation name for any supplemental clause, except that the contracting officer shall insert (DEVIATION) after the date of the clause. Authorized Deviations in Clauses (Apr 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter1) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the date of the clause.
(b) The use in this solicitation or contract of any __Defense Federal Acquisition Regulation Supplements __. (48 CFR __Chapter 2__) clause with an authorized deviation is indicated by the addition of (DEVIATION) after the name of the regulation. (End of clause)
DFARS Clauses Incorporated by Full Text
252.225-7044 Balance of Payments Program--Construction Material. 2014-11
Basic. As prescribed in 225.7503(a) and (a)(1), use the following clause: BALANCE OF PAYMENTS
PROGRAMCONSTRUCTION MATERIALBASIC (NOV 2014)
(a) Definitions. As used in this clause- Commercially available off-the-shelf (COTS) item- (i) Means any item of supply (including construction material) that is (A) A commercial item (as defined in paragraph (1) of the definition of commercial item in section 2.101 of the Federal Acquisition Regulation); (B) Sold in substantial quantities in the commercial marketplace;
and (C) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and (ii) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products. Component means any article, material, or supply incorporated directly into construction material. Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material. Cost of components means (i) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the end product (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(ii) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit.
Cost of components does not include any costs associated with the manufacture of the construction material. Domestic construction material means (i) An unmanufactured construction material mined or produced in the United States; or (ii) A construction material manufactured in the United States, if (A) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or (B) The construction material is a COTS item. United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. This clause implements the Balance of Payments Program by providing a preference for domestic construction material. The Contractor shall use only domestic construction material in performing this contract, except for-- (1) Construction material valued at or below the simplified acquisition threshold in part 2 of the Federal Acquisition Regulation; (2) Information technology that is a commercial item; or (3) The construction material or components listed by the Government as follows:
__Construction materials or components may be procured locally__
252.229-7001 Tax Relief. 2014-09
Basic. As prescribed in 229.402-70(a) and (a)(1), use the following clause: TAX RELIEFBASIC (SEP 2014)
(a) Prices set forth in this contract are exclusive of all taxes and duties from which the United States Government is exempt by virtue of tax agreements between the United States Government and the Contractors government. The following taxes or duties have been excluded from the contract price:
| NAME OF TAX: __ __(Offeror insert) | See paragraph 1002(d) in Attachment 4 for fill-out__ | RATE (PERCENTAGE): __ __(Offeror insert) | See paragraph 1002(d) in Attachment 4 for fill-out__
(b) The Contractors invoice shall list separately the gross price, amount of tax deducted, and net price charged.
(c) When items manufactured to United States Government specifications are being acquired, the Contractor shall identify the materials or components intended to be imported in order to ensure that relief from import duties is obtained. If the Contractor intends to use imported products from inventories on hand, the price of which includes a factor for import duties, the Contractor shall ensure the United States Governments exemption from these taxes. The Contractor may obtain a refund of the import duties from its government or request the duty-free import of an amount of supplies or components corresponding to that used from inventory for this contract.
252.236-7001 Contract Drawings and Specifications. 2000-08
As prescribed in 236.570(a), use the following clause: CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall (1) Check all drawings furnished immediately upon receipt; (2) Compare all drawings and verify the figures before laying out the work; (3) Promptly notify the Contracting Officer of any discrepancies; (4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and (5) Reproduce and print contract drawings and specifications as needed.
(c) In general-- (1) Large-scale drawings shall govern small-scale drawings; and (2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly…