Atch2d_Rev_Submittals_20180208.pdf

PDF 117 KB Posted

Attached to
Roads/Pavements & Misc. Civil Work Indefinite-Delivery/Indefinite-Quantity (IDIQ) Contract, Misawa Air Base (MAB), Japan
Solicitation number
FA520518R0003
Issued by

About this file

Atch 2d Rev Submittals 20180208

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED DISAPPROV

ED

DIVISION 1 - GENERAL REQUIREMENTS

1. Section - 01 11 00, Special Contract Requirements

2.14.1 As-Built Drawings ( Paper) 3 within 10 days after on-

site work completion.

2.14.1 As-Built Drawings ( Reproducible) 1

2.14.1 As-Built Drawings (CD Auto CAD) 3

2. Section - 01 33 00, Submittals SD-01 a. Submittal Register 3

3. Section - 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS SD-01 a. Environmental Protection Plan 3 SD-01 b. Dirt and Dust Control Plan 3 SD-01 c. Employee Training Records 3 SD-01 d. Environmental Manager Qualifications 3 SD-06 a. Laboratory Analysis Inspection 3 SD-06 b. Solid Waste Management Report 3 SD-07 a. Employee Training Records 3 SD-07 b. EMS Certificate Of Completion 3 SD-07 c. Certificate of Competency 3 SD-07 d. Erosion and Sediment Control Inspector Qua 3 SD-11 a. Stormwater Pollution Prevention Plan Complianc 3 SD-11 b. Waste Determination Documentation 3 SD-11 c. Solid Waste Management Report 3 SD-11 d. Contractor Certification 3

DIVISION 2 - EXISTING CONDITIONS

4. Section - 02 41 00, Demolition

SD-07 a. Demolition Plan 3 3

DIVISION 3 - CONCRETE

5. Section - 03 20 00 00 10, CONCRETE REINFORCEMENT

SD-02 a. Reinforcement 3 SD-03 a. Welding 3 SD-07 a. Reinforcing Steel 3

DIVISION 26 - ELECTRICAL

6. Section - 26 00 00 00 20, BASIC ELECTRICAL MATERIALS AND METHODS

SD-02 a. Wiring Diagrams and Installation Details 3

SU

BM

IT

TA

L

N U

M

BE

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

IN

ST

R U

C

TI

O N

M

SD

S H

EE

TS

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

PR

EC

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

R

EC

O R

D S

M

AN

U

FA

C

TU

R

ER

C

AT

AL

O

G D

AT

A

O

PE

R

AT

IO

N

, M

AI

N

TE

N

AN

C E

M

AN

U

AL

S

SC

H

ED

U

LE

SOLICITATION / CONTRACT NO.

FA520518R0003

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

BE

R

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

D

ES

IG

N

D

AT

A

SA

M

PL

ESITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Roads/Pavements & Misc. Civil Work IDIQ contract, Misawa Aie Base Japan

TE

ST

R

EP

O R

TS

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

IN

ST

R

U C

TI

O

N S

PR

O

D U

C T

D

AT

A

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) Page 1 of 5 Revised per addendum No. 1, date 8 Feb 18

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

IN

ST

R U

C

TI

S H

EE

TS

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

PR

EC

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

R

EC

O R

D S

M

AN

U

FA

C

TU

R

ER

C

AT

AL

O

G D

AT

A

O

PE

R

AT

IO

N

, M

AI

N

TE

N

AN

C E

M

AN

U

AL

S

SC

H

ED

U

LE

SOLICITATION / CONTRACT NO.

FA520518R0003

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

BE

R

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

D

ES

IG

N

D

AT

A

SA

M

PL

ESITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Roads/Pavements & Misc. Civil Work IDIQ contract, Misawa Aie Base Japan

TE

ST

R

EP

O R

TS

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

IN

ST

R

U C

TI

O

N S

PR

O

D U

C T

D

AT

A

SD-03 a. Performance and Characteristic Curves 3

DIVISION 31 - EXTERIOR IMPROVEMENTS

7. Section - 31 00 00, EARTHWORK

SD-01 a. Shoring 3 SD-01 b. Dewatering Work Plan 3 SD-03 a. Utilization of Excavated materials 3 SD-06 a. Testing 3 SD-06 b. Borrow Site Testing 3 SD-07 a. Testing 3

8. Section - 31 05 19, GEOTEXTILE SD-03 a. Thread 3 SD-04 a. Quality Assurance Samples and Tests 3 SD-07 a. Geotextile 3

9. Section - 31 11 00, CLEARING AND GRUBBING SD-03 a. Nonsaleable Materials SD-04 a. Tree Wound Paint SD-04 b. Herbicide

10. Section - 31 23 00 00 20, EXCAVATION AND FILL SD-01 a. Shoring and Sheeting Plan 3 SD-01 b. Dewatering Work Plan 3 SD-01 c. Blasting Work Plan 3 SD-06 a. Borrow Site Testing 3 SD-06 b. Fill and Backfill Test 3 SD-06 c. Select Material Test 3 SD-06 d. Porous Fill for Capillary Water Barrier 3 SD-06 e. Density Tests 3

DIVISION 32 - EXTERIOR IMPROVEMENTS

11. Section - 32 01 19 61 RESEALING OF JOINTS IN RIGID PAVEMENT

SD-03 a. Joint Sealant 3 SD-04 a. Joint Filler 3 SD-04 b. Separating Tape 3 SD-04 c. Joint Backer Rod 3 SD-04 d. Joint Sealant 3 3 SD-06 a. Joint Sealant 3 SD-07 a. Equipment List 3

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) Page 2 of 5 Revised per addendum No. 1, date 8 Feb 18

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

IN

ST

R U

C

TI

S H

EE

TS

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

PR

EC

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

R

EC

O R

D S

M

AN

U

FA

C

TU

R

ER

C

AT

AL

O

G D

AT

A

O

PE

R

AT

IO

N

, M

AI

N

TE

N

AN

C E

M

AN

U

AL

S

SC

H

ED

U

LE

SOLICITATION / CONTRACT NO.

FA520518R0003

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

BE

R

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

D

ES

IG

N

D

AT

A

SA

M

PL

ESITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Roads/Pavements & Misc. Civil Work IDIQ contract, Misawa Aie Base Japan

TE

ST

R

EP

O R

TS

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

IN

ST

R

U C

TI

O

N S

PR

O

D U

C T

D

AT

A

SD-08 a. Joint Sealant 3

12. Section - 32 01 24 HOT IN-PLACE RECYCLING OF BITUMINOUS PAVEMENTS

SD-04 a. Samples 3 SD-06 a. Field Testing and Sampling 3

13. Section - 32 11 16 BASE COURSE FOR RIGID AND SUBBASES COURSES FOR FLEXIBLE PAVING SD-03 a. Equipment 3 SD-06 a. Sampling and Testing 3 SD-06 b. Field Density Tests 3

14. Section - 32 11 23 AGGREGATE BASE COURSE SD-03 a. Plant, Equipment, and Tools 3 SD-06 a. Sampling and Testing 3 SD-06 b. Field Density Tests 3

15. Section - 32 12 10 BITUMINOUS TACK AND PRIME COATS SD-03 a. Waybills and Delivery Tickets 3 SD-03 b. Local/Regional Materials 3 SD-06 a. Sampling and Testing 3

16. Section - 32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS SD-03 a. Mix Design 3 SD-03 b. Quality Control 3 SD-03 c. Material Acceptance 3 SD-04 a. Asphalt Cement Binder 3 SD-04 b. Aggregates 3 SD-06 a. Aggregates 3 SD-06 b. QC Monitoring 3 SD-07 a. Asphalt Cement Binder 3 SD-07 b. Testing Laboratory 3

17. Section - 32 13 13 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES 1.2.1.a Curing Material 3 1.2.1.b Admixtures 3 1.2.1.c Dowel 3 1.2.1.d Reinforcement 3 1.2.2.a Concrete Mix Design 3 1.2.3.a Aggregate Tests 3 1.2.3.b Concrete Slump Tests 3 1.2.3.c Air Content Tests 3 1.2.3.d Flexural Strength Test 3 1.2.3.e Pavement Inspection Reports 3

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) Page 3 of 5 Revised per addendum No. 1, date 8 Feb 18

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

IN

ST

R U

C

TI

S H

EE

TS

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

PR

EC

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

R

EC

O R

D S

M

AN

U

FA

C

TU

R

ER

C

AT

AL

O

G D

AT

A

O

PE

R

AT

IO

N

, M

AI

N

TE

N

AN

C E

M

AN

U

AL

S

SC

H

ED

U

LE

SOLICITATION / CONTRACT NO.

FA520518R0003

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

BE

R

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

D

ES

IG

N

D

AT

A

SA

M

PL

ESITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Roads/Pavements & Misc. Civil Work IDIQ contract, Misawa Aie Base Japan

TE

ST

R

EP

O R

TS

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

IN

ST

R

U C

TI

O

N S

PR

O

D U

C T

D

AT

A

1.2.4.a Ready-mixed Concrete Plant 3 1.2.4.b Batch Tickets 3 1.2.4.c Cementitious Materials 3

18. Section - 32 16 13 CONCRETE SIDEWALKS, CURBS AND GUTTERS 1.2.1.a Construction Equipment 3 1.2.1.b Course and Fine Aggregate 3 1.2.1.c Job Mix Formula 3 1.2.1.d Expansion Joint Filler 3 1.2.1.e Joint Sealant 3 1.2.1.f Epoxy-Resin 3 1.2.2.a Precast Concrete Curb and Gutter 3 1.2.2.b Concrete Stairs with Steel Handrails 3 1.2.2.c Traffic Sign Post w/Concrete Footing 3 1.2.2.d Precast Concrete Wheel Stop 3 1.2.2.e Sidewalk Ramp Type A, B, & C 3 1.2.3.a Pavement Inspection 3 1.2.3.b Sieve Analysis of Aggregates 3 1.2.3.c Compressive Strength 3 1.2.3.d Liquid Limit of Aggregate 3 1.2.3.e Plasticity Index of Aggregates 3 1.2.3.f Sieve Analysis of Combined Material 3 1.2.3.g Portland Cement 3 1.2.4.a Location of Aggregate Source 3 1.2.5.a Construction Equipment List / Mixing Plant 3

19. Section - 32 17 23 PAVEMENT MARKINGS SD-03 a. Equipment 3 SD-03 b. Composition Requirements 3 SD-03 c. Qualifications 3 SD-06 a. Sampling and Testing 3

20. Section - 32 31 26 WIRE FENCES AND GATES 1.2.1.a Chain Link Fence 3 1.2.2.a Electro-Mechanical Locks 3 1.2.2.b Gate Operator 3

21. Section - 32 92 19 SEEDING SD-03 a. Wood Cellulose Fiber Mulch 3 SD-03 b. Fertilizer 3 SD-06 a. Topsoil Composition Tests 3

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) Page 4 of 5 Revised per addendum No. 1, date 8 Feb 18

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

IN

ST

R U

C

TI

S H

EE

TS

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

PR

EC

O N

ST

R

U C

TI

O

N S

U

BM

IT

TA

LS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

R

EC

O R

D S

M

AN

U

FA

C

TU

R

ER

C

AT

AL

O

G D

AT

A

O

PE

R

AT

IO

N

, M

AI

N

TE

N

AN

C E

M

AN

U

AL

S

SC

H

ED

U

LE

SOLICITATION / CONTRACT NO.

FA520518R0003

(To be completed by Project Engineer) (To be completed by Contract Administrator)

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

BE

R

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

D

ES

IG

N

D

AT

A

SA

M

PL

ESITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE

Roads/Pavements & Misc. Civil Work IDIQ contract, Misawa Aie Base Japan

TE

ST

R

EP

O R

TS

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

IN

ST

R

U C

TI

O

N S

PR

O

D U

C T

D

AT

A

SD-07 a. State Certification and Approval for Seed 3 SD-08 a. Erosion Control Materials 3

22. Section - 32 92 23 SODDING SD-03 a. Fertilizer 3 SD-06 a. Topsoil Composition Tests 3 SD-07 a. Sod farm certification for sods 3

DIVISION 33 - UTILITIES

23. Section - 33 11 00 WATER UTILITY DISTRIBUTION PIPING

1.2.a Ductile Iron Pipe 3 3 1.2.b Ductile Iron Fittings 3 3 1.2.c Gate Valve 3 3 1.2.d Air Release Valve 3 3

1.2.e Polyethylene Coated Rigid Steel Conduit 3 3

1.2.f Polyethylene Flexible Conduit 3 3 1.2.g Handhole with Frame and Cover 3 3 1.2.h Pre-cast Valve Box (Water) 3 3

1.2.j Locking Device for Manhole Frame & Cover 3 3

24. Section - 33 40 00 STORM DRAINAGE UTILITIES SD-03 a. Placing Pipe 3 SD-04 a. Pipe for Culverts and Storm Drains 3 SD-07 a. Resin Certification 3 SD-07 b. Pipeline Testing 3 SD-07 c. Hydrostatic Test on Watertight Joints 3 SD-07 d. Determination of Density 3 SD-07 e. Frame and Cover for Gratings 3

25. Section - 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION 1.3.1.a Cubicle Transformer 3 1.3.1.b Pre-Cast Manhole 3 1.3.1.c Polyethylene Flexible Conduit 3 1.3.1.d Fittings for Flexible Conduit 3

Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) Page 5 of 5 Revised per addendum No. 1, date 8 Feb 18

File details come from the government source that posted it.