AMD0002_Exhibits_replacemet_pages.pdf

PDF 113 KB Posted

Attached to
Transportation of Tactical Vehicles and Other Freight for Camp Fuji
Solicitation number
FA5209-16-T-1011
Issued by

About this file

Amendment 0002 Exhibits Replacement Pages

View the file

Other files

File Type Posted
QA4_20161013.pdf PDF
QA3_20161012.doc DOC document
FA520916T10110002.pdf PDF
AMD0002_PWS_replacemet_page.pdf PDF
QA2_20161005.pdf PDF
QA1_20161003.pdf PDF
FA5209T10110001.pdf PDF
AMD0001_replacement_pages.pdf PDF
Precon_Minutes_20160928.pdf PDF
08._Atch3_PP_information.pdf PDF
06._Atch2_PPQ_Cvrltr.pdf PDF
05._Atch1_PWS.pdf PDF
02._NTO_20160913.pdf PDF
01._GovtPlcyLtr.pdf PDF
07._Atch2_Past_Performance_Quesionnaire.pdf PDF
04._Atch_Pricing_Schedule.pdf PDF
09._OF17_offerlabel.pdf PDF
03._SF1449_20160913.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibits to Solicitation No. FA5209-16-T-1011 Amendment 0002

Note: The offerors are required to fill in the above toll charge(s) effective on the date of offer.

EXHIBIT A : TABLE 3

BASE YEAR: 12 months After Date of Contract (ADC) from the Effective Date in Block 3 of SF1449

A21Y Table 3: Toll Charges (PWS 1.8.5.)

Per one way trip per truck basis.

A10A: By 4-Ton capacity truck (Between Camp Fuji and Yokohama ND)

Toll Charges cited below for A080 through A120 in the Pricing Schedule (and corresponding items for options) will be used only for the purpose to calculate cancelation charges as cited at PWS 1.8.3.(c).

Toll Charges cited below is for ELIN A21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

Toll Charges in conjunction with rates at Table 2

(PWS 1.8.4.)

Actual amount as supported by actual reciepts

A11A: By 4-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

A10B: By 10-Ton capacity truck (Between Camp Fuji and Yokohama ND)

¥A12A: By 4-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

Toll Charge

A09A: By 4-Ton capacity truck (Between Camp Fuji and Yokota AB)

A08A: By 4-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

A08B: By 10-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

Applicable Item Number in the Pricing Schedule

A09B: By 10-Ton capacity truck (Between Camp Fuji and Yokota AB)

A11B: By 10-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

A12B: By 10-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

1503675567U Stamp

B08A: By 4-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

B08B: By 10-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

EXHIBIT B : TABLE 3

B11B: By 10-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

B12A: By 4-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

B11A: By 4-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

B12B: By 10-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

Toll Charges cited below is for ELIN B21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

Toll Charges in conjunction with rates at Table 2

(PWS 1.8.4.)

Actual amount as supported by actual reciepts

Note: The offerors are required to fill in the above toll charge(s) effective on the date of offer.

B09A: By 4-Ton capacity truck (Between Camp Fuji and Yokota AB)

B09B: By 10-Ton capacity truck (Between Camp Fuji and Yokota AB)

B10A: By 4-Ton capacity truck (Between Camp Fuji and Yokohama ND)

B10B: By 10-Ton capacity truck (Between Camp Fuji and Yokohama ND)

OPTION ONE: 12 months after BASE YEAR

B21Y Table 3: Toll Charges (PWS 1.8.5.)

Per one way trip per truck basis.

Applicable Item Number in the Pricing Schedule

Toll Charge

Toll Charges cited below for B080 through B120 in the Pricing Schedule (and corresponding items for options) will be used only for the purpose to calculate cancelation charges as cited at PWS 1.8.3.(c).

EXHIBIT C : TABLE 3

C09A: By 4-Ton capacity truck (Between Camp Fuji and Yokota AB)

C09B: By 10-Ton capacity truck (Between Camp Fuji and Yokota AB)

C10A: By 4-Ton capacity truck (Between Camp Fuji and Yokohama ND)

C10B: By 10-Ton capacity truck (Between Camp Fuji and Yokohama ND)

OPTION TWO: 12 months after OPTION ONE

C21Y Table 3: Toll Charges (PWS 1.8.5.)

Per one way trip per truck basis.

Applicable Item Number in the Pricing Schedule

Toll Charge

Toll Charges cited below for C080 through C120 in the Pricing Schedule (and corresponding items for options) will be used only for the purpose to calculate cancelation charges as cited at PWS 1.8.3.(c).

C08A: By 4-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

C08B: By 10-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

C11B: By 10-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

C12A: By 4-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

C12B: By 10-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

Toll Charges cited below is for ELIN C21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

Toll Charges in conjunction with rates at Table 2

(PWS 1.8.4.)

Actual amount as supported by actual reciepts

Note: The offerors are required to fill in the above toll charge(s) effective on the date of offer.

C11A: By 4-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

OPTION THREE: 12 months after OPTION TWO

D21Y Table 3: Toll Charges (PWS 1.8.5.)

Per one way trip per truck basis.

D11A: By 4-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

Applicable Item Number in the Pricing Schedule

Toll Charge

Toll Charges cited below for D080 through D120 in the Pricing Schedule (and corresponding items for options) will be used only for the purpose to calculate cancelation charges as cited at PWS 1.8.3.(c).

D08A: By 4-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

D08B: By 10-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

D09A: By 4-Ton capacity truck (Between Camp Fuji and Yokota AB)

D09B: By 10-Ton capacity truck (Between Camp Fuji and Yokota AB)

EXHIBIT D : TABLE 3

D10A: By 4-Ton capacity truck (Between Camp Fuji and Yokohama ND)

D10B: By 10-Ton capacity truck (Between Camp Fuji and Yokohama ND)

D11B: By 10-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

D12A: By 4-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

D12B: By 10-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

Toll Charges cited below is for ELIN D21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

Toll Charges in conjunction with rates at Table 2

(PWS 1.8.4.)

Actual amount as supported by actual reciepts

Note: The offerors are required to fill in the above toll charge(s) effective on the date of offer.

EXHIBIT E : TABLE 3

E11A: By 4-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

E09A: By 4-Ton capacity truck (Between Camp Fuji and Yokota AB)

E09B: By 10-Ton capacity truck (Between Camp Fuji and Yokota AB)

E10A: By 4-Ton capacity truck (Between Camp Fuji and Yokohama ND)

E10B: By 10-Ton capacity truck (Between Camp Fuji and Yokohama ND)

OPTION FOUR: 12 months after OPTION THREE

E21Y Table 3: Toll Charges (PWS 1.8.5.)

Per one way trip per truck basis.

Applicable Item Number in the Pricing Schedule

Toll Charge

Toll Charges cited below for E080 through E120 in the Pricing Schedule (and corresponding items for options) will be used only for the purpose to calculate cancelation charges as cited at PWS 1.8.3.(c).

E08A: By 4-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

E12B: By 10-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

Toll Charges cited below is for ELIN E21B, Table 2, only to be used in addition with conjunction to Table 2, Rates for services by trucks other than specific points (and corresponding items for options) as cited at PWS 1.8.4.)

Toll Charges in conjunction with rates at Table 2

(PWS 1.8.4.)

Actual amount as supported by actual reciepts

Note: The offerors are required to fill in the above toll charge(s) effective on the date of offer.

E11B: By 10-Ton capacity truck (Between Camp Fuji and NFA Yokosuka)

E12A: By 4-Ton capacity truck (Between Camp Fuji and MCAS Iwakuni)

E08B: By 10-Ton capacity truck (Between Camp Fuji and NAF Atsugi)

File details come from the government source that posted it. Updated .