Revised per addendum No. 2, date 24 May 18

PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: NH LOCATION MAP 4 OF 15

SHEET NUMBER

T-4 4

LOCATION MAP OF MISAWA AB

Project location is entire Misawa Air Base and locations within 40 km radius from Misawa AB, including its associated sites of Draughon

Range and Fleet Logistics Center Yokosuka Hachinohe Fuel Terminal, with the exception of the Misawa AB Airfield., PROJECT TITLE: RF.NO. SEQ.NO.

DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET

CHECKED BY: NH CONCRETE SIDEWALK DETAIL 7 OF 15

SHEET NUMBER

B-1 7

CONCRETE SIDEWALK DETAIL

SECTION

TRANSVERSE CONTRACTION JOINT

NOTES:

1. TRANSVERSE CONTRACTION

JOINTS SHALL BE LOCATED

SUCH THAT THE LENGH

DIMENSION OF THE SLABS IS

NO GREATER THAN 1.25 TIMES

THE WIDTH AND NORMALLY

1.0 TIMES THE WIDTH.

2. EXPANSION JOINTS SHALL

BE CONSTRUCTED NOT MORE

THAN FIVE TIMES THE WIDTH

"W" OF THE WALKWAY.

EXPANTION JOINT