This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Operation and Maintenance (O&M) of Draughon Bombing and Electronic Attack Range at Misawa Air Base, Japan. The amendment (Number 0003) corrects the descriptions of Contract Line Item Numbers (CLINs) 2001 through 5005 in Section B of the solicitation, specifically changing option year references from "Option One" to "Option Two", "Option Three", "Option Four", and "Option Five" for respective contract periods.
The amendment requires offerors to replace pages 5 through 9 of the solicitation with revised pages. The contract line items cover monthly O&M services, contractor-acquired parts, travel and temporary duty (TDY), deployment support, and extended work hours for the Draughon Bombing and Electronic Attack Range. Each CLIN spans different option years from October 2026 through September 2030, with consistent language about non-personal services, government reimbursement limitations, and specific operational requirements at Misawa Air Base. The amendment ensures accurate documentation of contract options without changing the fundamental scope of services.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to correct the descriptions of Contract Line Item Numbers (CLINs) 2001 Block 14 (Description of Amendment/Modification):
through 5005 in Section B of the subject solicitation.
(a) The contract option year references in the descriptions of CLINs 2001 through 2005, 3001 through 3005, 4001 through 4005, and 5001 through 5005 are corrected from "Option One" to "Option Two", "Option Three", "Option Four", and "Option Five", respectively, as shown in the Summary of Changes below.
(b) The offerors are required to replace page 5 through 9 of the solicitation with revised pages numbered with FA520525R00010003 (Attachment to this amendment).
(c) Except as provided herein, all terms and conditions remain unchanged.
Attachment:
Revised Solicitation pages 5 through 9 numbered with FA520525R00010003, 5 pages
Section B - Supplies or Services & Prices or Costs
Option Line Item 2001
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Monthly O&M Service of Draughon Bombing and Electronic Attack Range Option One:
The contractor shall provide non-personal services and related supplies for operation and maintenance (O&M) support of Draughon Bombing and Electronic Attack Range, Misawa Air Base, Japan in accordance with the PWS and the terms and conditions of this contract (See PWS paragraphs 1.4 and 1.5).
Period of Option One: 1 Oct 26 through 30 Sep 27
Monthly O&M Service of Draughon Bombing and Electronic Attack Range Option Two:
The contractor shall provide non-personal services and related supplies for operation and maintenance (O&M) support of Draughon Bombing and Electronic Attack Range, Misawa Air Base, Japan in accordance with the PWS and the terms and conditions of this contract (See PWS paragraphs 1.4 and 1.5).
Period of Option Two: 1 Oct 26 through 30 Sep 27
Option Line Item 2002
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Contractor Acquired Parts Option One:
The contractor shall acquire supplies, parts, and materials for O&M purposes in accordance with the PWS paragraph
1.5.2. The contractor's one-time purchase exceeding
$10,000 shall be approved by the CO in accordance with the PWS paragraph 1.5.2.3.2.1. and Attachment 1, Other Contract Requirements, paragraph 6, H002. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 26 through 30 Sep 27
Contractor Acquired Parts Option Two:
The contractor shall acquire supplies, parts, and materials for O&M purposes in accordance with the PWS paragraph
1.5.2. The contractor's one-time purchase exceeding
$10,000 shall be approved by the CO in accordance with the PWS paragraph 1.5.2.3.2.1. and Attachment 1, Other Contract Requirements, paragraph 6, H002. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Two: 1 Oct 26 through 30 Sep 27
Option Line Item 2003
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Travel and TDY Option One:
Temporary Duty (TDY) and travel requirement. All travel must be approved in advance by the CO in accordance with the PWS paragraph 2.3.4. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 26 through 30 Sep 27
Travel and TDY Option Two:
Temporary Duty (TDY) and travel requirement. All travel must be approved in advance by the CO in accordance with the PWS paragraph 2.3.4. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Two: 1 Oct 26 through 30 Sep 27
Option Line Item 2004
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Deployment Option One:
Deployment support in accordance with the PWS paragraph
1.4.5.7. The government is not obligated to reimburse the
contractor for any costs in excess of the Estimated amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 26 through 30 Sep 27
Deployment Option Two:
Deployment support in accordance with the PWS paragraph
1.4.5.7. The government is not obligated to reimburse the
contractor for any costs in excess of the Estimated amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Two: 1 Oct 26 through 30 Sep 27
Option Line Item 2005
The following Line Item modifications were made:
FA520525R00010003
INFORMATION FROM TO
Description
Extended Work Hours Option One:
Extended work hours with the government approval in accordance with the PWS paragraph 1.2.2.1.1.6. The government is not obligated to pay the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this
CLIN.
Period of Option One: 1 Oct 26 through 30 Sep 27
Extended Work Hours Option Two:
Extended work hours with the government approval in accordance with the PWS paragraph 1.2.2.1.1.6. The government is not obligated to pay the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this
CLIN.
Period of Option Two: 1 Oct 26 through 30 Sep 27
Option Line Item 3001
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Monthly O&M Service of Draughon Bombing and Electronic Attack Range Option One:
The contractor shall provide non-personal services and related supplies for operation and maintenance (O&M) support of Draughon Bombing and Electronic Attack Range, Misawa Air Base, Japan in accordance with the PWS and the terms and conditions of this contract (See PWS paragraphs 1.4 and 1.5).
Period of Option One: 1 Oct 27 through 30 Sep 28
Monthly O&M Service of Draughon Bombing and Electronic Attack Range Option Three:
The contractor shall provide non-personal services and related supplies for operation and maintenance (O&M) support of Draughon Bombing and Electronic Attack Range, Misawa Air Base, Japan in accordance with the PWS and the terms and conditions of this contract (See PWS paragraphs 1.4 and 1.5).
Period of Option Three: 1 Oct 27 through 30 Sep 28
Option Line Item 3002
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Contractor Acquired Parts Option One:
The contractor shall acquire supplies, parts, and materials for O&M purposes in accordance with the PWS paragraph
1.5.2. The contractor's one-time purchase exceeding
$10,000 shall be approved by the CO in accordance with the PWS paragraph 1.5.2.3.2.1. and Attachment 1, Other Contract Requirements, paragraph 6, H002. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 27 through 30 Sep 28
Contractor Acquired Parts Option Three:
The contractor shall acquire supplies, parts, and materials for O&M purposes in accordance with the PWS paragraph
1.5.2. The contractor's one-time purchase exceeding
$10,000 shall be approved by the CO in accordance with the PWS paragraph 1.5.2.3.2.1. and Attachment 1, Other Contract Requirements, paragraph 6, H002. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Three: 1 Oct 27 through 30 Sep 28
Option Line Item 3003
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Travel and TDY Option One:
Temporary Duty (TDY) and travel requirement. All travel must be approved in advance by the CO in accordance with the PWS paragraph 2.3.4. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 27 through 30 Sep 28
Travel and TDY Option Three:
Temporary Duty (TDY) and travel requirement. All travel must be approved in advance by the CO in accordance with the PWS paragraph 2.3.4. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Three: 1 Oct 27 through 30 Sep 28
Option Line Item 3004
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Deployment Option One:
Deployment support in accordance with the PWS paragraph
1.4.5.7. The government is not obligated to reimburse the
contractor for any costs in excess of the Estimated amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 27 through 30 Sep 28
Deployment Option Three:
Deployment support in accordance with the PWS paragraph
1.4.5.7. The government is not obligated to reimburse the
contractor for any costs in excess of the Estimated amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Three: 1 Oct 27 through 30 Sep 28
Option Line Item 3005
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Extended Work Hours Option One:
Extended work hours with the government approval in accordance with the PWS paragraph 1.2.2.1.1.6. The government is not obligated to pay the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this
CLIN.
Period of Option One: 1 Oct 27 through 30 Sep 28
Extended Work Hours Option Three:
Extended work hours with the government approval in accordance with the PWS paragraph 1.2.2.1.1.6. The government is not obligated to pay the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this
CLIN.
Period of Option Three: 1 Oct 27 through 30 Sep 28
Option Line Item 4001
The following Line Item modifications were made:
INFORMATION FROM TO
Monthly O&M Service of Draughon Bombing and Electronic Monthly O&M Service of Draughon Bombing and Electronic
Attack Range Option One:
The contractor shall provide non-personal services and related supplies for operation and maintenance (O&M) support of Draughon Bombing and Electronic Attack Range, Misawa Air Base, Japan in accordance with the PWS and the terms and conditions of this contract (See PWS paragraphs 1.4 and 1.5).
Period of Option One: 1 Oct 28 through 30 Sep 29
Attack Range Option Four:
The contractor shall provide non-personal services and related supplies for operation and maintenance (O&M) support of Draughon Bombing and Electronic Attack Range, Misawa Air Base, Japan in accordance with the PWS and the terms and conditions of this contract (See PWS paragraphs 1.4 and 1.5).
Period of Option Four: 1 Oct 28 through 30 Sep 29
Option Line Item 4002
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Contractor Acquired Parts Option One:
The contractor shall acquire supplies, parts, and materials for O&M purposes in accordance with the PWS paragraph
1.5.2. The contractor's one-time purchase exceeding
$10,000 shall be approved by the CO in accordance with the PWS paragraph 1.5.2.3.2.1. and Attachment 1, Other Contract Requirements, paragraph 6, H002. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 28 through 30 Sep 29
Contractor Acquired Parts Option Four:
The contractor shall acquire supplies, parts, and materials for O&M purposes in accordance with the PWS paragraph
1.5.2. The contractor's one-time purchase exceeding
$10,000 shall be approved by the CO in accordance with the PWS paragraph 1.5.2.3.2.1. and Attachment 1, Other Contract Requirements, paragraph 6, H002. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Four: 1 Oct 28 through 30 Sep 29
Option Line Item 4003
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Travel and TDY Option One:
Temporary Duty (TDY) and travel requirement. All travel must be approved in advance by the CO in accordance with the PWS paragraph 2.3.4. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 28 through 30 Sep 29
Travel and TDY Option Four:
Temporary Duty (TDY) and travel requirement. All travel must be approved in advance by the CO in accordance with the PWS paragraph 2.3.4. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Four: 1 Oct 28 through 30 Sep 29
Option Line Item 4004
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Deployment Option One:
Deployment support in accordance with the PWS paragraph
1.4.5.7. The government is not obligated to reimburse the
contractor for any costs in excess of the Estimated amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 28 through 30 Sep 29
Deployment Option Four:
Deployment support in accordance with the PWS paragraph
1.4.5.7. The government is not obligated to reimburse the
contractor for any costs in excess of the Estimated amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Four: 1 Oct 28 through 30 Sep 29
Option Line Item 4005
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Extended Work Hours Option One:
Extended work hours with the government approval in accordance with the PWS paragraph 1.2.2.1.1.6. The government is not obligated to pay the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this
CLIN.
Period of Option One: 1 Oct 28 through 30 Sep 29
Extended Work Hours Option Four:
Extended work hours with the government approval in accordance with the PWS paragraph 1.2.2.1.1.6. The government is not obligated to pay the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this
CLIN.
Period of Option Four: 1 Oct 28 through 30 Sep 29
Option Line Item 5001
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Monthly O&M Service of Draughon Bombing and Electronic Attack Range Option One:
The contractor shall provide non-personal services and related supplies for operation and maintenance (O&M) support of Draughon Bombing and Electronic Attack Range, Misawa Air Base, Japan in accordance with the PWS and the terms and conditions of this contract (See PWS paragraphs 1.4 and 1.5).
Period of Option One: 1 Oct 29 through 30 Sep 30
Monthly O&M Service of Draughon Bombing and Electronic Attack Range Option Five:
The contractor shall provide non-personal services and related supplies for operation and maintenance (O&M) support of Draughon Bombing and Electronic Attack Range, Misawa Air Base, Japan in accordance with the PWS and the terms and conditions of this contract (See PWS paragraphs 1.4 and 1.5).
Period of Option Five: 1 Oct 29 through 30 Sep 30
Option Line Item 5002
The following Line Item modifications were made:
INFORMATION FROM TO
Contractor Acquired Parts Option One: Contractor Acquired Parts Option Five:
The contractor shall acquire supplies, parts, and materials for O&M purposes in accordance with the PWS paragraph
1.5.2. The contractor's one-time purchase exceeding
$10,000 shall be approved by the CO in accordance with the PWS paragraph 1.5.2.3.2.1. and Attachment 1, Other Contract Requirements, paragraph 6, H002. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 29 through 30 Sep 30
The contractor shall acquire supplies, parts, and materials for O&M purposes in accordance with the PWS paragraph
1.5.2. The contractor's one-time purchase exceeding
$10,000 shall be approved by the CO in accordance with the PWS paragraph 1.5.2.3.2.1. and Attachment 1, Other Contract Requirements, paragraph 6, H002. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Five: 1 Oct 29 through 30 Sep 30
Option Line Item 5003
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Travel and TDY Option One:
Temporary Duty (TDY) and travel requirement. All travel must be approved in advance by the CO in accordance with the PWS paragraph 2.3.4. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 29 through 30 Sep 30
Travel and TDY Option Five:
Temporary Duty (TDY) and travel requirement. All travel must be approved in advance by the CO in accordance with the PWS paragraph 2.3.4. The government is not obligated to reimburse the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Five: 1 Oct 29 through 30 Sep 30
Option Line Item 5004
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Deployment Option One:
Deployment support in accordance with the PWS paragraph
1.4.5.7. The government is not obligated to reimburse the
contractor for any costs in excess of the Estimated amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option One: 1 Oct 29 through 30 Sep 30
Deployment Option Five:
Deployment support in accordance with the PWS paragraph
1.4.5.7. The government is not obligated to reimburse the
contractor for any costs in excess of the Estimated amount of this CLIN.
***Offerors are not required to propose on this CLIN.*** Period of Option Five: 1 Oct 29 through 30 Sep 30
Option Line Item 5005
The following Line Item modifications were made:
INFORMATION FROM TO
Description
Extended Work Hours Option One:
Extended work hours with the government approval in accordance with the PWS paragraph 1.2.2.1.1.6. The government is not obligated to pay the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this
CLIN.
Period of Option One: 1 Oct 29 through 30 Sep 30
Extended Work Hours Option Five:
Extended work hours with the government approval in accordance with the PWS paragraph 1.2.2.1.1.6. The government is not obligated to pay the contractor for any costs in excess of the Not-to-Exceed (NTE) amount of this
CLIN.
Period of Option Five: 1 Oct 29 through 30 Sep 30
| SUMMARY OF CHANGES |
| Supplies or Services & Prices or Costs |
| IDCode: J |
| Page: 1 |
| Pages: 5 |
| AmendNo: 0003 |
| EffDate: 21 Apr 2025 |
| ReqNo: |
| ProjNo: |
| IssCode: FA5205 |
| AdmCode: |
| IssuedBy: FA5205 35 CONS PK |
UNIT 5201, APO AP 96319-5201
APO, AP 96319-5201
UNITED STATES
Kazuo Miura, Email: kazuo.miura.jp@us.af.mil Telephone: 315-226-6097 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA520525R0001 |
| SolDate: 06 Mar 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Miyako Fujimoto |
| ContDate: |
| CODate: 21 Apr 2025 |