FA5205-11-R-0001_ Atch2.pdf

PDF 1 MB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Contract, Misawa Air Base Japan
Solicitation number
FA5205-11-R-0001
Issued by

About this file

Attachment 2 to FA5205-11-R-0001 Volume II Unit Price Book (UPB)

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Contract No.

Solicitation No. FA5205-11-R-0001

SABER

SIMPLIFIED ACQUISITION OF BASE ENGINEERING

REQUIREMENTS

VOLUME II

UNIT PRICE BOOK (UPB)

18 April 2011

MISAWA AIR BASE

JAPAN

DATE 04/18/11

UNIT PRICE BOOK - VOLUME II

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

DIVISION 01 GENERAL REQUIREMENT

01010 SUMMARY OF WORK

01020 ALLOWANCES

01030 SPECIAL PROJECT PROCEDURES

01040 COORDINATION

01050 FIELD ENGINEERING

01060 REGULATORY REQUIREMENTS

01070 ABBREVIATIONS AND SYMBOLS

01080 IDENTIFICATION SYSTEMS

01100 ALTERNATES/ALTERNATIVES

01200 PROJECT MEETINGS

01300 SUBMITTALS

01400 QUALITY CONTROL

01500 CONSTRUCTION FACILITIES AND TEMP

01600 MATERIAL AND EQUIPMENT

01650 STARTING OF SYSTEMS

01660 TESTING ADJUSTING & BALANCING

01700 CONTRACT CLOSEOUT

01710 CONSTRUCTION FINAL CLEAN-UP

01800 MAINTENANCE MATERIALS

DIVISION 02 SITE WORK

02080 UTILITY MATERIALS

02100 SITE REMEDIATION

02200 SITE PREPARATION

02210 SUBSURFACE INVESTIGATION

02220 SITE DEMOLITION

02225 SELECTIVE DEMOLITION (1)

02226 SELECTIVE DEMOLITION (2)

02230 SITE CLEARING

02240 DEWATERING

02250 SHORING & UNDERPINNING

02270 MISCELLANEOUS SITE MATERIALS

02300 EARTHWORK

02310 GRADING

02315 FILLING

02317 EXCAVATION

02320 HAULING

02340 SOIL STABILIZATION

02360 SOIL TREATMENT

02370 EROSION & SEDIMENTATION CONTROL

02400 TUNNELING, BORING & JACKING

02445 BORING OR JACKING CONDUITS

02450 FOUNDATION & LOAD BEARING ELEMENTS

02455 DRIVEN PILES

02500 UTILITY SERVICES

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

DIVISION 00 INDEX Page 1

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02510 PIPING, WATER DISTRIBUTION, DUCTILE IRON

02530 SANITARY SEWERAGE

02580 ELEC/COMMUNICATION STRUCTURES

02600 DRAINAGE & CONTAINMENT

02620 SUBDRAINAGE

02630 STORM DRAINAGE

02700 BASES, BALLASTS, PAVEMENTS & APPURTENANCES

02720 UNBOUND BASE COURSE & BALLASTS

02740 FLEXIBLE PAVEMENT

02750 RIGID PAVEMENT

02766 PAVEMENT MARKINGS, COST INCLUDES PREPARATION,

MEASUREMENT, CLEAN UP, PRIMER, PAINT, AND CURING.

02770 CURBS AND GUTTERS

02775 SIDEWALKS

02785 FLEXIBLE PAVEMENT COATING

02790 ATHLETIC/RECREATIONAL SURFACES

02800 SITE IMPROVEMENTS AND AMENITIES

02810 IRRIGATION SYSTEM

02820 FENCES & GATES

02830 RETAINING WALLS

02840 WALK/ROAD/PARKING APPURTENANCES

02870 SITE FURNISHINGS

02880 PLAYFIELD EQUIPMENT

02890 TRAFFIC SIGNS & SIGNALS

02900 PLANTING

02905 TRANSPLANTING

02910 PLANT PREPARATION

02912 GENERAL PLANTING

02920 LAWNS & GRASSES

02930 EXTERIOR PLANTS

02935 PLANT MAINTENANCE

02945 PLANTING ACCESSORIES

02950 SITE RESTORATION & REHABILITATION

02990 STRUCTURE MOVING

DIVISION 03 CONCRETE

03100 CONCRETE FORMWORK

03110 STRUCTURAL CAST-IN-PLACE CONCRETE FORMWORK

NOTE - INCLUDES ERECTING, STRIPPING, CLEANING, AND

STACKING PLUS ACCESSORIES

03200 CONCRETE REINFORCEMENT

03210 REINFORCING STEEL NOTE -INCLUDES DELIVERY,

FABRICATION AND ACCESSORIES

03220 WELDED WIRE FABRIC

03250 CONCRETE ACCESSORIES

03251 EXPANSION AND CONTRACTION JOINTS

03253 WATERSTOPS

DIVISION 00 INDEX Page 2

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

03300 CONCRETE WORK

03310 CAST IN PLACE CONCRETE, NOTE-INCLUDES SHEET

CURRING AND WOOD FLOATING FINISH AS NEEDED

03400 CONCRETE AND MORTAR FINISH

03410 CONCRETE SURFACE FINISH

03420 SPECIAL CONCRETE FINISHES

03430 PRECAST CONCRETE, PLANTER, GLASS REINFORCED

CEMENT

03440 ALC PANEL NOTE-INCLUDES JOINT SEALING

03500 CEMENTITIOUS DECKS

03520 INSULATING CONCRETE ROOF DECK NOTE -ADD COSTS

FOR FORMING TO ALL PRICES BELOW. SEE CSI 03300

03600 GROUT

03610 GROUTING FOR BASES

03620 GROUTING FOR JOINTS

DIVISION 04 MASONRY

04100 MORTAR

04110 CEMENT AND LIME MORTARS

04160 JOINT REINFORCEMENT

04180 CONTROL JOINTS

04190 MORTAR

04200 UNIT MASONRY

04205 SCAFFOLDING

04220 CONCRETE UNIT MASONRY NOTE-INCLUDES FILING UP

MORTAR, GROUTING AND REINFORCING BAR (ADD 20%

FOR COST BELOW 100M2)

04230 BRICK

04500 MASONRY RESTORATION AND CLEANING

04510 MASONRY CLEANING

04520 MASONRY RESTORATION

04550 REFRACTORIES

DIVISION 05 METAL

05100 STRUCTURAL METAL FRAMING NOTE- PRICE INCLUDES

DELIVERY, PAINT(JIS K 5622), TOUCH UP PAINT, HI

TENSION BOLT, SITE WELDING. LABOR PRICE INCLUDES

CRANE AND OPERATOR AS NEEDED

05110 STRUCTURAL STEEL

05120 MISCELLANEOUS STEEL ITEMS

05300 METAL DECKING

05310 METAL ROOF AND FLOOR DECK NOTE- INCLUDES ALL

COMPONENTS AND HARDWARE

05500 METAL FABRICATION

05501 ANCHOR BOLTS

DIVISION 00 INDEX Page 3

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

05502 EXPANSION BOLTS INCLUDING NUT, WASHER, DRILLING

CONC OR BLOCK

05521 PIPE AND TUBE RAILING

05530 GRATING

05540 CASTINGS

05700 ORNAMENTAL METAL

05720 ORNAMENTAL HANDRAIL AND RAILINGS

05730 ORNAMENTAL SHEET METAL

05800 EXPANSION CONTROL

05805 EXPANSION JOINT COVERS

DIVISION 06 WOOD AND PLASTIC

06100 ROUGH CARPENTRY

06110 FRAMING AND SHEATHING NOTE -ALL LUMBER GRADES

ARE PRESUMED TO BE 75 PCT CONST. AND 25 PCT

STANDARD OR EQUIVALENT GRADE UNLESS OTHERWISE

LISTED. DIMENSIONS ARE NOMINAL

06111 LIGHT WOODEN STRUCTURES FRAMING

06113 SHEATHING, SIDING AND SUB-FLOORING 0901

06130 HEAVY TIMBER CONSTRUCTION (U.S. MATERIALS OR

EQUIVALENT) 06132 MILL FRAMED STRUCTURES

06170 PREFABRICATED WOOD

06200 FINISH CARPENTRY

06220 MILLWORK

06300 WOOD TREATMENT

06310 PRESSURE TREATED LUMBER

06311 PRESERVATIVE TREATED LUMBER

06312 FIRE RETARDANT TREATED LUMBER

06313 KILN DRYING TREATMENT

06400 ARCHITECTURAL WOODWORK

06410 CABINETWORK W/ HARDWARE

06420 PANELING

06700 FASTENERS AND SUPPORTS

06710 ANCHORS

06720 JOINT SUPPORTS

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07100 WATERPROOFING W/SEAL CAULKING NOTE -THE

FOLLOWING PRICES ARE FOR APPLICATION TO VERTICAL

SURFACES

07110 MEMBRANE WATERPROOFING

07111 ELASTOMERIC MEMBRANE WATERPROOFING

DIVISION 00 INDEX Page 4

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

07112 BITUMINOUS MEMBRANE WATERPROOFING IAW ASPHALT

JIS K 2207, ASPHALT ROOFING JIS A 6005, STRETCHY

ASPHALT ROOFING JIS A 6022, SANDED BITUMINOUS FELT

JIS A 6022, PERFORATED ASPHALT ROOFING JIS A 6023

07113 VINYL CHLORIDE SHEET WATERPROOF NOTE-INCLUDING

PREPARE OF CRACKS,HOLES,REMOVE & REINSTALL

ASSOCIATED APPURTENANCE

07150 DAMPPROOFING

07155 DAMPPROOFING MAINTENANCE AND REPAIR

07160 BITUMINOUS DAMPPROOFING

07170 SILICONE DAMPPROOFING

07180 CEMENTITIOUS DAMPPROOFING

07200 INSULATION

07210 THERMAL INSULATION MATERIAL MADE OF GLASSWOOL

JIS 9505 FOR BUILDING INSULATION

07211 LOOSE FILL INSULATION

07212 THERMAL INSULATION MATERIAL MADE OF

POLYSTYRENE FORM JIS A 9511

07213 RIGID INSULATION FOR ROOFS NOTE -TYPES ARE STOCK

SIZES MASTIC APPLIED OR NAILED ON

07215 SPRAYED ON INSULATION

07240 ROCK WOOL FIREPROOF SPRAYING

07400 ROOFING AND SIDING

07410 ROOFING

07420 SIDING

07500 MEMBRANE ROOFING

07510 BUILT-UP BITUMINOUS ROOFING NOTE -THE FOLLOWING

PRICES DO NOT INCLUDE THE INSULATION COSTS- FOR

INSULATION SEE CSI07200

07550 INVERTED ROOF SYSTEM

07600 FLASHING AND SHEETMETAL

07610 SHEET METAL ROOFING SEE ALSO CSI SECTION 7410

07620 FLASHING AND TRIM

07630 COPING

07631 GUTTERS AND DOWNSPOUTS

07660 GRAVEL STOPS

07670 VENTS

07800 ROOF ACCESSORIES

07810 SKYLIGHTS

07811 PLASTIC SKYLIGHTS

07830 ROOF HATCHES EXHAUST SMOKE TYPE

07840 GRAVITY VENTILATORS NOTE -PRICE INCLUDES CURB,

BASE, DAMPER, STAINLESS BIRD SCREEN AND SECURING

COMPONENTS

07900 SEALANTS

07910 SEALING COMPOUNDS FOR SEALING AND GLAZING IN

BUILDING JIS A 5758

07920 SEALANTS AND CAULKING

07930 PLASTER REPAIRS:

DIVISION 00 INDEX Page 5

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

DIVISION 08 DOORS AND WINDOWS

08100 METAL DOORS AND FRAMES

08110 STEEL DOORS AND FRAMES

08120 ALUMINUM DOORS AND FRAMES

08200 WOOD AND PLASTIC DOORS

08210 WOOD DOORS

08300 SPECIAL DOORS

08310 HEAVY STEEL ROLL UP DOOR NOTE- INCLUDES

STAINLESS FRAME

08320 LIGHT STEEL ROLL UP DOOR

08330 OVER HEAD SLIDING DOOR

08340 MONITOR CONTROL SYSTEMS, TURNSTILE

08350 FOLDING DOORS

08353 ACCORDION FOLDING DOORS INCLUDES TRACKS AND

FITTINGS COMPLETE

08355 ACCESS FLOOR AND CEILING DOORS, WITH STAINLESS

STEEL FLAME

08362 METAL SLIDING DOOR -INCLUDES TRACKS, HARDWARES,

AND FITTINGS COMPLETE

08370 SLIDING GLASS DOORS, ALUMINUM NOTE -PRICES

INCLUDE STOCK FRAMES, TRIM AND GLASS USUAL

HARDWARE

08390 SCREEN AND STORM DOORS

08400 ENTRANCES AND STOREFRONTS

08420 ENTRANCE DOORS

08450 REVOLVING DOORS NOTE -PRICES ARE FOR STOCK

UNITS, INCLUDING FRAME AND TRIM 6 FT 6 IN TO 7 FT IN

DIAMETER AND 6 FT 10 IN TO 7 FT HIGH

08500 METAL WINDOWS

08510 STEEL WINDOWS NOTE -ALL SASHES ARE FACTORY

PRIMED BUT NOT FACTORY GLAZED SEE CSI 08800 FOR

GLAZING

08520 ALUMINUM WINDOWS

08600 WOOD AND PLASTIC WINDOWS

08610 WOOD WINDOWS NOTE -WINDOWS ARE GLAZED W/ DSA

AND PROVIDED W/SCREENS

08700 HARDWARE AND SPECIALTIES

08710 FINISH HARDWARE

08720 OPERATORS

08730 WEATHERSTRIPPING AND SEALS

08740 THRESHOLDS

08750 WINDOW STOPPER

08800 GLAZING

08810 GLASS NOTE-INCLUDES NEOPLANE SETTING BLOCKS,

SPACERS AND ELASTOMETRIC SEALANTS

08830 MIRROR GLASS

08850 GLAZING ACCESSORIES

08900 GLAZED CURTAIN WALLS

DIVISION 00 INDEX Page 6

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

08912 ALUMINUM WINDOW WALLS/CURTAIN WALLS

DIVISION 09 FINISHES

09100 LIGHT STEEL FURRING

09110 CEILING SUSPENSION SYSTEMS

09120 WALL STEEL FURRING SYSTEM

09130 ACCESS DOOR

09200 DRYWALL AND CEILING CONSTRUCTION

09210 DRYWALL CONSTRUCTION

09220 CEILING BOARD

09230 MISCELLANEOUS DRY WALL

09300 TILE

09310 FLOOR TILE

09320 WALL TILE

09400 TERRAZZO

09410 PORTLAND CEMENT TERRAZZO NOTE -DIVIDER STRIPS

NOT INCLUDED, SEE CSI 09430 FOR CONDUCTIVE

TERRAZZO

09420 PRECAST TERRAZZO

09430 CONDUCTIVE TERRAZZO

09500 WOOD FLOORING

09510 WOOD STRIP FLOORING NOTE -ALL WOOD STRIP

FLOORING IS UNFINISHED, T&G, LAID OVER FELT

UNDERLAYMENT

09520 WOOD PARQUET FLOORING NOTE -ALL WOOD PARQUET

FLOOR IS PREFINISHED AT FACTORY

09530 RESILIENT WOOD FLOORING SYSTEM

09540 WOOD BLOCK INDUSTRIAL FLOORING

09600 FLOOR FINISH

09610 RESILIENT FLOORING

09620 CARPETING NOTE - FOLLOWING TASKS ARE FOR

TYPICAL INSTALLATIONS AND GRADES MATCH WITH

PROJECT REQUIREMENTS

09630 MISCELLANEOUS CARPET ITEMS

09700 PAINTING NOTE -INCLUDES PROTECTION OF ADJACENT

ITEMS NOT BEING PAINTED

09710 STEEL SURFACE

09720 CONCRETE, MORTAR AND GYP BOARD SURFACE

09730 WOOD SURFACE

09740 TEXTURE PAINT, JIS A 6909

09750 PAINTING PIPE AND INSULATION

09760 TRANSPARENT FINISHES

09770 SURFACE PREPARATION FOR PAINTING

09800 WALL COVERINGS, NOTE- INCLUDE SURFACE

PREPARATION

09810 VINYL WALL COVERINGS

09900 PROTECTIVE COATING

09910 PROTECTIVE FLOOR COATING

DIVISION 00 INDEX Page 7

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

09920 SPRAY COATING

DIVISION 10 SPECIALTIES

10150 COMPARTMENTS AND CUBICLES

10160 TOILET PARTITIONS AND URINAL SCREENS

10161 LAMINATED MELAMINE BOARD TOILET PARTITIONS AND

URINAL SCREENS WITH HARDWARE

10162 METAL TOILET PARTITIONS AND URINAL SCREENS WITH

HARDWARES

10170 SHOWER AND DRESSING COMPARTMENTS

10350 FLAGPOLES ALL ARE INSTALLED IN A 2 CY CONCRETE

BASE AND FULLY RIGGED, ROPE TYPE (BASE NOT

INCLUDED IN COST)

10410 DIRECTORY AND BULLETIN BOARDS NOTE -ALL PRICES

INCLUDE CHANGEABLE LETTERS OR SIGNS FELT BACKED

AND ATTACHED TO MASONRY WALLS

10440 SIGNS

10500 LOCKERS

10502 BOX LOCKERS

10520 FIRE EXTINGUISHERS, CABINETS, AND ACCESSORIES

10521 PORTABLE FIRE EXTINGUISHERS

10522 FIRE EXTINGUISHER CABINETS

10600 PARTITIONS NOTE -CUBICLE PRICES INCLUDE STANDARD

UNITS -STANDARD HEIGHT GLASS AND GLAZING

INCLUDED. FOR 25 PCT AND 50 PCT GLASS 5 MM PLATE

GLASS IS USED. FOR 100 PCT GLASS 5 MM TEMPERED

PLATE IS

10610 DEMOUNTABLE PARTITIONS NOTE -BASIC UNIT INCLUDES

BAKED ENAMEL WALL 80 MM (3.1 IN) THICK WITH DOOR

AND FRAME

10617 METAL PARTITIONS

10618 WIRE MESH PARTITIONS

10670 STORAGE SHELVING

10671 METAL STORAGE SHELVING

10672 WOOD SHELVING

10800 TOILET AND BATH ACCESSORIES

10810 MISC. TOILET AND BATH EQUIPMENT NOTE -TOILET &

BATH ACCESSORIES CHROME PLATED, GOOD QUALITY,

FOR COMMERCIAL AND RESIDENTIAL USE

10820 DISPENSERS AND RECEPTACLES

10830 MEDICINE CABINETS

10850 SHOWER CURTAIN ROD

10860 JANITORIAL MATERIAL (NOT IN USE)

10870 HAND DRYER

10880 HOSPITAL ACCESSORIES (NOT IN USE)

10900 WARDROBE SPECIALTIES

DIVISION 00 INDEX Page 8

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

DIVISION 11 EQUIPMENT

11400 FOOD SERVICE EQUIPMENT

11415 UNIT KITCHENS

11420 COOKING EQUIPMENT

11430 DISHWASHING EQUIPMENT

11500 ATHLETIC EQUIPMENT

11510 GYMNASIUM EQUIPMENT

11550 INDUSTRIAL EQUIPMENT

11551 PAINT SPRAY BOOTHS

11570 SHOP EQUIPMENT

11870 LOADING DOCK EQUIPMENT

11875 DOCK BUMPERS

11900 RESIDENTIAL EQUIPMENT

11910 RESIDENTIAL KITCHEN EQUIPMENT

11920 RESIDENTIAL WASHING EQUIPMENT

11930 RESIDENTIAL ENVIRONMENTAL EQUIPMENT

11950 CONSTRUCTION AIDS

DIVISION 13 SPECIAL CONSTRUCTION

13150 ACCESS AND PEDESTAL FLOORS (SPECIALTY ITEMS,

QUOTE REQUIRED)

13281 ENGINEERING CONROL OF ASBESTOS CONTAINING

MATERIALS

13283 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD

13600 PRE-ENGINEERED STRUCTURES (U. S .MATERIAL OR

EQUIVALENT)

13601 PRE-ENGINEERED BUILDINGS

13602 METAL BUILDING SYSTEMS

13603 MEZZANINE SYSTEM

13610 PRE CAST CONCRETE PRODUCT

DIVISION 14 CONVEYING SYSTEMS

14300 HOISTS AND CRANES

14301 INDUSTRIAL HOISTS

14302 INDUSTRIAL HOISTS, HEAVY DUTY

DIVISION 15 MECHANICAL

15010 GENERAL PROVISIONS

15100 PIPE AND PIPE FITTINGS

15110 STEEL PIPE

15120 LINING AND COATING STEEL PIPE

15130 CAST IRON PIPE AND FITTINGS

DIVISION 00 INDEX Page 9

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

15140 COPPER PIPE AND FITTINGS

15160 STAINLESS STEEL PIPE

15170 CONDUIT PIPE

15180 PIPING ACCESSORIES

15200 PIPING SPECIALTIES

15210 VALVES FOR GENERAL PURPOSE

15220 VALVES FOR WATER SUPPLY

15230 CONTROL VALVES

15240 TEMPERATURE CONTROL VALVE

15260 PUMPS

15270 AIR COMPRESSOR AND DRYER

15300 PLUMBING FIXTURE

15310 BATHROOM, KITCHEN AND OTHER

15320 FAUCETS AND VALVES

15330 DRAINS

15340 DOMESTIC HOT WATER HEATERS

15350 HAND DRYERS

15360 STEEL TANKS

15370 SPECIAL PIPING SYSTEMS AND WASTE WATER DISPOSAL

AND TREATMENT SYSTEM

15400 VENTILATION

15410 FANS

15420 TAILPIPE EXHAUST EQUIPMENT

15421 DUST COLLECTORS

15500 HEATING AND AIR CONDITIONING

15510 BOILERS

15520 SPACE HEATING EQUIPMENT

15530 REFRIGERATION

15540 LIQUID HEAT TRANSFER

15550 PACKAGED AIR CONDITIONING EQUIPMENT

15560 AIR HANDLING UNITS

15570 CONTROL EQUIPMENT

15600 AIR DISTRIBUTION

15610 DUCT WORK

15620 DIFFUSERS AND GRILLES

15630 DAMPERS

15700 MECHANICAL INSULATION WORK

15710 PIPE INSULATION

15720 DUCT INSULATION

15730 INSULATION FOR EQUIPMENT

15740 INSULATION FOR VALVES

15800 FIRE PROTECTION

15810 DELUGE AUTOMATIC SPRINKLER SYSTEMS

15820 HALON FIRE PROTECTION SYSTEMS

15830 DRY CHEMICAL SPRINKLER SYSTEM

15840 SPRINKLER EQUIPMENT

15850 STANDPIPE AND FIRE HOSE EQUIPMENT

15860 FIRE HOSE CABINETS AND ACCESSORIES

15900 SNOW MELTING SYSTEM

15910 PEX PIPE

DIVISION 00 INDEX Page 10

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

15920 PEX FITTINGS

15930 SNOW MELTING SYSTEM, ASSEMBLY

DIVISION 16 ELECTRICAL

16100 BASIC MATERIALS AND METHODS

16110 RACEWAYS

16120 CABLE TRAYS

16130 CONDUITS

16140 WIRE AND CABLE NOTE: UNLOADING, HANDLING, PULL

WIRE, PULLING BRANCH CIRCUIT CONDUCTOR, TESTING,

SPLICING AND CLEANUP. ALL CONDUCTORS ARE COPPER

16150 WIRE CONNECTION DEVICES NOTE: LABOR INCLUDED

INSULATION RESISTANCE TESTS AND INSULATION HIGH

POTENTIAL TESTS.

16160 WIRING DEVICES

16170 MOTOR CONTROL DEVICE

16200 POWER GENERATION

16210 RENTAL GENERATOR (PAR ONE WEEK)

16300 POWER TRANSMISSION

16310 TRANSFORMERS NOTE: PRICES INCLUDE CRANE AND

OPERATOR AS NECESSARY

16320 HIGH VOLTAGE DEVICES

16330 CUBICLE

16400 SERVICE AND DISTRIBUTION

16410 POLE LINE CONSTRUCTION

16420 OVERHEAD SERVICE

16430 UNDERGROUND SERVICE

16440 GROUNDING

16450 BOX-TYPE SWITCHGEAR ASSEMBLIES FOR LOW-

VOLTAGE DISTRIBUTION PURPOSE

16460 INVERTER PANEL

16470 DIMMER CONTROL PANEL

16500 LIGHTING

16510 RESIDENTIAL FIXTURES

16520 COMMERCIAL FLUORESCENT FIXTURES

16530 INDUSTRIAL FIXTURES

16540 FLOODLIGHT FIXTURES

16550 AREA LIGHTING

16560 STREET LIGHTING

16570 EMERGENCY/EXIT LIGHTING

16580 HID LAMP AND BALLAST

16600 SPECIAL SYSTEM

16610 HEATING SYSTEM

16700 COMMUNICATIONS

16710 FIRE ALARM SYSTEM

16720 REINSTALLATION/MISCELLANEOUS WORK

16730 GFM INSTALLATION WORK

16810 REINSTALLATION FOR ALL ELECTRICAL WORK

DIVISION 00 INDEX Page 11

INDEX

MAJOR

BASIC

MINOR

BASIC DESCRIPTION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

16900 GFM INSTALLATION WORK

16910 GFM INSTALLATION FOR ALL ELECTRICAL WORK

DIVISION 00 INDEX Page 12

DIVISION 01 GENERAL REQUIREMENT

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

01000 0000 GENERAL REQUIREMENT

01010 0000 SUMMARY OF WORK

01010 1000 CONSTRUCTION FINAL CLEAN-UP

01010 1100 GENERAL

01010 1101 SWEEP DEBRIS M2 305 377

01010 1200 FLOORS

01010 1201 CLEAN & POLISH TILE/WOOD FLOORS M2 219 271

01010 1202 VACUUM CARPET FLOORS M2 181 224

01010 1203 STEAM CLEAN CARPET M2 572 708

01010 1300 GLASS

01010 1301 CLEAN GLASS SURFACES M2 219 271

01010 2000 IDENTIFICATION SIGN

01010 2001 CONSTRUCTION SIGN EA 42,000 45,000

01020 0000 ALLOWANCES

01030 0000 SPECIAL PROJECT PROCEDURES

01030 1000

01030 1001 CIVIL SHOP DRAWINGS AND QUANTITY

CALCULATION

JOB 300,000 300,000

01030 1002 ARCHITECT SHOP DRAWINGS AND

QUANTITY CALCULATION

JOB 300,000 300,000

01030 1003 STRUCTURAL SHOP DRAWINGS AND

QUANTITY CALCULATION

JOB 300,000 300,000

01030 1004 MECHANICAL SHOP DRAWINGS AND

QUANTITY CALCULATION

JOB 300,000 300,000

01030 1005 ELECTRICAL SHOP DRAWINGS AND

QUANTITY CALCULATION

JOB 300,000 300,000

01030 2000

01030 2001 CIVIL SHOP DRAWINGS AND QUANTITY

CALCULATION

JOB 120,000 120,000

01030 2002 ARCHITECT SHOP DRAWINGS AND

QUANTITY CALCULATION

JOB 120,000 120,000

01030 2003 STRUCTURAL SHOP DRAWINGS AND

QUANTITY CALCULATION

JOB 120,000 120,000

01030 2004 MECHANICAL SHOP DRAWINGS AND

QUANTITY CALCULATION

JOB 120,000 120,000

01030 2005 ELECTRICAL SHOP DRAWINGS AND

QUANTITY CALCULATION

JOB 120,000 120,000

01030 3000

01030 3001 MISCELLANEOUS SHOP DRAWINGS AND

QUANTITY CALCULATION

JOB 60,000 60,000

01040 0000 COORDINATION

01050 0000 FIELD ENGINEERING

01060 0000 REGULATORY REQUIREMENTS

01070 0000 ABBREVIATIONS AND SYMBOLS

01080 0000 IDENTIFICATION SYSTEMS

01100 0000 ALTERNATES/ALTERNATIVES

01200 0000 PROJECT MEETINGS

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

SURVEY AND TEST - QUANTITY SURVEY REPORT AND SHOP DRAWINGS (1 JOB =

APPROXIMATELY FIVE A1 SIZE SHEETS OR EQUIVALENT EFFORT)

SURVEY AND TEST - QUANTITY SURVEY REPORT AND SHOP DRAWINGS (1 JOB =

APPROXIMATELY THREE A1 SIZE SHEETS OR EQUIVALENT EFFORT)

SURVEY AND TEST - QUANTITY SURVEY REPORT AND SHOP DRAWINGS (1 JOB =

APPROXIMATELY TEN A1 SIZE SHEETS OR EQUIVALENT EFFORT)

DIVISION 01 GENERAL REQUIREMENT Page 1

DIVISION 01 GENERAL REQUIREMENT

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

01300 0000 SUBMITTALS

01400 0000 QUALITY CONTROL

01500 0000 CONSTRUCTION FACILITIES AND TEMP

01600 0000 MATERIAL AND EQUIPMENT

01650 0000 STARTING OF SYSTEMS

01660 0000 TESTING ADJUSTING & BALANCING

01700 0000 CONTRACT CLOSEOUT

01800 0000 MAINTENANCE MATERIALS

DIVISION 01 GENERAL REQUIREMENT Page 2

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

02000 0000 SITE WORK

02080 0000 UTILITY MATERIALS

02080 2000

02080 2100

02080 2101 150MM WIDTH, SINGLE M 133 147 20%

02080 2102 150MM WIDTH, DOUBLE M 211 225 20%

02080 2103 300MM WIDTH, SINGLE M 211 225 20%

02080 2104 300MM WIDTH, DOUBLE M 367 381 20%

02080 2200

02080 2201 150MM WIDTH, SINGLE M 211 225 20%

02080 2202 150MM WIDTH, DOUBLE M 367 381 20%

02080 2203 300MM WIDTH, DOUBLE M 679 693 20%

02080 4000

02080 4100

02080 4101 4 IN (100MM) DIA. EA 136,508 142,760 20%

02080 4102 6 IN (150MM) DIA. EA 167,451 175,787 20%

02080 4103 8 IN (21CM) DIA. EA 262,427 274,155 20%

02080 4104 10 IN (25CM) DIA. EA 384,193 398,854 20%

02080 4105 12 IN (31CM) DIA. EA 534,443 553,990 20%

02080 4106 14 IN (36CM) DIA. EA 780,865 810,186 12%

02080 4107 16 IN (41CM) DIA. EA 1,010,705 1,040,026 12%

02100 0000 SITE REMEDIATION

02200 0000 SITE PREPARATION

02210 0000 SUBSURFACE INVESTIGATION

02210 1000

02210 1100

02210 1101 2-1/2 IN (64MM) DIA. LF 7,814 9,080

02210 1102 4 IN (100MM) DIA. LF 11,539 13,410

02210 1200

02210 1201 2-1/2 IN (64MM) DIA. LF 24,006 27,896

02210 1202 4 IN (100MM) DIA. LF 27,732 32,227

02210 2000

02210 2100

02210 2101 NO SAMPLING LF 14,893 17,307

02210 2102 WITH CASING AND SAMPLING LF 31,086 36,124

02210 2200

02210 2201 NO SAMPLING LF 24,913 28,951

02210 2202 WITH CASING AND SAMPLING LF 41,107 47,769

02210 3000

02210 3100

02210 3101 LIGHT SOIL CY 4,034 5,019

02210 3102 HEAVY SOIL CY 7,259 9,032

02220 0000 SITE DEMOLITION

02220 1000 BUILDING DEMOLITION

02220 1100

02220 1101 CHUTE-PREFAB-STEEL M 7,897 8,829

UNDERGROUND MARKING TAPE

UNDERGROUND MARKING TAPE

PIPING VALVES

CAST IRON GATE VALVES WITH BOXES

BORINGS

AUGER HOLES IN EARTH, NO SAMPLE

DRILLING, CORE

DRILLING IN ROCK, BX CORE

DRILLING IN ROCK, NX CORE

TEST PITS

UNDERGROUND MARKING TAPE, DETECTABLE

CASED BORINGS IN EARTH, WITH SAMPLES

TEST PITS - HAND-DUG

CHUTE INSTALLATION; NOTE --- PRICES INCLUDE ALL MATERIALS AND ERECTION

COST FOR A COMPLETE INSTALLATION

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

DIVISION 02 SITE WORK Page 1

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02220 1200

02220 1201 RESIDENTIAL BUILDING, BY HAND M2 4,018 4,667

02220 1202 RESIDENTIAL BUILDING, BY HAND AND

MACHINE

M2 2,842 3,301

02220 1203 COMMERCIAL BUILDING, BY HAND AND

MACHINE

M2 2,450 2,846

02220 1300

02220 1301 BY HEAVY EQUIPMENTS M3 5,087 5,714

02220 1302 BY HAND TOOLS M3 14,700 17,075

02220 1303 BY HEAVY EQUIPMENTS AND HAND TOOLS M3 9,800 11,384

02220 1400

02220 1401 BY HEAVY TOOLS M3 6,614 7,429

02220 1500

02220 1501 HEAVY STRUCTURE M2 5,978 6,944

02220 1502 INTERMEDIATE STRUCTURE M2 4,606 5,350

02220 1503 LIGHT STRUCTURE M2 2,744 3,188

02220 1600

02220 1601 BY HEAVY EQUIPMENTS M3 3,561 4,000

02220 1602 BY HAND TOOLS M3 11,760 13,660

02220 1603 BY HEAVY EQUIPMENTS AND HAND TOOLS M3 5,292 6,147

02220 2000

02220 2100

02220 2101 WOODEN BUILDING, BY HAND M3 18,620 21,629

02220 2102 WOODEN BUILDING, BY HAND AND MACHINE M3 11,760 13,660

02220 2103 WOODEN BUILDING, BY MACHINE M3 7,816 8,843

02220 2104 S/RC/SRC, BY HAND M3 20,580 23,905

02220 2105 S/RC/SRC, BY HAND AND MACHINE M3 12,740 14,799

02220 2106 S/RC/SRC, BY MACHINE M3 8,309 9,336

02220 2200

02220 2210

02220 2211 CONCRETE PLAIN, BY MACHINE M3 6,558 7,475

02220 2212 CONCRETE PLAIN, BY HAND M3 26,225 31,808

02220 2213 CONCRETE REINF, BY MACHINE M3 11,587 13,247

02220 2214 CONCRETE REINF, BY HAND M3 39,183 47,871

02220 2220

02220 2221 CONCRETE PLAIN, BY MACHINE M3 4,768 5,523

02220 2222 CONCRETE PLAIN, BY HAND M3 20,653 25,470

02220 2223 CONCRETE REINF, BY MACHINE M3 8,981 10,437

02220 2224 CONCRETE REINF, BY HAND M3 33,611 41,534

02220 4000

02220 4100

02220 4101 50 MM THICK M2 887 1,031

02220 4102 100 MM THICK M2 980 1,139

02220 4103 200 MM THICK M2 1,431 1,662

02220 4104 300 MM THICK M2 1,842 2,139

02220 4200

02220 4201 50 MM (2 IN) THICK M2 1,068 1,241

02220 4202 100 MM (4 IN) THICK M2 1,323 1,537

02220 4203 200 MM (8 IN) THICK M2 1,774 2,061

SRC BUILDING

S BUILDING

CONCRETE FLOOR SLAB

FOOTINGS AND FOUNDATIONS DEMOLITION

WOODEN BUILDING

RC BUILDING

SITE DEMOLITION; NOTE --- PRICE INCLUDE MACHINE BREAK-UP AND LOADING

REMOVE ASPHALT PAVEMENT

CONCRETE PAVEMENT

FOUNDATION OF BUILDING

OTHER CONCRETE STRUCTURAL DEMOLITION

UP TO 10M3 (VOLUME)

MORE THAN 10M3 (VOLUME)

DIVISION 02 SITE WORK Page 2

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02220 4204 300 MM (12 IN) THICK M2 2,237 2,599

02220 4300

02220 4301 CONCRETE CURBING M 778 888

02220 4302 CONCRETE GUTTER M 987 1,127

02220 4303 CONCRETE GUTTER W/CURBING M 1,209 1,380

02220 4400

02220 4401 15 MM (5/8 IN) THICK M2 5,290 6,159

02220 4402 30 MM (1-1/4 IN) THICK M2 7,050 8,209

02220 4500

02220 4501 MASONRY OR CONCRETE, ABANDON EA 16,073 18,346

02220 4502 MASONRY 5 FT (1.5M) DEEP -4 FT (1.2M) DIA.

REMOVE

EA 28,130 32,107

02220 4503 CONCRETE 5 FT (1.5M) DEEP -4 FT (1.2M) DIA.

REMOVE

EA 28,130 32,107

02220 4600

02220 4601 REMOVE RAILROAD TRACK AND TIES M 2,330 2,671

02220 4602 REMOVE AND RE-INSTALL TIE AND TRACK

WITH NEW BOLTS AND SPIKES

M 10,035 11,673

02220 4603 REMOVE BALLAST M3 399 465

02220 4604 TURNOUTS WITH NEW BOLTS AND SPIKES EA 152,921 177,896

02220 4700

02220 4701 REMOVE FENCE AND LOADING ON TRUCK M 1,284 1,528

02220 4702 REMOVE AND RESET M 1,945 2,316

02225 0000 SELECTIVE DEMOLITION (1)

02225 1000

02225 1100

02225 1101 PLYWOOD, GYPSUM BOARD M2 1,241 1,478

02225 2000

02225 2100

02225 2101 ELEVATED SLABS WITH LIGHT REINFORCING

UNDER 6 CF (.17M3)

M3 45,080 54,344

02225 2102 ELEVATED SLABS WITH LIGHT REINFORCING

OVER 6 CF (.17M3)

M3 37,543 45,278

02225 2103 ELEVATED SLABS WITH BAR REINFORCING

UNDER 6 CF (.17M3)

M3 67,598 81,502

02225 2104 ELEVATED SLABS WITH BAR REINFORCING

OVER 6 CF (.17M3)

M3 56,317 67,910

02225 2105 WALLS-BAR REINF. UNDER 6 CF (.17M3) M3 56,317 67,910

02225 2106 WALLS-BAR REINF. OVER 6 CF (.17M3) M3 52,029 62,727

02225 2200

02225 2201 4 IN (100MM) THICK M2 3,914 4,721

02225 2202 8 IN (200MM) THICK M2 4,776 5,759

02225 2203 12 IN (305MM) THICK M2 5,359 6,461

02225 2300

02225 2301 4 IN (100MM) THICK M2 3,562 4,296

02225 2302 8 IN (200MM) THICK M2 4,339 5,237

02225 2303 12 IN (305MM)THICK M2 4,870 5,870

02225 2400

CURBING REMOVED AND LOADED

CEILING DEMOLITION

CEILING

CUTOUT DEMOLITION

CONCRETE

CONCRETE CHIPPING

CATCH BASINS OR MANHOLE

RAILROAD TRACKAGE

FENCE REMOVALS - CHAIN LINK

BRICK WALLS; NOTE --- NOT INCLUDING TOOTHING TO 4 SF (.37M2) OPENING

CONCRETE BLOCK WALLS; NOTE --- NOT INCLUDING TOOTHING TO 4 SF (.37M2)

OPENING

BRICK OR BLOCK WALLS; NOTE --- OVER 4 SF FOR DOORS AND WINDOWS, NOT

INCLUDING TOOTHING.

DIVISION 02 SITE WORK Page 3

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02225 2401 4 IN (100MM) THICK M2 3,740 4,507

02225 2402 8 IN (200MM) THICK M2 4,559 5,497

02225 2403 12 IN (305MM) THICK M2 5,121 6,172

02225 2500

02225 2501 WALL M2 1,672 2,076

02225 2502 CEILING M2 1,765 2,190

02225 4000

02225 4100

02225 4101 100MM THICK, UP TO 50M2 M2 3,589 4,272

02225 4102 100MM THICK, UP TO 100M2 M2 2,871 3,418

02225 4103 100MM THICK, ABOVE 100M2 M2 1,435 1,709

02225 4104 150MM THICK, UP TO 50M2 M2 4,074 4,850

02225 4105 150MM THICK, UP TO 100M2 M2 3,259 3,879

02225 4106 150MM THICK, ABOVE 100M2 M2 1,630 1,941

02225 4200

02225 4201 CHIPPING CONCRETE FLOOR 30MM THICK M2 4,074 4,850

02225 4202 SANDING CONCRETE FLOOR (MEARASHI) M2 1,353 1,611

02225 4203 TRENCH CUT, 60 X 60MM M 2,085 2,482

02225 4204 TRENCH CUT, 90 X 90MM M 2,667 3,175

02225 4205 TRENCH CUT, 100 X 100MM M 3,104 3,695

02225 4300

02225 4301 CERAMIC OR QUARRY TILE M2 2,718 3,373

02225 4302 VINYL M2 1,548 1,921

02225 4303 WOOD M2 1,713 2,127

02225 7000

02225 7100

02225 7101 METAL M2 1,459 1,684

02225 7102 WATERRPROOF MATERIAL M2 1,784 2,070

02225 8000

02225 8100

02225 8101 100MM THICK M2 2,078 2,474

02225 8102 150MM THICK M2 2,802 3,336

02225 8200

02225 8201 150MM THICK M2 3,759 4,474

02225 8300

02225 8301 4 IN (100MM) THICK TO 12 IN (310MM) THICK M3 15,363 18,531

02225 8400

02225 8401 METAL OR WOOD WITH DRYWALL BOTH

SIDES

M2 1,896 2,357

02225 8500

02225 8501 GYPSUM WALL BOARD M2 1,304 1,552

02225 8502 TILE (INCLUDES MORTAR) M2 2,648 3,153

02225 8600

02225 8601 MORTAR 30MM THICK M2 2,401 2,858

02225 8602 TILE 30MM THICK M2 2,692 3,204

02225 8603 CONCRETE 30MM THICK M2 4,292 5,110

02226 0000

02226 1000

FLOOR DEMOLITION

REINFORCED CONCRETE FLOOR

CHIPPING

FLOORING REMOVAL

BRICK OR BLOCK WALLS; NOTE --- OVER 4 SF FOR DOORS AND WINDOWS, NOT

INCLUDING TOOTHING.

STUCCO, GYPSUM BOARD OR WOOD

CONCRETE PARTITIONS CAST IN PLACE

BRICK MASONRY PARTITIONS

STUD PORTIONS

WALL SURFACE REMOVAL

ROOFING AND SIDING DEMOLITION

ROOFING

WALLS AND PARTITIONS DEMOLITION; NOTE --- PRICE INCLUDES KNOCK DOWN

CONCRETE BLOCK PARTITIONS

WALL CHIPPING

SELECTIVE DEMOLITION, CONTINUOUS

MASONRY DEMOLITION (MATL VOL)

DIVISION 02 SITE WORK Page 4

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02226 1001 WALL M2 3,523 4,094

02226 2000

02226 2001 SURPLUS SOIL M3 1,022 1,022

02226 2002 CONCRETE DEBRIS M3 3,120 3,120

02226 2003 TREE, STUMPS, AND WEED M3 7,280 7,280

02226 2004 BUILDING MATERIAL M3 10,400 10,400

02226 2005 METALLIC SCRAP TON 26,000 26,000

02226 2006 GYPSUM BOARD TON 56,160 56,160

02226 2007 FIBROUS - GLASS/ROCK WOOL TON 187,200 187,200

02226 2008 PLASTICS - EXPANDED POLYSTYRENE,

URETHANE FOAM

TON 254,800 254,800

02226 3000

02226 3100

02226 3101 MACHINE LOADING TO TRUCK M3 321 373

02226 3102 HAND LOADING TO TRUCK M3 1,639 1,952

02226 5000

02226 5100

02226 5101 BITUMINOUS PAVING M 177 194

02226 5102 CONCRETE PAVING M 767 818

02226 5103 CONCRETE SLABS PLAIN M 660 703

02226 5104 CONCRETE SLABS -MESH REINF M 965 1,031

02226 5105 CONCRETE SLABS -ROD REINF M 1,142 1,222

02226 5106 CONCRETE WALLS -LIGHT REINF M 2,481 2,698

02226 5107 CONCRETE WALLS -ROD REINF M 4,323 4,701

02226 5108 BLOCK MASONRY M 1,056 1,130

02226 5109 BRICK MASONRY M 1,214 1,299

02226 6000

02226 6100

02226 6101 STEEL PLATE -TORCH CUT M 1,500 1,765

02230 0000

02230 1000

02230 1100

02230 1101 LIGHT TREES TO 6 IN (150MM) DIA. CUT A 22,795 27,136

02230 1102 GRUB STUMPS AND REMOVE A 11,640 13,856

02230 1103 MEDIUM TREES TO 10 IN (25CM)DIA. CUT A 27,641 32,905

02230 1104 GRUB STUMPS AND REMOVE A 15,787 18,793

02230 1105 HEAVY TREES TO 16 IN (41CM) DIA. CUT A 57,228 68,127

02230 1106 GRUB STUMPS AND REMOVE A 24,444 29,099

02240 0000

02240 1000

02240 1100

02240 1110

02240 1111 TRENCH DRAIN 2 FT X 3 FT EXC. M3 1,472 1,680

02240 1112 12 IN (36CM) CORRUGATED METAL PIPE.

INSTALL AND REMOVE W/EXCAV (ASSUME 3

USES)

M 9,248 9,974

RUBBISH HANDLING (MATL VOL)

RUBBISH HANDLING

SAW CUTTING

SAW CUTTING, PER 50MM

DISPOSAL ONLY; NOTE --- IF IT IS NEEDED TO ADD TRANSPORT TO DISPOSAL PLACE,

SEE 02320-1000

CUT TREES - GRUB ROOTS AND STUMP

DEWATERING

DEWATERING

SAND DRAINS

TORCH CUTTING

TORCH CUTTING

SITE CLEARING

CLEAR AND GRUB

TEMPORARY DRAINAGE SYSTEMS GRAVITY RUN-OFF SYSTEM

DIVISION 02 SITE WORK Page 5

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02240 1113 18 IN CORRUGATED METAL PIPE. INSTALL

AND REMOVE W/EXCAV. (ASSUME 3 USES)

M 11,762 12,597

02240 2000 WELLS

02240 2100

02240 2101 UNLINED HOLE M3 6,014 6,718 10%

02240 2102 12 IN (36CM) DIA. W/CORRUGATED METAL

LINER

M 14,315 15,509 10%

02240 2103 15 IN (38CM) DIA. W/CORRUGATED METAL

LINER

M 17,753 19,271 10%

02240 2104 24 IN (61CM) DIA. W/CORRUGATED METAL

LINER

M 28,719 30,807 10%

02240 2105 WOOD LINED HOLE UP TO 4 FT X 4 FT

(CONTACT AREA)

M2 6,819 7,729 10%

02240 2200

02240 2201 50MM (2") 300L/M (79 GPM) EA 79,355 82,996 10%

02240 2202 65MM (2-1/2") 360 L/M (95 GPM) EA 217,417 222,880 10%

02240 2203 80 MM (3") 500 L/M (132 GPM) EA 264,025 277,492 10%

02240 2204 100 MM (4" ) 600 L/M (159 GPM) EA 335,197 355,398 10%

02240 2300

02240 2310

02240 2311 50 MM DIA EA 2,208 2,453

02240 2312 75 (80) MM DIA EA 3,009 3,254

02240 2313 100 MM DIA EA 3,664 3,909

02240 2314 150 MM DIA EA 5,047 5,292

02240 2315 200 MM DIA EA 6,358 6,603

02240 2320

02240 2321 50 MM DIA EA 2,718 2,963

02240 2322 75 (80) MM DIA EA 3,446 3,691

02240 2323 100 MM DIA EA 4,174 4,419

02240 2324 150 MM DIA EA 5,994 6,239

02240 2325 200 MM DIA EA 7,450 7,695

02240 2330

02240 2331 50 MM DIA EA 3,446 3,691

02240 2332 75 (80) MM DIA EA 4,174 4,419

02240 2333 100 MM DIA EA 6,358 6,603

02240 2334 150 MM DIA EA 11,090 11,335

02240 2400

02240 2401 40 MM DIA M 351 422

02240 2402 50 MM DIA M 370 440

02240 2403 65 MM DIA M 420 496

02240 2404 75 MM DIA M 470 542

02240 2405 100 MM DIA M 530 608

02240 2406 125 MM DIA M 608 695

02240 2407 150 MM DIA M 770 864

02240 2408 200 MM DIA M 1,032 1,143

02240 2409 250 MM DIA M 1,419 1,546

02240 2411 300 MM DIA M 1,864 2,007

02250 0000

10 M HEAD

15 M HEAD

30 M HEAD

TEMPORARY PIPE, PVC

RELIEF WELLS, SUMP HOLE CONSTRUCTION INCLUDES EXCAVATION AND GRAVEL

PUMPS - SUBMERSIBLE, STARTER, LEVEL CONTROL - 20 FT (6.1M) HEAD

TEMPORARY PUMPS, PER ONE WEEK - SUBMERSIBLE, STARTER, LEVEL CONTROL

SHORING & UNDERPINNING

DIVISION 02 SITE WORK Page 6

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02250 3000

02250 3100

02250 3101 VIBROHAMMER, DIESEL HAMMER TON 139,251 143,157

02250 3102 PILE JACKING TON 158,651 164,983

02250 3200

02250 3210

02250 3211 UNDER ONE MONTH USING TON 62,559 69,023

02250 3212 OVER ONE MONTH USING, ADD COST PER

ONE MONTH

TON 2,032 2,058

02250 3220

02250 3221 UNDER ONE MONTH USING TON 89,756 99,619

02250 3222 OVER ONE MONTH USING, ADD COST PER

ONE MONTH

TON 2,063 2,089

02250 3300 H-STEEL PILE

02250 3301 LEFT IN PLACE MATERIAL, COST INCLUDES

MATERIAL/EQUIPMENT TRANSPORT

TON 117,575 123,085

02250 3302 CUT PILE EA 3,750 4,081

02250 3310

02250 3311 UNDER ONE MONTH USING TON 103,517 112,226

02250 3312 OVER ONE MONTH USING, ADD COST PER

ONE MONTH

TON 2,050 2,078

02250 3400

02250 3401 UNDER ONE MONTH USING TON 153,539 167,389

02250 3402 OVER ONE MONTH USING, ADD COST PER

ONE MONTH

TON 6,644 6,769

02250 4000

02250 4100

02250 4101 TO 2.0M DEEP EXCAVATION M2 2,326 2,714

02250 4102 2.0M TO 3.0M DEEP EXCAVATION M2 2,542 2,985

02250 4103 3.0M TO 4.0M DEEP EXCAVATION M2 2,791 3,258

02250 4104 4.0M TO 5.0M DEEP EXCAVATION M2 3,057 3,567

02250 4105 5.0M TO 6.0M DEEP EXCAVATION M2 3,348 3,907

02250 4200

02250 4201 UNDER ONE MONTH USING M2 6,588 7,526

02250 4202 OVER ONE MONTH USING, ADD COST PER

ONE MONTH

M2 1,763 1,809

02250 4300

02250 4310

02250 4311 UP TO 3.5M DEEP EXCAVATION M2 3,742 4,283

02250 4312 4.0M TO 4.5M DEEP EXCAVATION M2 3,904 4,468

02250 4313 5.0M TO 6.5M DEEP EXCAVATION M2 4,067 4,655

02250 4320

02250 4321 UP TO 4.5M DEEP EXCAVATION M2 4,230 4,842

VIBROHAMMER, DIESEL HAMMER

PILE JACKING

SHEET PILING

STEEL SHEET PILE - LEFT IN PLACE MATERIAL, COST INCLUDES MATERIAL/EQUIPMENT

TRASPORTATION.

STEEL SHEET PILE - FOR TEMPORARY SHORING WORK, COST INCLUDES

MATERIAL/EQUIPMENT TRANSPORT, AND BACKFILLING AFTER REMOVED PILES.

WOOD SHEATHING, INSTALLATION AND PULL OUT, COST INCLUDES WALES,

CONNECTIONS AND STRUTS, W/TURNBUCKLE

METAL PANEL TYPED - THE COST INCLUDES ANY SUPPORTING COMPONENTS,

INSTALLATION, PULL OUT, AND TRANSPORTATION.

UP TO 3.0M WIDTH EXCAVATION, PER ONE MONTH

3.0M TO 4.7M WIDTH EXCAVATION, PER ONE MONTH

H-STEEL PILE FOR TEMPORARY SHORING WORK, COST INCLUDES

MATERIAL/EQUIPMENT TRANSPORT, AND BACKFILLING AFTER REMOVED PILES.

SHORING

SHEET PILE TYPE, LIGHT WEIGHT STEEL - THE COST INCLUDES ANY SUPPORTING

COMPONENTS, INSTALLATION, PULL OUT, AND TRANSPORTATION.

STEEL SUPPORT FOR TEMPORARY SHORING, WALING, STRUT AND OTHER MISC.

MATERIALS - COST INCLUDES MATERIAL/EQUIPMENT TRANSPORT

DIVISION 02 SITE WORK Page 7

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02250 4322 5.0M DEEP EXCAVATION M2 4,392 5,027

02250 4323 5.5M DEEP EXCAVATION M2 4,555 5,213

02250 4324 6.0M DEEP EXCAVATION M2 4,718 5,400

02270 0000

02270 1000

02270 1100

02270 1101 GUARD FENCE, 1800MM HEIGHT M 380 393

02270 1102 MINI FENCE, 1200MM HEIGHT M 307 324

02270 1103 A TYPE BARRICADE M 244 255

02270 1104 LIGHT EA 237 249

02270 1105 TRAFFIC LIGHT INCLUDES GENERATOR SET 10,693 11,292

02270 1200

02270 1201 FLAG MAN, PER DAY DAY 8,228 9,843

02270 2000

02270 2100

02270 2101 UNDER ONE MONTH USING M2 2,720 2,958

02270 2102 OVER ONE MONTH USING, ADD COST PER

ONE MONTH

M2 300 301

02270 2200

02270 2201 UNDER ONE MONTH USING M2 4,356 4,715

02270 2202 OVER ONE MONTH USING, ADD COST PER

ONE MONTH

M2 1,614 1,747

02270 3000

02270 3001 CURRING SHEET (BLUE SHEET) M2 273 320

02270 3002 PLYWOOD CURRING ONE SIDE M2 2,247 2,630

02270 3003 PLYWOOD CURRING BOTH SIDES M2 3,224 3,773

02300 0000 EARTHWORK

02310 0000 GRADING

02310 1000

02310 1100

02310 1101 ROADWAY CLEARING OR GENERAL AREA

GRADING WITH GRADER (ROUGH)

A 15,266 17,524

02310 1102 SUBGRADE -FINE GRADING +/- .1FT A 17,235 19,784

02310 1103 CUT + EMBANKMENT SLOPES INCLUDES

DITCHES TO 3 FT (lM) DEEP AND SLOPES TO

1V/2H

M3 768 881

02310 1104 ROUGH GRADING LARGE AREA WITH DOZER M3 608 639

02310 1105 ROUGH GRADING SMALL AREA WITH DOZER M3 856 999

02310 1106 GENERAL AREA CLEARING BY DOZER IN

ROUGH TERRAIN OR HARD SOIL MATERIAL

A 7,145 7,501

02310 1200

02310 1201 SUBGRADE OR SUBBASE COURSES A 6,204 7,122

02310 1202 FINISH GRADE -BASE OR LEVELNG A 12,113 13,905

02310 1300

02310 1310

02310 1311 WITH DOZER 140 HP PUSH TO PILE M3 243 268

COVERING PLATE FOR ACCESS; NOTE --- THE COST INCLUDES LOAD/UNLOAD

METAL PLATE

ROAD DECKING PANEL

CURRING MATERIALS

MISCELLANEOUS SITE MATERIALS

SAFETY MATERIALS

SAFETY MATERIALS, PER ONE WEEK

FLAG MAN

ROUGH GRADE FOR STRUCTURES AND SLABS

FINE GRADE

SITE GRADING

ROADWAY GRADING

STRUCTURE GRADING

DIVISION 02 SITE WORK Page 8

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02310 1320

02310 1321 WITH GRADER WINDROW EXCESS M2 328 378

02310 1322 HAND CLEAN FOR CONCRETE PLACING OR

PIPE BEDDING

M2 493 611

02310 2000

02310 2100

02310 2101 TRIM AND SHAPE MACHINE EXCAVATED

AREAS BY HAND

M2 470 587

02310 2102 TRIM AND SHAPE FOR SLAB ON GRADE M2 820 1,020

02310 2103 FINE GRADE GRAVEL BEDDING BY HAND M2 493 611

02310 2104 FINE GRADE GRAVEL M2 197 246

02310 2200

02310 2210

02310 2211 ROUGH GRADE A 21,107 23,040

02310 2220

02310 2221 SEMI GRADE 2 PASSES A 22,827 26,202

02310 2222 FINE GRADE 3 PASSES A 45,652 52,405

02315 0000

02315 2000

02315 2100

02315 2101 BY HAND M3 2,396 2,852

02315 2102 DUMPED AND PLACED BY MACHINE M3 700 814

02315 2103 FILLED BY DOZER M3 294 322

02315 2104 FILLED BY LOADER M3 790 910

02315 3000

02315 3100

02315 3101 STABILIZED AGGREGATE MATERIAL M3 6,149 6,552

02315 3102 CRUSHER RUN M3 5,032 5,362

02315 3200

02315 3201 150-100 MM M3 7,896 8,414

02315 3202 200-150 MM M3 8,291 8,835

02315 3300

02315 3301 NON FROST MATERIAL M3 3,176 3,384

02315 3302 SATISFACTORY FILL MATERIAL M3 2,345 2,498

02315 5000

02315 5100

02315 5101 LARGE AREAS 150MM LIFT M3 220 234

02315 5102 LARGE AREAS 200MM LIFT M3 262 279

02315 5200

02315 5201 LARGE AREAS 150MM LIFT M3 118 137

02315 5202 LARGE AREAS 200MM LIFT M3 110 127

02315 5203 LARGE AREAS 250MM LIFT M3 101 118

02315 5300

02315 5310

02315 5311 UP TO 1 ON 4 SLOPE M2 176 205

02315 5312 ABOVE 1 ON 4 SLOPE M2 305 355

02315 5320

02315 5321 UP TO 1 ON 4 SLOPE M2 240 286

02315 5322 ABOVE 1 ON 4 SLOPE M2 316 376

BY MACHINE

BY HAND

FINISH GRADE FOR STRUCTURES AND SLABS

FINISH GRADING FOR STRUCTURES AND SLABS

HAND DIGGING AND GRADING

BACKFILL, STRUCTURAL

BACKFILLING FOUNDATION, COMPACTED MATERIAL VOLUME

BEDDING, COMPACTED MATERIAL VOLUME

CRUSHED ROCK; NOTE --- COST INCLUDES PLACING AND SPREADING MATERIAL

MACHINE OPERATIONS

WITH DOZER

WITH GRADER

FILLING

COBBLESTONE; NOTE --- COST INCUDES DELIVERED AND SCREEN

SOIL; NOTE --- COST INCLUDES PLACING AND SPREADING MATERIAL

COMPACTION

COMPATION BY DOZER

COMPACTION BY TIRE ROLLER

FOR SHAPING SLOPES OF EMBANKMENT ONLY

DIVISION 02 SITE WORK Page 9

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02315 6000

02315 6100

02315 6101 BY HAND WITH AIR TAMPER M3 960 1,115

02315 6102 BY HAND WITH VIB PLATE HAND TAMPER M3 517 601

02315 6103 BY HAND WITH 1 TON ROLLER M3 259 301

02315 7000

02315 7100

02315 7110

02315 7111 DENSITY OF SOIL BY NUCLEAR METHOD

ASTM D2922-71 (3 MINIMUM)

EA 45,048 47,091

02315 7120

02315 7121 BY SAND CONE -ASTM D1556064 BY RUBBER

BALLOON METHOD -ASTM D2167-66

EA 37,154 38,430

02315 7130

02315 7131 MOISTURE DENSITY RELATION OF SOILS -

STD PROCTOR

EA 2,481 2,933

02315 8000

02315 8100

02315 8101 BY HAND M3 2,706 3,222

02315 8102 BY MACHINE M3 696 808

02317 0000

02317 2000

02317 2100

02317 2110

02317 2111 SAND OR SANDY SOIL M3 352 398

02317 2112 GRAVELLY SOIL OR CLAY M3 352 398

02317 2113 BLASTED ROCK OR COBBLE STONE M3 468 529

02317 2120

02317 2121 SAND OR SANDY SOIL M3 249 281

02317 2122 GRAVELLY SOIL OR CLAY M3 249 281

02317 2123 BLASTED ROCK OR COBBLE STONE M3 331 374

02317 2200

02317 2210

02317 2211 SAND OR SANDY SOIL M3 187 211

02317 2212 CLAY M3 187 211

02317 2213 GRAVELLY SOIL, BLASTED ROCK OR COBBLE

STONE

M3 248 280

02317 2220

02317 2221 SAND OR SANDY SOIL M3 676 764

02317 2222 CLAY M3 835 943

02317 2223 GRAVELLY SOIL, BLASTED ROCK OR COBBLE

STONE

M3 835 943

02317 2230

02317 2231 SAND OR SANDY SOIL M3 723 817

02317 2232 CLAY M3 900 1,017

90 DEGREE TURNING

135 DEGREE TURNING

EXCAVATING, BULK BANK MEASURE, INCLUDE DIGGING PILING OR LOADING ON

TRUCKS

BACKHOE

0.35M3 CAPACITY

0.60M3 CAPACITY

CLAMSHELL

45 DEGREE TURNING

IN PLACE TESTS

STANDARD METHODS

LAB TEST

BACKFILL AND COMPACTION, TRENCH

BACKFILL WITH COMPACTION IN 150MM LAYERS

EXCAVATION

COMPACTION, STRUCTURAL

COMPACTION OF BACKFILL AROUND STRUCTURES OR IN TRENCH; NOTE ---

COMPACTION IN 150MM LAYERS

SOIL COMPACTION CONTROL

FIELD DENSITY TESTS

DIVISION 02 SITE WORK Page 10

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02317 2233 GRAVELLY SOIL, BLASTED ROCK OR COBBLE

STONE

M3 900 1,017

02317 2240

02317 2241 SAND OR SANDY SOIL M3 789 891

02317 2242 CLAY M3 980 1,107

02317 2243 GRAVELLY SOIL, BLASTED ROCK OR COBBLE

STONE

M3 980 1,107

02317 3000

02317 3100

02317 3110

02317 3111 SAND OR SANDY SOIL M3 483 524

02317 3112 GRAVELLY SOIL OR CLAY M3 510 556

02317 3113 BLASTED ROCK OR COBBLE STONE M3 535 585

02317 3120

02317 3121 SAND OR SANDY SOIL M3 327 368

02317 3122 GRAVELLY SOIL OR CLAY M3 354 400

02317 3123 BLASTED ROCK OR COBBLE STONE M3 379 429

02317 3130

02317 3131 SAND OR SANDY SOIL M3 275 316

02317 3132 GRAVELLY SOIL OR CLAY M3 302 348

02317 3133 BLASTED ROCK OR COBBLE STONE M3 327 377

02317 5000

02317 5100

02317 5101 UNCLASSIFIED, INCLUDING SLOPE HAND

TRIMMING

M3 2,522 3,003

02317 5102 TEST PIT, UNCLASSIFIEED, INCLUDING HAND

WORK FOR UTILITIES

M3 5,296 6,305

02317 5200

02317 5201 LESS THAN 1.0M DEPTH M3 745 864

02317 5202 MORE THAN 1.0M AND LESS THAN 3.0M

DEPTH

M3 823 956

02317 5203 MORE THAN 3.0M AND LESS THAN 6.0M M3 1,010 1,174

02317 5204 MORE THAN 6.0M M3 1,176 1,366

02317 5300

02317 5301 BY HAND M2 490 583

02317 5302 BY MACHINE M2 313 363

02317 6000

02317 6100

02317 6101 UP TO D= 0.5M M3 6,247 7,437

02317 6102 UP TO D= 1.0M M3 6,868 8,176

02317 6103 UP TO D= 2.0M M3 8,585 10,220

02317 6200

02317 6201 UP TO 10M3 M3 2,241 2,668

02317 6202 UP TO 50M3 M3 1,681 2,001

02317 6203 UP TO 100M3 M3 1,400 1,667

02317 6204 ABOVE 100M3 M3 1,120 1,333

02317 6300

02317 6301 BY HAND M2 2,817 3,353

02317 6302 BY MACHINE M2 621 739

02317 6400

EXCAVATION BY HAND; NOTE --- ONLY AROUND OBSTRUCTIONS AND UTILITIES

EXCAVATION BY MACHINE; NOTE --- INCLUDES MACHINE DELIVERY COST

TRIM BOTTOM OF EXCAVATION

GRADING

TRIM BOTTOM OF EXCAVATION

500M3 VOLUME

MORE THAN 1,000M3 VOLUME

EXCAVATING, STRUCTURAL

EXCAVATION BY HAND; NOTE --- ONLY AROUND OBSTRUCTIONS AND UTILITIES

EXCAVATION BY MACHINE; NOTE --- INCLUDES LOADING ON TRUCK

ARCHITECTURAL EARTHWORK

135 DEGREE TURNING

EXCAVATING, BULK, DOZER

EXCAVATION WITH PUSHING SOIL BY DOZER

UP TO 200M3 VOLUME

DIVISION 02 SITE WORK Page 11

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02317 6401 BY HAND M2 582 693

02317 6402 BY MACHINE M2 419 499

02317 6500

02317 6510

02317 6511 BY HAND M3 3,248 3,867

02317 6512 BY MACHINE M3 827 985

02317 6520

02317 6521 NORMAL SOIL, BY HAND M3 4,305 5,001

02317 6522 NORMAL SOIL, BY MACHINE M3 2,963 3,442

02317 6523 NON FROST SOIL, BY HAND M3 5,386 6,256

02317 6524 NON FROST SOIL, BY MACHINE M3 3,975 4,617

02317 6600

02317 6610

02317 6611 BY HAND M3 3,446 4,103

02317 6612 BY MACHINE M3 1,199 1,428

02317 6620

02317 6621 NORMAL SOIL, BY HAND M3 4,975 5,779

02317 6622 NORMAL SOIL, BY MACHINE M3 3,034 3,524

02317 6623 NON FROST SOIL, BY HAND M3 5,951 6,913

02317 6624 NON FROST SOIL, BY MACHINE M3 3,869 4,494

02317 6700

02317 6701 BY HAND M3 6,997 8,128

02317 6702 BY MACHINE M3 5,527 6,420

02317 6800

02317 6801 POLYSTYRENE FILM, 0.1MM M2 200 232

02317 6802 POLYSTYRENE FILM, 0.15MM M2 271 315

02317 6803 POLYSTYRENE FORM, 20MM M2 1,035 1,202

02317 6804 POLYSTYRENE FORM, 25MM M2 1,211 1,407

02317 6805 POLYSTYRENE FORM, 50MM M2 1,823 2,118

02317 7000

02317 7100

02317 7110

02317 7111 D-9 CAT W/DOUBLE SHANK RIPPER M3 272 284

02317 7112 D-8 CAT W/SINGLE SHANK RIPPER M3 287 299

02317 7120

02317 7121 D-9 CAT W/DOUBLE SHANK RIPPER M3 272 284

02317 7122 D-8 CAT W/SINGLE SHANK RIPPER M3 287 299

02317 7130

02317 7131 D-9 CAT W/DOUBLE SHANK RIPPER M3 335 348

02317 7132 D-8 CAT W/SINGLE SHANK RIPPER M3 374 392

02317 7140

02317 7141 D-9 CAT W/DOUBLE SHANK RIPPER M3 374 392

02317 7142 D-8 CAT W/SINGLE SHANK RIPPER M3 561 585

02317 7150

02317 7151 D-9 CAT W/DOUBLE SHANK RIPPER M3 448 467

02317 7152 D-8 CAT W/SINGLE SHANK RIPPER M3 934 975

02317 7200

METAMORPHIC ROCK (SLATE)

IGNEOUS ROCK (GRANITE, BASALT) HIGHLY WEATHERED-WEATHERED ROCK. NON-

WEATHERED ROCK IS BLASTED

COSTS TO USE AIR OPERATED HAMMERS TO BREAK UP ROCK NOTE - ADD FOR

LOADING

INSULATION AND MOISTURE PROOFING

RIPPING

ROCK BREAKING BY RIPPER; NOTE --- COSTS ARE PER TYPE OF MATERIAL W/O LOAD

OR HAUL

CLAYS

GLACIAL TILLS

SEDIMENTARY ROCKS (SHALE, SANDSTONE, LIMESTONE)

EXCAVATED SOIL

DELIVERED SOIL

FILLING; NOTE --- INCLUDES COMPACTION

EXCAVATED SOIL

DELIVERED SOIL

CRUSHED STONE; NOTE --- INCLUDES COMPACTION

BACKFILLING; NOTE --- INCLUDES COMPACTION

DIVISION 02 SITE WORK Page 12

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02317 7201 VERY DENSE ROCK M3 3,263 3,882

02317 7202 MEDIUM DENSITY ROCK M3 2,611 3,105

02317 7203 SOFT ROCK M3 2,089 2,484

02317 8000

02317 8100

02317 8101 UNCLASSIFIED, INCLUDING SLOPE HAND

TRIMMING

M3 2,522 3,003

02317 8102 TEST PIT, UNCLASSIFIEED, INCLUDING HAND

WORK FOR UTILITIES

M3 5,781 6,882

02317 8200

02317 8201 LESS THAN 1.0M DEPTH M3 804 934

02317 8202 MORE THAN 1.0M AND LESS THAN 3.0M

DEPTH

M3 843 979

02317 8203 MORE THAN 3.0M AND LESS THAN 6.0M M3 951 1,105

02317 8204 MORE THAN 6.0M M3 1,284 1,491

02317 8300

02317 8301 BY HAND M2 549 637

02317 8302 BY MACHINE M2 338 393

02320 0000

02320 1000

02320 1100

02320 1101 1 KM HAUL M3 118 136

02320 1102 2 KM HAUL M3 220 254

02320 1103 3 KM HAUL M3 319 369

02320 1104 4 KM HAUL M3 409 473

02320 1105 5 KM HAUL M3 501 579

02320 1106 8 KM HAUL M3 786 908

02320 1107 10 KM HAUL M3 963 1,112

02320 1108 15 KM HAUL M3 1,425 1,646

02320 1109 20 KM HAUL M3 1,818 2,099

02320 1110 30 KM HAUL M3 2,653 3,064

02320 1111 ADD HAULING COST PER 10 KM M3 884 1,021

02340 0000

02340 2000

02340 2100

02340 2101 SOIL STABILIZATION: LIME SLURRY 10 PCT

BY VOLUMN

M3 7,816 8,472

02340 2200

02340 2201 MAXIMUM OUTPUT M 2,990 3,365

02340 2202 MINIMUM OUTPUT M 1,793 2,019

02360 0000 SOIL TREATMENT

02360 1000

02360 1100

02360 1101 SOIL POISONING EA 8,644 10,755

02370 0000

SOIL STABILIZATION: LIME

SOIL STABILIZATION: VIBROFLOATION

TERMITE PRETREATMENT

SOIL TREATMENT

EROSION & SEDIMENTATION CONTROL

TRIM BOTTOM OF EXCAVATION

HAULING

HAULING

HAULING - INCLUDES TIME FOR LOADING, TRAVEL, DUMP AND MISC; NOTE ---

PRICING DOES NOT INCLUDE COST FOR EXCAVATION AND LOADING

SOIL STABILIZATION

SOIL STABILIZATION

EXCAVATING, TRENCH

EXCAVATION BY HAND; NOTE --- ONLY AROUND OBSTRUCTIONS AND UTILITIES

EXCAVATION BY MACHINE; NOTE --- INCLUDES LOADING ON TRUCK

DIVISION 02 SITE WORK Page 13

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02370 1000

02370 1100

02370 1101 3/8 TO 1/4 CY PIECES M3 30,610 35,307

02370 1200

02370 1201 GALVANIZED STEEL MESH BOXES STONE

FILLED, LIGHT WEIGHT

M3 24,309 26,136

02370 1202 GALVANIZED STEEL MESH BOXES STONE

FILLED, MIDDLE WEIGHT

M3 34,179 36,748

02370 1203 GALVANIZED STEEL MESH BOXES STONE

FILLED, HEAVY WEIGHT

M3 46,940 50,468

02370 2000

02370 2100

02370 2101 JUTE MESH M2 294 305

02370 2102 PLASTIC NETTING M2 175 186

02370 2103 POLYPROPYLENE MESH M2 735 746

02370 2200

02370 2201 NON-WOVEN FILTER FABRIC, 10MM THICK M2 867 933

02370 2202 IMPERVIOUS SHEET M2 2,456 2,640

02370 2300

02370 2301 SOIL CEMENT -INCLUDES MATERIALS AND

PLACEMENT (PORTLAND CEMENT CONTENT

7 PCT)

M3 47,043 52,584

02400 0000

02445 0000

02445 1000

02445 1100

02445 1101 24 IN (61CM) DIA. CASING -.25 IN WALL M 79,233 85,791

02445 1102 36 IN (91CM) DIA. CASING -.375 IN WALL M 134,038 143,872

02445 1103 48 IN (122CM) DIA. CASING -.375 IN WALL M 174,723 187,365

02445 1200

02445 1201 4 IN (100 MM) NOM SIZE ELEC CONDUIT M 34,100 37,052

02445 1202 24 IN (61CM) DIA. CASING -.25 IN WALL M 99,920 108,772

02445 1203 36 IN (91CM) DIA. CASING -.375 IN WALL M 178,367 193,116

02445 1204 48 IN (122CM) DIA. CASING -.375 IN WALL M 220,998 238,699

02450 0000

02455 0000

02455 1000

02455 1100

02455 1110

02455 1111 D=300MM EA 79,136 86,347

02455 1112 D=350MM EA 92,350 99,931

02455 1113 D=400MM EA 110,240 118,363

02455 1114 D=450MM EA 130,324 139,131

02455 1115 D=500MM EA 158,009 167,528

02455 1116 D=600MM EA 204,192 214,680

02455 1120

02455 1121 D=300MM EA 152,003 164,857

NETTING - 100 SY (83.6M2) PER ROLL 4 FT (1.2M) WIDE - STAPLED

RIP-RAP

RANDOM - FILTER STONE DUMPED FROM TRUCKS - MACHINE PLACED SLOPE

PROTECTION (KEYED)

GALVANIZED STEEL MESH BOXES, STONE FILLED

EROSION CONTROL

SHEETING FOR EROSION CONTROL

SOIL CEMENT SURFACING

TUNNELING, BORING & JACKING

BORING OR JACKING CONDUITS

PRE BORING WITH DROP HAMMER

L=10M

L=20M

HORIZONTAL BORING

ROADWORK

RAILROAD WORK

PRECAST CONCRETE PILE; NOTE --- INCLUDES ALL MATERIAL COST

FOUNDATION & LOAD BEARING ELEMENTS

DRIVEN PILES

DIVISION 02 SITE WORK Page 14

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR BASE - SABER CONTRACTING SYSTEM

02455 1122 D=350MM EA 178,543 192,166

02455 1123 D=400MM EA 214,325 229,031

02455 1124 D=450MM EA 257,455 274,270

02455 1125 D=500MM EA 311,686 329,641

02455 1126 D=600MM EA 400,176 419,100

02455 1130

02455 1131 D=350MM EA 256,187 273,715

02455 1132 D=400MM EA 312,367 332,146

02455 1133 D=450MM EA 376,949 399,863

02455 1134 D=500MM EA 461,372 486,766

02455 1135 D=600MM EA 592,740 619,245

02455 1200

02455 1210

02455 1211 D=300MM EA 76,631 90,454

02455 1212 D=350MM EA 89,516 104,574

02455 1213 D=400MM EA 106,635 124,270

02455 1214 D=450MM EA 125,345 147,290

02455 1215 D=500MM EA 152,663 176,290

02455 1216 D=600MM EA 196,416 227,424

02455 1220

02455 1221 D=300MM EA 146,968 173,109

02455 1222 D=350MM EA 172,109 202,711

02455 1223 D=400MM EA 207,370 240,430

02455 1224 D=450MM EA 246,772 291,778

02455 1225 D=500MM EA 301,030 347,105

02455 1226 D=600MM EA 385,002 443,969

02455 1230

02455 1231 D=350MM EA 246,584 289,453

02455 1232 D=400MM EA 300,597 351,434

02455 1233 D=450MM EA 360,216 427,286

02455 1234 D=500MM EA 445,406 512,933

02455 1235 D=600MM EA 572,341 652,676

02455 1300

02455 1310

02455 1311 D=400MM EA 156,980 176,788

02455 1312 D=450MM EA 175,012 194,991

02455 1313 D=500MM EA 201,899 222,391

02455 1314 D=600MM EA 244,776 265,410

02455 1320

02455 1321 D=400MM EA 295,151 330,064

02455 1322 D=450MM EA 330,757 365,898

02455 1323 D=500MM EA 381,340 416,709

02455 1324 D=600MM EA 467,436 503,175

02455 1330

02455 1331 D=450MM EA 495,509 548,063

02455 1332 D=500MM EA 572,066 625,133

02455 1333 D=600MM EA 701,040 754,620

02500 0000

02510 0000

L=30M

PREBORING WITH AUGER AND BUCKET

L=10M

L=20M

L=30M

PREBORING WITH CEMENT MILK

L=10M

L=20M

L=30M

WATER DISTRIBUTION

UTILITY SERVICES

DIVISION 02 SITE WORK Page 15

DIVISION 02 SITE WORK

BASIC SUFFIX DESCRIPTION

UNIT

MEAS

REG TIME

YEN

NON-REG

YEN

DEMO

RATE

MISAWA AIR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .