PREPARED BY:
35 CIVIL ENGINEERING SQUADRON
US AIR FORCE, MISAWA AB
APO AP 96319-5022
PROJECT TITLE: RF.NO. SEQ.NO.
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH TITLE SHEET 1 OF 15
SHEET NUMBER
T-1 1
TITLE SHEET
MISAWA AIR BASE
JAPAN
IDIQ CONTRACT
ROADS/PAVEMENTS & MISC. CIVIL WORK
Revised per addendum No.1, date 8 Feb 18
Solicitation No.
Contract No.
SEQ. NO. REF.NO.
1 1 OF 15 T-1 TITLE SHEET
2 2 OF 15 T-2 LIST OF DRAWINGS
3 3 OF 15 T-3 REVISIONS
4 4 OF 15 T-4 LOCATION MAP
5 5 OF 15 A-1 CRACK REPAIR DETAIL (GEOTEXTILE)
6 6 OF 15 A-2 CONCRETE PAVEMENT DETAIL
7 7 OF 15 B-1 CONCRETE SIDEWALK DETAIL
8 8 OF 15 B-2 CONCRETE CURBS DETAIL
9 9 OF 15 B-3 CONCRETE CURBS & GUTTER DETAIL
10 10 OF 15 C-1 ALPHANUMERIC SYMBOL DETAIL
11 11 OF 15 C-2 HANDICAP PAVEMENT MARKINGS
12 12 OF 15 C-3 TYPICAL SIGN & POST DETAIL
13 13 OF 15 D-1 STANDARD EARTHWORKS FOR PIPE
14 14 OF 15 D-2 L-TYPE GUTTER INLET DETAIL
15 15 OF 15 G-1 CONSTRUCTION SIGN
PROJECT TITLE: RF.NO. SEQ.NO.
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH LIST OF DRAWINGS 2 OF 15
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
LIST OF DRAWINGS
SHEET NO.
SIDEWALK, CURBS, AND GUTTERS WORK
PAVEMENT AND GEOTEXTILE WORK
DESCRIPTION DATE OF DRAWING/REVISION
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
PAVEMENT MARKINGS, TRAFFIC SAFTY WORK
SANITARY SEWER, DRAINAGE WORK
SHEET NUMBER
T-2 2
CONSTRUCTION SIGN
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No. 1, date 8 Feb 18
Revised per addendum No.1, date 8 Feb 18
SHEET NO. REV. LTR SYMBOL DATE
PROJECT TITLE: RF.NO. SEQ.NO.
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH REVISIONS 3 OF 15
SHEET NUMBER
T-3 3
REVISIONS
APPROVALDESCRIPTION
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH LOCATION MAP 4 OF 15
SHEET NUMBER
T-4 4
LOCATION MAP OF MISAWA AB
Project location is entire Misawa Air Base and locations within 40 km radius from Misawa AB, including its associated sites of Draughon
Range and Fleet Logistics Center Yokosuka Hachinohe Fuel Terminal, with the exception of the Misawa AB Airfield., NOTE:
1. THICKNESS OF EXISTING AC SURFACE SHALL BE VERIFIED IN THE FIELD.
2. GEOTEXTILE SHALL EXTEND A MINIMUM 300MM BEYOND CRACK.
PROJECT TITLE: RF.NO. SEQ.NO.
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH CRACK REPAIR DETAIL (GEOTEXTILE) 5 OF 15
SHEET NUMBER
A-1 5
CRACK REPAIR DETAIL (GEOTEXTILE)
3. CRACKS WIDTH LESS THAN 20MM SHALL BE FIELD WITH JOINT SEALANT. CRACKS WIDTH LARGER THAN
20MM SHALL BE FILLED WITH A BITUMINOUS MIXTURE OF SAND AND ASPHALT.
CHECKED BY: NH ALPHANUMERIC SYMBOL DETAIL 6 OF 15
SHEET NUMBER
A-2 6
CONCRETE PAVEMENT DETAIL
CHECKED BY: NH CONCRETE SIDEWALK DETAIL 7 OF 15
SHEET NUMBER
B-1 7
CONCRETE SIDEWALK DETAIL
SECTION
TRANSVERSE CONTRACTION JOINT
NOTES:
1. TRANSVERSE CONTRACTION
JOINTS SHALL BE LOCATED
SUCH THAT THE LENGH
DIMENSION OF THE SLABS IS
NO GREATER THAN 1.25 TIMES
THE WIDTH AND NORMALLY
1.0 TIMES THE WIDTH.
2. EXPANSION JOINTS SHALL
BE CONSTRUCTED NOT MORE
THAN FIVE TIMES THE WIDTH
"W" OF THE WALKWAY.
EXPANTION JOINT
PRECAST CONCRETE CURB BLOCK TYPE A
CAST-IN PLACE CONCRETE CURB 150 MM (BARRIER)
PROJECT TITLE: RF.NO. SEQ.NO.
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH CONCRETE CURBS DETAIL 8 OF 15
SHEET NUMBER
B-2 8
CONCRETE CURBS DETAIL
PRECAST A BLOCK & CAST-IN PLACE CONCRETE GUTTER
CAST-IN PLACE STANDARD BARRIER CONCRETE CURB AND GUTTER
PROJECT TITLE: RF.NO. SEQ.NO.
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH CONCRETE CURBS & GUTTER DETAIL 9 OF 15
SHEET NUMBER
B-3 9
CONCRETE CURBS & GUTTER DETAIL
CHECKED BY: NH ALPHANUMERIC SYMBOL DETAIL 10 OF 15
SHEET NUMBER
C-1 10
ALPHANUMERIC SYMBOL DETAIL
Unit: mm
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH HANDICAP PAVEMENT MARKINGS 11 OF 15
SHEET NUMBER
C-2 11
HANDICAP PAVEMENT MARKINGS
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH TYPICAL SIGN & POST DETAIL 12 OF 15
SHEET NUMBER
C-3 12
TYPICAL SIGN & POST DETAIL
CHECKED BY: NH STANDARD EARTHWORKS FOR PIPE 13 OF 15
SHEET NUMBER
D-1 13
STANDARD EARTHWORKS FOR PIPE
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH L-TYPE GUTTER INLET DETAIL 14 OF 15
SHEET NUMBER
D-2 14
L-TYPE GUTTER INLET DETAIL
GRATING COVER WITH
FRAME AND ANCHOR
(LOAD CLASS T-25)
DRAWING BY: NH ROADS/PAVEMENTS & MISC. CIVIL WORK IDIQ CONTRACT CLASS LOG SHEET
CHECKED BY: NH CONSTRUCTION SIGN 15 OF 15
SHEET NUMBER
G-1 15
AF DÉCOR and all characters shall be white space on dark browned background.
CONSTRUCTION SIGN
| T-1 Title sheet |
| T-2 LIST OF DRAWINGS |
| T-3 REVISIONS |
| T-4 LOCATION MAP |
| A-1 |
| A-2 |
| B-1 |
| B-2 |
| B-3 |
| C-1 |
| C-2 |
| C-3 |
| D-1 |
| D-2 |
| G-1 |