Text version

A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only *** CMB Only

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

A-16-164

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SECTION 01 11 00

1.10.2 Safety *

SECTION 01 11 00

1.10.3 Environmental **

SECTION 01 11 00

1.13.1 Comprehensive Construction P

SECTION 01 11 00

2.1 Memo for HM Usage

SECTION 01 11 00

2.3 Drawing Bindings

SECTION 01 11 00

1.17.1 As Built Drawing

SECTION 01 11 00

1.16.2 Photographic Records

SECTION 01 11 00

1.17.3 Inspection document

SECTION 01 35 29

1.4 Accident Prevention Plan

SECTION 01 35 29

1.4 Certificate of Competent Person

SECTION 01 35 43

1.4 Environmental Protection Plan

SECTION 01 74 19

1.6 Waste Managt Plan**

SECTION 01 74 19

1.7 Manifest

SECTION 01 74 19

1.7.1 Receipts

SECTION 02 41 00

1.8 Dem / Deconst Plan

X

X E14

A

A

11 X

A

9 X

X E8

A

D

E

A

D

A

A

A

A

X

X

A

X2

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

C

EN

SE

S

X

Demolish 16 army family housing buildings, phase 8

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

IN

ST

R U

C

TI

O N

S

W O

R K

P R

O C

ED

U

R E

PL

A

N S

O

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

3 X

4 X

X

X

X

C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only *** CMB Only

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

A-16-164

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

C

EN

SE

S

Demolish 16 army family housing buildings, phase 8

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

IN

ST

R U

C

TI

O N

S

W O

R K

P R

O C

ED

U

R E

PL

A

N S

O

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

SECTION 02 82 13

1.5.1 Work Procedure

SECTION 02 82 13

1.3 ACM Abatement Plan

SECTION 02 82 13

3.7 Exposure Assessment and Air M

SECTION 02 82 13

1.5.1 Field Inspection/Tests

SECTION 02 82 13

3.9.3.1 Asbestos Waste Shipment Re

SECTION 02 82 33

3.3.1 Work Procedure

SECTION 02 82 33

3.4.1 Tests

SECTION 02 82 33

3.6 Abatement Report

SECTION 02 82 33

3.5.1.1 Clearance Certification

SECTION 02 82 33

3.5.2.1 Hazardous Waste Manifest

SECTION 31 23 00

3.1 Work Procedure

SECTION 31 23 00

3.1 Field Inspection Report

SECTION 31 23 00

2.3 Pile Remain locations

SECTION 31 23 00

3.13 Topographic Survey Result

SECTION 32 16 13

1.5 Work Procedure A30 X

X D29

X D28

X D27

A26 X

X D25

X A24

X D23

X D22

A21 X

X D20

D

D19

A

D

16 X

17 X

18 X

C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only *** CMB Only

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

A-16-164

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

C

EN

SE

S

Demolish 16 army family housing buildings, phase 8

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

IN

ST

R U

C

TI

O N

S

W O

R K

P R

O C

ED

U

R E

PL

A

N S

O

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

SECTION 32 16 13

2.3.1 Sidewalk Form

SECTION 32 16 13

3.7 Field Inspection Report

SECTION 32 92 23

1.5 Work Procedure

SECTION 32 92 23

1.5 Field Inspection Report

SECTION 33 11 00

3.3 Work Procedure

SECTION 33 11 00

1.3 Detail Drawings

SECTION 33 11 00

3.3 Field inspection report

SECTION 33 11 00

3.2.4 Disinfection Procedures

SECTION 33 44 00

3.1 Work Procedure

SECTION 33 44 00

1.4 Detail Drawings

SECTION 33 44 00

3.1 Field inspection report

X A38

X D37

D36 X

A35 X

X D34

A33 X

X D32

D31 X

39 X A

40 X D

41 DX

submittal