FA520525R0001_Atch5_Past Performance Questionnaire_4Mar25.pdf
PDF 2 MB Posted
- Attached to
- Operation and Maintenance (O&M) of Draughon Bombing and Electronic Attack Range, Misawa Air Base, Japan
- Solicitation number
- FA520525R0001
About this file
This is a Past Performance Questionnaire (PPQ) template that is Attachment 5 to RFP No. FA520525R0001 for Operation and Maintenance of Draughon Bombing and Electronic Attack Range at Misawa Air Base, Japan. The questionnaire is designed to gather detailed performance information about contractors from previous government contracts.
The five-section questionnaire requests information about contract identification, customer/agency details, respondent information, and performance ratings across multiple categories including quality, schedule, management, and regulatory compliance. Performance is rated on a scale from Exceptional (E) to Unsatisfactory (U), with specific rating criteria provided for each level. The form must be completed by government representatives and returned to the 35th Contracting Squadron at Misawa Air Base, specifically to Ms. Miyako Fujimoto or Mr. Kazuo Miura. When completed, the document becomes Source Selection Information under FAR 2.101 and 3.104 and is considered Controlled Unclassified Information.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled Unclassified Information When completed, this document is Source Selection Information IAW FAR 2.101 and 3.104.
Attachment 5 to RFP No. FA520525R0001 Date: 4 Mar 25
Section 1: Contract Identification
A. Contractor (Company/Division):
B. Contractor Cage Code:
C. Contract Number:
D. Contract Type (e.g., Firm-Fixed-Price (FFP), Fixed-Price-Incentive-Fee (FPIF), Cost-Plus-Incentive-Fee (CPIF), Cost-Plus-Fixed-Fee (CPFF), etc.):
E. Contract Title:
F. Period of Performance
1. Original Schedule (assuming all options exercised):
Beginning Date ____________ through ____________
2. Current Schedule (assuming all options exercised):
Beginning Date ____________ through ____________
3. Reason for difference (if applicable):
G. Contract Value
1. Original maximum contract value (assuming all options exercised):
2. Current maximum contract value (assuming all options exercised):
3. Reasons for difference between original and current contract value (if applicable):
H. Description of work performed:
I. Was this a competitively awarded contract? ☐ Yes ☐ No
J. Contractor’s Role: ☐ Prime Contractor ☐ Subcontractor ☐ Key Personnel
Attachment 5 to RFP No. FA520525R0001 Date: 4 Mar 25
Section 2: Customer or Agency Identification
A. Customer or agency name:
B. Customer or agency description (if applicable):
C. Geographic description of services under this contract (i.e., local, nationwide, worldwide, other Commands):
Section 3: Respondent Identification
A. Respondent’s name:
B. Respondent’s title:
C. Respondent’s phone number / fax number / e-mail address:
D. Respondent’s position (e.g., Program Manager, Contracting Officer, etc.):
E. Length of time (number of years/months) respondent worked on subject contract and description of responsibility/position/role:
Section 4: Performance Information
In the tables below, indicate your rating for the contractor’s performance by placing an “X” in the appropriate block to the right of each question. Provide supporting information for each response in the space provided.
Attach additional pages if more space is needed. The performance rating scale is defined as follows:
Code Performance Rating
E EXCEPTIONAL – Performance meets contractual requirements and exceeds many requirements to the Government’s benefit. The contractual performance being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
V VERY GOOD – Performance meets contractual requirements and exceeds some requirements to the Government’s benefit. The contractual performance being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
S SATISFACTORY – Performance meets contractual requirements. The contractual performance being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
M MARGINAL – Performance does not meet some contractual requirements. The contractual performance being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
Attachment 5 to RFP No. FA520525R0001 Date: 4 Mar 25
U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
N/A NOT APPLICABLE – Unable to provide a rating. Contract did not include performance for this aspect, performance was not observed, or information was not available. Do not know.
Quality E V S M U N/A
Q1. Adherence to required quality of service performance.
Q2. Quality and timeliness of required documentation and reporting.
Q3. Identification and correction of deficient work in a timely manner.
Schedule E V S M U N/A
S1. Completion of required work in a timely manner.
S2. Adherence to approved service schedule.
S3. Resolution of delays.
Management E V S M U N/A
M1. Interaction between the contractor and the customer.
M2. Coordination and control of subcontractors.
M3. Effectiveness of job-site supervision.
Attachment 5 to RFP No. FA520525R0001 Date: 4 Mar 25
Regulatory Compliance E V S M U N/A
R1. Compliance with safety and environmental regulations.
R2. Compliance with environmental reporting requirements.
Overall Rating E V S M U N/A
O1. Based on the above, what is your overall assessment of the present/past performance for this contractor?
Government Contracts Only: Was this contract partially or completely terminated for default or convenience, or are there any pending terminations?
☐ Yes ☐ Default ☐ Convenience ☐ Pending Terminations ☐ No
If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules).
SECTION 5: GENERAL COMMENT
Given what I know today about the contractor’s ability to execute what he promised in his proposal, I
[☐ definitely would, ☐ probably would, ☐ might or might not, ☐ probably would not, ☐ definitely would not] award to him today given that I had a choice.
Please provide any additional comments concerning this contractor’s performance, as desired.
Respondent’s Signature Date
Attachment 5 to RFP No. FA520525R0001 Date: 4 Mar 25
Thank you for your prompt response and assistance!
Please return this completed questionnaire to:
E-Mail: Ms. Miyako Fujimoto (miyako.fujimoto.jp@us.af.mil) Mr. Kazuo Miura (kazuo.miura.jp@us.af.mil)
Mailing Address: 35th Contracting Squadron Attn: Ms. Miyako Fujimoto Bldg. 656, Misawa Air Base, Hirahata, Misawa-shi, Aomori-ken, Japan 033-0012
FAX: 011-81-176-52-4793 (Attn: Ms. Miyako Fujimoto and Mr. Kazuo Miura)
| A Contractor CompanyDivision: |
| B Contractor Cage Code: |
| C Contract Number: |
| CPIF CostPlusFixedFee CPFF etc: |
| E Contract Title: |
| Beginning Date: |
| through: |
| Beginning Date_2: |
| through_2: |
| Reason for difference if applicable: |
| Original maximum contract value assuming all options exercised: |
| Current maximum contract value assuming all options exercised: |
| Reasons for difference between original and current contract value if applicable: |
| H Description of work performed: |
| Prime Contractor: Off |
| Subcontractor: Off |
| Key Personnel: Off |
| Check Box2: Off |
| Check Box3: Off |
| A Customer or agency name: |
| B Customer or agency description if applicable: |
| C Geographic description of services under this contract ie local nationwide worldwide other Commands: |
| A Respondents name: |
| B Respondents title: |
| C Respondents phone number fax number email address: |
| D Respondents position eg Program Manager Contracting Officer etc: |
| responsibilitypositionrole: |
| EQ1 Adherence to required quality of service performance: |
| VQ1 Adherence to required quality of service performance: |
| SQ1 Adherence to required quality of service performance: |
| MQ1 Adherence to required quality of service performance: |
| UQ1 Adherence to required quality of service performance: |
| NAQ1 Adherence to required quality of service performance: |
| EQ2 Quality and timeliness of required documentation and reporting: |
| VQ2 Quality and timeliness of required documentation and reporting: |
| SQ2 Quality and timeliness of required documentation and reporting: |
| MQ2 Quality and timeliness of required documentation and reporting: |
| UQ2 Quality and timeliness of required documentation and reporting: |
| NAQ2 Quality and timeliness of required documentation and reporting: |
| EQ3 Identification and correction of deficient work in a timely manner: |
| VQ3 Identification and correction of deficient work in a timely manner: |
| SQ3 Identification and correction of deficient work in a timely manner: |
| MQ3 Identification and correction of deficient work in a timely manner: |
| UQ3 Identification and correction of deficient work in a timely manner: |
| NAQ3 Identification and correction of deficient work in a timely manner: |
| ES1 Completion of required work in a timely manner: |
| VS1 Completion of required work in a timely manner: |
| SS1 Completion of required work in a timely manner: |
| MS1 Completion of required work in a timely manner: |
| US1 Completion of required work in a timely manner: |
| NAS1 Completion of required work in a timely manner: |
| ES2 Adherence to approved service schedule: |
| VS2 Adherence to approved service schedule: |
| SS2 Adherence to approved service schedule: |
| MS2 Adherence to approved service schedule: |
| US2 Adherence to approved service schedule: |
| NAS2 Adherence to approved service schedule: |
| ES3 Resolution of Delays: |
| VS3 Resolution of Delays: |
| SS3 Resolution of Delays: |
| MS3 Resolution of Delays: |
| US3 Resolution of Delays: |
| NAS3 Resolution of Delays: |
| EM1 Interaction between the contractor and the customer: |
| VM1 Interaction between the contractor and the customer: |
| SM1 Interaction between the contractor and the customer: |
| MM1 Interaction between the contractor and the customer: |
| UM1 Interaction between the contractor and the customer: |
| NAM1 Interaction between the contractor and the customer: |
| EM2 Coordination and control of subcontractors: |
| VM2 Coordination and control of subcontractors: |
| SM2 Coordination and control of subcontractors: |
| MM2 Coordination and control of subcontractors: |
| UM2 Coordination and control of subcontractors: |
| NAM2 Coordination and control of subcontractors: |
| EM3 Effectiveness of jobsite supervision: |
| VM3 Effectiveness of jobsite supervision: |
| SM3 Effectiveness of jobsite supervision: |
| MM3 Effectiveness of jobsite supervision: |
| UM3 Effectiveness of jobsite supervision: |
| NAM3 Effectiveness of jobsite supervision: |
| E: |
| V: |
| S: |
| M: |
| U: |
| NA: |
| ER2 Compliance with environmental reporting requirements: |
| VR2 Compliance with environmental reporting requirements: |
| SR2 Compliance with environmental reporting requirements: |
| MR2 Compliance with environmental reporting requirements: |
| UR2 Compliance with environmental reporting requirements: |
| NAR2 Compliance with environmental reporting requirements: |
| E_2: |
| V_2: |
| S_2: |
| M_2: |
| U_2: |
| NA_2: |
| Yes_2: Off |
| Default: Off |
| Convenience: Off |
| Pending Terminations: Off |
| No_2: Off |
| If yes please explain eg inability to meet cost performance or delivery schedules: |
| definitely would: Off |
| probably would: Off |
| might or might not: Off |
| probably would not: Off |
| definitely would not: Off |
| Please provide any additional comments concerning this contractors performance as desired: |
| Date: |
File details come from the government source that posted it. Updated .