FA520916T10110002.pdf

PDF 40 KB Posted

Attached to
Transportation of Tactical Vehicles and Other Freight for Camp Fuji
Solicitation number
FA5209-16-T-1011
Issued by

About this file

Standard Form (SF) 30 - Solicitation Amendment 0002

View the file

Other files

File Type Posted
QA4_20161013.pdf PDF
QA3_20161012.doc DOC document
AMD0002_PWS_replacemet_page.pdf PDF
AMD0002_Exhibits_replacemet_pages.pdf PDF
QA2_20161005.pdf PDF
QA1_20161003.pdf PDF
FA5209T10110001.pdf PDF
AMD0001_replacement_pages.pdf PDF
Precon_Minutes_20160928.pdf PDF
08._Atch3_PP_information.pdf PDF
06._Atch2_PPQ_Cvrltr.pdf PDF
05._Atch1_PWS.pdf PDF
02._NTO_20160913.pdf PDF
01._GovtPlcyLtr.pdf PDF
07._Atch2_Past_Performance_Quesionnaire.pdf PDF
04._Atch_Pricing_Schedule.pdf PDF
09._OF17_offerlabel.pdf PDF
03._SF1449_20160913.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See schedule

POC:

Contract Administrator: Mr. Naotsugu Kono, Phone: 042-552-3010, Fax: 042-551-0973, E-mail: naotsugu.kono.jp@us.af.mil Contracting Officer: Ms. Maki Kodama, Phone/Fax (same as above), E-mail: maki.kodama.jp@us.af.mil)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Oct-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5209-16-T-1011

X 9B. DATED (SEE ITEM 11)

13-Sep-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Oct-2016

CODE

374TH CONTRACTING SQUADRON

UNIT 5228, BLDG 620, YOKOTA AB

FUSSA-SHI, TOKYO 197-0001 JAPAN

FA5209 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA5209-16-T-1011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

The purpose of this amendment is to incorporate revisions in (1) Exhibits Pricing Schedule, Table 3, Toll Charges and (2) Attachment 1, Performance Work Statement (PWS), 1.8.5. Toll Charges.

A. Exhibits Pricing Schedule, page 8 of 40, Exhibit A: Table 3, entitled “A21Y Table 3: Toll Charges”, incorporate the change to read as follows:

From: Toll Charges cited below for A080 through A130 in the Pricing Schedule (and corresponding items for options) will be used only for the purpose to calculate cancelation charges as cited at PWS 1.8.3.(c).

A080

(Between Camp Fuji and NAF Atsugi)

A080

A100 (Between Camp Fuji and Yokohama ND)

A120 (Between Camp Fuji and MCAS Iwakuni)

A130 (Between Camp Fuji and NFA Sasebo)

Toll Charges cited below is for ELIN A21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

To: Toll Charges cited below for A080 through A120 in the Pricing Schedule (and corresponding items for options) will

A08A: By 4-Ton capacity truck

A08B: By 10-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

A09A: By 4-Ton capacity truck (Between Camp Fuji and Yokota AB)

A09B: By 10-Ton capacity truck (Between Camp Fuji and Yokota AB)

A10A: By 4-Ton capacity truck (Between Camp Fuji and Yokohama ND)

A10B: By 10-Ton capacity truck (Between Camp Fuji and Yokohama ND)

A11A: By 4-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

A11B: By 10-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

A12A: By 4-Ton capacity truck

A12B: By 10-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

Toll Charges cited below is for ELIN A21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

B. Exhibits Pricing Schedule, page 16 of 40, Exhibit B: Table 3, entitled “B21Y Table 3: Toll Charges”, From: Toll Charges cited below for B080 through B130 in the Pricing Schedule (and corresponding items for options) will

B080

B080

B100

B120

B130

Toll Charges cited below is for ELIN A21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

To: Toll Charges cited below for B080 through B120 in the Pricing Schedule (and corresponding items for options) will

B08A: By 4-Ton capacity truck

B08B: By 10-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

B09A: By 4-Ton capacity truck (Between Camp Fuji and Yokota AB)

B09B: By 10-Ton capacity truck (Between Camp Fuji and Yokota AB)

B10A: By 4-Ton capacity truck (Between Camp Fuji and Yokohama ND)

B10B: By 10-Ton capacity truck (Between Camp Fuji and Yokohama ND)

B11A: By 4-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

B11B: By 10-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

B12A: By 4-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

B12B: By 10-Ton capacity truck

Toll Charges cited below is for ELIN B21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

C. Exhibits Pricing Schedule, page 24 of 40, Exhibit C: Table 3, entitled “C21Y Table 3: Toll Charges”, From: Toll Charges cited below for C080 through C130 in the Pricing Schedule (and corresponding items for options) will

C080

C080

C100

C120

C130

Toll Charges cited below is for ELIN A21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

To: Toll Charges cited below for C080 through C120 in the Pricing Schedule (and corresponding items for options) will

C08A: By 4-Ton capacity truck

C08B: By 10-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

C09A: By 4-Ton capacity truck (Between Camp Fuji and Yokota AB)

C09B: By 10-Ton capacity truck (Between Camp Fuji and Yokota AB)

C10A: By 4-Ton capacity truck (Between Camp Fuji and Yokohama ND)

C10B: By 10-Ton capacity truck (Between Camp Fuji and Yokohama ND)

C11A: By 4-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

C11B: By 10-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

C12A: By 4-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

C12B: By 10-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

Toll Charges cited below is for ELIN C21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

D. Exhibits Pricing Schedule, page 32 of 40, Exhibit D: Table 3, entitled “D21Y Table 3: Toll Charges”, From: Toll Charges cited below for D080 through D130 in the Pricing Schedule (and corresponding items for options) will

D080

D080

D100

D120

D130

Toll Charges cited below is for ELIN A21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

To: Toll Charges cited below for D080 through D120 in the Pricing Schedule (and corresponding items for options) will

D08A: By 4-Ton capacity truck

D08B: By 10-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

D09A: By 4-Ton capacity truck (Between Camp Fuji and Yokota AB)

D09B: By 10-Ton capacity truck (Between Camp Fuji and Yokota AB)

D10A: By 4-Ton capacity truck (Between Camp Fuji and Yokohama ND)

D10B: By 10-Ton capacity truck (Between Camp Fuji and Yokohama ND)

D11A: By 4-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

D11B: By 10-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

D12A: By 4-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

D12B: By 10-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

Toll Charges cited below is for ELIN D21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

E. Exhibits Pricing Schedule, page 40 of 40, Exhibit E: Table 3, entitled “E21Y Table 3: Toll Charges”, From: Toll Charges cited below for E080 through E130 in the Pricing Schedule (and corresponding items for options) will

E080

E080

E100

E120

E130

Toll Charges cited below is for ELIN A21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

To: Toll Charges cited below for E080 through E120 in the Pricing Schedule (and corresponding items for options) will

E08A: By 4-Ton capacity truck

E08B: By 10-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

E09A: By 4-Ton capacity truck (Between Camp Fuji and Yokota AB)

E09B: By 10-Ton capacity truck (Between Camp Fuji and Yokota AB)

E10A: By 4-Ton capacity truck (Between Camp Fuji and Yokohama ND)

E10B: By 10-Ton capacity truck (Between Camp Fuji and Yokohama ND)

E11A: By 4-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

E11B: By 10-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

E12A: By 4-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

E12B: By 10-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

Toll Charges cited below is for ELIN E21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

F. PWS, Page 7 of 13, entitled “1.8.5. Toll Charges”, paragraph (a), incorporate the change to read as follows:

From: adjustments based on the new toll charges shall be made to the unit prices for point-to-point routes ELIN A080 through A130, (and corresponding items for options)

To: adjustments based on the new toll charges shall be made to the unit prices for point-to-point routes ELIN A080 through A120, (and corresponding items for options)

G. Replacement pages to reflect the above changes are attached herewith. The changes are indicated with vertical lines in the left margin of the pages.

H. Offerors may respond to this amendment via hand carried or mail delivered to the address listed on SF1449, page 22, para D. General Information. The offer due date and time remain unchanged.

I. Except as provided herein, all other terms and conditions of this solicitation remain unchanged in full force and in effect.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .