(Identifiable Offeror Name)_22R0005_Exhibit A-E.xlsx

XLSX spreadsheet 66 KB Posted

Attached to
Airfield/Pavements IDIQ Contract, Misawa Air Base, Japan
Solicitation number
FA520522R0005
Issued by

About this file

This solicitation is for an Airfield/Pavements Indefinite-Delivery/Indefinite-Quantity contract at Misawa Air Base in Japan. The scope of work includes repair, maintenance, and construction of airfield pavement, roads, parking lots, and associated incidental work such as survey, runway rubber removal, pavement marking, airfield drainage, and utility and grounding. The period of performance is one year with four one-year options. A minimum of 300,000 Japanese yen is guaranteed, and the maximum contract value is 5.2 billion Japanese yen over the life of the contract. The contract will be awarded competitively using a subjective tradeoff technique to the offeror providing the best value based on technical acceptability, price, and past performance. Registration in the US System for Award Management is required due to the location of award and performance in Japan.

View the file

Other files

File Type Posted
4b Specifications.pdf PDF
4 Amendment FA520522R00050002.pdf PDF
4c Addendum No. 2.pdf PDF
4a (Identifiable Offeror Name)_22R0005_Exhibit A-E.xls XLS spreadsheet
3a (Identifiable Offeror Name)_22R0005_Exhibit A-E R.xls XLS spreadsheet
3c Drawings 19Jul22.pdf PDF
3d Addendum No.1.pdf PDF
3 Amendment FA520522R00050001.pdf PDF
3b Specifications 19Jul22.pdf PDF
2 Govt Response to Q_22R0005.pdf PDF
2a Summary of QA_19Jul22.pdf PDF
1a Pre-Pro Conf Slide.pdf PDF
1b Precon_QA_Summary_22R05.pdf PDF
1 Pre-proposal Conf Minutes_22R05.pdf PDF
Atch7_PPQ_Signed.pdf PDF
Atch2_Specifications.pdf PDF
Atch3_Drawings.pdf PDF
Atch6_Historical Data.pdf PDF
Atch1_Other Contract Requirements.pdf PDF
Atch5_List of CFUSM.pdf PDF
RFP_FA520522R0005.pdf PDF
Atch7_PPQ_.pdf PDF
Atch4_Schedule of Material Submittals.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A

Exhibit A
AIRFIELD/PAVEMENTS IDIQ CONTRACT
MISAWA AB, JAPAN
REQUEST FOR PROPOSAL No.FA520522R0005
CONTRACT No.

Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)

Company Name and Address

CategoryELIN
ADescriptionEstimated
QuantityUnit of IssueUnit Price
¥Estimated Amount
Survey001Topographic Survey and Report, 2,000 SM Area50LOT
002Topographic Survey from Bench Marks and Report, 2,000 SM Area20LOT
003Survey and Report Crack Sealing20,000LM
004Survey and Report, Pavement Markings40,000SM
005Survey and Report for Rubber Markings, 2,000 SM Area10LOT
Test006Field CBR and Laboratory Tests of Paved Airfield, Roads and Parking Lots3EA
007Plate Load Test of Unpaved Airfield, Roads, Parking Lots and Other Surfaces3EA
008Core Drilling and Sampling of AC or PCC Pavement of Airfield, Roads, Parking Lots19EA
009Flight Line Drivers Training and Foreign Object Damage (FOD) Training1,000DRIVER/DAY
Temporary010Temporary Installation of 22/25 mm Thick Steel Plate90SM/MONTH
and
Protection011Temporary Installation of Low Profile Barricades with Lights, 2,000 SM Area30LOT
Work012Heavy Equipment Transportation with 30 ton Trailer90DAY
013Temporary 2 Lights with Generator29EA/MONTH
014Temporary 1 Balloon Light with Generator45EA/MONTH
Airfield
Asphalt01550 mm Thick AC Wearing Course, Gradation 2 for Less Than 1,000 SM Construction1,000SM
Concrete
Surfaces01650 mm Thick AC Wearing Course, Gradation 2 for more than 1,000 SM Construction40,000SM
01750 mm Thick Modified AC Wearing Course, Gradation 2 for less than 1,000 SM Construction1,000SM
01850 mm Thick Modified AC Wearing Course, Gradation 2 for more than 1,000 SM Construction15,000SM
01950 mm Thick AC Intermediate Course, Gradation 1 for less than 1,000 SM Construction1,000SM
02050 mm Thick AC Intermediate Course, Gradation 1 for more than 1.000 SM Construction40,000SM
021Leveling AC Intermediate Course, Gradation 3 for less than 1,000 SM Construction20TON
022Leveling AC Intermediate Course, Gradation 3 for more than 1,000 SM Construction145TON
023Construct Base Course, M-251,000CM
024Construct Subbase Course, C-40100CM
025Construct Granular Material10CM
026Install Static Ground for AC5EA
027Grooving of AC Surface100SM
028Base Stabilization for pavement, Mix 150mm Thick100SM
029Base Stabilization for pavement, Mix 200mm Thick100SM
Additional030Install Geotextile on Existing AC or Concrete Pavement1,000SM
Minor031Seal Crack of Existing AC Pavement500LM
Pavement032Seal Crack of Existing AC or PCC Pavement with Epoxy Sealant20LM
Work033Furnish & Apply Asphalt Prime Coat20,000SM
034Furnish & Apply Modified Asphalt Tack Coat20,000SM
035Place Concrete for Less Than 1,000 SM Construction10CM
036Place Concrete for More Than 1,000 SM Construction10CM
037Install Concrete Formwork10SM
038Install Concrete Reinforcement Bars125KG
Airfield PCC
Pavement039Place Various Thick Plain PCC Pavement for Less Than 1,000 SM Construction100CM
Surface
040Place Various Thick Plain PCC Pavement for more than 1,000 SM Construction900CM
041Expansion Joint with Two-component Sealant100LM
042Expansion Joint with Silicon Sealant100LM
043Sprit-type Doweled Construction Joint with Two-component Sealant100LM
044Sprit-type Doweled Construction Joint with Silicon Sealant100LM
045Single-piece Doweled Construction Joint with Two-component Sealant100LM
046Single-piece Doweled Construction Joint with Silicon Sealant100LM
047Reseal Joints and Seal Cracks of PCC with Two-component Sealant12,000LM
048Reseal Joints and Seal Cracks of PCC with Silicon Sealant100LM
049Apply Seal-Coat with Primer for Heat Resistance20SM
050Apply Epoxy Concrete Patch 75 mm Thick20SM
051Install Static Ground for PCC4EA
052Grooving of PCC Surface500SM
Recycled AC
Pavement for05350 mm Thick Recycled AC Surfaces for Less Than 1,000 SM Construction10SM
Service
Roadway05450 mm Thick Recycled AC Surfaces for more than 1,000 SM Construction10SM
Pavement055Removal and Disposal of Pavement Marking by Water Pressure200SM
Markings/056Pavement Marking Stripes Retro-reflective Beads, Type I15,000SM
Rubber057Pavement Marking Stripes Retro-reflective Beads, Type III2,000SM
Removal058Pavement Marking Stripes Non-Retro-reflective Beads15,000SM
059Alphanumeric and Japanese Sign Board Marking Type 1 or 2300SM
060Various Alphanumeric and Japanese Stencil Paving Marking135SM
061Removal and Disposal of Rubber Deposits by Water Pressure15,000SM
Surface062Install V-Type Concrete Ditch (W700mm x 85mm Thick)50LM
Inlets/Ditches063Install Free Gradient Concrete "U" Ditches and Concrete Cover (W400mm x D1,100mm, Load Class T-25)20LM
064Install Free Gradient Concrete "U" Ditches and Grating Cover (W400mm x D1,100mm, Load Class T-25)10LM
065Install Aircraft type Concrete Catch Basin with Bolt Fixed Steel Frame and Grating Cover, 500mm Square x D1,000mm2EA
066Install Aircraft type Concrete "U" Ditches with Bolt Fixed Steel Frame and Grating Cover, (W500mm x D1,000mm)20LM
Storm067Install 300 mm Diameter Ribbed VU Pipe100LM
Drain Lines/068Install 600 mm Diameter Concrete Pipe100LM
Manholes069Install 800 mm Diameter Concrete Pipe10LM
070Install 1000 mm Diameter Concrete Pipe10LM
071Raise/Lower existing Manhole or Catch Basin Frame and Cover6EA
072Install new Manhole or Catch Basin with Frame and Cover, 600 mm square or round (Load Class T-25)10EA
073Install new Manhole or Catch Basin with Frame and Cover, 900 mm square or round (Load Class T-25)3EA
Erosion074Install Geotextile with Seed and Fertilizer for Erosion Protection20SM
Protection075Install Square River Stone Wire Bag for Erosion Protection (H=50cm x W=120cm)10LM
Earth Work/076Pavement Excavation5,000CM
Sodding/077Earth Work (Digging and Grading)2,000CM
Hydroseeding078Transportation of Excavated Soil to Stock Yard7,000CM
079Construct Embankment with Excavated Soil1,000CM
080Construct Embankment with New Soil1,000CM
081Backfill Excavated Soil500CM
082Backfill New Soil500CM
083Place Sod (Noshiba)2,000SM
084Hydroseeding20,000SM
085Place Topsoil5,000CM
Electric086Install 50 mm Diameter Polyethylene Flexible Conduit200LM
Work087Install New Cable CV 3.5mm2-3C200LM
088Install New 6KV Cable CVT22SQ50LM
089Raise/Lower Existing Runway/Taxiway Light and Concrete Foundation50EA
090Install Grounding Rod3EA
091Install Stand Type Runway Light and Light Assembly with Concrete Foundation2EA
092Install Flash Mount Type Runway Light and Light Assembly with Concrete Foundation2EA
093Install Stand Type Taxiway Light and Light Assembly with Concrete Foundation2EA
Miscellaneous
Work094Install Cable Tie-down Anchors for Ultra-High-Molecular-Weight (UHMW) Polyethylene Panels or AC Surface for BAK-128EA
095Install Frangible Type Airfield Sign with Concrete Foundation1EA
Removal and096Saw Cutting Existing AC Pavement 0-100 mm thick500LM
Disposal097Saw Cutting Existing AC Pavement 101-200 mm thick500LM
Work098Saw Cutting Existing Concrete Pavement 201-300 mm thick10LM
099Saw Cutting Existing Concrete Pavement 301-400 mm thick10LM
100100 mm Diameter Core Drilling of Existing Concrete Pavement 0-400 mm thick10EA
10150 mm Thick Cold Milling of Existing AC Pavement10,000SM
102100 mm Thick Cold Milling of Existing AC Pavement10,000SM
103Cold Milling of PCC Pavement50CM
104Partial Depth Concrete Removal 100mm - 150mm Thick by Chipping or Cold Milling100SM
105Removal of Asphalt Concrete Pavement5,000MTON
106Removal of Reinforced Concrete By Machine500CM
107Removal of Reinforced Concrete By Labor10CM
108Removal of Plain Concrete by Machine200CM
109Removal of Plain Concrete by Labor10CM
110Removal of Steel10MTON
111Removal of PVC Pipe30LM
112Disposal of Asphalt/Concrete Pavement with Non-Recyclable Geotextile10MTON
113Cut Flush and Removal Shrub, Bush, or Tree, less than 5 cm Caliper (Diameter) at Breast High120EA
114Cut Flush and Removal Tree, 5 cm or more, and less than 50 cm Caliper (Diameter) at Breast High200EA
115Removal of Stabilized Gravel/Soil10CM
116Hauling and Disposal of Extra Soil/Gravel to Off Base200MTON
117Hauling and Disposal of Asphalt Concrete to Off Base200MTON
118Hauling and Disposal of Cold Milling AC to Off Base200MTON
119Hauling and Disposal of Plain Concrete to Off Base50MTON
120Hauling and Disposal of Reinforced Concrete to Off Base50MTON
121Hauling and Disposal of Precast Concrete Product to Off Base10MTON
122Hauling and Disposal of Trees and Stump to Off Base100MTON
123Hauling and Disposal of Steel to Off Base10MTON
124Hauling and Disposal of Plastics to Off Base10MTON
Compensation125Labor for Operator30MAN/DAY
Labor126Labor for Civil Worker30MAN/DAY
127Labor for Electrician30MAN/DAY
128Labor for Driver30MAN/DAY
129Labor for Jobsite Foreman30MAN/DAY
Material130AC Wearing Course, Gradation 220MTON
131Modified AC Wearing Course, Gradation 220MTON
132AC Intermediate Course, Gradation 120MTON
133Compressive Concrete20CM
134Flexural Concrete20CM
Equipment135Bulldozer10EA/DAY
136Backhoe10EA/DAY
137Shovel Loader10EA/DAY
138Dump Truck10EA/DAY
139Truck Crane10EA/DAY
140Carrier Dump10EA/DAY
141Forklift10EA/DAY
142Breaker10EA/DAY
143Motor Grader10EA/DAY
144Tire Roller10EA/DAY
145Asphalt Finisher10EA/DAY
146Concrete Cutter10EA/DAY
147Hand Cutter10EA/DAY
148Compressor10EA/DAY
149Generator10EA/DAY
150Vibrator10EA/DAY
151Floodlight10EA/DAY
TOTAL ESTIMATED AMOUNT OF ELINs (Yen)

&10Exhibit A RFP No. &10page &P of &N

Exhibit B

Exhibit B
AIRFIELD/PAVEMENTS IDIQ CONTRACT
MISAWA AB, JAPAN
REQUEST FOR PROPOSAL No.FA520522R0005
CONTRACT No.

Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)

Company Name and Address

CategoryELIN
BDescriptionEstimated
QuantityUnit of IssueUnit Price
¥Estimated Amount
Survey001Topographic Survey and Report, 2,000 SM Area50LOT
002Topographic Survey from Bench Marks and Report, 2,000 SM Area20LOT
003Survey and Report Crack Sealing20,000LM
004Survey and Report, Pavement Markings40,000SM
005Survey and Report for Rubber Markings, 2,000 SM Area10LOT
Test006Field CBR and Laboratory Tests of Paved Airfield, Roads and Parking Lots3EA
007Plate Load Test of Unpaved Airfield, Roads, Parking Lots and Other Surfaces3EA
008Core Drilling and Sampling of AC or PCC Pavement of Airfield, Roads, Parking Lots19EA
009Flight Line Drivers Training and Foreign Object Damage (FOD) Training1,000DRIVER/DAY
Temporary010Temporary Installation of 22/25 mm Thick Steel Plate90SM/MONTH
and
Protection011Temporary Installation of Low Profile Barricades with Lights, 2,000 SM Area30LOT
Work012Heavy Equipment Transportation with 30 ton Trailer90DAY
013Temporary 2 Lights with Generator29EA/MONTH
014Temporary 1 Balloon Light with Generator45EA/MONTH
Airfield
Asphalt01550 mm Thick AC Wearing Course, Gradation 2 for Less Than 1,000 SM Construction1,000SM
Concrete
Surfaces01650 mm Thick AC Wearing Course, Gradation 2 for more than 1,000 SM Construction40,000SM
01750 mm Thick Modified AC Wearing Course, Gradation 2 for less than 1,000 SM Construction1,000SM
01850 mm Thick Modified AC Wearing Course, Gradation 2 for more than 1,000 SM Construction15,000SM
01950 mm Thick AC Intermediate Course, Gradation 1 for less than 1,000 SM Construction1,000SM
02050 mm Thick AC Intermediate Course, Gradation 1 for more than 1.000 SM Construction40,000SM
021Leveling AC Intermediate Course, Gradation 3 for less than 1,000 SM Construction20TON
022Leveling AC Intermediate Course, Gradation 3 for more than 1,000 SM Construction145TON
023Construct Base Course, M-251,000CM
024Construct Subbase Course, C-40100CM
025Construct Granular Material10CM
026Install Static Ground for AC5EA
027Grooving of AC Surface100SM
028Base Stabilization for pavement, Mix 150mm Thick100SM
029Base Stabilization for pavement, Mix 200mm Thick100SM
Additional030Install Geotextile on Existing AC or Concrete Pavement1,000SM
Minor031Seal Crack of Existing AC Pavement500LM
Pavement032Seal Crack of Existing AC or PCC Pavement with Epoxy Sealant20LM
Work033Furnish & Apply Asphalt Prime Coat20,000SM
034Furnish & Apply Modified Asphalt Tack Coat20,000SM
035Place Concrete for Less Than 1,000 SM Construction10CM
036Place Concrete for More Than 1,000 SM Construction10CM
037Install Concrete Formwork10SM
038Install Concrete Reinforcement Bars125KG
Airfield PCC
Pavement039Place Various Thick Plain PCC Pavement for Less Than 1,000 SM Construction100CM
Surface
040Place Various Thick Plain PCC Pavement for more than 1,000 SM Construction900CM
041Expansion Joint with Two-component Sealant100LM
042Expansion Joint with Silicon Sealant100LM
043Sprit-type Doweled Construction Joint with Two-component Sealant100LM
044Sprit-type Doweled Construction Joint with Silicon Sealant100LM
045Single-piece Doweled Construction Joint with Two-component Sealant100LM
046Single-piece Doweled Construction Joint with Silicon Sealant100LM
047Reseal Joints and Seal Cracks of PCC with Two-component Sealant12,000LM
048Reseal Joints and Seal Cracks of PCC with Silicon Sealant100LM
049Apply Seal-Coat with Primer for Heat Resistance20SM
050Apply Epoxy Concrete Patch 75 mm Thick20SM
051Install Static Ground for PCC4EA
052Grooving of PCC Surface500SM
Recycled AC
Pavement for05350 mm Thick Recycled AC Surfaces for Less Than 1,000 SM Construction10SM
Service
Roadway05450 mm Thick Recycled AC Surfaces for more than 1,000 SM Construction10SM
Pavement055Removal and Disposal of Pavement Marking by Water Pressure200SM
Markings/056Pavement Marking Stripes Retro-reflective Beads, Type I15,000SM
Rubber057Pavement Marking Stripes Retro-reflective Beads, Type III2,000SM
Removal058Pavement Marking Stripes Non-Retro-reflective Beads15,000SM
059Alphanumeric and Japanese Sign Board Marking Type 1 or 2300SM
060Various Alphanumeric and Japanese Stencil Paving Marking135SM
061Removal and Disposal of Rubber Deposits by Water Pressure15,000SM
Surface062Install V-Type Concrete Ditch (W700mm x 85mm Thick)50LM
Inlets/Ditches063Install Free Gradient Concrete "U" Ditches and Concrete Cover (W400mm x D1,100mm, Load Class T-25)20LM
064Install Free Gradient Concrete "U" Ditches and Grating Cover (W400mm x D1,100mm, Load Class T-25)10LM
065Install Aircraft type Concrete Catch Basin with Bolt Fixed Steel Frame and Grating Cover, 500mm Square x D1,000mm2EA
066Install Aircraft type Concrete "U" Ditches with Bolt Fixed Steel Frame and Grating Cover, (W500mm x D1,000mm)20LM
Storm067Install 300 mm Diameter Ribbed VU Pipe100LM
Drain Lines/068Install 600 mm Diameter Concrete Pipe100LM
Manholes069Install 800 mm Diameter Concrete Pipe10LM
070Install 1000 mm Diameter Concrete Pipe10LM
071Raise/Lower existing Manhole or Catch Basin Frame and Cover6EA
072Install new Manhole or Catch Basin with Frame and Cover, 600 mm square or round (Load Class T-25)10EA
073Install new Manhole or Catch Basin with Frame and Cover, 900 mm square or round (Load Class T-25)3EA
Erosion074Install Geotextile with Seed and Fertilizer for Erosion Protection20SM
Protection075Install Square River Stone Wire Bag for Erosion Protection (H=50cm x W=120cm)10LM
Earth Work/076Pavement Excavation5,000CM
Sodding/077Earth Work (Digging and Grading)2,000CM
Hydroseeding078Transportation of Excavated Soil to Stock Yard7,000CM
079Construct Embankment with Excavated Soil1,000CM
080Construct Embankment with New Soil1,000CM
081Backfill Excavated Soil500CM
082Backfill New Soil500CM
083Place Sod (Noshiba)2,000SM
084Hydroseeding20,000SM
085Place Topsoil5,000CM
Electric086Install 50 mm Diameter Polyethylene Flexible Conduit200LM
Work087Install New Cable CV 3.5mm2-3C200LM
088Install New 6KV Cable CVT22SQ50LM
089Raise/Lower Existing Runway/Taxiway Light and Concrete Foundation50EA
090Install Grounding Rod3EA
091Install Stand Type Runway Light and Light Assembly with Concrete Foundation2EA
092Install Flash Mount Type Runway Light and Light Assembly with Concrete Foundation2EA
093Install Stand Type Taxiway Light and Light Assembly with Concrete Foundation2EA
Miscellaneous
Work094Install Cable Tie-down Anchors for Ultra-High-Molecular-Weight (UHMW) Polyethylene Panels or AC Surface for BAK-128EA
095Install Frangible Type Airfield Sign with Concrete Foundation1EA
Removal and096Saw Cutting Existing AC Pavement 0-100 mm thick500LM
Disposal097Saw Cutting Existing AC Pavement 101-200 mm thick500LM
Work098Saw Cutting Existing Concrete Pavement 201-300 mm thick10LM
099Saw Cutting Existing Concrete Pavement 301-400 mm thick10LM
100100 mm Diameter Core Drilling of Existing Concrete Pavement 0-400 mm thick10EA
10150 mm Thick Cold Milling of Existing AC Pavement10,000SM
102100 mm Thick Cold Milling of Existing AC Pavement10,000SM
103Cold Milling of PCC Pavement50CM
104Partial Depth Concrete Removal 100mm - 150mm Thick by Chipping or Cold Milling100SM
105Removal of Asphalt Concrete Pavement5,000MTON
106Removal of Reinforced Concrete By Machine500CM
107Removal of Reinforced Concrete By Labor10CM
108Removal of Plain Concrete by Machine200CM
109Removal of Plain Concrete by Labor10CM
110Removal of Steel10MTON
111Removal of PVC Pipe30LM
112Disposal of Asphalt/Concrete Pavement with Non-Recyclable Geotextile10MTON
113Cut Flush and Removal Shrub, Bush, or Tree, less than 5 cm Caliper (Diameter) at Breast High120EA
114Cut Flush and Removal Tree, 5 cm or more, and less than 50 cm Caliper (Diameter) at Breast High200EA
115Removal of Stabilized Gravel/Soil10CM
116Hauling and Disposal of Extra Soil/Gravel to Off Base200MTON
117Hauling and Disposal of Asphalt Concrete to Off Base200MTON
118Hauling and Disposal of Cold Milling AC to Off Base200MTON
119Hauling and Disposal of Plain Concrete to Off Base50MTON
120Hauling and Disposal of Reinforced Concrete to Off Base50MTON
121Hauling and Disposal of Precast Concrete Product to Off Base10MTON
122Hauling and Disposal of Trees and Stump to Off Base100MTON
123Hauling and Disposal of Steel to Off Base10MTON
124Hauling and Disposal of Plastics to Off Base10MTON
Compensation125Labor for Operator30MAN/DAY
Labor126Labor for Civil Worker30MAN/DAY
127Labor for Electrician30MAN/DAY
128Labor for Driver30MAN/DAY
129Labor for Jobsite Foreman30MAN/DAY
Material130AC Wearing Course, Gradation 220MTON
131Modified AC Wearing Course, Gradation 220MTON
132AC Intermediate Course, Gradation 120MTON
133Compressive Concrete20CM
134Flexural Concrete20CM
Equipment135Bulldozer10EA/DAY
136Backhoe10EA/DAY
137Shovel Loader10EA/DAY
138Dump Truck10EA/DAY
139Truck Crane10EA/DAY
140Carrier Dump10EA/DAY
141Forklift10EA/DAY
142Breaker10EA/DAY
143Motor Grader10EA/DAY
144Tire Roller10EA/DAY
145Asphalt Finisher10EA/DAY
146Concrete Cutter10EA/DAY
147Hand Cutter10EA/DAY
148Compressor10EA/DAY
149Generator10EA/DAY
150Vibrator10EA/DAY
151Floodlight10EA/DAY
TOTAL ESTIMATED AMOUNT OF ELINs (Yen)

&10Exhibit B RFP No. &10page &P of &N

Exhibit C

Exhibit C
AIRFIELD/PAVEMENTS IDIQ CONTRACT
MISAWA AB, JAPAN
REQUEST FOR PROPOSAL No.FA520522R0005
CONTRACT No.

Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)

Company Name and Address

CategoryELIN
CDescriptionEstimated
QuantityUnit of IssueUnit Price
¥Estimated Amount
Survey001Topographic Survey and Report, 2,000 SM Area50LOT
002Topographic Survey from Bench Marks and Report, 2,000 SM Area20LOT
003Survey and Report Crack Sealing20,000LM
004Survey and Report, Pavement Markings40,000SM
005Survey and Report for Rubber Markings, 2,000 SM Area10LOT
Test006Field CBR and Laboratory Tests of Paved Airfield, Roads and Parking Lots3EA
007Plate Load Test of Unpaved Airfield, Roads, Parking Lots and Other Surfaces3EA
008Core Drilling and Sampling of AC or PCC Pavement of Airfield, Roads, Parking Lots19EA
009Flight Line Drivers Training and Foreign Object Damage (FOD) Training1,000DRIVER/DAY
Temporary010Temporary Installation of 22/25 mm Thick Steel Plate90SM/MONTH
and
Protection011Temporary Installation of Low Profile Barricades with Lights, 2,000 SM Area30LOT
Work012Heavy Equipment Transportation with 30 ton Trailer90DAY
013Temporary 2 Lights with Generator29EA/MONTH
014Temporary 1 Balloon Light with Generator45EA/MONTH
Airfield
Asphalt01550 mm Thick AC Wearing Course, Gradation 2 for Less Than 1,000 SM Construction1,000SM
Concrete
Surfaces01650 mm Thick AC Wearing Course, Gradation 2 for more than 1,000 SM Construction40,000SM
01750 mm Thick Modified AC Wearing Course, Gradation 2 for less than 1,000 SM Construction1,000SM
01850 mm Thick Modified AC Wearing Course, Gradation 2 for more than 1,000 SM Construction15,000SM
01950 mm Thick AC Intermediate Course, Gradation 1 for less than 1,000 SM Construction1,000SM
02050 mm Thick AC Intermediate Course, Gradation 1 for more than 1.000 SM Construction40,000SM
021Leveling AC Intermediate Course, Gradation 3 for less than 1,000 SM Construction20TON
022Leveling AC Intermediate Course, Gradation 3 for more than 1,000 SM Construction145TON
023Construct Base Course, M-251,000CM
024Construct Subbase Course, C-40100CM
025Construct Granular Material10CM
026Install Static Ground for AC5EA
027Grooving of AC Surface100SM
028Base Stabilization for pavement, Mix 150mm Thick100SM
029Base Stabilization for pavement, Mix 200mm Thick100SM
Additional030Install Geotextile on Existing AC or Concrete Pavement1,000SM
Minor031Seal Crack of Existing AC Pavement500LM
Pavement032Seal Crack of Existing AC or PCC Pavement with Epoxy Sealant20LM
Work033Furnish & Apply Asphalt Prime Coat20,000SM
034Furnish & Apply Modified Asphalt Tack Coat20,000SM
035Place Concrete for Less Than 1,000 SM Construction10CM
036Place Concrete for More Than 1,000 SM Construction10CM
037Install Concrete Formwork10SM
038Install Concrete Reinforcement Bars125KG
Airfield PCC
Pavement039Place Various Thick Plain PCC Pavement for Less Than 1,000 SM Construction100CM
Surface
040Place Various Thick Plain PCC Pavement for more than 1,000 SM Construction900CM
041Expansion Joint with Two-component Sealant100LM
042Expansion Joint with Silicon Sealant100LM
043Sprit-type Doweled Construction Joint with Two-component Sealant100LM
044Sprit-type Doweled Construction Joint with Silicon Sealant100LM
045Single-piece Doweled Construction Joint with Two-component Sealant100LM
046Single-piece Doweled Construction Joint with Silicon Sealant100LM
047Reseal Joints and Seal Cracks of PCC with Two-component Sealant12,000LM
048Reseal Joints and Seal Cracks of PCC with Silicon Sealant100LM
049Apply Seal-Coat with Primer for Heat Resistance20SM
050Apply Epoxy Concrete Patch 75 mm Thick20SM
051Install Static Ground for PCC4EA
052Grooving of PCC Surface500SM
Recycled AC
Pavement for05350 mm Thick Recycled AC Surfaces for Less Than 1,000 SM Construction10SM
Service
Roadway05450 mm Thick Recycled AC Surfaces for more than 1,000 SM Construction10SM
Pavement055Removal and Disposal of Pavement Marking by Water Pressure200SM
Markings/056Pavement Marking Stripes Retro-reflective Beads, Type I15,000SM
Rubber057Pavement Marking Stripes Retro-reflective Beads, Type III2,000SM
Removal058Pavement Marking Stripes Non-Retro-reflective Beads15,000SM
059Alphanumeric and Japanese Sign Board Marking Type 1 or 2300SM
060Various Alphanumeric and Japanese Stencil Paving Marking135SM
061Removal and Disposal of Rubber Deposits by Water Pressure15,000SM
Surface062Install V-Type Concrete Ditch (W700mm x 85mm Thick)50LM
Inlets/Ditches063Install Free Gradient Concrete "U" Ditches and Concrete Cover (W400mm x D1,100mm, Load Class T-25)20LM
064Install Free Gradient Concrete "U" Ditches and Grating Cover (W400mm x D1,100mm, Load Class T-25)10LM
065Install Aircraft type Concrete Catch Basin with Bolt Fixed Steel Frame and Grating Cover, 500mm Square x D1,000mm2EA
066Install Aircraft type Concrete "U" Ditches with Bolt Fixed Steel Frame and Grating Cover, (W500mm x D1,000mm)20LM
Storm067Install 300 mm Diameter Ribbed VU Pipe100LM
Drain Lines/068Install 600 mm Diameter Concrete Pipe100LM
Manholes069Install 800 mm Diameter Concrete Pipe10LM
070Install 1000 mm Diameter Concrete Pipe10LM
071Raise/Lower existing Manhole or Catch Basin Frame and Cover6EA
072Install new Manhole or Catch Basin with Frame and Cover, 600 mm square or round (Load Class T-25)10EA
073Install new Manhole or Catch Basin with Frame and Cover, 900 mm square or round (Load Class T-25)3EA
Erosion074Install Geotextile with Seed and Fertilizer for Erosion Protection20SM
Protection075Install Square River Stone Wire Bag for Erosion Protection (H=50cm x W=120cm)10LM
Earth Work/076Pavement Excavation5,000CM
Sodding/077Earth Work (Digging and Grading)2,000CM
Hydroseeding078Transportation of Excavated Soil to Stock Yard7,000CM
079Construct Embankment with Excavated Soil1,000CM
080Construct Embankment with New Soil1,000CM
081Backfill Excavated Soil500CM
082Backfill New Soil500CM
083Place Sod (Noshiba)2,000SM
084Hydroseeding20,000SM
085Place Topsoil5,000CM
Electric086Install 50 mm Diameter Polyethylene Flexible Conduit200LM
Work087Install New Cable CV 3.5mm2-3C200LM
088Install New 6KV Cable CVT22SQ50LM
089Raise/Lower Existing Runway/Taxiway Light and Concrete Foundation50EA
090Install Grounding Rod3EA
091Install Stand Type Runway Light and Light Assembly with Concrete Foundation2EA
092Install Flash Mount Type Runway Light and Light Assembly with Concrete Foundation2EA
093Install Stand Type Taxiway Light and Light Assembly with Concrete Foundation2EA
Miscellaneous
Work094Install Cable Tie-down Anchors for Ultra-High-Molecular-Weight (UHMW) Polyethylene Panels or AC Surface for BAK-128EA
095Install Frangible Type Airfield Sign with Concrete Foundation1EA
Removal and096Saw Cutting Existing AC Pavement 0-100 mm thick500LM
Disposal097Saw Cutting Existing AC Pavement 101-200 mm thick500LM
Work098Saw Cutting Existing Concrete Pavement 201-300 mm thick10LM
099Saw Cutting Existing Concrete Pavement 301-400 mm thick10LM
100100 mm Diameter Core Drilling of Existing Concrete Pavement 0-400 mm thick10EA
10150 mm Thick Cold Milling of Existing AC Pavement10,000SM
102100 mm Thick Cold Milling of Existing AC Pavement10,000SM
103Cold Milling of PCC Pavement50CM
104Partial Depth Concrete Removal 100mm - 150mm Thick by Chipping or Cold Milling100SM
105Removal of Asphalt Concrete Pavement5,000MTON
106Removal of Reinforced Concrete By Machine500CM
107Removal of Reinforced Concrete By Labor10CM
108Removal of Plain Concrete by Machine200CM
109Removal of Plain Concrete by Labor10CM
110Removal of Steel10MTON
111Removal of PVC Pipe30LM
112Disposal of Asphalt/Concrete Pavement with Non-Recyclable Geotextile10MTON
113Cut Flush and Removal Shrub, Bush, or Tree, less than 5 cm Caliper (Diameter) at Breast High120EA
114Cut Flush and Removal Tree, 5 cm or more, and less than 50 cm Caliper (Diameter) at Breast High200EA
115Removal of Stabilized Gravel/Soil10CM
116Hauling and Disposal of Extra Soil/Gravel to Off Base200MTON
117Hauling and Disposal of Asphalt Concrete to Off Base200MTON
118Hauling and Disposal of Cold Milling AC to Off Base200MTON
119Hauling and Disposal of Plain Concrete to Off Base50MTON
120Hauling and Disposal of Reinforced Concrete to Off Base50MTON
121Hauling and Disposal of Precast Concrete Product to Off Base10MTON
122Hauling and Disposal of Trees and Stump to Off Base100MTON
123Hauling and Disposal of Steel to Off Base10MTON
124Hauling and Disposal of Plastics to Off Base10MTON
Compensation125Labor for Operator30MAN/DAY
Labor126Labor for Civil Worker30MAN/DAY
127Labor for Electrician30MAN/DAY
128Labor for Driver30MAN/DAY
129Labor for Jobsite Foreman30MAN/DAY
Material130AC Wearing Course, Gradation 220MTON
131Modified AC Wearing Course, Gradation 220MTON
132AC Intermediate Course, Gradation 120MTON
133Compressive Concrete20CM
134Flexural Concrete20CM
Equipment135Bulldozer10EA/DAY
136Backhoe10EA/DAY
137Shovel Loader10EA/DAY
138Dump Truck10EA/DAY
139Truck Crane10EA/DAY
140Carrier Dump10EA/DAY
141Forklift10EA/DAY
142Breaker10EA/DAY
143Motor Grader10EA/DAY
144Tire Roller10EA/DAY
145Asphalt Finisher10EA/DAY
146Concrete Cutter10EA/DAY
147Hand Cutter10EA/DAY
148Compressor10EA/DAY
149Generator10EA/DAY
150Vibrator10EA/DAY
151Floodlight10EA/DAY
TOTAL ESTIMATED AMOUNT OF ELINs (Yen)

&10Exhibit C RFP No. &10page &P of &N

Exhibit D

Exhibit D
AIRFIELD/PAVEMENTS IDIQ CONTRACT
MISAWA AB, JAPAN
REQUEST FOR PROPOSAL No.FA520522R0005
CONTRACT No.

Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)

Company Name and Address

CategoryELIN
DDescriptionEstimated
QuantityUnit of IssueUnit Price
¥Estimated Amount
Survey001Topographic Survey and Report, 2,000 SM Area50LOT
002Topographic Survey from Bench Marks and Report, 2,000 SM Area20LOT
003Survey and Report Crack Sealing20,000LM
004Survey and Report, Pavement Markings40,000SM
005Survey and Report for Rubber Markings, 2,000 SM Area10LOT
Test006Field CBR and Laboratory Tests of Paved Airfield, Roads and Parking Lots3EA
007Plate Load Test of Unpaved Airfield, Roads, Parking Lots and Other Surfaces3EA
008Core Drilling and Sampling of AC or PCC Pavement of Airfield, Roads, Parking Lots19EA
009Flight Line Drivers Training and Foreign Object Damage (FOD) Training1,000DRIVER/DAY
Temporary010Temporary Installation of 22/25 mm Thick Steel Plate90SM/MONTH
and
Protection011Temporary Installation of Low Profile Barricades with Lights, 2,000 SM Area30LOT
Work012Heavy Equipment Transportation with 30 ton Trailer90DAY
013Temporary 2 Lights with Generator29EA/MONTH
014Temporary 1 Balloon Light with Generator45EA/MONTH
Airfield
Asphalt01550 mm Thick AC Wearing Course, Gradation 2 for Less Than 1,000 SM Construction1,000SM
Concrete
Surfaces01650 mm Thick AC Wearing Course, Gradation 2 for more than 1,000 SM Construction40,000SM
01750 mm Thick Modified AC Wearing Course, Gradation 2 for less than 1,000 SM Construction1,000SM
01850 mm Thick Modified AC Wearing Course, Gradation 2 for more than 1,000 SM Construction15,000SM
01950 mm Thick AC Intermediate Course, Gradation 1 for less than 1,000 SM Construction1,000SM
02050 mm Thick AC Intermediate Course, Gradation 1 for more than 1.000 SM Construction40,000SM
021Leveling AC Intermediate Course, Gradation 3 for less than 1,000 SM Construction20TON
022Leveling AC Intermediate Course, Gradation 3 for more than 1,000 SM Construction145TON
023Construct Base Course, M-251,000CM
024Construct Subbase Course, C-40100CM
025Construct Granular Material10CM
026Install Static Ground for AC5EA
027Grooving of AC Surface100SM
028Base Stabilization for pavement, Mix 150mm Thick100SM
029Base Stabilization for pavement, Mix 200mm Thick100SM
Additional030Install Geotextile on Existing AC or Concrete Pavement1,000SM
Minor031Seal Crack of Existing AC Pavement500LM
Pavement032Seal Crack of Existing AC or PCC Pavement with Epoxy Sealant20LM
Work033Furnish & Apply Asphalt Prime Coat20,000SM
034Furnish & Apply Modified Asphalt Tack Coat20,000SM
035Place Concrete for Less Than 1,000 SM Construction10CM
036Place Concrete for More Than 1,000 SM Construction10CM
037Install Concrete Formwork10SM
038Install Concrete Reinforcement Bars125KG
Airfield PCC
Pavement039Place Various Thick Plain PCC Pavement for Less Than 1,000 SM Construction100CM
Surface
040Place Various Thick Plain PCC Pavement for more than 1,000 SM Construction900CM
041Expansion Joint with Two-component Sealant100LM
042Expansion Joint with Silicon Sealant100LM
043Sprit-type Doweled Construction Joint with Two-component Sealant100LM
044Sprit-type Doweled Construction Joint with Silicon Sealant100LM
045Single-piece Doweled Construction Joint with Two-component Sealant100LM
046Single-piece Doweled Construction Joint with Silicon Sealant100LM
047Reseal Joints and Seal Cracks of PCC with Two-component Sealant12,000LM
048Reseal Joints and Seal Cracks of PCC with Silicon Sealant100LM
049Apply Seal-Coat with Primer for Heat Resistance20SM
050Apply Epoxy Concrete Patch 75 mm Thick20SM
051Install Static Ground for PCC4EA
052Grooving of PCC Surface500SM
Recycled AC
Pavement for05350 mm Thick Recycled AC Surfaces for Less Than 1,000 SM Construction10SM
Service
Roadway05450 mm Thick Recycled AC Surfaces for more than 1,000 SM Construction10SM
Pavement055Removal and Disposal of Pavement Marking by Water Pressure200SM
Markings/056Pavement Marking Stripes Retro-reflective Beads, Type I15,000SM
Rubber057Pavement Marking Stripes Retro-reflective Beads, Type III2,000SM
Removal058Pavement Marking Stripes Non-Retro-reflective Beads15,000SM
059Alphanumeric and Japanese Sign Board Marking Type 1 or 2300SM
060Various Alphanumeric and Japanese Stencil Paving Marking135SM
061Removal and Disposal of Rubber Deposits by Water Pressure15,000SM
Surface062Install V-Type Concrete Ditch (W700mm x 85mm Thick)50LM
Inlets/Ditches063Install Free Gradient Concrete "U" Ditches and Concrete Cover (W400mm x D1,100mm, Load Class T-25)20LM
064Install Free Gradient Concrete "U" Ditches and Grating Cover (W400mm x D1,100mm, Load Class T-25)10LM
065Install Aircraft type Concrete Catch Basin with Bolt Fixed Steel Frame and Grating Cover, 500mm Square x D1,000mm2EA
066Install Aircraft type Concrete "U" Ditches with Bolt Fixed Steel Frame and Grating Cover, (W500mm x D1,000mm)20LM
Storm067Install 300 mm Diameter Ribbed VU Pipe100LM
Drain Lines/068Install 600 mm Diameter Concrete Pipe100LM
Manholes069Install 800 mm Diameter Concrete Pipe10LM
070Install 1000 mm Diameter Concrete Pipe10LM
071Raise/Lower existing Manhole or Catch Basin Frame and Cover6EA
072Install new Manhole or Catch Basin with Frame and Cover, 600 mm square or round (Load Class T-25)10EA
073Install new Manhole or Catch Basin with Frame and Cover, 900 mm square or round (Load Class T-25)3EA
Erosion074Install Geotextile with Seed and Fertilizer for Erosion Protection20SM
Protection075Install Square River Stone Wire Bag for Erosion Protection (H=50cm x W=120cm)10LM
Earth Work/076Pavement Excavation5,000CM
Sodding/077Earth Work (Digging and Grading)2,000CM
Hydroseeding078Transportation of Excavated Soil to Stock Yard7,000CM
079Construct Embankment with Excavated Soil1,000CM
080Construct Embankment with New Soil1,000CM
081Backfill Excavated Soil500CM
082Backfill New Soil500CM
083Place Sod (Noshiba)2,000SM
084Hydroseeding20,000SM
085Place Topsoil5,000CM
Electric086Install 50 mm Diameter Polyethylene Flexible Conduit200LM
Work087Install New Cable CV 3.5mm2-3C200LM
088Install New 6KV Cable CVT22SQ50LM
089Raise/Lower Existing Runway/Taxiway Light and Concrete Foundation50EA
090Install Grounding Rod3EA
091Install Stand Type Runway Light and Light Assembly with Concrete Foundation2EA
092Install Flash Mount Type Runway Light and Light Assembly with Concrete Foundation2EA
093Install Stand Type Taxiway Light and Light Assembly with Concrete Foundation2EA
Miscellaneous
Work094Install Cable Tie-down Anchors for Ultra-High-Molecular-Weight (UHMW) Polyethylene Panels or AC Surface for BAK-128EA
095Install Frangible Type Airfield Sign with Concrete Foundation1EA
Removal and096Saw Cutting Existing AC Pavement 0-100 mm thick500LM
Disposal097Saw Cutting Existing AC Pavement 101-200 mm thick500LM
Work098Saw Cutting Existing Concrete Pavement 201-300 mm thick10LM
099Saw Cutting Existing Concrete Pavement 301-400 mm thick10LM
100100 mm Diameter Core Drilling of Existing Concrete Pavement 0-400 mm thick10EA
10150 mm Thick Cold Milling of Existing AC Pavement10,000SM
102100 mm Thick Cold Milling of Existing AC Pavement10,000SM
103Cold Milling of PCC Pavement50CM
104Partial Depth Concrete Removal 100mm - 150mm Thick by Chipping or Cold Milling100SM
105Removal of Asphalt Concrete Pavement5,000MTON
106Removal of Reinforced Concrete By Machine500CM
107Removal of Reinforced Concrete By Labor10CM
108Removal of Plain Concrete by Machine200CM
109Removal of Plain Concrete by Labor10CM
110Removal of Steel10MTON
111Removal of PVC Pipe30LM
112Disposal of Asphalt/Concrete Pavement with Non-Recyclable Geotextile10MTON
113Cut Flush and Removal Shrub, Bush, or Tree, less than 5 cm Caliper (Diameter) at Breast High120EA
114Cut Flush and Removal Tree, 5 cm or more, and less than 50 cm Caliper (Diameter) at Breast High200EA
115Removal of Stabilized Gravel/Soil10CM
116Hauling and Disposal of Extra Soil/Gravel to Off Base200MTON
117Hauling and Disposal of Asphalt Concrete to Off Base200MTON
118Hauling and Disposal of Cold Milling AC to Off Base200MTON
119Hauling and Disposal of Plain Concrete to Off Base50MTON
120Hauling and Disposal of Reinforced Concrete to Off Base50MTON
121Hauling and Disposal of Precast Concrete Product to Off Base10MTON
122Hauling and Disposal of Trees and Stump to Off Base100MTON
123Hauling and Disposal of Steel to Off Base10MTON
124Hauling and Disposal of Plastics to Off Base10MTON
Compensation125Labor for Operator30MAN/DAY
Labor126Labor for Civil Worker30MAN/DAY
127Labor for Electrician30MAN/DAY
128Labor for Driver30MAN/DAY
129Labor for Jobsite Foreman30MAN/DAY
Material130AC Wearing Course, Gradation 220MTON
131Modified AC Wearing Course, Gradation 220MTON
132AC Intermediate Course, Gradation 120MTON
133Compressive Concrete20CM
134Flexural Concrete20CM
Equipment135Bulldozer10EA/DAY
136Backhoe10EA/DAY
137Shovel Loader10EA/DAY
138Dump Truck10EA/DAY
139Truck Crane10EA/DAY
140Carrier Dump10EA/DAY
141Forklift10EA/DAY
142Breaker10EA/DAY
143Motor Grader10EA/DAY
144Tire Roller10EA/DAY
145Asphalt Finisher10EA/DAY
146Concrete Cutter10EA/DAY
147Hand Cutter10EA/DAY
148Compressor10EA/DAY
149Generator10EA/DAY
150Vibrator10EA/DAY
151Floodlight10EA/DAY
TOTAL ESTIMATED AMOUNT OF ELINs (Yen)

&10Exhibit D RFP No. &10page &P of &N

Exhibit E

Exhibit E
AIRFIELD/PAVEMENTS IDIQ CONTRACT
MISAWA AB, JAPAN
REQUEST FOR PROPOSAL No.FA520522R0005
CONTRACT No.

Offeror (Print Name, Title and Signature) Date Corporate Seal (Han)

Company Name and Address

CategoryELIN
EDescriptionEstimated
QuantityUnit of IssueUnit Price
¥Estimated Amount
Survey001Topographic Survey and Report, 2,000 SM Area50LOT
002Topographic Survey from Bench Marks and Report, 2,000 SM Area20LOT
003Survey and Report Crack Sealing20,000LM
004Survey and Report, Pavement Markings40,000SM
005Survey and Report for Rubber Markings, 2,000 SM Area10LOT
Test006Field CBR and Laboratory Tests of Paved Airfield, Roads and Parking Lots3EA
007Plate Load Test of Unpaved Airfield, Roads, Parking Lots and Other Surfaces3EA
008Core Drilling and Sampling of AC or PCC Pavement of Airfield, Roads, Parking Lots19EA
009Flight Line Drivers Training and Foreign Object Damage (FOD) Training1,000DRIVER/DAY
Temporary010Temporary Installation of 22/25 mm Thick Steel Plate90SM/MONTH
and
Protection011Temporary Installation of Low Profile Barricades with Lights, 2,000 SM Area30LOT
Work012Heavy Equipment Transportation with 30 ton Trailer90DAY
013Temporary 2 Lights with Generator29EA/MONTH
014Temporary 1 Balloon Light with Generator45EA/MONTH
Airfield
Asphalt01550 mm Thick AC Wearing Course, Gradation 2 for Less Than 1,000 SM Construction1,000SM
Concrete
Surfaces01650 mm Thick AC Wearing Course, Gradation 2 for more than 1,000 SM Construction40,000SM
01750 mm Thick Modified AC Wearing Course, Gradation 2 for less than 1,000 SM Construction1,000SM
01850 mm Thick Modified AC Wearing Course, Gradation 2 for more than 1,000 SM Construction15,000SM
01950 mm Thick AC Intermediate Course, Gradation 1 for less than 1,000 SM Construction1,000SM
02050 mm Thick AC Intermediate Course, Gradation 1 for more than 1.000 SM Construction40,000SM
021Leveling AC Intermediate Course, Gradation 3 for less than 1,000 SM Construction20TON
022Leveling AC Intermediate Course, Gradation 3 for more than 1,000 SM Construction145TON
023Construct Base Course, M-251,000CM
024Construct Subbase Course, C-40100CM
025Construct Granular Material10CM
026Install Static Ground for AC5EA
027Grooving of AC Surface100SM
028Base Stabilization for pavement, Mix 150mm Thick100SM
029Base Stabilization for pavement, Mix 200mm Thick100SM
Additional030Install Geotextile on Existing AC or Concrete Pavement1,000SM
Minor031Seal Crack of Existing AC Pavement500LM
Pavement032Seal Crack of Existing AC or PCC Pavement with Epoxy Sealant20LM
Work033Furnish & Apply Asphalt Prime Coat20,000SM
034Furnish & Apply Modified Asphalt Tack Coat20,000SM
035Place Concrete for Less Than 1,000 SM Construction10CM
036Place Concrete for More Than 1,000 SM Construction10CM
037Install Concrete Formwork10SM
038Install Concrete Reinforcement Bars125KG
Airfield PCC
Pavement039Place Various Thick Plain PCC Pavement for Less Than 1,000 SM Construction100CM
Surface
040Place Various Thick Plain PCC Pavement for more than 1,000 SM Construction900CM
041Expansion Joint with Two-component Sealant100LM
042Expansion Joint with Silicon Sealant100LM
043Sprit-type Doweled Construction Joint with Two-component Sealant100LM
044Sprit-type Doweled Construction Joint with Silicon Sealant100LM
045Single-piece Doweled Construction Joint with Two-component Sealant100LM
046Single-piece Doweled Construction Joint with Silicon Sealant100LM
047Reseal Joints and Seal Cracks of PCC with Two-component Sealant12,000LM
048Reseal Joints and Seal Cracks of PCC with Silicon Sealant100LM
049Apply Seal-Coat with Primer for Heat Resistance20SM
050Apply Epoxy Concrete Patch 75 mm Thick20SM
051Install Static Ground for PCC4EA
052Grooving of PCC Surface500SM
Recycled AC
Pavement for05350 mm Thick Recycled AC Surfaces for Less Than 1,000 SM Construction10SM
Service
Roadway05450 mm Thick Recycled AC Surfaces for more than 1,000 SM Construction10SM
Pavement055Removal and Disposal of Pavement Marking by Water Pressure200SM
Markings/056Pavement Marking Stripes Retro-reflective Beads, Type I15,000SM
Rubber057Pavement Marking Stripes Retro-reflective Beads, Type III2,000SM
Removal058Pavement Marking Stripes Non-Retro-reflective Beads15,000SM
059Alphanumeric and Japanese Sign Board Marking Type 1 or 2300SM
060Various Alphanumeric and Japanese Stencil Paving Marking135SM
061Removal and Disposal of Rubber Deposits by Water Pressure15,000SM
Surface062Install V-Type Concrete Ditch (W700mm x 85mm Thick)50LM
Inlets/Ditches063Install Free Gradient Concrete "U" Ditches and Concrete Cover (W400mm x D1,100mm, Load Class T-25)20LM
064Install Free Gradient Concrete "U" Ditches and Grating Cover (W400mm x D1,100mm, Load Class T-25)10LM
065Install Aircraft type Concrete Catch Basin with Bolt Fixed Steel Frame and Grating Cover, 500mm Square x D1,000mm2EA
066Install Aircraft type Concrete "U" Ditches with Bolt Fixed Steel Frame and Grating Cover, (W500mm x D1,000mm)20LM
Storm067Install 300 mm Diameter Ribbed VU Pipe100LM
Drain Lines/068Install 600 mm Diameter Concrete Pipe100LM
Manholes069Install 800 mm Diameter Concrete Pipe10LM
070Install 1000 mm Diameter Concrete Pipe10LM
071Raise/Lower existing Manhole or Catch Basin Frame and Cover6EA
072Install new Manhole or Catch Basin with Frame and Cover, 600 mm square or round (Load Class T-25)10EA
073Install new Manhole or Catch Basin with Frame and Cover, 900 mm square or round (Load Class T-25)3EA
Erosion074Install Geotextile with Seed and Fertilizer for Erosion Protection20SM
Protection075Install Square River Stone Wire Bag for Erosion Protection (H=50cm x W=120cm)10LM
Earth Work/076Pavement Excavation5,000CM
Sodding/077Earth Work (Digging and Grading)2,000CM
Hydroseeding078Transportation of Excavated Soil to Stock Yard7,000CM
079Construct Embankment with Excavated Soil1,000CM
080Construct Embankment with New Soil1,000CM
081Backfill Excavated Soil500CM
082Backfill New Soil500CM
083Place Sod (Noshiba)2,000SM
084Hydroseeding20,000SM
085Place Topsoil5,000CM
Electric086Install 50 mm Diameter Polyethylene Flexible Conduit200LM
Work087Install New Cable CV 3.5mm2-3C200LM
088Install New 6KV Cable CVT22SQ50LM
089Raise/Lower Existing Runway/Taxiway Light and Concrete Foundation50EA
090Install Grounding Rod3EA
091Install Stand Type Runway Light and Light Assembly with Concrete Foundation2EA
092Install Flash Mount Type Runway Light and Light Assembly with Concrete Foundation2EA
093Install Stand Type Taxiway Light and Light Assembly with Concrete Foundation2EA
Miscellaneous
Work094Install Cable Tie-down Anchors for Ultra-High-Molecular-Weight (UHMW) Polyethylene Panels or AC Surface for BAK-128EA
095Install Frangible Type Airfield Sign with Concrete Foundation1EA
Removal and096Saw Cutting Existing AC Pavement 0-100 mm thick500LM
Disposal097Saw Cutting Existing AC Pavement 101-200 mm thick500LM
Work098Saw Cutting Existing Concrete Pavement 201-300 mm thick10LM
099Saw Cutting Existing Concrete Pavement 301-400 mm thick10LM
100100 mm Diameter Core Drilling of Existing Concrete Pavement 0-400 mm thick10EA
10150 mm Thick Cold Milling of Existing AC Pavement10,000SM
102100 mm Thick Cold Milling of Existing AC Pavement10,000SM
103Cold Milling of PCC Pavement50CM
104Partial Depth Concrete Removal 100mm - 150mm Thick by Chipping or Cold Milling100SM
105Removal of Asphalt Concrete Pavement5,000MTON
106Removal of Reinforced Concrete By Machine500CM
107Removal of Reinforced Concrete By Labor10CM
108Removal of Plain Concrete by Machine200CM
109Removal of Plain Concrete by Labor10CM
110Removal of Steel10MTON
111Removal of PVC Pipe30LM
112Disposal of Asphalt/Concrete Pavement with Non-Recyclable Geotextile10MTON
113Cut Flush and Removal Shrub, Bush, or Tree, less than 5 cm Caliper (Diameter) at Breast High120EA
114Cut Flush and Removal Tree, 5 cm or more, and less than 50 cm Caliper (Diameter) at Breast High200EA
115Removal of Stabilized Gravel/Soil10CM
116Hauling and Disposal of Extra Soil/Gravel to Off Base200MTON
117Hauling and Disposal of Asphalt Concrete to Off Base200MTON
118Hauling and Disposal of Cold Milling AC to Off Base200MTON
119Hauling and Disposal of Plain Concrete to Off Base50MTON
120Hauling and Disposal of Reinforced Concrete to Off Base50MTON
121Hauling and Disposal of Precast Concrete Product to Off Base10MTON
122Hauling and Disposal of Trees and Stump to Off Base100MTON
123Hauling and Disposal of Steel to Off Base10MTON
124Hauling and Disposal of Plastics to Off Base10MTON
Compensation125Labor for Operator30MAN/DAY
Labor126Labor for Civil Worker30MAN/DAY
127Labor for Electrician30MAN/DAY
128Labor for Driver30MAN/DAY
129Labor for Jobsite Foreman30MAN/DAY
Material130AC Wearing Course, Gradation 220MTON
131Modified AC Wearing Course, Gradation 220MTON
132AC Intermediate Course, Gradation 120MTON
133Compressive Concrete20CM
134Flexural Concrete20CM
Equipment135Bulldozer10EA/DAY
136Backhoe10EA/DAY
137Shovel Loader10EA/DAY
138Dump Truck10EA/DAY
139Truck Crane10EA/DAY

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .