Exhibit A
| EXHIBIT A | Date: 15 Dec 2017 | ||||||||
| ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT | |||||||||
| MISAWA AB, JAPAN | |||||||||
| REQUEST FOR PROPOSAL No. FA520518R0003 | |||||||||
| CONTRACT No. | |||||||||
| Offeror (Print Name, Title and Signature) Date | |||||||||
| Company Name and Address | |||||||||
| Estimated | Unit of | Estimated | |||||||
| Item No. | Description | Quantity | Issue | Unit Price | Amount | ||||
| ELIN | |||||||||
| SURVEY AND TEST | |||||||||
| 6 | |||||||||
| A | 001 | Quantity Survey of Current Condition for Pavement and Construction Area, One Section per extension 10 m. | 75 | LOT | ¥ | ¥ | 0 | ||
| A | 002 | Quantity Survey of current condition for Concrete Sidewalk, Curb, Gutter and construction Area, One Section per Extension 10 m. | 75 | LOT | ¥ | ¥ | 0 | ||
| A | 003 | Quantity Survey and Report, Pavement Cracks and Joint Seal | 10 | LM | ¥ | ¥ | 0 | ||
| A | 004 | Quantity Survey and Report, Pavement Markings | 10 | LM | ¥ | ¥ | 0 | ||
| A | 005 | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 17 | EA | ¥ | ¥ | 0 | ||
| A | 006 | Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces | 28 | EA | ¥ | ¥ | 0 | ||
| A | 007 | Test Digging of AC Pavement, not to exceed 1m x 1m x 1m includes temporary pavement restoration | 28 | EA | ¥ | ¥ | 0 | ||
| GENERAL CONSTRUCTION AND OTHER WORK | 0 | ||||||||
| 0 | 0 | ||||||||
| A | 008 | Construct Formwork | 10 | SM | ¥ | ¥ | 0 | ||
| A | 009 | Construct Steel Reinforcement Bar | 2 | MTON | ¥ | ¥ | 0 | ||
| A | 010 | Frost Inhibition Course (RC-40) | 10 | CM | ¥ | ¥ | 0 | ||
| A | 011 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 10 | CM | ¥ | ¥ | 0 | ||
| A | 012 | Construct Basis Crushed stone (RC-40) | 10 | CM | ¥ | ¥ | 0 | ||
| A | 013 | Place Concrete (21-8-25) | 10 | CM | ¥ | ¥ | 0 | ||
| A | 014 | Place Concrete (27-8-25) | 10 | CM | ¥ | ¥ | 0 | ||
| A | 015 | Placing and Removing Steel Plate, Size 1.5m x 3.0m | 10 | EA/DAY | ¥ | ¥ | 0 | 1 | |
| A | 016 | Temporary Construction Fence, 1.8m Height x 1.8m Length | 10 | EA/DAY | ¥ | ¥ | 0 | 1 | |
| A | 017 | Temporary Construction Traffic Cone with Lights | 50 | EA/MONTH | ¥ | ¥ | 0 | 0 | |
| A | 018 | Temporary Construction Barricades 4m long x 0.75m Height with Lights | 50 | EA/MONTH | ¥ | ¥ | 0 | 0 | |
| A | 019 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 4,507 | CM | ¥ | ¥ | 0 | ||
| A | 020 | Transportation of Removed Cold Mill AC from Construction Site to Stock Yard/on Base | 4,507 | CM | ¥ | ¥ | 0 | ||
| A | 021 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 2,000 | CM | ¥ | ¥ | 0 | ||
| A | 022 | Transportation of Heavy Equipment with Trailer/Truck on Base | 20 | WAY | ¥ | ¥ | 0 | ||
| A | 023 | Transportation of Heavy Equipment with Self/Truck on Base | 20 | WAY | ¥ | ¥ | 0 | ||
| A | 024 | Traffic Regulator (Flag Man) | 680 | MAN/DAY | ¥ | ¥ | 0 | ||
| ASPHALT PAVING WORK | 0 | ||||||||
| A | 025 | Construct Subbase Course (RC-40) | 50 | CM | ¥ | ¥ | 0 | ||
| A | 026 | Leveling Base/Subbase Course | 500 | SM | ¥ | ¥ | 0 | ||
| A | 027 | Leveling Base Course (M-25, Average thickness 30mm) | 500 | CM | ¥ | ¥ | 0 | ||
| A | 028 | Construct Base Course (M-25) | 4,500 | CM | ¥ | ¥ | 0 | ||
| A | 029 | Leveling AC Pavement (Recycled AC No.1, Average thickness 40mm) | 50 | MTON | ¥ | ¥ | 0 | ||
| A | 030 | 50mm Thick Recycled AC Intermediate Course (AC No.1) | 3,260 | SM | ¥ | ¥ | 0 | ||
| A | 031 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 3,260 | SM | ¥ | ¥ | 0 | 19 | |
| A | 032 | 50mm Thick Recycled AC Wearing Course (AC No.5) | 2,263 | SM | ¥ | ¥ | 0 | ||
| A | 033 | Construct AC Surface by Modified Asphalt (AC No.5) | 997 | MTON | ¥ | ¥ | 0 | ||
| A | 034 | Prime Coat (PK-3) | 3,260 | SM | ¥ | ¥ | 0 | ||
| A | 035 | Tack Coat (PK-4) | 3,260 | SM | ¥ | ¥ | 0 | ||
| A | 036 | Tack Coat (Modified PK-4) | 3,260 | SM | ¥ | ¥ | 0 | ||
| A | 037 | AC Wearing Course (Labor) | 50 | MTON | ¥ | ¥ | 0 | ||
| CONCRETE PAVING WORK | 0 | ||||||||
| A | 038 | Doweled Construction Joint | 10 | EA | ¥ | ¥ | 0 | ||
| A | 039 | Construct Concrete Pavement (Labor) | 20 | CM | ¥ | ¥ | 0 | ||
| GEOTEXTILE WORK | 0 | ||||||||
| 0 | |||||||||
| A | 040 | Removal and Disposal of Existing Crack Seal (Include Cleaning) | 20 | LM | ¥ | ¥ | 0 | ||
| A | 041 | Install Seal Joint of PCC | 20 | LM | ¥ | ¥ | 0 | ||
| A | 042 | Install Seal Joint of AC | 283 | LM | ¥ | ¥ | 0 | ||
| A | 043 | Saw Cutting of AC for Joint Sealing | 283 | LM | ¥ | ¥ | 0 | ||
| A | 044 | Install Geotextile | 100 | SM | ¥ | ¥ | 0 | ||
| SIDEWALK, CURBS, AND GUTTERS WORK | 0 | ||||||||
| A | 045 | Base Course (RC-40, T=100mm) | 3,017 | SM | ¥ | ¥ | 0 | ||
| A | 046 | Sub Base Course (Sand) | 917 | CM | ¥ | ¥ | 0 | ||
| A | 047 | Leveling Base Course (RC-40, Average thickness 30mm) | 50 | CM | ¥ | ¥ | 0 | ||
| A | 048 | Install Roadbed Paper | 3,017 | SM | ¥ | ¥ | 0 | ||
| A | 049 | Install Joint Filler | 200 | SM | ¥ | ¥ | 0 | ||
| A | 050 | Install Sealant (10mm x 5mm) | 200 | LM | ¥ | ¥ | 0 | ||
| A | 051 | Contraction Joint Cutter | 500 | LM | ¥ | ¥ | 0 | ||
| A | 052 | Install Precast Type A Block | 2,520 | LM | ¥ | ¥ | 0 | ||
| PAVEMENT MARKINGS, TRAFFIC SAFTY WORK | 0 | ||||||||
| 0 | 7 | ||||||||
| A | 053 | Removal of Pavement Marking (W=15cm) | 10 | LM | ¥ | ¥ | 0 | ||
| A | 054 | Install Reflective Marking, White (W=15cm) | 2,833 | LM | ¥ | ¥ | 0 | ||
| A | 055 | Install Non-Reflective Marking, White (W=15cm) | 500 | LM | ¥ | ¥ | 0 | ||
| A | 056 | Alphanumeric Concrete Curb Marking | 100 | EA | ¥ | ¥ | 0 | ||
| A | 057 | Install Handicap Symbol Marking, White | 10 | EA | ¥ | ¥ | 0 | ||
| A | 058 | Install Traffic Sign & Post | 3 | EA | ¥ | ¥ | 0 | ||
| A | 059 | Relocate Traffic Sign & Post | 3 | EA | ¥ | ¥ | 0 | ||
| EARTH WORK, SODDING, PLANTING WORK | 0 | ||||||||
| 0 | 10 | ||||||||
| A | 060 | Road Excavation | 4,500 | CM | ¥ | ¥ | 0 | ||
| A | 061 | Earthwork (Digging and Grading) | 10 | CM | ¥ | ¥ | 0 | 2 | |
| A | 062 | Transportation of Excavated Soil to Stock Yard | 4,580 | CM | ¥ | ¥ | 0 | ||
| A | 063 | Construct Embankment with Excavated Soil | 2,000 | CM | ¥ | ¥ | 0 | ||
| A | 064 | Construct Embankment with New Soil | 50 | CM | ¥ | ¥ | 0 | ||
| A | 065 | Backfill Excavated Soil | 50 | CM | ¥ | ¥ | 0 | ||
| A | 066 | Backfill New Soil | 3,240 | CM | ¥ | ¥ | 0 | ||
| A | 067 | Place New Top Soil, 100mm Thick | 327 | CM | ¥ | ¥ | 0 | ||
| A | 068 | Place Sod (Noshiba) | 327 | SM | ¥ | ¥ | 0 | ||
| A | 069 | Removal and reinstallation of Sod | 10 | SM | ¥ | ¥ | 0 | ||
| SANITARY SEWER, DRAINAGE WORK | 0 | ||||||||
| 0 | |||||||||
| A | 070 | Install 200mm VU Rib Pipe | 5 | LM | ¥ | ¥ | 0 | ||
| A | 071 | Install New Manhole Frame and Cover(T-25) | 2 | EA | ¥ | ¥ | 0 | ||
| A | 072 | Install New Manhole Frame and Cover(T-6) | 2 | EA | ¥ | ¥ | 0 | ||
| A | 073 | Raise/Lower existing Manhole Frame and Cover | 2 | EA | ¥ | ¥ | 0 | ||
| A | 074 | Install New Concrete Frame and Grating Cover (T-25) of Gutter Inlet | 2 | EA | ¥ | ¥ | 0 | ||
| A | 075 | Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.3m less than | 2 | EA | ¥ | ¥ | 0 | ||
| A | 076 | Raise/Lower existing Concrete Frame and Grating Cover of Gutter Inlet | 2 | EA | ¥ | ¥ | 0 | ||
| A | 077 | Install New Frame and Grating Cover (T-25) for Catch Basin, 600 mm square | 2 | EA | ¥ | ¥ | 0 | ||
| A | 078 | Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square | 2 | EA | ¥ | ¥ | 0 | ||
| ELECTRICAL WORK | 0 | ||||||||
| 0 | 6 | ||||||||
| A | 079 | Install FEP 30 mm | 2 | LM | ¥ | ¥ | 0 | ||
| WATER LINE WORK | 0 | ||||||||
| 0 | 0 | ||||||||
| A | 080 | Raise/Lower existing Gate Valve Box | 10 | EA | ¥ | ¥ | 0 | ||
| 0 | |||||||||
| REMOVAL AND DISPOSAL WORK | 0 | ||||||||
| 0 | 20 | ||||||||
| A | 081 | Saw Cutting of Existing AC Pavement, less than 15cm | 283 | LM | ¥ | ¥ | 0 | ||
| A | 082 | Saw Cutting of Existing AC Pavement, 15cm or more and less than 30cm | 20 | LM | ¥ | ¥ | 0 | ||
| A | 083 | Saw Cutting of Existing Concrete Pavement, less than 15cm | 20 | LM | ¥ | ¥ | 0 | ||
| A | 084 | Saw Cutting of Existing Concrete Pavement, 15cm or more and less than 30cm | 50 | LM | ¥ | ¥ | 0 | ||
| A | 085 | Cold Milling of AC Pavement, less than 6cm | 50 | SM | ¥ | ¥ | 0 | ||
| A | 086 | Cold Milling of AC Pavement, 6cm or more and less than 12cm | 3,260 | SM | ¥ | ¥ | 0 | ||
| A | 087 | Removal of AC Pavement, less than 10cm | 3,260 | SM | ¥ | ¥ | 0 | ||
| A | 088 | Removal of AC Pavement, 10cm or more and less than 20cm | 20 | SM | ¥ | ¥ | 0 | ||
| A | 089 | Removal of Reinforced Concrete by Labor | 20 | CM | ¥ | ¥ | 0 | ||
| A | 090 | Removal of Reinforced Concrete by Machine | 10 | CM | ¥ | ¥ | 0 | ||
| A | 091 | Removal of Plain Concrete by Labor | 10 | CM | ¥ | ¥ | 0 | ||
| A | 092 | Removal of Plain Concrete by Machine | 10 | CM | ¥ | ¥ | 0 | ||
| A | 093 | Removal of Existing Manhole Frame and Cover | 10 | EA | ¥ | ¥ | 0 | ||
| A | 094 | Removal of Existing Frame and Grating Drainage Product | 10 | EA | ¥ | ¥ | 0 | ||
| A | 095 | Removal of Precast Concrete Curb Block | 10 | LM | ¥ | ¥ | 0 | ||
| A | 096 | Removal of Existing Tree and Stump, Circumference of tree less than 20cm | 5 | EA | ¥ | ¥ | 0 | ||
| A | 097 | Removal of Existing Tree and Stump, Circumference of tree 21~30cm | 5 | EA | ¥ | ¥ | 0 | ||
| A | 098 | Removal of Existing Tree and Stump, Circumference of tree 31~60cm | 5 | EA | ¥ | ¥ | 0 | ||
| A | 099 | Removal of Existing Tree and Stump, Circumference of tree 61~90cm | 5 | EA | ¥ | ¥ | 0 | ||
| A | 100 | Removal of PVC Pipe | 3 | LM | ¥ | ¥ | 0 | ||
| A | 101 | Hauling and Disposal of Extra Soils/Gravels to Off Base | 3,178 | CM | ¥ | ¥ | 0 | ||
| A | 102 | Hauling and Disposal of Asphalt Concrete to Off Base | 814 | MTON | ¥ | ¥ | 0 | ||
| A | 103 | Hauling and Disposal of Cold Milling AC to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| A | 104 | Hauling and Disposal of Plain Concrete to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| A | 105 | Hauling and Disposal of Reinforced Concrete to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| A | 106 | Hauling and Disposal of Precast Concrete Product to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| A | 107 | Hauling and Disposal of Plastics to Off Base | 10 | MTON | ¥ | ¥ | 0 | ||
| A | 108 | Hauling and Disposal of Trees and stump to Off Base | 10 | MTON | ¥ | ¥ | 0 | ||
| TOTAL ESTIMATED AMOUNT OF ELINs (Yen) | ¥ |
&L&10Exhibit A RFP No. FA520518R0003&C&10Page &P of &N
Exhibit B
| EXHIBIT B | Date: 15 Dec 2017 | ||||||||
| ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT | |||||||||
| MISAWA AB, JAPAN | |||||||||
| REQUEST FOR PROPOSAL No. FA520518R0003 | |||||||||
| CONTRACT No. | |||||||||
| Offeror (Print Name, Title and Signature) Date | |||||||||
| Company Name and Address | |||||||||
| Estimated | Unit of | Estimated | |||||||
| Item No. | Description | Quantity | Issue | Unit Price | Amount | ||||
| ELIN | |||||||||
| SURVEY AND TEST | |||||||||
| 6 | |||||||||
| B | 001 | Quantity Survey of Current Condition for Pavement and Construction Area, One Section per extension 10 m. | 75 | LOT | ¥ | ¥ | 0 | ||
| B | 002 | Quantity Survey of current condition for Concrete Sidewalk, Curb, Gutter and construction Area, One Section per Extension 10 m. | 75 | LOT | ¥ | ¥ | 0 | ||
| B | 003 | Quantity Survey and Report, Pavement Cracks and Joint Seal | 10 | LM | ¥ | ¥ | 0 | ||
| B | 004 | Quantity Survey and Report, Pavement Markings | 10 | LM | ¥ | ¥ | 0 | ||
| B | 005 | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 17 | EA | ¥ | ¥ | 0 | ||
| B | 006 | Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces | 28 | EA | ¥ | ¥ | 0 | ||
| B | 007 | Test Digging of AC Pavement, not to exceed 1m x 1m x 1m includes temporary pavement restoration | 28 | EA | ¥ | ¥ | 0 | ||
| GENERAL CONSTRUCTION AND OTHER WORK | 0 | ||||||||
| 0 | 0 | ||||||||
| B | 008 | Construct Formwork | 10 | SM | ¥ | ¥ | 0 | ||
| B | 009 | Construct Steel Reinforcement Bar | 2 | MTON | ¥ | ¥ | 0 | ||
| B | 010 | Frost Inhibition Course (RC-40) | 10 | CM | ¥ | ¥ | 0 | ||
| B | 011 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 10 | CM | ¥ | ¥ | 0 | ||
| B | 012 | Construct Basis Crushed stone (RC-40) | 10 | CM | ¥ | ¥ | 0 | ||
| B | 013 | Place Concrete (21-8-25) | 10 | CM | ¥ | ¥ | 0 | ||
| B | 014 | Place Concrete (27-8-25) | 10 | CM | ¥ | ¥ | 0 | ||
| B | 015 | Placing and Removing Steel Plate, Size 1.5m x 3.0m | 10 | EA/DAY | ¥ | ¥ | 0 | 1 | |
| B | 016 | Temporary Construction Fence, 1.8m Height x 1.8m Length | 10 | EA/DAY | ¥ | ¥ | 0 | 1 | |
| B | 017 | Temporary Construction Traffic Cone with Lights | 50 | EA/MONTH | ¥ | ¥ | 0 | 0 | |
| B | 018 | Temporary Construction Barricades 4m long x 0.75m Height with Lights | 50 | EA/MONTH | ¥ | ¥ | 0 | 0 | |
| B | 019 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 4,507 | CM | ¥ | ¥ | 0 | ||
| B | 020 | Transportation of Removed Cold Mill AC from Construction Site to Stock Yard/on Base | 4,507 | CM | ¥ | ¥ | 0 | ||
| B | 021 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 2,000 | CM | ¥ | ¥ | 0 | ||
| B | 022 | Transportation of Heavy Equipment with Trailer/Truck on Base | 20 | WAY | ¥ | ¥ | 0 | ||
| B | 023 | Transportation of Heavy Equipment with Self/Truck on Base | 20 | WAY | ¥ | ¥ | 0 | ||
| B | 024 | Traffic Regulator (Flag Man) | 680 | MAN/DAY | ¥ | ¥ | 0 | ||
| ASPHALT PAVING WORK | 0 | ||||||||
| B | 025 | Construct Subbase Course (RC-40) | 50 | CM | ¥ | ¥ | 0 | ||
| B | 026 | Leveling Base/Subbase Course | 500 | SM | ¥ | ¥ | 0 | ||
| B | 027 | Leveling Base Course (M-25, Average thickness 30mm) | 500 | CM | ¥ | ¥ | 0 | ||
| B | 028 | Construct Base Course (M-25) | 4,500 | CM | ¥ | ¥ | 0 | ||
| B | 029 | Leveling AC Pavement (Recycled AC No.1, Average thickness 40mm) | 50 | MTON | ¥ | ¥ | 0 | ||
| B | 030 | 50mm Thick Recycled AC Intermediate Course (AC No.1) | 3,260 | SM | ¥ | ¥ | 0 | ||
| B | 031 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 3,260 | SM | ¥ | ¥ | 0 | 19 | |
| B | 032 | 50mm Thick Recycled AC Wearing Course (AC No.5) | 2,263 | SM | ¥ | ¥ | 0 | ||
| B | 033 | Construct AC Surface by Modified Asphalt (AC No.5) | 997 | MTON | ¥ | ¥ | 0 | ||
| B | 034 | Prime Coat (PK-3) | 3,260 | SM | ¥ | ¥ | 0 | ||
| B | 035 | Tack Coat (PK-4) | 3,260 | SM | ¥ | ¥ | 0 | ||
| B | 036 | Tack Coat (Modified PK-4) | 3,260 | SM | ¥ | ¥ | 0 | ||
| B | 037 | AC Wearing Course (Labor) | 50 | MTON | ¥ | ¥ | 0 | ||
| CONCRETE PAVING WORK | 0 | ||||||||
| B | 038 | Doweled Construction Joint | 10 | EA | ¥ | ¥ | 0 | ||
| B | 039 | Construct Concrete Pavement (Labor) | 20 | CM | ¥ | ¥ | 0 | ||
| GEOTEXTILE WORK | 0 | ||||||||
| 0 | |||||||||
| B | 040 | Removal and Disposal of Existing Crack Seal (Include Cleaning) | 20 | LM | ¥ | ¥ | 0 | ||
| B | 041 | Install Seal Joint of PCC | 20 | LM | ¥ | ¥ | 0 | ||
| B | 042 | Install Seal Joint of AC | 283 | LM | ¥ | ¥ | 0 | ||
| B | 043 | Saw Cutting of AC for Joint Sealing | 283 | LM | ¥ | ¥ | 0 | ||
| B | 044 | Install Geotextile | 100 | SM | ¥ | ¥ | 0 | ||
| SIDEWALK, CURBS, AND GUTTERS WORK | 0 | ||||||||
| B | 045 | Base Course (RC-40, T=100mm) | 3,017 | SM | ¥ | ¥ | 0 | ||
| B | 046 | Sub Base Course (Sand) | 917 | CM | ¥ | ¥ | 0 | ||
| B | 047 | Leveling Base Course (RC-40, Average thickness 30mm) | 50 | CM | ¥ | ¥ | 0 | ||
| B | 048 | Install Roadbed Paper | 3,017 | SM | ¥ | ¥ | 0 | ||
| B | 049 | Install Joint Filler | 200 | SM | ¥ | ¥ | 0 | ||
| B | 050 | Install Sealant (10mm x 5mm) | 200 | LM | ¥ | ¥ | 0 | ||
| B | 051 | Contraction Joint Cutter | 500 | LM | ¥ | ¥ | 0 | ||
| B | 052 | Install Precast Type A Block | 2,520 | LM | ¥ | ¥ | 0 | ||
| PAVEMENT MARKINGS, TRAFFIC SAFTY WORK | 0 | ||||||||
| 0 | 7 | ||||||||
| B | 053 | Removal of Pavement Marking (W=15cm) | 10 | LM | ¥ | ¥ | 0 | ||
| B | 054 | Install Reflective Marking, White (W=15cm) | 2,833 | LM | ¥ | ¥ | 0 | ||
| B | 055 | Install Non-Reflective Marking, White (W=15cm) | 500 | LM | ¥ | ¥ | 0 | ||
| B | 056 | Alphanumeric Concrete Curb Marking | 100 | EA | ¥ | ¥ | 0 | ||
| B | 057 | Install Handicap Symbol Marking, White | 10 | EA | ¥ | ¥ | 0 | ||
| B | 058 | Install Traffic Sign & Post | 3 | EA | ¥ | ¥ | 0 | ||
| B | 059 | Relocate Traffic Sign & Post | 3 | EA | ¥ | ¥ | 0 | ||
| EARTH WORK, SODDING, PLANTING WORK | 0 | ||||||||
| 0 | 10 | ||||||||
| B | 060 | Road Excavation | 4,500 | CM | ¥ | ¥ | 0 | ||
| B | 061 | Earthwork (Digging and Grading) | 10 | CM | ¥ | ¥ | 0 | 2 | |
| B | 062 | Transportation of Excavated Soil to Stock Yard | 4,580 | CM | ¥ | ¥ | 0 | ||
| B | 063 | Construct Embankment with Excavated Soil | 2,000 | CM | ¥ | ¥ | 0 | ||
| B | 064 | Construct Embankment with New Soil | 50 | CM | ¥ | ¥ | 0 | ||
| B | 065 | Backfill Excavated Soil | 50 | CM | ¥ | ¥ | 0 | ||
| B | 066 | Backfill New Soil | 3,240 | CM | ¥ | ¥ | 0 | ||
| B | 067 | Place New Top Soil, 100mm Thick | 327 | CM | ¥ | ¥ | 0 | ||
| B | 068 | Place Sod (Noshiba) | 327 | SM | ¥ | ¥ | 0 | ||
| B | 069 | Removal and reinstallation of Sod | 10 | SM | ¥ | ¥ | 0 | ||
| SANITARY SEWER, DRAINAGE WORK | 0 | ||||||||
| 0 | |||||||||
| B | 070 | Install 200mm VU Rib Pipe | 5 | LM | ¥ | ¥ | 0 | ||
| B | 071 | Install New Manhole Frame and Cover(T-25) | 2 | EA | ¥ | ¥ | 0 | ||
| B | 072 | Install New Manhole Frame and Cover(T-6) | 2 | EA | ¥ | ¥ | 0 | ||
| B | 073 | Raise/Lower existing Manhole Frame and Cover | 2 | EA | ¥ | ¥ | 0 | ||
| B | 074 | Install New Concrete Frame and Grating Cover (T-25) of Gutter Inlet | 2 | EA | ¥ | ¥ | 0 | ||
| B | 075 | Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.3m less than | 2 | EA | ¥ | ¥ | 0 | ||
| B | 076 | Raise/Lower existing Concrete Frame and Grating Cover of Gutter Inlet | 2 | EA | ¥ | ¥ | 0 | ||
| B | 077 | Install New Frame and Grating Cover (T-25) for Catch Basin, 600 mm square | 2 | EA | ¥ | ¥ | 0 | ||
| B | 078 | Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square | 2 | EA | ¥ | ¥ | 0 | ||
| ELECTRICAL WORK | 0 | ||||||||
| 0 | 6 | ||||||||
| B | 079 | Install FEP 30 mm | 2 | LM | ¥ | ¥ | 0 | ||
| WATER LINE WORK | 0 | ||||||||
| 0 | 0 | ||||||||
| B | 080 | Raise/Lower existing Gate Valve Box | 10 | EA | ¥ | ¥ | 0 | ||
| 0 | |||||||||
| REMOVAL AND DISPOSAL WORK | 0 | ||||||||
| 0 | 20 | ||||||||
| B | 081 | Saw Cutting of Existing AC Pavement, less than 15cm | 283 | LM | ¥ | ¥ | 0 | ||
| B | 082 | Saw Cutting of Existing AC Pavement, 15cm or more and less than 30cm | 20 | LM | ¥ | ¥ | 0 | ||
| B | 083 | Saw Cutting of Existing Concrete Pavement, less than 15cm | 20 | LM | ¥ | ¥ | 0 | ||
| B | 084 | Saw Cutting of Existing Concrete Pavement, 15cm or more and less than 30cm | 50 | LM | ¥ | ¥ | 0 | ||
| B | 085 | Cold Milling of AC Pavement, less than 6cm | 50 | SM | ¥ | ¥ | 0 | ||
| B | 086 | Cold Milling of AC Pavement, 6cm or more and less than 12cm | 3,260 | SM | ¥ | ¥ | 0 | ||
| B | 087 | Removal of AC Pavement, less than 10cm | 3,260 | SM | ¥ | ¥ | 0 | ||
| B | 088 | Removal of AC Pavement, 10cm or more and less than 20cm | 20 | SM | ¥ | ¥ | 0 | ||
| B | 089 | Removal of Reinforced Concrete by Labor | 20 | CM | ¥ | ¥ | 0 | ||
| B | 090 | Removal of Reinforced Concrete by Machine | 10 | CM | ¥ | ¥ | 0 | ||
| B | 091 | Removal of Plain Concrete by Labor | 10 | CM | ¥ | ¥ | 0 | ||
| B | 092 | Removal of Plain Concrete by Machine | 10 | CM | ¥ | ¥ | 0 | ||
| B | 093 | Removal of Existing Manhole Frame and Cover | 10 | EA | ¥ | ¥ | 0 | ||
| B | 094 | Removal of Existing Frame and Grating Drainage Product | 10 | EA | ¥ | ¥ | 0 | ||
| B | 095 | Removal of Precast Concrete Curb Block | 10 | LM | ¥ | ¥ | 0 | ||
| B | 096 | Removal of Existing Tree and Stump, Circumference of tree less than 20cm | 5 | EA | ¥ | ¥ | 0 | ||
| B | 097 | Removal of Existing Tree and Stump, Circumference of tree 21~30cm | 5 | EA | ¥ | ¥ | 0 | ||
| B | 098 | Removal of Existing Tree and Stump, Circumference of tree 31~60cm | 5 | EA | ¥ | ¥ | 0 | ||
| B | 099 | Removal of Existing Tree and Stump, Circumference of tree 61~90cm | 5 | EA | ¥ | ¥ | 0 | ||
| B | 100 | Removal of PVC Pipe | 3 | LM | ¥ | ¥ | 0 | ||
| B | 101 | Hauling and Disposal of Extra Soils/Gravels to Off Base | 3,178 | CM | ¥ | ¥ | 0 | ||
| B | 102 | Hauling and Disposal of Asphalt Concrete to Off Base | 814 | MTON | ¥ | ¥ | 0 | ||
| B | 103 | Hauling and Disposal of Cold Milling AC to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| B | 104 | Hauling and Disposal of Plain Concrete to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| B | 105 | Hauling and Disposal of Reinforced Concrete to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| B | 106 | Hauling and Disposal of Precast Concrete Product to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| B | 107 | Hauling and Disposal of Plastics to Off Base | 10 | MTON | ¥ | ¥ | 0 | ||
| B | 108 | Hauling and Disposal of Trees and stump to Off Base | 10 | MTON | ¥ | ¥ | 0 | ||
| TOTAL ESTIMATED AMOUNT OF ELINs (Yen) | ¥ |
&L&10Exhibit B RFP No. FA520518R0003&C&10Page &P of &N
Exhibit C
| EXHIBIT C | Date: 15 Dec 2017 | ||||||||
| ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT | |||||||||
| MISAWA AB, JAPAN | |||||||||
| REQUEST FOR PROPOSAL No. FA520518R0003 | |||||||||
| CONTRACT No. | |||||||||
| Offeror (Print Name, Title and Signature) Date | |||||||||
| Company Name and Address | |||||||||
| Estimated | Unit of | Estimated | |||||||
| Item No. | Description | Quantity | Issue | Unit Price | Amount | ||||
| ELIN | |||||||||
| SURVEY AND TEST | |||||||||
| 6 | |||||||||
| C | 001 | Quantity Survey of Current Condition for Pavement and Construction Area, One Section per extension 10 m. | 75 | LOT | ¥ | ¥ | 0 | ||
| C | 002 | Quantity Survey of current condition for Concrete Sidewalk, Curb, Gutter and construction Area, One Section per Extension 10 m. | 75 | LOT | ¥ | ¥ | 0 | ||
| C | 003 | Quantity Survey and Report, Pavement Cracks and Joint Seal | 10 | LM | ¥ | ¥ | 0 | ||
| C | 004 | Quantity Survey and Report, Pavement Markings | 10 | LM | ¥ | ¥ | 0 | ||
| C | 005 | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 17 | EA | ¥ | ¥ | 0 | ||
| C | 006 | Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces | 28 | EA | ¥ | ¥ | 0 | ||
| C | 007 | Test Digging of AC Pavement, not to exceed 1m x 1m x 1m includes temporary pavement restoration | 28 | EA | ¥ | ¥ | 0 | ||
| GENERAL CONSTRUCTION AND OTHER WORK | 0 | ||||||||
| 0 | 0 | ||||||||
| C | 008 | Construct Formwork | 10 | SM | ¥ | ¥ | 0 | ||
| C | 009 | Construct Steel Reinforcement Bar | 2 | MTON | ¥ | ¥ | 0 | ||
| C | 010 | Frost Inhibition Course (RC-40) | 10 | CM | ¥ | ¥ | 0 | ||
| C | 011 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 10 | CM | ¥ | ¥ | 0 | ||
| C | 012 | Construct Basis Crushed stone (RC-40) | 10 | CM | ¥ | ¥ | 0 | ||
| C | 013 | Place Concrete (21-8-25) | 10 | CM | ¥ | ¥ | 0 | ||
| C | 014 | Place Concrete (27-8-25) | 10 | CM | ¥ | ¥ | 0 | ||
| C | 015 | Placing and Removing Steel Plate, Size 1.5m x 3.0m | 10 | EA/DAY | ¥ | ¥ | 0 | 1 | |
| C | 016 | Temporary Construction Fence, 1.8m Height x 1.8m Length | 10 | EA/DAY | ¥ | ¥ | 0 | 1 | |
| C | 017 | Temporary Construction Traffic Cone with Lights | 50 | EA/MONTH | ¥ | ¥ | 0 | 0 | |
| C | 018 | Temporary Construction Barricades 4m long x 0.75m Height with Lights | 50 | EA/MONTH | ¥ | ¥ | 0 | 0 | |
| C | 019 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 4,507 | CM | ¥ | ¥ | 0 | ||
| C | 020 | Transportation of Removed Cold Mill AC from Construction Site to Stock Yard/on Base | 4,507 | CM | ¥ | ¥ | 0 | ||
| C | 021 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 2,000 | CM | ¥ | ¥ | 0 | ||
| C | 022 | Transportation of Heavy Equipment with Trailer/Truck on Base | 20 | WAY | ¥ | ¥ | 0 | ||
| C | 023 | Transportation of Heavy Equipment with Self/Truck on Base | 20 | WAY | ¥ | ¥ | 0 | ||
| C | 024 | Traffic Regulator (Flag Man) | 680 | MAN/DAY | ¥ | ¥ | 0 | ||
| ASPHALT PAVING WORK | 0 | ||||||||
| C | 025 | Construct Subbase Course (RC-40) | 50 | CM | ¥ | ¥ | 0 | ||
| C | 026 | Leveling Base/Subbase Course | 500 | SM | ¥ | ¥ | 0 | ||
| C | 027 | Leveling Base Course (M-25, Average thickness 30mm) | 500 | CM | ¥ | ¥ | 0 | ||
| C | 028 | Construct Base Course (M-25) | 4,500 | CM | ¥ | ¥ | 0 | ||
| C | 029 | Leveling AC Pavement (Recycled AC No.1, Average thickness 40mm) | 50 | MTON | ¥ | ¥ | 0 | ||
| C | 030 | 50mm Thick Recycled AC Intermediate Course (AC No.1) | 3,260 | SM | ¥ | ¥ | 0 | ||
| C | 031 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 3,260 | SM | ¥ | ¥ | 0 | 19 | |
| C | 032 | 50mm Thick Recycled AC Wearing Course (AC No.5) | 2,263 | SM | ¥ | ¥ | 0 | ||
| C | 033 | Construct AC Surface by Modified Asphalt (AC No.5) | 997 | MTON | ¥ | ¥ | 0 | ||
| C | 034 | Prime Coat (PK-3) | 3,260 | SM | ¥ | ¥ | 0 | ||
| C | 035 | Tack Coat (PK-4) | 3,260 | SM | ¥ | ¥ | 0 | ||
| C | 036 | Tack Coat (Modified PK-4) | 3,260 | SM | ¥ | ¥ | 0 | ||
| C | 037 | AC Wearing Course (Labor) | 50 | MTON | ¥ | ¥ | 0 | ||
| CONCRETE PAVING WORK | 0 | ||||||||
| C | 038 | Doweled Construction Joint | 10 | EA | ¥ | ¥ | 0 | ||
| C | 039 | Construct Concrete Pavement (Labor) | 20 | CM | ¥ | ¥ | 0 | ||
| GEOTEXTILE WORK | 0 | ||||||||
| 0 | |||||||||
| C | 040 | Removal and Disposal of Existing Crack Seal (Include Cleaning) | 20 | LM | ¥ | ¥ | 0 | ||
| C | 041 | Install Seal Joint of PCC | 20 | LM | ¥ | ¥ | 0 | ||
| C | 042 | Install Seal Joint of AC | 283 | LM | ¥ | ¥ | 0 | ||
| C | 043 | Saw Cutting of AC for Joint Sealing | 283 | LM | ¥ | ¥ | 0 | ||
| C | 044 | Install Geotextile | 100 | SM | ¥ | ¥ | 0 | ||
| SIDEWALK, CURBS, AND GUTTERS WORK | 0 | ||||||||
| C | 045 | Base Course (RC-40, T=100mm) | 3,017 | SM | ¥ | ¥ | 0 | ||
| C | 046 | Sub Base Course (Sand) | 917 | CM | ¥ | ¥ | 0 | ||
| C | 047 | Leveling Base Course (RC-40, Average thickness 30mm) | 50 | CM | ¥ | ¥ | 0 | ||
| C | 048 | Install Roadbed Paper | 3,017 | SM | ¥ | ¥ | 0 | ||
| C | 049 | Install Joint Filler | 200 | SM | ¥ | ¥ | 0 | ||
| C | 050 | Install Sealant (10mm x 5mm) | 200 | LM | ¥ | ¥ | 0 | ||
| C | 051 | Contraction Joint Cutter | 500 | LM | ¥ | ¥ | 0 | ||
| C | 052 | Install Precast Type A Block | 2,520 | LM | ¥ | ¥ | 0 | ||
| PAVEMENT MARKINGS, TRAFFIC SAFTY WORK | 0 | ||||||||
| 0 | 7 | ||||||||
| C | 053 | Removal of Pavement Marking (W=15cm) | 10 | LM | ¥ | ¥ | 0 | ||
| C | 054 | Install Reflective Marking, White (W=15cm) | 2,833 | LM | ¥ | ¥ | 0 | ||
| C | 055 | Install Non-Reflective Marking, White (W=15cm) | 500 | LM | ¥ | ¥ | 0 | ||
| C | 056 | Alphanumeric Concrete Curb Marking | 100 | EA | ¥ | ¥ | 0 | ||
| C | 057 | Install Handicap Symbol Marking, White | 10 | EA | ¥ | ¥ | 0 | ||
| C | 058 | Install Traffic Sign & Post | 3 | EA | ¥ | ¥ | 0 | ||
| C | 059 | Relocate Traffic Sign & Post | 3 | EA | ¥ | ¥ | 0 | ||
| EARTH WORK, SODDING, PLANTING WORK | 0 | ||||||||
| 0 | 10 | ||||||||
| C | 060 | Road Excavation | 4,500 | CM | ¥ | ¥ | 0 | ||
| C | 061 | Earthwork (Digging and Grading) | 10 | CM | ¥ | ¥ | 0 | 2 | |
| C | 062 | Transportation of Excavated Soil to Stock Yard | 4,580 | CM | ¥ | ¥ | 0 | ||
| C | 063 | Construct Embankment with Excavated Soil | 2,000 | CM | ¥ | ¥ | 0 | ||
| C | 064 | Construct Embankment with New Soil | 50 | CM | ¥ | ¥ | 0 | ||
| C | 065 | Backfill Excavated Soil | 50 | CM | ¥ | ¥ | 0 | ||
| C | 066 | Backfill New Soil | 3,240 | CM | ¥ | ¥ | 0 | ||
| C | 067 | Place New Top Soil, 100mm Thick | 327 | CM | ¥ | ¥ | 0 | ||
| C | 068 | Place Sod (Noshiba) | 327 | SM | ¥ | ¥ | 0 | ||
| C | 069 | Removal and reinstallation of Sod | 10 | SM | ¥ | ¥ | 0 | ||
| SANITARY SEWER, DRAINAGE WORK | 0 | ||||||||
| 0 | |||||||||
| C | 070 | Install 200mm VU Rib Pipe | 5 | LM | ¥ | ¥ | 0 | ||
| C | 071 | Install New Manhole Frame and Cover(T-25) | 2 | EA | ¥ | ¥ | 0 | ||
| C | 072 | Install New Manhole Frame and Cover(T-6) | 2 | EA | ¥ | ¥ | 0 | ||
| C | 073 | Raise/Lower existing Manhole Frame and Cover | 2 | EA | ¥ | ¥ | 0 | ||
| C | 074 | Install New Concrete Frame and Grating Cover (T-25) of Gutter Inlet | 2 | EA | ¥ | ¥ | 0 | ||
| C | 075 | Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.3m less than | 2 | EA | ¥ | ¥ | 0 | ||
| C | 076 | Raise/Lower existing Concrete Frame and Grating Cover of Gutter Inlet | 2 | EA | ¥ | ¥ | 0 | ||
| C | 077 | Install New Frame and Grating Cover (T-25) for Catch Basin, 600 mm square | 2 | EA | ¥ | ¥ | 0 | ||
| C | 078 | Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square | 2 | EA | ¥ | ¥ | 0 | ||
| ELECTRICAL WORK | 0 | ||||||||
| 0 | 6 | ||||||||
| C | 079 | Install FEP 30 mm | 2 | LM | ¥ | ¥ | 0 | ||
| WATER LINE WORK | 0 | ||||||||
| 0 | 0 | ||||||||
| C | 080 | Raise/Lower existing Gate Valve Box | 10 | EA | ¥ | ¥ | 0 | ||
| 0 | |||||||||
| REMOVAL AND DISPOSAL WORK | 0 | ||||||||
| 0 | 20 | ||||||||
| C | 081 | Saw Cutting of Existing AC Pavement, less than 15cm | 283 | LM | ¥ | ¥ | 0 | ||
| C | 082 | Saw Cutting of Existing AC Pavement, 15cm or more and less than 30cm | 20 | LM | ¥ | ¥ | 0 | ||
| C | 083 | Saw Cutting of Existing Concrete Pavement, less than 15cm | 20 | LM | ¥ | ¥ | 0 | ||
| C | 084 | Saw Cutting of Existing Concrete Pavement, 15cm or more and less than 30cm | 50 | LM | ¥ | ¥ | 0 | ||
| C | 085 | Cold Milling of AC Pavement, less than 6cm | 50 | SM | ¥ | ¥ | 0 | ||
| C | 086 | Cold Milling of AC Pavement, 6cm or more and less than 12cm | 3,260 | SM | ¥ | ¥ | 0 | ||
| C | 087 | Removal of AC Pavement, less than 10cm | 3,260 | SM | ¥ | ¥ | 0 | ||
| C | 088 | Removal of AC Pavement, 10cm or more and less than 20cm | 20 | SM | ¥ | ¥ | 0 | ||
| C | 089 | Removal of Reinforced Concrete by Labor | 20 | CM | ¥ | ¥ | 0 | ||
| C | 090 | Removal of Reinforced Concrete by Machine | 10 | CM | ¥ | ¥ | 0 | ||
| C | 091 | Removal of Plain Concrete by Labor | 10 | CM | ¥ | ¥ | 0 | ||
| C | 092 | Removal of Plain Concrete by Machine | 10 | CM | ¥ | ¥ | 0 | ||
| C | 093 | Removal of Existing Manhole Frame and Cover | 10 | EA | ¥ | ¥ | 0 | ||
| C | 094 | Removal of Existing Frame and Grating Drainage Product | 10 | EA | ¥ | ¥ | 0 | ||
| C | 095 | Removal of Precast Concrete Curb Block | 10 | LM | ¥ | ¥ | 0 | ||
| C | 096 | Removal of Existing Tree and Stump, Circumference of tree less than 20cm | 5 | EA | ¥ | ¥ | 0 | ||
| C | 097 | Removal of Existing Tree and Stump, Circumference of tree 21~30cm | 5 | EA | ¥ | ¥ | 0 | ||
| C | 098 | Removal of Existing Tree and Stump, Circumference of tree 31~60cm | 5 | EA | ¥ | ¥ | 0 | ||
| C | 099 | Removal of Existing Tree and Stump, Circumference of tree 61~90cm | 5 | EA | ¥ | ¥ | 0 | ||
| C | 100 | Removal of PVC Pipe | 3 | LM | ¥ | ¥ | 0 | ||
| C | 101 | Hauling and Disposal of Extra Soils/Gravels to Off Base | 3,178 | CM | ¥ | ¥ | 0 | ||
| C | 102 | Hauling and Disposal of Asphalt Concrete to Off Base | 814 | MTON | ¥ | ¥ | 0 | ||
| C | 103 | Hauling and Disposal of Cold Milling AC to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| C | 104 | Hauling and Disposal of Plain Concrete to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| C | 105 | Hauling and Disposal of Reinforced Concrete to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| C | 106 | Hauling and Disposal of Precast Concrete Product to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| C | 107 | Hauling and Disposal of Plastics to Off Base | 10 | MTON | ¥ | ¥ | 0 | ||
| C | 108 | Hauling and Disposal of Trees and stump to Off Base | 10 | MTON | ¥ | ¥ | 0 | ||
| TOTAL ESTIMATED AMOUNT OF ELINs (Yen) | ¥ |
&L&10Exhibit C RFP No. FA520518R0003&C&10Page &P of &N
Exhibit D
| EXHIBIT D | Date: 15 Dec 2017 | ||||||||
| ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT | |||||||||
| MISAWA AB, JAPAN | |||||||||
| REQUEST FOR PROPOSAL No. FA520518R0003 | |||||||||
| CONTRACT No. | |||||||||
| Offeror (Print Name, Title and Signature) Date | |||||||||
| Company Name and Address | |||||||||
| Estimated | Unit of | Estimated | |||||||
| Item No. | Description | Quantity | Issue | Unit Price | Amount | ||||
| ELIN | |||||||||
| SURVEY AND TEST | |||||||||
| 6 | |||||||||
| D | 001 | Quantity Survey of Current Condition for Pavement and Construction Area, One Section per extension 10 m. | 75 | LOT | ¥ | ¥ | 0 | ||
| D | 002 | Quantity Survey of current condition for Concrete Sidewalk, Curb, Gutter and construction Area, One Section per Extension 10 m. | 75 | LOT | ¥ | ¥ | 0 | ||
| D | 003 | Quantity Survey and Report, Pavement Cracks and Joint Seal | 10 | LM | ¥ | ¥ | 0 | ||
| D | 004 | Quantity Survey and Report, Pavement Markings | 10 | LM | ¥ | ¥ | 0 | ||
| D | 005 | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 17 | EA | ¥ | ¥ | 0 | ||
| D | 006 | Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces | 28 | EA | ¥ | ¥ | 0 | ||
| D | 007 | Test Digging of AC Pavement, not to exceed 1m x 1m x 1m includes temporary pavement restoration | 28 | EA | ¥ | ¥ | 0 | ||
| GENERAL CONSTRUCTION AND OTHER WORK | 0 | ||||||||
| 0 | 0 | ||||||||
| D | 008 | Construct Formwork | 10 | SM | ¥ | ¥ | 0 | ||
| D | 009 | Construct Steel Reinforcement Bar | 2 | MTON | ¥ | ¥ | 0 | ||
| D | 010 | Frost Inhibition Course (RC-40) | 10 | CM | ¥ | ¥ | 0 | ||
| D | 011 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 10 | CM | ¥ | ¥ | 0 | ||
| D | 012 | Construct Basis Crushed stone (RC-40) | 10 | CM | ¥ | ¥ | 0 | ||
| D | 013 | Place Concrete (21-8-25) | 10 | CM | ¥ | ¥ | 0 | ||
| D | 014 | Place Concrete (27-8-25) | 10 | CM | ¥ | ¥ | 0 | ||
| D | 015 | Placing and Removing Steel Plate, Size 1.5m x 3.0m | 10 | EA/DAY | ¥ | ¥ | 0 | 1 | |
| D | 016 | Temporary Construction Fence, 1.8m Height x 1.8m Length | 10 | EA/DAY | ¥ | ¥ | 0 | 1 | |
| D | 017 | Temporary Construction Traffic Cone with Lights | 50 | EA/MONTH | ¥ | ¥ | 0 | 0 | |
| D | 018 | Temporary Construction Barricades 4m long x 0.75m Height with Lights | 50 | EA/MONTH | ¥ | ¥ | 0 | 0 | |
| D | 019 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 4,507 | CM | ¥ | ¥ | 0 | ||
| D | 020 | Transportation of Removed Cold Mill AC from Construction Site to Stock Yard/on Base | 4,507 | CM | ¥ | ¥ | 0 | ||
| D | 021 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 2,000 | CM | ¥ | ¥ | 0 | ||
| D | 022 | Transportation of Heavy Equipment with Trailer/Truck on Base | 20 | WAY | ¥ | ¥ | 0 | ||
| D | 023 | Transportation of Heavy Equipment with Self/Truck on Base | 20 | WAY | ¥ | ¥ | 0 | ||
| D | 024 | Traffic Regulator (Flag Man) | 680 | MAN/DAY | ¥ | ¥ | 0 | ||
| ASPHALT PAVING WORK | 0 | ||||||||
| D | 025 | Construct Subbase Course (RC-40) | 50 | CM | ¥ | ¥ | 0 | ||
| D | 026 | Leveling Base/Subbase Course | 500 | SM | ¥ | ¥ | 0 | ||
| D | 027 | Leveling Base Course (M-25, Average thickness 30mm) | 500 | CM | ¥ | ¥ | 0 | ||
| D | 028 | Construct Base Course (M-25) | 4,500 | CM | ¥ | ¥ | 0 | ||
| D | 029 | Leveling AC Pavement (Recycled AC No.1, Average thickness 40mm) | 50 | MTON | ¥ | ¥ | 0 | ||
| D | 030 | 50mm Thick Recycled AC Intermediate Course (AC No.1) | 3,260 | SM | ¥ | ¥ | 0 | ||
| D | 031 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 3,260 | SM | ¥ | ¥ | 0 | 19 | |
| D | 032 | 50mm Thick Recycled AC Wearing Course (AC No.5) | 2,263 | SM | ¥ | ¥ | 0 | ||
| D | 033 | Construct AC Surface by Modified Asphalt (AC No.5) | 997 | MTON | ¥ | ¥ | 0 | ||
| D | 034 | Prime Coat (PK-3) | 3,260 | SM | ¥ | ¥ | 0 | ||
| D | 035 | Tack Coat (PK-4) | 3,260 | SM | ¥ | ¥ | 0 | ||
| D | 036 | Tack Coat (Modified PK-4) | 3,260 | SM | ¥ | ¥ | 0 | ||
| D | 037 | AC Wearing Course (Labor) | 50 | MTON | ¥ | ¥ | 0 | ||
| CONCRETE PAVING WORK | 0 | ||||||||
| D | 038 | Doweled Construction Joint | 10 | EA | ¥ | ¥ | 0 | ||
| D | 039 | Construct Concrete Pavement (Labor) | 20 | CM | ¥ | ¥ | 0 | ||
| GEOTEXTILE WORK | 0 | ||||||||
| 0 | |||||||||
| D | 040 | Removal and Disposal of Existing Crack Seal (Include Cleaning) | 20 | LM | ¥ | ¥ | 0 | ||
| D | 041 | Install Seal Joint of PCC | 20 | LM | ¥ | ¥ | 0 | ||
| D | 042 | Install Seal Joint of AC | 283 | LM | ¥ | ¥ | 0 | ||
| D | 043 | Saw Cutting of AC for Joint Sealing | 283 | LM | ¥ | ¥ | 0 | ||
| D | 044 | Install Geotextile | 100 | SM | ¥ | ¥ | 0 | ||
| SIDEWALK, CURBS, AND GUTTERS WORK | 0 | ||||||||
| D | 045 | Base Course (RC-40, T=100mm) | 3,017 | SM | ¥ | ¥ | 0 | ||
| D | 046 | Sub Base Course (Sand) | 917 | CM | ¥ | ¥ | 0 | ||
| D | 047 | Leveling Base Course (RC-40, Average thickness 30mm) | 50 | CM | ¥ | ¥ | 0 | ||
| D | 048 | Install Roadbed Paper | 3,017 | SM | ¥ | ¥ | 0 | ||
| D | 049 | Install Joint Filler | 200 | SM | ¥ | ¥ | 0 | ||
| D | 050 | Install Sealant (10mm x 5mm) | 200 | LM | ¥ | ¥ | 0 | ||
| D | 051 | Contraction Joint Cutter | 500 | LM | ¥ | ¥ | 0 | ||
| D | 052 | Install Precast Type A Block | 2,520 | LM | ¥ | ¥ | 0 | ||
| PAVEMENT MARKINGS, TRAFFIC SAFTY WORK | 0 | ||||||||
| 0 | 7 | ||||||||
| D | 053 | Removal of Pavement Marking (W=15cm) | 10 | LM | ¥ | ¥ | 0 | ||
| D | 054 | Install Reflective Marking, White (W=15cm) | 2,833 | LM | ¥ | ¥ | 0 | ||
| D | 055 | Install Non-Reflective Marking, White (W=15cm) | 500 | LM | ¥ | ¥ | 0 | ||
| D | 056 | Alphanumeric Concrete Curb Marking | 100 | EA | ¥ | ¥ | 0 | ||
| D | 057 | Install Handicap Symbol Marking, White | 10 | EA | ¥ | ¥ | 0 | ||
| D | 058 | Install Traffic Sign & Post | 3 | EA | ¥ | ¥ | 0 | ||
| D | 059 | Relocate Traffic Sign & Post | 3 | EA | ¥ | ¥ | 0 | ||
| EARTH WORK, SODDING, PLANTING WORK | 0 | ||||||||
| 0 | 10 | ||||||||
| D | 060 | Road Excavation | 4,500 | CM | ¥ | ¥ | 0 | ||
| D | 061 | Earthwork (Digging and Grading) | 10 | CM | ¥ | ¥ | 0 | 2 | |
| D | 062 | Transportation of Excavated Soil to Stock Yard | 4,580 | CM | ¥ | ¥ | 0 | ||
| D | 063 | Construct Embankment with Excavated Soil | 2,000 | CM | ¥ | ¥ | 0 | ||
| D | 064 | Construct Embankment with New Soil | 50 | CM | ¥ | ¥ | 0 | ||
| D | 065 | Backfill Excavated Soil | 50 | CM | ¥ | ¥ | 0 | ||
| D | 066 | Backfill New Soil | 3,240 | CM | ¥ | ¥ | 0 | ||
| D | 067 | Place New Top Soil, 100mm Thick | 327 | CM | ¥ | ¥ | 0 | ||
| D | 068 | Place Sod (Noshiba) | 327 | SM | ¥ | ¥ | 0 | ||
| D | 069 | Removal and reinstallation of Sod | 10 | SM | ¥ | ¥ | 0 | ||
| SANITARY SEWER, DRAINAGE WORK | 0 | ||||||||
| 0 | |||||||||
| D | 070 | Install 200mm VU Rib Pipe | 5 | LM | ¥ | ¥ | 0 | ||
| D | 071 | Install New Manhole Frame and Cover(T-25) | 2 | EA | ¥ | ¥ | 0 | ||
| D | 072 | Install New Manhole Frame and Cover(T-6) | 2 | EA | ¥ | ¥ | 0 | ||
| D | 073 | Raise/Lower existing Manhole Frame and Cover | 2 | EA | ¥ | ¥ | 0 | ||
| D | 074 | Install New Concrete Frame and Grating Cover (T-25) of Gutter Inlet | 2 | EA | ¥ | ¥ | 0 | ||
| D | 075 | Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.3m less than | 2 | EA | ¥ | ¥ | 0 | ||
| D | 076 | Raise/Lower existing Concrete Frame and Grating Cover of Gutter Inlet | 2 | EA | ¥ | ¥ | 0 | ||
| D | 077 | Install New Frame and Grating Cover (T-25) for Catch Basin, 600 mm square | 2 | EA | ¥ | ¥ | 0 | ||
| D | 078 | Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square | 2 | EA | ¥ | ¥ | 0 | ||
| ELECTRICAL WORK | 0 | ||||||||
| 0 | 6 | ||||||||
| D | 079 | Install FEP 30 mm | 2 | LM | ¥ | ¥ | 0 | ||
| WATER LINE WORK | 0 | ||||||||
| 0 | 0 | ||||||||
| D | 080 | Raise/Lower existing Gate Valve Box | 10 | EA | ¥ | ¥ | 0 | ||
| 0 | |||||||||
| REMOVAL AND DISPOSAL WORK | 0 | ||||||||
| 0 | 20 | ||||||||
| D | 081 | Saw Cutting of Existing AC Pavement, less than 15cm | 283 | LM | ¥ | ¥ | 0 | ||
| D | 082 | Saw Cutting of Existing AC Pavement, 15cm or more and less than 30cm | 20 | LM | ¥ | ¥ | 0 | ||
| D | 083 | Saw Cutting of Existing Concrete Pavement, less than 15cm | 20 | LM | ¥ | ¥ | 0 | ||
| D | 084 | Saw Cutting of Existing Concrete Pavement, 15cm or more and less than 30cm | 50 | LM | ¥ | ¥ | 0 | ||
| D | 085 | Cold Milling of AC Pavement, less than 6cm | 50 | SM | ¥ | ¥ | 0 | ||
| D | 086 | Cold Milling of AC Pavement, 6cm or more and less than 12cm | 3,260 | SM | ¥ | ¥ | 0 | ||
| D | 087 | Removal of AC Pavement, less than 10cm | 3,260 | SM | ¥ | ¥ | 0 | ||
| D | 088 | Removal of AC Pavement, 10cm or more and less than 20cm | 20 | SM | ¥ | ¥ | 0 | ||
| D | 089 | Removal of Reinforced Concrete by Labor | 20 | CM | ¥ | ¥ | 0 | ||
| D | 090 | Removal of Reinforced Concrete by Machine | 10 | CM | ¥ | ¥ | 0 | ||
| D | 091 | Removal of Plain Concrete by Labor | 10 | CM | ¥ | ¥ | 0 | ||
| D | 092 | Removal of Plain Concrete by Machine | 10 | CM | ¥ | ¥ | 0 | ||
| D | 093 | Removal of Existing Manhole Frame and Cover | 10 | EA | ¥ | ¥ | 0 | ||
| D | 094 | Removal of Existing Frame and Grating Drainage Product | 10 | EA | ¥ | ¥ | 0 | ||
| D | 095 | Removal of Precast Concrete Curb Block | 10 | LM | ¥ | ¥ | 0 | ||
| D | 096 | Removal of Existing Tree and Stump, Circumference of tree less than 20cm | 5 | EA | ¥ | ¥ | 0 | ||
| D | 097 | Removal of Existing Tree and Stump, Circumference of tree 21~30cm | 5 | EA | ¥ | ¥ | 0 | ||
| D | 098 | Removal of Existing Tree and Stump, Circumference of tree 31~60cm | 5 | EA | ¥ | ¥ | 0 | ||
| D | 099 | Removal of Existing Tree and Stump, Circumference of tree 61~90cm | 5 | EA | ¥ | ¥ | 0 | ||
| D | 100 | Removal of PVC Pipe | 3 | LM | ¥ | ¥ | 0 | ||
| D | 101 | Hauling and Disposal of Extra Soils/Gravels to Off Base | 3,178 | CM | ¥ | ¥ | 0 | ||
| D | 102 | Hauling and Disposal of Asphalt Concrete to Off Base | 814 | MTON | ¥ | ¥ | 0 | ||
| D | 103 | Hauling and Disposal of Cold Milling AC to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| D | 104 | Hauling and Disposal of Plain Concrete to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| D | 105 | Hauling and Disposal of Reinforced Concrete to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| D | 106 | Hauling and Disposal of Precast Concrete Product to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| D | 107 | Hauling and Disposal of Plastics to Off Base | 10 | MTON | ¥ | ¥ | 0 | ||
| D | 108 | Hauling and Disposal of Trees and stump to Off Base | 10 | MTON | ¥ | ¥ | 0 | ||
| TOTAL ESTIMATED AMOUNT OF ELINs (Yen) | ¥ |
&L&10Exhibit D RFP No. FA520518R0003&C&10Page &P of &N
Exhibit E
| EXHIBIT E | Date: 15 Dec 2017 | ||||||||
| ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT | |||||||||
| MISAWA AB, JAPAN | |||||||||
| REQUEST FOR PROPOSAL No. FA520518R0003 | |||||||||
| CONTRACT No. | |||||||||
| Offeror (Print Name, Title and Signature) Date | |||||||||
| Company Name and Address | |||||||||
| Estimated | Unit of | Estimated | |||||||
| Item No. | Description | Quantity | Issue | Unit Price | Amount | ||||
| ELIN | |||||||||
| SURVEY AND TEST | |||||||||
| 6 | |||||||||
| E | 001 | Quantity Survey of Current Condition for Pavement and Construction Area, One Section per extension 10 m. | 75 | LOT | ¥ | ¥ | 0 | ||
| E | 002 | Quantity Survey of current condition for Concrete Sidewalk, Curb, Gutter and construction Area, One Section per Extension 10 m. | 75 | LOT | ¥ | ¥ | 0 | ||
| E | 003 | Quantity Survey and Report, Pavement Cracks and Joint Seal | 10 | LM | ¥ | ¥ | 0 | ||
| E | 004 | Quantity Survey and Report, Pavement Markings | 10 | LM | ¥ | ¥ | 0 | ||
| E | 005 | Field CBR and Laboratory Tests of Roads, Parking Lots and Other Surfaces | 17 | EA | ¥ | ¥ | 0 | ||
| E | 006 | Core Drilling and Sampling of AC or Concrete Pavement of Roads, Parking Lots, and Other Surfaces | 28 | EA | ¥ | ¥ | 0 | ||
| E | 007 | Test Digging of AC Pavement, not to exceed 1m x 1m x 1m includes temporary pavement restoration | 28 | EA | ¥ | ¥ | 0 | ||
| GENERAL CONSTRUCTION AND OTHER WORK | 0 | ||||||||
| 0 | 0 | ||||||||
| E | 008 | Construct Formwork | 10 | SM | ¥ | ¥ | 0 | ||
| E | 009 | Construct Steel Reinforcement Bar | 2 | MTON | ¥ | ¥ | 0 | ||
| E | 010 | Frost Inhibition Course (RC-40) | 10 | CM | ¥ | ¥ | 0 | ||
| E | 011 | Leveling Basis Crushed stone (RC-40,Average thickness 30mm) | 10 | CM | ¥ | ¥ | 0 | ||
| E | 012 | Construct Basis Crushed stone (RC-40) | 10 | CM | ¥ | ¥ | 0 | ||
| E | 013 | Place Concrete (21-8-25) | 10 | CM | ¥ | ¥ | 0 | ||
| E | 014 | Place Concrete (27-8-25) | 10 | CM | ¥ | ¥ | 0 | ||
| E | 015 | Placing and Removing Steel Plate, Size 1.5m x 3.0m | 10 | EA/DAY | ¥ | ¥ | 0 | 1 | |
| E | 016 | Temporary Construction Fence, 1.8m Height x 1.8m Length | 10 | EA/DAY | ¥ | ¥ | 0 | 1 | |
| E | 017 | Temporary Construction Traffic Cone with Lights | 50 | EA/MONTH | ¥ | ¥ | 0 | 0 | |
| E | 018 | Temporary Construction Barricades 4m long x 0.75m Height with Lights | 50 | EA/MONTH | ¥ | ¥ | 0 | 0 | |
| E | 019 | Transportation of Removed Concrete, AC and Concrete products from Construction Site to Stock Yard/on Base | 4,507 | CM | ¥ | ¥ | 0 | ||
| E | 020 | Transportation of Removed Cold Mill AC from Construction Site to Stock Yard/on Base | 4,507 | CM | ¥ | ¥ | 0 | ||
| E | 021 | Transportation of Removed Miscellaneous Material from Construction Site to Stock Yard/on Base | 2,000 | CM | ¥ | ¥ | 0 | ||
| E | 022 | Transportation of Heavy Equipment with Trailer/Truck on Base | 20 | WAY | ¥ | ¥ | 0 | ||
| E | 023 | Transportation of Heavy Equipment with Self/Truck on Base | 20 | WAY | ¥ | ¥ | 0 | ||
| E | 024 | Traffic Regulator (Flag Man) | 680 | MAN/DAY | ¥ | ¥ | 0 | ||
| ASPHALT PAVING WORK | 0 | ||||||||
| E | 025 | Construct Subbase Course (RC-40) | 50 | CM | ¥ | ¥ | 0 | ||
| E | 026 | Leveling Base/Subbase Course | 500 | SM | ¥ | ¥ | 0 | ||
| E | 027 | Leveling Base Course (M-25, Average thickness 30mm) | 500 | CM | ¥ | ¥ | 0 | ||
| E | 028 | Construct Base Course (M-25) | 4,500 | CM | ¥ | ¥ | 0 | ||
| E | 029 | Leveling AC Pavement (Recycled AC No.1, Average thickness 40mm) | 50 | MTON | ¥ | ¥ | 0 | ||
| E | 030 | 50mm Thick Recycled AC Intermediate Course (AC No.1) | 3,260 | SM | ¥ | ¥ | 0 | ||
| E | 031 | 50mm Thick Recycled AC Intermediate Course (AC No.2) | 3,260 | SM | ¥ | ¥ | 0 | 19 | |
| E | 032 | 50mm Thick Recycled AC Wearing Course (AC No.5) | 2,263 | SM | ¥ | ¥ | 0 | ||
| E | 033 | Construct AC Surface by Modified Asphalt (AC No.5) | 997 | MTON | ¥ | ¥ | 0 | ||
| E | 034 | Prime Coat (PK-3) | 3,260 | SM | ¥ | ¥ | 0 | ||
| E | 035 | Tack Coat (PK-4) | 3,260 | SM | ¥ | ¥ | 0 | ||
| E | 036 | Tack Coat (Modified PK-4) | 3,260 | SM | ¥ | ¥ | 0 | ||
| E | 037 | AC Wearing Course (Labor) | 50 | MTON | ¥ | ¥ | 0 | ||
| CONCRETE PAVING WORK | 0 | ||||||||
| E | 038 | Doweled Construction Joint | 10 | EA | ¥ | ¥ | 0 | ||
| E | 039 | Construct Concrete Pavement (Labor) | 20 | CM | ¥ | ¥ | 0 | ||
| GEOTEXTILE WORK | 0 | ||||||||
| 0 | |||||||||
| E | 040 | Removal and Disposal of Existing Crack Seal (Include Cleaning) | 20 | LM | ¥ | ¥ | 0 | ||
| E | 041 | Install Seal Joint of PCC | 20 | LM | ¥ | ¥ | 0 | ||
| E | 042 | Install Seal Joint of AC | 283 | LM | ¥ | ¥ | 0 | ||
| E | 043 | Saw Cutting of AC for Joint Sealing | 283 | LM | ¥ | ¥ | 0 | ||
| E | 044 | Install Geotextile | 100 | SM | ¥ | ¥ | 0 | ||
| SIDEWALK, CURBS, AND GUTTERS WORK | 0 | ||||||||
| E | 045 | Base Course (RC-40, T=100mm) | 3,017 | SM | ¥ | ¥ | 0 | ||
| E | 046 | Sub Base Course (Sand) | 917 | CM | ¥ | ¥ | 0 | ||
| E | 047 | Leveling Base Course (RC-40, Average thickness 30mm) | 50 | CM | ¥ | ¥ | 0 | ||
| E | 048 | Install Roadbed Paper | 3,017 | SM | ¥ | ¥ | 0 | ||
| E | 049 | Install Joint Filler | 200 | SM | ¥ | ¥ | 0 | ||
| E | 050 | Install Sealant (10mm x 5mm) | 200 | LM | ¥ | ¥ | 0 | ||
| E | 051 | Contraction Joint Cutter | 500 | LM | ¥ | ¥ | 0 | ||
| E | 052 | Install Precast Type A Block | 2,520 | LM | ¥ | ¥ | 0 | ||
| PAVEMENT MARKINGS, TRAFFIC SAFTY WORK | 0 | ||||||||
| 0 | 7 | ||||||||
| E | 053 | Removal of Pavement Marking (W=15cm) | 10 | LM | ¥ | ¥ | 0 | ||
| E | 054 | Install Reflective Marking, White (W=15cm) | 2,833 | LM | ¥ | ¥ | 0 | ||
| E | 055 | Install Non-Reflective Marking, White (W=15cm) | 500 | LM | ¥ | ¥ | 0 | ||
| E | 056 | Alphanumeric Concrete Curb Marking | 100 | EA | ¥ | ¥ | 0 | ||
| E | 057 | Install Handicap Symbol Marking, White | 10 | EA | ¥ | ¥ | 0 | ||
| E | 058 | Install Traffic Sign & Post | 3 | EA | ¥ | ¥ | 0 | ||
| E | 059 | Relocate Traffic Sign & Post | 3 | EA | ¥ | ¥ | 0 | ||
| EARTH WORK, SODDING, PLANTING WORK | 0 | ||||||||
| 0 | 10 | ||||||||
| E | 060 | Road Excavation | 4,500 | CM | ¥ | ¥ | 0 | ||
| E | 061 | Earthwork (Digging and Grading) | 10 | CM | ¥ | ¥ | 0 | 2 | |
| E | 062 | Transportation of Excavated Soil to Stock Yard | 4,580 | CM | ¥ | ¥ | 0 | ||
| E | 063 | Construct Embankment with Excavated Soil | 2,000 | CM | ¥ | ¥ | 0 | ||
| E | 064 | Construct Embankment with New Soil | 50 | CM | ¥ | ¥ | 0 | ||
| E | 065 | Backfill Excavated Soil | 50 | CM | ¥ | ¥ | 0 | ||
| E | 066 | Backfill New Soil | 3,240 | CM | ¥ | ¥ | 0 | ||
| E | 067 | Place New Top Soil, 100mm Thick | 327 | CM | ¥ | ¥ | 0 | ||
| E | 068 | Place Sod (Noshiba) | 327 | SM | ¥ | ¥ | 0 | ||
| E | 069 | Removal and reinstallation of Sod | 10 | SM | ¥ | ¥ | 0 | ||
| SANITARY SEWER, DRAINAGE WORK | 0 | ||||||||
| 0 | |||||||||
| E | 070 | Install 200mm VU Rib Pipe | 5 | LM | ¥ | ¥ | 0 | ||
| E | 071 | Install New Manhole Frame and Cover(T-25) | 2 | EA | ¥ | ¥ | 0 | ||
| E | 072 | Install New Manhole Frame and Cover(T-6) | 2 | EA | ¥ | ¥ | 0 | ||
| E | 073 | Raise/Lower existing Manhole Frame and Cover | 2 | EA | ¥ | ¥ | 0 | ||
| E | 074 | Install New Concrete Frame and Grating Cover (T-25) of Gutter Inlet | 2 | EA | ¥ | ¥ | 0 | ||
| E | 075 | Install New Gutter Inlet with Pre-cast Concrete Structures, Inlet Height 1.3m less than | 2 | EA | ¥ | ¥ | 0 | ||
| E | 076 | Raise/Lower existing Concrete Frame and Grating Cover of Gutter Inlet | 2 | EA | ¥ | ¥ | 0 | ||
| E | 077 | Install New Frame and Grating Cover (T-25) for Catch Basin, 600 mm square | 2 | EA | ¥ | ¥ | 0 | ||
| E | 078 | Install New Frame and Grating Cover (T-25) for Catch Basin, 900 mm square | 2 | EA | ¥ | ¥ | 0 | ||
| ELECTRICAL WORK | 0 | ||||||||
| 0 | 6 | ||||||||
| E | 079 | Install FEP 30 mm | 2 | LM | ¥ | ¥ | 0 | ||
| WATER LINE WORK | 0 | ||||||||
| 0 | 0 | ||||||||
| E | 080 | Raise/Lower existing Gate Valve Box | 10 | EA | ¥ | ¥ | 0 | ||
| 0 | |||||||||
| REMOVAL AND DISPOSAL WORK | 0 | ||||||||
| 0 | 20 | ||||||||
| E | 081 | Saw Cutting of Existing AC Pavement, less than 15cm | 283 | LM | ¥ | ¥ | 0 | ||
| E | 082 | Saw Cutting of Existing AC Pavement, 15cm or more and less than 30cm | 20 | LM | ¥ | ¥ | 0 | ||
| E | 083 | Saw Cutting of Existing Concrete Pavement, less than 15cm | 20 | LM | ¥ | ¥ | 0 | ||
| E | 084 | Saw Cutting of Existing Concrete Pavement, 15cm or more and less than 30cm | 50 | LM | ¥ | ¥ | 0 | ||
| E | 085 | Cold Milling of AC Pavement, less than 6cm | 50 | SM | ¥ | ¥ | 0 | ||
| E | 086 | Cold Milling of AC Pavement, 6cm or more and less than 12cm | 3,260 | SM | ¥ | ¥ | 0 | ||
| E | 087 | Removal of AC Pavement, less than 10cm | 3,260 | SM | ¥ | ¥ | 0 | ||
| E | 088 | Removal of AC Pavement, 10cm or more and less than 20cm | 20 | SM | ¥ | ¥ | 0 | ||
| E | 089 | Removal of Reinforced Concrete by Labor | 20 | CM | ¥ | ¥ | 0 | ||
| E | 090 | Removal of Reinforced Concrete by Machine | 10 | CM | ¥ | ¥ | 0 | ||
| E | 091 | Removal of Plain Concrete by Labor | 10 | CM | ¥ | ¥ | 0 | ||
| E | 092 | Removal of Plain Concrete by Machine | 10 | CM | ¥ | ¥ | 0 | ||
| E | 093 | Removal of Existing Manhole Frame and Cover | 10 | EA | ¥ | ¥ | 0 | ||
| E | 094 | Removal of Existing Frame and Grating Drainage Product | 10 | EA | ¥ | ¥ | 0 | ||
| E | 095 | Removal of Precast Concrete Curb Block | 10 | LM | ¥ | ¥ | 0 | ||
| E | 096 | Removal of Existing Tree and Stump, Circumference of tree less than 20cm | 5 | EA | ¥ | ¥ | 0 | ||
| E | 097 | Removal of Existing Tree and Stump, Circumference of tree 21~30cm | 5 | EA | ¥ | ¥ | 0 | ||
| E | 098 | Removal of Existing Tree and Stump, Circumference of tree 31~60cm | 5 | EA | ¥ | ¥ | 0 | ||
| E | 099 | Removal of Existing Tree and Stump, Circumference of tree 61~90cm | 5 | EA | ¥ | ¥ | 0 | ||
| E | 100 | Removal of PVC Pipe | 3 | LM | ¥ | ¥ | 0 | ||
| E | 101 | Hauling and Disposal of Extra Soils/Gravels to Off Base | 3,178 | CM | ¥ | ¥ | 0 | ||
| E | 102 | Hauling and Disposal of Asphalt Concrete to Off Base | 814 | MTON | ¥ | ¥ | 0 | ||
| E | 103 | Hauling and Disposal of Cold Milling AC to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| E | 104 | Hauling and Disposal of Plain Concrete to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| E | 105 | Hauling and Disposal of Reinforced Concrete to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| E | 106 | Hauling and Disposal of Precast Concrete Product to Off Base | 50 | MTON | ¥ | ¥ | 0 | ||
| E | 107 | Hauling and Disposal of Plastics to Off Base | 10 | MTON | ¥ | ¥ | 0 | ||
| E | 108 | Hauling and Disposal of Trees and stump to Off Base | 10 | MTON | ¥ | ¥ | 0 | ||
| TOTAL ESTIMATED AMOUNT OF ELINs (Yen) | ¥ |
&L&10Exhibit E RFP No. FA520518R0003&C&10Page &P of &N