Attachment 2 to FA5205-11-R-0001 Volume II Unit Price Book (UPB)
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 Contract No.
Solicitation No. FA5205-11-R-0001
SABER
SIMPLIFIED ACQUISITION OF BASE ENGINEERING
REQUIREMENTS
VOLUME II
UNIT PRICE BOOK (UPB)
18 April 2011
MISAWA AIR BASE
JAPAN
DATE 04/18/11
UNIT PRICE BOOK - VOLUME II
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
DIVISION 01 GENERAL REQUIREMENT
01010 SUMMARY OF WORK
01020 ALLOWANCES
01030 SPECIAL PROJECT PROCEDURES
01040 COORDINATION
01050 FIELD ENGINEERING
01060 REGULATORY REQUIREMENTS
01070 ABBREVIATIONS AND SYMBOLS
01080 IDENTIFICATION SYSTEMS
01100 ALTERNATES/ALTERNATIVES
01200 PROJECT MEETINGS
01300 SUBMITTALS
01400 QUALITY CONTROL
01500 CONSTRUCTION FACILITIES AND TEMP
01600 MATERIAL AND EQUIPMENT
01650 STARTING OF SYSTEMS
01660 TESTING ADJUSTING & BALANCING
01700 CONTRACT CLOSEOUT
01710 CONSTRUCTION FINAL CLEAN-UP
01800 MAINTENANCE MATERIALS
DIVISION 02 SITE WORK
02080 UTILITY MATERIALS
02100 SITE REMEDIATION
02200 SITE PREPARATION
02210 SUBSURFACE INVESTIGATION
02220 SITE DEMOLITION
02225 SELECTIVE DEMOLITION (1)
02226 SELECTIVE DEMOLITION (2)
02230 SITE CLEARING
02240 DEWATERING
02250 SHORING & UNDERPINNING
02270 MISCELLANEOUS SITE MATERIALS
02300 EARTHWORK
02310 GRADING
02315 FILLING
02317 EXCAVATION
02320 HAULING
02340 SOIL STABILIZATION
02360 SOIL TREATMENT
02370 EROSION & SEDIMENTATION CONTROL
02400 TUNNELING, BORING & JACKING
02445 BORING OR JACKING CONDUITS
02450 FOUNDATION & LOAD BEARING ELEMENTS
02455 DRIVEN PILES
02500 UTILITY SERVICES
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
DIVISION 00 INDEX Page 1
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02510 PIPING, WATER DISTRIBUTION, DUCTILE IRON
02530 SANITARY SEWERAGE
02580 ELEC/COMMUNICATION STRUCTURES
02600 DRAINAGE & CONTAINMENT
02620 SUBDRAINAGE
02630 STORM DRAINAGE
02700 BASES, BALLASTS, PAVEMENTS & APPURTENANCES
02720 UNBOUND BASE COURSE & BALLASTS
02740 FLEXIBLE PAVEMENT
02750 RIGID PAVEMENT
02766 PAVEMENT MARKINGS, COST INCLUDES PREPARATION,
MEASUREMENT, CLEAN UP, PRIMER, PAINT, AND CURING.
02770 CURBS AND GUTTERS
02775 SIDEWALKS
02785 FLEXIBLE PAVEMENT COATING
02790 ATHLETIC/RECREATIONAL SURFACES
02800 SITE IMPROVEMENTS AND AMENITIES
02810 IRRIGATION SYSTEM
02820 FENCES & GATES
02830 RETAINING WALLS
02840 WALK/ROAD/PARKING APPURTENANCES
02870 SITE FURNISHINGS
02880 PLAYFIELD EQUIPMENT
02890 TRAFFIC SIGNS & SIGNALS
02900 PLANTING
02905 TRANSPLANTING
02910 PLANT PREPARATION
02912 GENERAL PLANTING
02920 LAWNS & GRASSES
02930 EXTERIOR PLANTS
02935 PLANT MAINTENANCE
02945 PLANTING ACCESSORIES
02950 SITE RESTORATION & REHABILITATION
02990 STRUCTURE MOVING
DIVISION 03 CONCRETE
03100 CONCRETE FORMWORK
03110 STRUCTURAL CAST-IN-PLACE CONCRETE FORMWORK
NOTE - INCLUDES ERECTING, STRIPPING, CLEANING, AND
STACKING PLUS ACCESSORIES
03200 CONCRETE REINFORCEMENT
03210 REINFORCING STEEL NOTE -INCLUDES DELIVERY,
FABRICATION AND ACCESSORIES
03220 WELDED WIRE FABRIC
03250 CONCRETE ACCESSORIES
03251 EXPANSION AND CONTRACTION JOINTS
03253 WATERSTOPS
DIVISION 00 INDEX Page 2
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
03300 CONCRETE WORK
03310 CAST IN PLACE CONCRETE, NOTE-INCLUDES SHEET
CURRING AND WOOD FLOATING FINISH AS NEEDED
03400 CONCRETE AND MORTAR FINISH
03410 CONCRETE SURFACE FINISH
03420 SPECIAL CONCRETE FINISHES
03430 PRECAST CONCRETE, PLANTER, GLASS REINFORCED
CEMENT
03440 ALC PANEL NOTE-INCLUDES JOINT SEALING
03500 CEMENTITIOUS DECKS
03520 INSULATING CONCRETE ROOF DECK NOTE -ADD COSTS
FOR FORMING TO ALL PRICES BELOW. SEE CSI 03300
03600 GROUT
03610 GROUTING FOR BASES
03620 GROUTING FOR JOINTS
DIVISION 04 MASONRY
04100 MORTAR
04110 CEMENT AND LIME MORTARS
04160 JOINT REINFORCEMENT
04180 CONTROL JOINTS
04190 MORTAR
04200 UNIT MASONRY
04205 SCAFFOLDING
04220 CONCRETE UNIT MASONRY NOTE-INCLUDES FILING UP
MORTAR, GROUTING AND REINFORCING BAR (ADD 20%
FOR COST BELOW 100M2)
04230 BRICK
04500 MASONRY RESTORATION AND CLEANING
04510 MASONRY CLEANING
04520 MASONRY RESTORATION
04550 REFRACTORIES
DIVISION 05 METAL
05100 STRUCTURAL METAL FRAMING NOTE- PRICE INCLUDES
DELIVERY, PAINT(JIS K 5622), TOUCH UP PAINT, HI
TENSION BOLT, SITE WELDING. LABOR PRICE INCLUDES
CRANE AND OPERATOR AS NEEDED
05110 STRUCTURAL STEEL
05120 MISCELLANEOUS STEEL ITEMS
05300 METAL DECKING
05310 METAL ROOF AND FLOOR DECK NOTE- INCLUDES ALL
COMPONENTS AND HARDWARE
05500 METAL FABRICATION
05501 ANCHOR BOLTS
DIVISION 00 INDEX Page 3
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
05502 EXPANSION BOLTS INCLUDING NUT, WASHER, DRILLING
CONC OR BLOCK
05521 PIPE AND TUBE RAILING
05530 GRATING
05540 CASTINGS
05700 ORNAMENTAL METAL
05720 ORNAMENTAL HANDRAIL AND RAILINGS
05730 ORNAMENTAL SHEET METAL
05800 EXPANSION CONTROL
05805 EXPANSION JOINT COVERS
DIVISION 06 WOOD AND PLASTIC
06100 ROUGH CARPENTRY
06110 FRAMING AND SHEATHING NOTE -ALL LUMBER GRADES
ARE PRESUMED TO BE 75 PCT CONST. AND 25 PCT
STANDARD OR EQUIVALENT GRADE UNLESS OTHERWISE
LISTED. DIMENSIONS ARE NOMINAL
06111 LIGHT WOODEN STRUCTURES FRAMING
06113 SHEATHING, SIDING AND SUB-FLOORING 0901
06130 HEAVY TIMBER CONSTRUCTION (U.S. MATERIALS OR
EQUIVALENT) 06132 MILL FRAMED STRUCTURES
06170 PREFABRICATED WOOD
06200 FINISH CARPENTRY
06220 MILLWORK
06300 WOOD TREATMENT
06310 PRESSURE TREATED LUMBER
06311 PRESERVATIVE TREATED LUMBER
06312 FIRE RETARDANT TREATED LUMBER
06313 KILN DRYING TREATMENT
06400 ARCHITECTURAL WOODWORK
06410 CABINETWORK W/ HARDWARE
06420 PANELING
06700 FASTENERS AND SUPPORTS
06710 ANCHORS
06720 JOINT SUPPORTS
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07100 WATERPROOFING W/SEAL CAULKING NOTE -THE
FOLLOWING PRICES ARE FOR APPLICATION TO VERTICAL
SURFACES
07110 MEMBRANE WATERPROOFING
07111 ELASTOMERIC MEMBRANE WATERPROOFING
DIVISION 00 INDEX Page 4
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
07112 BITUMINOUS MEMBRANE WATERPROOFING IAW ASPHALT
JIS K 2207, ASPHALT ROOFING JIS A 6005, STRETCHY
ASPHALT ROOFING JIS A 6022, SANDED BITUMINOUS FELT
JIS A 6022, PERFORATED ASPHALT ROOFING JIS A 6023
07113 VINYL CHLORIDE SHEET WATERPROOF NOTE-INCLUDING
PREPARE OF CRACKS,HOLES,REMOVE & REINSTALL
ASSOCIATED APPURTENANCE
07150 DAMPPROOFING
07155 DAMPPROOFING MAINTENANCE AND REPAIR
07160 BITUMINOUS DAMPPROOFING
07170 SILICONE DAMPPROOFING
07180 CEMENTITIOUS DAMPPROOFING
07200 INSULATION
07210 THERMAL INSULATION MATERIAL MADE OF GLASSWOOL
JIS 9505 FOR BUILDING INSULATION
07211 LOOSE FILL INSULATION
07212 THERMAL INSULATION MATERIAL MADE OF
POLYSTYRENE FORM JIS A 9511
07213 RIGID INSULATION FOR ROOFS NOTE -TYPES ARE STOCK
SIZES MASTIC APPLIED OR NAILED ON
07215 SPRAYED ON INSULATION
07240 ROCK WOOL FIREPROOF SPRAYING
07400 ROOFING AND SIDING
07410 ROOFING
07420 SIDING
07500 MEMBRANE ROOFING
07510 BUILT-UP BITUMINOUS ROOFING NOTE -THE FOLLOWING
PRICES DO NOT INCLUDE THE INSULATION COSTS- FOR
INSULATION SEE CSI07200
07550 INVERTED ROOF SYSTEM
07600 FLASHING AND SHEETMETAL
07610 SHEET METAL ROOFING SEE ALSO CSI SECTION 7410
07620 FLASHING AND TRIM
07630 COPING
07631 GUTTERS AND DOWNSPOUTS
07660 GRAVEL STOPS
07670 VENTS
07800 ROOF ACCESSORIES
07810 SKYLIGHTS
07811 PLASTIC SKYLIGHTS
07830 ROOF HATCHES EXHAUST SMOKE TYPE
07840 GRAVITY VENTILATORS NOTE -PRICE INCLUDES CURB,
BASE, DAMPER, STAINLESS BIRD SCREEN AND SECURING
COMPONENTS
07900 SEALANTS
07910 SEALING COMPOUNDS FOR SEALING AND GLAZING IN
BUILDING JIS A 5758
07920 SEALANTS AND CAULKING
07930 PLASTER REPAIRS:
DIVISION 00 INDEX Page 5
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
DIVISION 08 DOORS AND WINDOWS
08100 METAL DOORS AND FRAMES
08110 STEEL DOORS AND FRAMES
08120 ALUMINUM DOORS AND FRAMES
08200 WOOD AND PLASTIC DOORS
08210 WOOD DOORS
08300 SPECIAL DOORS
08310 HEAVY STEEL ROLL UP DOOR NOTE- INCLUDES
STAINLESS FRAME
08320 LIGHT STEEL ROLL UP DOOR
08330 OVER HEAD SLIDING DOOR
08340 MONITOR CONTROL SYSTEMS, TURNSTILE
08350 FOLDING DOORS
08353 ACCORDION FOLDING DOORS INCLUDES TRACKS AND
FITTINGS COMPLETE
08355 ACCESS FLOOR AND CEILING DOORS, WITH STAINLESS
STEEL FLAME
08362 METAL SLIDING DOOR -INCLUDES TRACKS, HARDWARES,
AND FITTINGS COMPLETE
08370 SLIDING GLASS DOORS, ALUMINUM NOTE -PRICES
INCLUDE STOCK FRAMES, TRIM AND GLASS USUAL
HARDWARE
08390 SCREEN AND STORM DOORS
08400 ENTRANCES AND STOREFRONTS
08420 ENTRANCE DOORS
08450 REVOLVING DOORS NOTE -PRICES ARE FOR STOCK
UNITS, INCLUDING FRAME AND TRIM 6 FT 6 IN TO 7 FT IN
DIAMETER AND 6 FT 10 IN TO 7 FT HIGH
08500 METAL WINDOWS
08510 STEEL WINDOWS NOTE -ALL SASHES ARE FACTORY
PRIMED BUT NOT FACTORY GLAZED SEE CSI 08800 FOR
GLAZING
08520 ALUMINUM WINDOWS
08600 WOOD AND PLASTIC WINDOWS
08610 WOOD WINDOWS NOTE -WINDOWS ARE GLAZED W/ DSA
AND PROVIDED W/SCREENS
08700 HARDWARE AND SPECIALTIES
08710 FINISH HARDWARE
08720 OPERATORS
08730 WEATHERSTRIPPING AND SEALS
08740 THRESHOLDS
08750 WINDOW STOPPER
08800 GLAZING
08810 GLASS NOTE-INCLUDES NEOPLANE SETTING BLOCKS,
SPACERS AND ELASTOMETRIC SEALANTS
08830 MIRROR GLASS
08850 GLAZING ACCESSORIES
08900 GLAZED CURTAIN WALLS
DIVISION 00 INDEX Page 6
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
08912 ALUMINUM WINDOW WALLS/CURTAIN WALLS
DIVISION 09 FINISHES
09100 LIGHT STEEL FURRING
09110 CEILING SUSPENSION SYSTEMS
09120 WALL STEEL FURRING SYSTEM
09130 ACCESS DOOR
09200 DRYWALL AND CEILING CONSTRUCTION
09210 DRYWALL CONSTRUCTION
09220 CEILING BOARD
09230 MISCELLANEOUS DRY WALL
09300 TILE
09310 FLOOR TILE
09320 WALL TILE
09400 TERRAZZO
09410 PORTLAND CEMENT TERRAZZO NOTE -DIVIDER STRIPS
NOT INCLUDED, SEE CSI 09430 FOR CONDUCTIVE
TERRAZZO
09420 PRECAST TERRAZZO
09430 CONDUCTIVE TERRAZZO
09500 WOOD FLOORING
09510 WOOD STRIP FLOORING NOTE -ALL WOOD STRIP
FLOORING IS UNFINISHED, T&G, LAID OVER FELT
UNDERLAYMENT
09520 WOOD PARQUET FLOORING NOTE -ALL WOOD PARQUET
FLOOR IS PREFINISHED AT FACTORY
09530 RESILIENT WOOD FLOORING SYSTEM
09540 WOOD BLOCK INDUSTRIAL FLOORING
09600 FLOOR FINISH
09610 RESILIENT FLOORING
09620 CARPETING NOTE - FOLLOWING TASKS ARE FOR
TYPICAL INSTALLATIONS AND GRADES MATCH WITH
PROJECT REQUIREMENTS
09630 MISCELLANEOUS CARPET ITEMS
09700 PAINTING NOTE -INCLUDES PROTECTION OF ADJACENT
ITEMS NOT BEING PAINTED
09710 STEEL SURFACE
09720 CONCRETE, MORTAR AND GYP BOARD SURFACE
09730 WOOD SURFACE
09740 TEXTURE PAINT, JIS A 6909
09750 PAINTING PIPE AND INSULATION
09760 TRANSPARENT FINISHES
09770 SURFACE PREPARATION FOR PAINTING
09800 WALL COVERINGS, NOTE- INCLUDE SURFACE
PREPARATION
09810 VINYL WALL COVERINGS
09900 PROTECTIVE COATING
09910 PROTECTIVE FLOOR COATING
DIVISION 00 INDEX Page 7
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
09920 SPRAY COATING
DIVISION 10 SPECIALTIES
10150 COMPARTMENTS AND CUBICLES
10160 TOILET PARTITIONS AND URINAL SCREENS
10161 LAMINATED MELAMINE BOARD TOILET PARTITIONS AND
URINAL SCREENS WITH HARDWARE
10162 METAL TOILET PARTITIONS AND URINAL SCREENS WITH
HARDWARES
10170 SHOWER AND DRESSING COMPARTMENTS
10350 FLAGPOLES ALL ARE INSTALLED IN A 2 CY CONCRETE
BASE AND FULLY RIGGED, ROPE TYPE (BASE NOT
INCLUDED IN COST)
10410 DIRECTORY AND BULLETIN BOARDS NOTE -ALL PRICES
INCLUDE CHANGEABLE LETTERS OR SIGNS FELT BACKED
AND ATTACHED TO MASONRY WALLS
10440 SIGNS
10500 LOCKERS
10502 BOX LOCKERS
10520 FIRE EXTINGUISHERS, CABINETS, AND ACCESSORIES
10521 PORTABLE FIRE EXTINGUISHERS
10522 FIRE EXTINGUISHER CABINETS
10600 PARTITIONS NOTE -CUBICLE PRICES INCLUDE STANDARD
UNITS -STANDARD HEIGHT GLASS AND GLAZING
INCLUDED. FOR 25 PCT AND 50 PCT GLASS 5 MM PLATE
GLASS IS USED. FOR 100 PCT GLASS 5 MM TEMPERED
PLATE IS
10610 DEMOUNTABLE PARTITIONS NOTE -BASIC UNIT INCLUDES
BAKED ENAMEL WALL 80 MM (3.1 IN) THICK WITH DOOR
AND FRAME
10617 METAL PARTITIONS
10618 WIRE MESH PARTITIONS
10670 STORAGE SHELVING
10671 METAL STORAGE SHELVING
10672 WOOD SHELVING
10800 TOILET AND BATH ACCESSORIES
10810 MISC. TOILET AND BATH EQUIPMENT NOTE -TOILET &
BATH ACCESSORIES CHROME PLATED, GOOD QUALITY,
FOR COMMERCIAL AND RESIDENTIAL USE
10820 DISPENSERS AND RECEPTACLES
10830 MEDICINE CABINETS
10850 SHOWER CURTAIN ROD
10860 JANITORIAL MATERIAL (NOT IN USE)
10870 HAND DRYER
10880 HOSPITAL ACCESSORIES (NOT IN USE)
10900 WARDROBE SPECIALTIES
DIVISION 00 INDEX Page 8
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
DIVISION 11 EQUIPMENT
11400 FOOD SERVICE EQUIPMENT
11415 UNIT KITCHENS
11420 COOKING EQUIPMENT
11430 DISHWASHING EQUIPMENT
11500 ATHLETIC EQUIPMENT
11510 GYMNASIUM EQUIPMENT
11550 INDUSTRIAL EQUIPMENT
11551 PAINT SPRAY BOOTHS
11570 SHOP EQUIPMENT
11870 LOADING DOCK EQUIPMENT
11875 DOCK BUMPERS
11900 RESIDENTIAL EQUIPMENT
11910 RESIDENTIAL KITCHEN EQUIPMENT
11920 RESIDENTIAL WASHING EQUIPMENT
11930 RESIDENTIAL ENVIRONMENTAL EQUIPMENT
11950 CONSTRUCTION AIDS
DIVISION 13 SPECIAL CONSTRUCTION
13150 ACCESS AND PEDESTAL FLOORS (SPECIALTY ITEMS,
QUOTE REQUIRED)
13281 ENGINEERING CONROL OF ASBESTOS CONTAINING
MATERIALS
13283 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
13600 PRE-ENGINEERED STRUCTURES (U. S .MATERIAL OR
EQUIVALENT)
13601 PRE-ENGINEERED BUILDINGS
13602 METAL BUILDING SYSTEMS
13603 MEZZANINE SYSTEM
13610 PRE CAST CONCRETE PRODUCT
DIVISION 14 CONVEYING SYSTEMS
14300 HOISTS AND CRANES
14301 INDUSTRIAL HOISTS
14302 INDUSTRIAL HOISTS, HEAVY DUTY
DIVISION 15 MECHANICAL
15010 GENERAL PROVISIONS
15100 PIPE AND PIPE FITTINGS
15110 STEEL PIPE
15120 LINING AND COATING STEEL PIPE
15130 CAST IRON PIPE AND FITTINGS
DIVISION 00 INDEX Page 9
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
15140 COPPER PIPE AND FITTINGS
15160 STAINLESS STEEL PIPE
15170 CONDUIT PIPE
15180 PIPING ACCESSORIES
15200 PIPING SPECIALTIES
15210 VALVES FOR GENERAL PURPOSE
15220 VALVES FOR WATER SUPPLY
15230 CONTROL VALVES
15240 TEMPERATURE CONTROL VALVE
15260 PUMPS
15270 AIR COMPRESSOR AND DRYER
15300 PLUMBING FIXTURE
15310 BATHROOM, KITCHEN AND OTHER
15320 FAUCETS AND VALVES
15330 DRAINS
15340 DOMESTIC HOT WATER HEATERS
15350 HAND DRYERS
15360 STEEL TANKS
15370 SPECIAL PIPING SYSTEMS AND WASTE WATER DISPOSAL
AND TREATMENT SYSTEM
15400 VENTILATION
15410 FANS
15420 TAILPIPE EXHAUST EQUIPMENT
15421 DUST COLLECTORS
15500 HEATING AND AIR CONDITIONING
15510 BOILERS
15520 SPACE HEATING EQUIPMENT
15530 REFRIGERATION
15540 LIQUID HEAT TRANSFER
15550 PACKAGED AIR CONDITIONING EQUIPMENT
15560 AIR HANDLING UNITS
15570 CONTROL EQUIPMENT
15600 AIR DISTRIBUTION
15610 DUCT WORK
15620 DIFFUSERS AND GRILLES
15630 DAMPERS
15700 MECHANICAL INSULATION WORK
15710 PIPE INSULATION
15720 DUCT INSULATION
15730 INSULATION FOR EQUIPMENT
15740 INSULATION FOR VALVES
15800 FIRE PROTECTION
15810 DELUGE AUTOMATIC SPRINKLER SYSTEMS
15820 HALON FIRE PROTECTION SYSTEMS
15830 DRY CHEMICAL SPRINKLER SYSTEM
15840 SPRINKLER EQUIPMENT
15850 STANDPIPE AND FIRE HOSE EQUIPMENT
15860 FIRE HOSE CABINETS AND ACCESSORIES
15900 SNOW MELTING SYSTEM
15910 PEX PIPE
DIVISION 00 INDEX Page 10
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
15920 PEX FITTINGS
15930 SNOW MELTING SYSTEM, ASSEMBLY
DIVISION 16 ELECTRICAL
16100 BASIC MATERIALS AND METHODS
16110 RACEWAYS
16120 CABLE TRAYS
16130 CONDUITS
16140 WIRE AND CABLE NOTE: UNLOADING, HANDLING, PULL
WIRE, PULLING BRANCH CIRCUIT CONDUCTOR, TESTING,
SPLICING AND CLEANUP. ALL CONDUCTORS ARE COPPER
16150 WIRE CONNECTION DEVICES NOTE: LABOR INCLUDED
INSULATION RESISTANCE TESTS AND INSULATION HIGH
POTENTIAL TESTS.
16160 WIRING DEVICES
16170 MOTOR CONTROL DEVICE
16200 POWER GENERATION
16210 RENTAL GENERATOR (PAR ONE WEEK)
16300 POWER TRANSMISSION
16310 TRANSFORMERS NOTE: PRICES INCLUDE CRANE AND
OPERATOR AS NECESSARY
16320 HIGH VOLTAGE DEVICES
16330 CUBICLE
16400 SERVICE AND DISTRIBUTION
16410 POLE LINE CONSTRUCTION
16420 OVERHEAD SERVICE
16430 UNDERGROUND SERVICE
16440 GROUNDING
16450 BOX-TYPE SWITCHGEAR ASSEMBLIES FOR LOW-
VOLTAGE DISTRIBUTION PURPOSE
16460 INVERTER PANEL
16470 DIMMER CONTROL PANEL
16500 LIGHTING
16510 RESIDENTIAL FIXTURES
16520 COMMERCIAL FLUORESCENT FIXTURES
16530 INDUSTRIAL FIXTURES
16540 FLOODLIGHT FIXTURES
16550 AREA LIGHTING
16560 STREET LIGHTING
16570 EMERGENCY/EXIT LIGHTING
16580 HID LAMP AND BALLAST
16600 SPECIAL SYSTEM
16610 HEATING SYSTEM
16700 COMMUNICATIONS
16710 FIRE ALARM SYSTEM
16720 REINSTALLATION/MISCELLANEOUS WORK
16730 GFM INSTALLATION WORK
16810 REINSTALLATION FOR ALL ELECTRICAL WORK
DIVISION 00 INDEX Page 11
INDEX
MAJOR
BASIC
MINOR
BASIC DESCRIPTION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
16900 GFM INSTALLATION WORK
16910 GFM INSTALLATION FOR ALL ELECTRICAL WORK
DIVISION 00 INDEX Page 12
DIVISION 01 GENERAL REQUIREMENT
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
01000 0000 GENERAL REQUIREMENT
01010 0000 SUMMARY OF WORK
01010 1000 CONSTRUCTION FINAL CLEAN-UP
01010 1100 GENERAL
01010 1101 SWEEP DEBRIS M2 305 377
01010 1200 FLOORS
01010 1201 CLEAN & POLISH TILE/WOOD FLOORS M2 219 271
01010 1202 VACUUM CARPET FLOORS M2 181 224
01010 1203 STEAM CLEAN CARPET M2 572 708
01010 1300 GLASS
01010 1301 CLEAN GLASS SURFACES M2 219 271
01010 2000 IDENTIFICATION SIGN
01010 2001 CONSTRUCTION SIGN EA 42,000 45,000
01020 0000 ALLOWANCES
01030 0000 SPECIAL PROJECT PROCEDURES
01030 1000
01030 1001 CIVIL SHOP DRAWINGS AND QUANTITY
CALCULATION
JOB 300,000 300,000
01030 1002 ARCHITECT SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 300,000 300,000
01030 1003 STRUCTURAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 300,000 300,000
01030 1004 MECHANICAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 300,000 300,000
01030 1005 ELECTRICAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 300,000 300,000
01030 2000
01030 2001 CIVIL SHOP DRAWINGS AND QUANTITY
CALCULATION
JOB 120,000 120,000
01030 2002 ARCHITECT SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 120,000 120,000
01030 2003 STRUCTURAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 120,000 120,000
01030 2004 MECHANICAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 120,000 120,000
01030 2005 ELECTRICAL SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 120,000 120,000
01030 3000
01030 3001 MISCELLANEOUS SHOP DRAWINGS AND
QUANTITY CALCULATION
JOB 60,000 60,000
01040 0000 COORDINATION
01050 0000 FIELD ENGINEERING
01060 0000 REGULATORY REQUIREMENTS
01070 0000 ABBREVIATIONS AND SYMBOLS
01080 0000 IDENTIFICATION SYSTEMS
01100 0000 ALTERNATES/ALTERNATIVES
01200 0000 PROJECT MEETINGS
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
SURVEY AND TEST - QUANTITY SURVEY REPORT AND SHOP DRAWINGS (1 JOB =
APPROXIMATELY FIVE A1 SIZE SHEETS OR EQUIVALENT EFFORT)
SURVEY AND TEST - QUANTITY SURVEY REPORT AND SHOP DRAWINGS (1 JOB =
APPROXIMATELY THREE A1 SIZE SHEETS OR EQUIVALENT EFFORT)
SURVEY AND TEST - QUANTITY SURVEY REPORT AND SHOP DRAWINGS (1 JOB =
APPROXIMATELY TEN A1 SIZE SHEETS OR EQUIVALENT EFFORT)
DIVISION 01 GENERAL REQUIREMENT Page 1
DIVISION 01 GENERAL REQUIREMENT
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
01300 0000 SUBMITTALS
01400 0000 QUALITY CONTROL
01500 0000 CONSTRUCTION FACILITIES AND TEMP
01600 0000 MATERIAL AND EQUIPMENT
01650 0000 STARTING OF SYSTEMS
01660 0000 TESTING ADJUSTING & BALANCING
01700 0000 CONTRACT CLOSEOUT
01800 0000 MAINTENANCE MATERIALS
DIVISION 01 GENERAL REQUIREMENT Page 2
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
02000 0000 SITE WORK
02080 0000 UTILITY MATERIALS
02080 2000
02080 2100
02080 2101 150MM WIDTH, SINGLE M 133 147 20%
02080 2102 150MM WIDTH, DOUBLE M 211 225 20%
02080 2103 300MM WIDTH, SINGLE M 211 225 20%
02080 2104 300MM WIDTH, DOUBLE M 367 381 20%
02080 2200
02080 2201 150MM WIDTH, SINGLE M 211 225 20%
02080 2202 150MM WIDTH, DOUBLE M 367 381 20%
02080 2203 300MM WIDTH, DOUBLE M 679 693 20%
02080 4000
02080 4100
02080 4101 4 IN (100MM) DIA. EA 136,508 142,760 20%
02080 4102 6 IN (150MM) DIA. EA 167,451 175,787 20%
02080 4103 8 IN (21CM) DIA. EA 262,427 274,155 20%
02080 4104 10 IN (25CM) DIA. EA 384,193 398,854 20%
02080 4105 12 IN (31CM) DIA. EA 534,443 553,990 20%
02080 4106 14 IN (36CM) DIA. EA 780,865 810,186 12%
02080 4107 16 IN (41CM) DIA. EA 1,010,705 1,040,026 12%
02100 0000 SITE REMEDIATION
02200 0000 SITE PREPARATION
02210 0000 SUBSURFACE INVESTIGATION
02210 1000
02210 1100
02210 1101 2-1/2 IN (64MM) DIA. LF 7,814 9,080
02210 1102 4 IN (100MM) DIA. LF 11,539 13,410
02210 1200
02210 1201 2-1/2 IN (64MM) DIA. LF 24,006 27,896
02210 1202 4 IN (100MM) DIA. LF 27,732 32,227
02210 2000
02210 2100
02210 2101 NO SAMPLING LF 14,893 17,307
02210 2102 WITH CASING AND SAMPLING LF 31,086 36,124
02210 2200
02210 2201 NO SAMPLING LF 24,913 28,951
02210 2202 WITH CASING AND SAMPLING LF 41,107 47,769
02210 3000
02210 3100
02210 3101 LIGHT SOIL CY 4,034 5,019
02210 3102 HEAVY SOIL CY 7,259 9,032
02220 0000 SITE DEMOLITION
02220 1000 BUILDING DEMOLITION
02220 1100
02220 1101 CHUTE-PREFAB-STEEL M 7,897 8,829
UNDERGROUND MARKING TAPE
UNDERGROUND MARKING TAPE
PIPING VALVES
CAST IRON GATE VALVES WITH BOXES
BORINGS
AUGER HOLES IN EARTH, NO SAMPLE
DRILLING, CORE
DRILLING IN ROCK, BX CORE
DRILLING IN ROCK, NX CORE
TEST PITS
UNDERGROUND MARKING TAPE, DETECTABLE
CASED BORINGS IN EARTH, WITH SAMPLES
TEST PITS - HAND-DUG
CHUTE INSTALLATION; NOTE --- PRICES INCLUDE ALL MATERIALS AND ERECTION
COST FOR A COMPLETE INSTALLATION
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
DIVISION 02 SITE WORK Page 1
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02220 1200
02220 1201 RESIDENTIAL BUILDING, BY HAND M2 4,018 4,667
02220 1202 RESIDENTIAL BUILDING, BY HAND AND
MACHINE
M2 2,842 3,301
02220 1203 COMMERCIAL BUILDING, BY HAND AND
MACHINE
M2 2,450 2,846
02220 1300
02220 1301 BY HEAVY EQUIPMENTS M3 5,087 5,714
02220 1302 BY HAND TOOLS M3 14,700 17,075
02220 1303 BY HEAVY EQUIPMENTS AND HAND TOOLS M3 9,800 11,384
02220 1400
02220 1401 BY HEAVY TOOLS M3 6,614 7,429
02220 1500
02220 1501 HEAVY STRUCTURE M2 5,978 6,944
02220 1502 INTERMEDIATE STRUCTURE M2 4,606 5,350
02220 1503 LIGHT STRUCTURE M2 2,744 3,188
02220 1600
02220 1601 BY HEAVY EQUIPMENTS M3 3,561 4,000
02220 1602 BY HAND TOOLS M3 11,760 13,660
02220 1603 BY HEAVY EQUIPMENTS AND HAND TOOLS M3 5,292 6,147
02220 2000
02220 2100
02220 2101 WOODEN BUILDING, BY HAND M3 18,620 21,629
02220 2102 WOODEN BUILDING, BY HAND AND MACHINE M3 11,760 13,660
02220 2103 WOODEN BUILDING, BY MACHINE M3 7,816 8,843
02220 2104 S/RC/SRC, BY HAND M3 20,580 23,905
02220 2105 S/RC/SRC, BY HAND AND MACHINE M3 12,740 14,799
02220 2106 S/RC/SRC, BY MACHINE M3 8,309 9,336
02220 2200
02220 2210
02220 2211 CONCRETE PLAIN, BY MACHINE M3 6,558 7,475
02220 2212 CONCRETE PLAIN, BY HAND M3 26,225 31,808
02220 2213 CONCRETE REINF, BY MACHINE M3 11,587 13,247
02220 2214 CONCRETE REINF, BY HAND M3 39,183 47,871
02220 2220
02220 2221 CONCRETE PLAIN, BY MACHINE M3 4,768 5,523
02220 2222 CONCRETE PLAIN, BY HAND M3 20,653 25,470
02220 2223 CONCRETE REINF, BY MACHINE M3 8,981 10,437
02220 2224 CONCRETE REINF, BY HAND M3 33,611 41,534
02220 4000
02220 4100
02220 4101 50 MM THICK M2 887 1,031
02220 4102 100 MM THICK M2 980 1,139
02220 4103 200 MM THICK M2 1,431 1,662
02220 4104 300 MM THICK M2 1,842 2,139
02220 4200
02220 4201 50 MM (2 IN) THICK M2 1,068 1,241
02220 4202 100 MM (4 IN) THICK M2 1,323 1,537
02220 4203 200 MM (8 IN) THICK M2 1,774 2,061
SRC BUILDING
S BUILDING
CONCRETE FLOOR SLAB
FOOTINGS AND FOUNDATIONS DEMOLITION
WOODEN BUILDING
RC BUILDING
SITE DEMOLITION; NOTE --- PRICE INCLUDE MACHINE BREAK-UP AND LOADING
REMOVE ASPHALT PAVEMENT
CONCRETE PAVEMENT
FOUNDATION OF BUILDING
OTHER CONCRETE STRUCTURAL DEMOLITION
UP TO 10M3 (VOLUME)
MORE THAN 10M3 (VOLUME)
DIVISION 02 SITE WORK Page 2
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02220 4204 300 MM (12 IN) THICK M2 2,237 2,599
02220 4300
02220 4301 CONCRETE CURBING M 778 888
02220 4302 CONCRETE GUTTER M 987 1,127
02220 4303 CONCRETE GUTTER W/CURBING M 1,209 1,380
02220 4400
02220 4401 15 MM (5/8 IN) THICK M2 5,290 6,159
02220 4402 30 MM (1-1/4 IN) THICK M2 7,050 8,209
02220 4500
02220 4501 MASONRY OR CONCRETE, ABANDON EA 16,073 18,346
02220 4502 MASONRY 5 FT (1.5M) DEEP -4 FT (1.2M) DIA.
REMOVE
EA 28,130 32,107
02220 4503 CONCRETE 5 FT (1.5M) DEEP -4 FT (1.2M) DIA.
REMOVE
EA 28,130 32,107
02220 4600
02220 4601 REMOVE RAILROAD TRACK AND TIES M 2,330 2,671
02220 4602 REMOVE AND RE-INSTALL TIE AND TRACK
WITH NEW BOLTS AND SPIKES
M 10,035 11,673
02220 4603 REMOVE BALLAST M3 399 465
02220 4604 TURNOUTS WITH NEW BOLTS AND SPIKES EA 152,921 177,896
02220 4700
02220 4701 REMOVE FENCE AND LOADING ON TRUCK M 1,284 1,528
02220 4702 REMOVE AND RESET M 1,945 2,316
02225 0000 SELECTIVE DEMOLITION (1)
02225 1000
02225 1100
02225 1101 PLYWOOD, GYPSUM BOARD M2 1,241 1,478
02225 2000
02225 2100
02225 2101 ELEVATED SLABS WITH LIGHT REINFORCING
UNDER 6 CF (.17M3)
M3 45,080 54,344
02225 2102 ELEVATED SLABS WITH LIGHT REINFORCING
OVER 6 CF (.17M3)
M3 37,543 45,278
02225 2103 ELEVATED SLABS WITH BAR REINFORCING
UNDER 6 CF (.17M3)
M3 67,598 81,502
02225 2104 ELEVATED SLABS WITH BAR REINFORCING
OVER 6 CF (.17M3)
M3 56,317 67,910
02225 2105 WALLS-BAR REINF. UNDER 6 CF (.17M3) M3 56,317 67,910
02225 2106 WALLS-BAR REINF. OVER 6 CF (.17M3) M3 52,029 62,727
02225 2200
02225 2201 4 IN (100MM) THICK M2 3,914 4,721
02225 2202 8 IN (200MM) THICK M2 4,776 5,759
02225 2203 12 IN (305MM) THICK M2 5,359 6,461
02225 2300
02225 2301 4 IN (100MM) THICK M2 3,562 4,296
02225 2302 8 IN (200MM) THICK M2 4,339 5,237
02225 2303 12 IN (305MM)THICK M2 4,870 5,870
02225 2400
CURBING REMOVED AND LOADED
CEILING DEMOLITION
CEILING
CUTOUT DEMOLITION
CONCRETE
CONCRETE CHIPPING
CATCH BASINS OR MANHOLE
RAILROAD TRACKAGE
FENCE REMOVALS - CHAIN LINK
BRICK WALLS; NOTE --- NOT INCLUDING TOOTHING TO 4 SF (.37M2) OPENING
CONCRETE BLOCK WALLS; NOTE --- NOT INCLUDING TOOTHING TO 4 SF (.37M2)
OPENING
BRICK OR BLOCK WALLS; NOTE --- OVER 4 SF FOR DOORS AND WINDOWS, NOT
INCLUDING TOOTHING.
DIVISION 02 SITE WORK Page 3
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02225 2401 4 IN (100MM) THICK M2 3,740 4,507
02225 2402 8 IN (200MM) THICK M2 4,559 5,497
02225 2403 12 IN (305MM) THICK M2 5,121 6,172
02225 2500
02225 2501 WALL M2 1,672 2,076
02225 2502 CEILING M2 1,765 2,190
02225 4000
02225 4100
02225 4101 100MM THICK, UP TO 50M2 M2 3,589 4,272
02225 4102 100MM THICK, UP TO 100M2 M2 2,871 3,418
02225 4103 100MM THICK, ABOVE 100M2 M2 1,435 1,709
02225 4104 150MM THICK, UP TO 50M2 M2 4,074 4,850
02225 4105 150MM THICK, UP TO 100M2 M2 3,259 3,879
02225 4106 150MM THICK, ABOVE 100M2 M2 1,630 1,941
02225 4200
02225 4201 CHIPPING CONCRETE FLOOR 30MM THICK M2 4,074 4,850
02225 4202 SANDING CONCRETE FLOOR (MEARASHI) M2 1,353 1,611
02225 4203 TRENCH CUT, 60 X 60MM M 2,085 2,482
02225 4204 TRENCH CUT, 90 X 90MM M 2,667 3,175
02225 4205 TRENCH CUT, 100 X 100MM M 3,104 3,695
02225 4300
02225 4301 CERAMIC OR QUARRY TILE M2 2,718 3,373
02225 4302 VINYL M2 1,548 1,921
02225 4303 WOOD M2 1,713 2,127
02225 7000
02225 7100
02225 7101 METAL M2 1,459 1,684
02225 7102 WATERRPROOF MATERIAL M2 1,784 2,070
02225 8000
02225 8100
02225 8101 100MM THICK M2 2,078 2,474
02225 8102 150MM THICK M2 2,802 3,336
02225 8200
02225 8201 150MM THICK M2 3,759 4,474
02225 8300
02225 8301 4 IN (100MM) THICK TO 12 IN (310MM) THICK M3 15,363 18,531
02225 8400
02225 8401 METAL OR WOOD WITH DRYWALL BOTH
SIDES
M2 1,896 2,357
02225 8500
02225 8501 GYPSUM WALL BOARD M2 1,304 1,552
02225 8502 TILE (INCLUDES MORTAR) M2 2,648 3,153
02225 8600
02225 8601 MORTAR 30MM THICK M2 2,401 2,858
02225 8602 TILE 30MM THICK M2 2,692 3,204
02225 8603 CONCRETE 30MM THICK M2 4,292 5,110
02226 0000
02226 1000
FLOOR DEMOLITION
REINFORCED CONCRETE FLOOR
CHIPPING
FLOORING REMOVAL
BRICK OR BLOCK WALLS; NOTE --- OVER 4 SF FOR DOORS AND WINDOWS, NOT
INCLUDING TOOTHING.
STUCCO, GYPSUM BOARD OR WOOD
CONCRETE PARTITIONS CAST IN PLACE
BRICK MASONRY PARTITIONS
STUD PORTIONS
WALL SURFACE REMOVAL
ROOFING AND SIDING DEMOLITION
ROOFING
WALLS AND PARTITIONS DEMOLITION; NOTE --- PRICE INCLUDES KNOCK DOWN
CONCRETE BLOCK PARTITIONS
WALL CHIPPING
SELECTIVE DEMOLITION, CONTINUOUS
MASONRY DEMOLITION (MATL VOL)
DIVISION 02 SITE WORK Page 4
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02226 1001 WALL M2 3,523 4,094
02226 2000
02226 2001 SURPLUS SOIL M3 1,022 1,022
02226 2002 CONCRETE DEBRIS M3 3,120 3,120
02226 2003 TREE, STUMPS, AND WEED M3 7,280 7,280
02226 2004 BUILDING MATERIAL M3 10,400 10,400
02226 2005 METALLIC SCRAP TON 26,000 26,000
02226 2006 GYPSUM BOARD TON 56,160 56,160
02226 2007 FIBROUS - GLASS/ROCK WOOL TON 187,200 187,200
02226 2008 PLASTICS - EXPANDED POLYSTYRENE,
URETHANE FOAM
TON 254,800 254,800
02226 3000
02226 3100
02226 3101 MACHINE LOADING TO TRUCK M3 321 373
02226 3102 HAND LOADING TO TRUCK M3 1,639 1,952
02226 5000
02226 5100
02226 5101 BITUMINOUS PAVING M 177 194
02226 5102 CONCRETE PAVING M 767 818
02226 5103 CONCRETE SLABS PLAIN M 660 703
02226 5104 CONCRETE SLABS -MESH REINF M 965 1,031
02226 5105 CONCRETE SLABS -ROD REINF M 1,142 1,222
02226 5106 CONCRETE WALLS -LIGHT REINF M 2,481 2,698
02226 5107 CONCRETE WALLS -ROD REINF M 4,323 4,701
02226 5108 BLOCK MASONRY M 1,056 1,130
02226 5109 BRICK MASONRY M 1,214 1,299
02226 6000
02226 6100
02226 6101 STEEL PLATE -TORCH CUT M 1,500 1,765
02230 0000
02230 1000
02230 1100
02230 1101 LIGHT TREES TO 6 IN (150MM) DIA. CUT A 22,795 27,136
02230 1102 GRUB STUMPS AND REMOVE A 11,640 13,856
02230 1103 MEDIUM TREES TO 10 IN (25CM)DIA. CUT A 27,641 32,905
02230 1104 GRUB STUMPS AND REMOVE A 15,787 18,793
02230 1105 HEAVY TREES TO 16 IN (41CM) DIA. CUT A 57,228 68,127
02230 1106 GRUB STUMPS AND REMOVE A 24,444 29,099
02240 0000
02240 1000
02240 1100
02240 1110
02240 1111 TRENCH DRAIN 2 FT X 3 FT EXC. M3 1,472 1,680
02240 1112 12 IN (36CM) CORRUGATED METAL PIPE.
INSTALL AND REMOVE W/EXCAV (ASSUME 3
USES)
M 9,248 9,974
RUBBISH HANDLING (MATL VOL)
RUBBISH HANDLING
SAW CUTTING
SAW CUTTING, PER 50MM
DISPOSAL ONLY; NOTE --- IF IT IS NEEDED TO ADD TRANSPORT TO DISPOSAL PLACE,
SEE 02320-1000
CUT TREES - GRUB ROOTS AND STUMP
DEWATERING
DEWATERING
SAND DRAINS
TORCH CUTTING
TORCH CUTTING
SITE CLEARING
CLEAR AND GRUB
TEMPORARY DRAINAGE SYSTEMS GRAVITY RUN-OFF SYSTEM
DIVISION 02 SITE WORK Page 5
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02240 1113 18 IN CORRUGATED METAL PIPE. INSTALL
AND REMOVE W/EXCAV. (ASSUME 3 USES)
M 11,762 12,597
02240 2000 WELLS
02240 2100
02240 2101 UNLINED HOLE M3 6,014 6,718 10%
02240 2102 12 IN (36CM) DIA. W/CORRUGATED METAL
LINER
M 14,315 15,509 10%
02240 2103 15 IN (38CM) DIA. W/CORRUGATED METAL
LINER
M 17,753 19,271 10%
02240 2104 24 IN (61CM) DIA. W/CORRUGATED METAL
LINER
M 28,719 30,807 10%
02240 2105 WOOD LINED HOLE UP TO 4 FT X 4 FT
(CONTACT AREA)
M2 6,819 7,729 10%
02240 2200
02240 2201 50MM (2") 300L/M (79 GPM) EA 79,355 82,996 10%
02240 2202 65MM (2-1/2") 360 L/M (95 GPM) EA 217,417 222,880 10%
02240 2203 80 MM (3") 500 L/M (132 GPM) EA 264,025 277,492 10%
02240 2204 100 MM (4" ) 600 L/M (159 GPM) EA 335,197 355,398 10%
02240 2300
02240 2310
02240 2311 50 MM DIA EA 2,208 2,453
02240 2312 75 (80) MM DIA EA 3,009 3,254
02240 2313 100 MM DIA EA 3,664 3,909
02240 2314 150 MM DIA EA 5,047 5,292
02240 2315 200 MM DIA EA 6,358 6,603
02240 2320
02240 2321 50 MM DIA EA 2,718 2,963
02240 2322 75 (80) MM DIA EA 3,446 3,691
02240 2323 100 MM DIA EA 4,174 4,419
02240 2324 150 MM DIA EA 5,994 6,239
02240 2325 200 MM DIA EA 7,450 7,695
02240 2330
02240 2331 50 MM DIA EA 3,446 3,691
02240 2332 75 (80) MM DIA EA 4,174 4,419
02240 2333 100 MM DIA EA 6,358 6,603
02240 2334 150 MM DIA EA 11,090 11,335
02240 2400
02240 2401 40 MM DIA M 351 422
02240 2402 50 MM DIA M 370 440
02240 2403 65 MM DIA M 420 496
02240 2404 75 MM DIA M 470 542
02240 2405 100 MM DIA M 530 608
02240 2406 125 MM DIA M 608 695
02240 2407 150 MM DIA M 770 864
02240 2408 200 MM DIA M 1,032 1,143
02240 2409 250 MM DIA M 1,419 1,546
02240 2411 300 MM DIA M 1,864 2,007
02250 0000
10 M HEAD
15 M HEAD
30 M HEAD
TEMPORARY PIPE, PVC
RELIEF WELLS, SUMP HOLE CONSTRUCTION INCLUDES EXCAVATION AND GRAVEL
PUMPS - SUBMERSIBLE, STARTER, LEVEL CONTROL - 20 FT (6.1M) HEAD
TEMPORARY PUMPS, PER ONE WEEK - SUBMERSIBLE, STARTER, LEVEL CONTROL
SHORING & UNDERPINNING
DIVISION 02 SITE WORK Page 6
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02250 3000
02250 3100
02250 3101 VIBROHAMMER, DIESEL HAMMER TON 139,251 143,157
02250 3102 PILE JACKING TON 158,651 164,983
02250 3200
02250 3210
02250 3211 UNDER ONE MONTH USING TON 62,559 69,023
02250 3212 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
TON 2,032 2,058
02250 3220
02250 3221 UNDER ONE MONTH USING TON 89,756 99,619
02250 3222 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
TON 2,063 2,089
02250 3300 H-STEEL PILE
02250 3301 LEFT IN PLACE MATERIAL, COST INCLUDES
MATERIAL/EQUIPMENT TRANSPORT
TON 117,575 123,085
02250 3302 CUT PILE EA 3,750 4,081
02250 3310
02250 3311 UNDER ONE MONTH USING TON 103,517 112,226
02250 3312 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
TON 2,050 2,078
02250 3400
02250 3401 UNDER ONE MONTH USING TON 153,539 167,389
02250 3402 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
TON 6,644 6,769
02250 4000
02250 4100
02250 4101 TO 2.0M DEEP EXCAVATION M2 2,326 2,714
02250 4102 2.0M TO 3.0M DEEP EXCAVATION M2 2,542 2,985
02250 4103 3.0M TO 4.0M DEEP EXCAVATION M2 2,791 3,258
02250 4104 4.0M TO 5.0M DEEP EXCAVATION M2 3,057 3,567
02250 4105 5.0M TO 6.0M DEEP EXCAVATION M2 3,348 3,907
02250 4200
02250 4201 UNDER ONE MONTH USING M2 6,588 7,526
02250 4202 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
M2 1,763 1,809
02250 4300
02250 4310
02250 4311 UP TO 3.5M DEEP EXCAVATION M2 3,742 4,283
02250 4312 4.0M TO 4.5M DEEP EXCAVATION M2 3,904 4,468
02250 4313 5.0M TO 6.5M DEEP EXCAVATION M2 4,067 4,655
02250 4320
02250 4321 UP TO 4.5M DEEP EXCAVATION M2 4,230 4,842
VIBROHAMMER, DIESEL HAMMER
PILE JACKING
SHEET PILING
STEEL SHEET PILE - LEFT IN PLACE MATERIAL, COST INCLUDES MATERIAL/EQUIPMENT
TRASPORTATION.
STEEL SHEET PILE - FOR TEMPORARY SHORING WORK, COST INCLUDES
MATERIAL/EQUIPMENT TRANSPORT, AND BACKFILLING AFTER REMOVED PILES.
WOOD SHEATHING, INSTALLATION AND PULL OUT, COST INCLUDES WALES,
CONNECTIONS AND STRUTS, W/TURNBUCKLE
METAL PANEL TYPED - THE COST INCLUDES ANY SUPPORTING COMPONENTS,
INSTALLATION, PULL OUT, AND TRANSPORTATION.
UP TO 3.0M WIDTH EXCAVATION, PER ONE MONTH
3.0M TO 4.7M WIDTH EXCAVATION, PER ONE MONTH
H-STEEL PILE FOR TEMPORARY SHORING WORK, COST INCLUDES
MATERIAL/EQUIPMENT TRANSPORT, AND BACKFILLING AFTER REMOVED PILES.
SHORING
SHEET PILE TYPE, LIGHT WEIGHT STEEL - THE COST INCLUDES ANY SUPPORTING
COMPONENTS, INSTALLATION, PULL OUT, AND TRANSPORTATION.
STEEL SUPPORT FOR TEMPORARY SHORING, WALING, STRUT AND OTHER MISC.
MATERIALS - COST INCLUDES MATERIAL/EQUIPMENT TRANSPORT
DIVISION 02 SITE WORK Page 7
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02250 4322 5.0M DEEP EXCAVATION M2 4,392 5,027
02250 4323 5.5M DEEP EXCAVATION M2 4,555 5,213
02250 4324 6.0M DEEP EXCAVATION M2 4,718 5,400
02270 0000
02270 1000
02270 1100
02270 1101 GUARD FENCE, 1800MM HEIGHT M 380 393
02270 1102 MINI FENCE, 1200MM HEIGHT M 307 324
02270 1103 A TYPE BARRICADE M 244 255
02270 1104 LIGHT EA 237 249
02270 1105 TRAFFIC LIGHT INCLUDES GENERATOR SET 10,693 11,292
02270 1200
02270 1201 FLAG MAN, PER DAY DAY 8,228 9,843
02270 2000
02270 2100
02270 2101 UNDER ONE MONTH USING M2 2,720 2,958
02270 2102 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
M2 300 301
02270 2200
02270 2201 UNDER ONE MONTH USING M2 4,356 4,715
02270 2202 OVER ONE MONTH USING, ADD COST PER
ONE MONTH
M2 1,614 1,747
02270 3000
02270 3001 CURRING SHEET (BLUE SHEET) M2 273 320
02270 3002 PLYWOOD CURRING ONE SIDE M2 2,247 2,630
02270 3003 PLYWOOD CURRING BOTH SIDES M2 3,224 3,773
02300 0000 EARTHWORK
02310 0000 GRADING
02310 1000
02310 1100
02310 1101 ROADWAY CLEARING OR GENERAL AREA
GRADING WITH GRADER (ROUGH)
A 15,266 17,524
02310 1102 SUBGRADE -FINE GRADING +/- .1FT A 17,235 19,784
02310 1103 CUT + EMBANKMENT SLOPES INCLUDES
DITCHES TO 3 FT (lM) DEEP AND SLOPES TO
1V/2H
M3 768 881
02310 1104 ROUGH GRADING LARGE AREA WITH DOZER M3 608 639
02310 1105 ROUGH GRADING SMALL AREA WITH DOZER M3 856 999
02310 1106 GENERAL AREA CLEARING BY DOZER IN
ROUGH TERRAIN OR HARD SOIL MATERIAL
A 7,145 7,501
02310 1200
02310 1201 SUBGRADE OR SUBBASE COURSES A 6,204 7,122
02310 1202 FINISH GRADE -BASE OR LEVELNG A 12,113 13,905
02310 1300
02310 1310
02310 1311 WITH DOZER 140 HP PUSH TO PILE M3 243 268
COVERING PLATE FOR ACCESS; NOTE --- THE COST INCLUDES LOAD/UNLOAD
METAL PLATE
ROAD DECKING PANEL
CURRING MATERIALS
MISCELLANEOUS SITE MATERIALS
SAFETY MATERIALS
SAFETY MATERIALS, PER ONE WEEK
FLAG MAN
ROUGH GRADE FOR STRUCTURES AND SLABS
FINE GRADE
SITE GRADING
ROADWAY GRADING
STRUCTURE GRADING
DIVISION 02 SITE WORK Page 8
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02310 1320
02310 1321 WITH GRADER WINDROW EXCESS M2 328 378
02310 1322 HAND CLEAN FOR CONCRETE PLACING OR
PIPE BEDDING
M2 493 611
02310 2000
02310 2100
02310 2101 TRIM AND SHAPE MACHINE EXCAVATED
AREAS BY HAND
M2 470 587
02310 2102 TRIM AND SHAPE FOR SLAB ON GRADE M2 820 1,020
02310 2103 FINE GRADE GRAVEL BEDDING BY HAND M2 493 611
02310 2104 FINE GRADE GRAVEL M2 197 246
02310 2200
02310 2210
02310 2211 ROUGH GRADE A 21,107 23,040
02310 2220
02310 2221 SEMI GRADE 2 PASSES A 22,827 26,202
02310 2222 FINE GRADE 3 PASSES A 45,652 52,405
02315 0000
02315 2000
02315 2100
02315 2101 BY HAND M3 2,396 2,852
02315 2102 DUMPED AND PLACED BY MACHINE M3 700 814
02315 2103 FILLED BY DOZER M3 294 322
02315 2104 FILLED BY LOADER M3 790 910
02315 3000
02315 3100
02315 3101 STABILIZED AGGREGATE MATERIAL M3 6,149 6,552
02315 3102 CRUSHER RUN M3 5,032 5,362
02315 3200
02315 3201 150-100 MM M3 7,896 8,414
02315 3202 200-150 MM M3 8,291 8,835
02315 3300
02315 3301 NON FROST MATERIAL M3 3,176 3,384
02315 3302 SATISFACTORY FILL MATERIAL M3 2,345 2,498
02315 5000
02315 5100
02315 5101 LARGE AREAS 150MM LIFT M3 220 234
02315 5102 LARGE AREAS 200MM LIFT M3 262 279
02315 5200
02315 5201 LARGE AREAS 150MM LIFT M3 118 137
02315 5202 LARGE AREAS 200MM LIFT M3 110 127
02315 5203 LARGE AREAS 250MM LIFT M3 101 118
02315 5300
02315 5310
02315 5311 UP TO 1 ON 4 SLOPE M2 176 205
02315 5312 ABOVE 1 ON 4 SLOPE M2 305 355
02315 5320
02315 5321 UP TO 1 ON 4 SLOPE M2 240 286
02315 5322 ABOVE 1 ON 4 SLOPE M2 316 376
BY MACHINE
BY HAND
FINISH GRADE FOR STRUCTURES AND SLABS
FINISH GRADING FOR STRUCTURES AND SLABS
HAND DIGGING AND GRADING
BACKFILL, STRUCTURAL
BACKFILLING FOUNDATION, COMPACTED MATERIAL VOLUME
BEDDING, COMPACTED MATERIAL VOLUME
CRUSHED ROCK; NOTE --- COST INCLUDES PLACING AND SPREADING MATERIAL
MACHINE OPERATIONS
WITH DOZER
WITH GRADER
FILLING
COBBLESTONE; NOTE --- COST INCUDES DELIVERED AND SCREEN
SOIL; NOTE --- COST INCLUDES PLACING AND SPREADING MATERIAL
COMPACTION
COMPATION BY DOZER
COMPACTION BY TIRE ROLLER
FOR SHAPING SLOPES OF EMBANKMENT ONLY
DIVISION 02 SITE WORK Page 9
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02315 6000
02315 6100
02315 6101 BY HAND WITH AIR TAMPER M3 960 1,115
02315 6102 BY HAND WITH VIB PLATE HAND TAMPER M3 517 601
02315 6103 BY HAND WITH 1 TON ROLLER M3 259 301
02315 7000
02315 7100
02315 7110
02315 7111 DENSITY OF SOIL BY NUCLEAR METHOD
ASTM D2922-71 (3 MINIMUM)
EA 45,048 47,091
02315 7120
02315 7121 BY SAND CONE -ASTM D1556064 BY RUBBER
BALLOON METHOD -ASTM D2167-66
EA 37,154 38,430
02315 7130
02315 7131 MOISTURE DENSITY RELATION OF SOILS -
STD PROCTOR
EA 2,481 2,933
02315 8000
02315 8100
02315 8101 BY HAND M3 2,706 3,222
02315 8102 BY MACHINE M3 696 808
02317 0000
02317 2000
02317 2100
02317 2110
02317 2111 SAND OR SANDY SOIL M3 352 398
02317 2112 GRAVELLY SOIL OR CLAY M3 352 398
02317 2113 BLASTED ROCK OR COBBLE STONE M3 468 529
02317 2120
02317 2121 SAND OR SANDY SOIL M3 249 281
02317 2122 GRAVELLY SOIL OR CLAY M3 249 281
02317 2123 BLASTED ROCK OR COBBLE STONE M3 331 374
02317 2200
02317 2210
02317 2211 SAND OR SANDY SOIL M3 187 211
02317 2212 CLAY M3 187 211
02317 2213 GRAVELLY SOIL, BLASTED ROCK OR COBBLE
STONE
M3 248 280
02317 2220
02317 2221 SAND OR SANDY SOIL M3 676 764
02317 2222 CLAY M3 835 943
02317 2223 GRAVELLY SOIL, BLASTED ROCK OR COBBLE
STONE
M3 835 943
02317 2230
02317 2231 SAND OR SANDY SOIL M3 723 817
02317 2232 CLAY M3 900 1,017
90 DEGREE TURNING
135 DEGREE TURNING
EXCAVATING, BULK BANK MEASURE, INCLUDE DIGGING PILING OR LOADING ON
TRUCKS
BACKHOE
0.35M3 CAPACITY
0.60M3 CAPACITY
CLAMSHELL
45 DEGREE TURNING
IN PLACE TESTS
STANDARD METHODS
LAB TEST
BACKFILL AND COMPACTION, TRENCH
BACKFILL WITH COMPACTION IN 150MM LAYERS
EXCAVATION
COMPACTION, STRUCTURAL
COMPACTION OF BACKFILL AROUND STRUCTURES OR IN TRENCH; NOTE ---
COMPACTION IN 150MM LAYERS
SOIL COMPACTION CONTROL
FIELD DENSITY TESTS
DIVISION 02 SITE WORK Page 10
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02317 2233 GRAVELLY SOIL, BLASTED ROCK OR COBBLE
STONE
M3 900 1,017
02317 2240
02317 2241 SAND OR SANDY SOIL M3 789 891
02317 2242 CLAY M3 980 1,107
02317 2243 GRAVELLY SOIL, BLASTED ROCK OR COBBLE
STONE
M3 980 1,107
02317 3000
02317 3100
02317 3110
02317 3111 SAND OR SANDY SOIL M3 483 524
02317 3112 GRAVELLY SOIL OR CLAY M3 510 556
02317 3113 BLASTED ROCK OR COBBLE STONE M3 535 585
02317 3120
02317 3121 SAND OR SANDY SOIL M3 327 368
02317 3122 GRAVELLY SOIL OR CLAY M3 354 400
02317 3123 BLASTED ROCK OR COBBLE STONE M3 379 429
02317 3130
02317 3131 SAND OR SANDY SOIL M3 275 316
02317 3132 GRAVELLY SOIL OR CLAY M3 302 348
02317 3133 BLASTED ROCK OR COBBLE STONE M3 327 377
02317 5000
02317 5100
02317 5101 UNCLASSIFIED, INCLUDING SLOPE HAND
TRIMMING
M3 2,522 3,003
02317 5102 TEST PIT, UNCLASSIFIEED, INCLUDING HAND
WORK FOR UTILITIES
M3 5,296 6,305
02317 5200
02317 5201 LESS THAN 1.0M DEPTH M3 745 864
02317 5202 MORE THAN 1.0M AND LESS THAN 3.0M
DEPTH
M3 823 956
02317 5203 MORE THAN 3.0M AND LESS THAN 6.0M M3 1,010 1,174
02317 5204 MORE THAN 6.0M M3 1,176 1,366
02317 5300
02317 5301 BY HAND M2 490 583
02317 5302 BY MACHINE M2 313 363
02317 6000
02317 6100
02317 6101 UP TO D= 0.5M M3 6,247 7,437
02317 6102 UP TO D= 1.0M M3 6,868 8,176
02317 6103 UP TO D= 2.0M M3 8,585 10,220
02317 6200
02317 6201 UP TO 10M3 M3 2,241 2,668
02317 6202 UP TO 50M3 M3 1,681 2,001
02317 6203 UP TO 100M3 M3 1,400 1,667
02317 6204 ABOVE 100M3 M3 1,120 1,333
02317 6300
02317 6301 BY HAND M2 2,817 3,353
02317 6302 BY MACHINE M2 621 739
02317 6400
EXCAVATION BY HAND; NOTE --- ONLY AROUND OBSTRUCTIONS AND UTILITIES
EXCAVATION BY MACHINE; NOTE --- INCLUDES MACHINE DELIVERY COST
TRIM BOTTOM OF EXCAVATION
GRADING
TRIM BOTTOM OF EXCAVATION
500M3 VOLUME
MORE THAN 1,000M3 VOLUME
EXCAVATING, STRUCTURAL
EXCAVATION BY HAND; NOTE --- ONLY AROUND OBSTRUCTIONS AND UTILITIES
EXCAVATION BY MACHINE; NOTE --- INCLUDES LOADING ON TRUCK
ARCHITECTURAL EARTHWORK
135 DEGREE TURNING
EXCAVATING, BULK, DOZER
EXCAVATION WITH PUSHING SOIL BY DOZER
UP TO 200M3 VOLUME
DIVISION 02 SITE WORK Page 11
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02317 6401 BY HAND M2 582 693
02317 6402 BY MACHINE M2 419 499
02317 6500
02317 6510
02317 6511 BY HAND M3 3,248 3,867
02317 6512 BY MACHINE M3 827 985
02317 6520
02317 6521 NORMAL SOIL, BY HAND M3 4,305 5,001
02317 6522 NORMAL SOIL, BY MACHINE M3 2,963 3,442
02317 6523 NON FROST SOIL, BY HAND M3 5,386 6,256
02317 6524 NON FROST SOIL, BY MACHINE M3 3,975 4,617
02317 6600
02317 6610
02317 6611 BY HAND M3 3,446 4,103
02317 6612 BY MACHINE M3 1,199 1,428
02317 6620
02317 6621 NORMAL SOIL, BY HAND M3 4,975 5,779
02317 6622 NORMAL SOIL, BY MACHINE M3 3,034 3,524
02317 6623 NON FROST SOIL, BY HAND M3 5,951 6,913
02317 6624 NON FROST SOIL, BY MACHINE M3 3,869 4,494
02317 6700
02317 6701 BY HAND M3 6,997 8,128
02317 6702 BY MACHINE M3 5,527 6,420
02317 6800
02317 6801 POLYSTYRENE FILM, 0.1MM M2 200 232
02317 6802 POLYSTYRENE FILM, 0.15MM M2 271 315
02317 6803 POLYSTYRENE FORM, 20MM M2 1,035 1,202
02317 6804 POLYSTYRENE FORM, 25MM M2 1,211 1,407
02317 6805 POLYSTYRENE FORM, 50MM M2 1,823 2,118
02317 7000
02317 7100
02317 7110
02317 7111 D-9 CAT W/DOUBLE SHANK RIPPER M3 272 284
02317 7112 D-8 CAT W/SINGLE SHANK RIPPER M3 287 299
02317 7120
02317 7121 D-9 CAT W/DOUBLE SHANK RIPPER M3 272 284
02317 7122 D-8 CAT W/SINGLE SHANK RIPPER M3 287 299
02317 7130
02317 7131 D-9 CAT W/DOUBLE SHANK RIPPER M3 335 348
02317 7132 D-8 CAT W/SINGLE SHANK RIPPER M3 374 392
02317 7140
02317 7141 D-9 CAT W/DOUBLE SHANK RIPPER M3 374 392
02317 7142 D-8 CAT W/SINGLE SHANK RIPPER M3 561 585
02317 7150
02317 7151 D-9 CAT W/DOUBLE SHANK RIPPER M3 448 467
02317 7152 D-8 CAT W/SINGLE SHANK RIPPER M3 934 975
02317 7200
METAMORPHIC ROCK (SLATE)
IGNEOUS ROCK (GRANITE, BASALT) HIGHLY WEATHERED-WEATHERED ROCK. NON-
WEATHERED ROCK IS BLASTED
COSTS TO USE AIR OPERATED HAMMERS TO BREAK UP ROCK NOTE - ADD FOR
LOADING
INSULATION AND MOISTURE PROOFING
RIPPING
ROCK BREAKING BY RIPPER; NOTE --- COSTS ARE PER TYPE OF MATERIAL W/O LOAD
OR HAUL
CLAYS
GLACIAL TILLS
SEDIMENTARY ROCKS (SHALE, SANDSTONE, LIMESTONE)
EXCAVATED SOIL
DELIVERED SOIL
FILLING; NOTE --- INCLUDES COMPACTION
EXCAVATED SOIL
DELIVERED SOIL
CRUSHED STONE; NOTE --- INCLUDES COMPACTION
BACKFILLING; NOTE --- INCLUDES COMPACTION
DIVISION 02 SITE WORK Page 12
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02317 7201 VERY DENSE ROCK M3 3,263 3,882
02317 7202 MEDIUM DENSITY ROCK M3 2,611 3,105
02317 7203 SOFT ROCK M3 2,089 2,484
02317 8000
02317 8100
02317 8101 UNCLASSIFIED, INCLUDING SLOPE HAND
TRIMMING
M3 2,522 3,003
02317 8102 TEST PIT, UNCLASSIFIEED, INCLUDING HAND
WORK FOR UTILITIES
M3 5,781 6,882
02317 8200
02317 8201 LESS THAN 1.0M DEPTH M3 804 934
02317 8202 MORE THAN 1.0M AND LESS THAN 3.0M
DEPTH
M3 843 979
02317 8203 MORE THAN 3.0M AND LESS THAN 6.0M M3 951 1,105
02317 8204 MORE THAN 6.0M M3 1,284 1,491
02317 8300
02317 8301 BY HAND M2 549 637
02317 8302 BY MACHINE M2 338 393
02320 0000
02320 1000
02320 1100
02320 1101 1 KM HAUL M3 118 136
02320 1102 2 KM HAUL M3 220 254
02320 1103 3 KM HAUL M3 319 369
02320 1104 4 KM HAUL M3 409 473
02320 1105 5 KM HAUL M3 501 579
02320 1106 8 KM HAUL M3 786 908
02320 1107 10 KM HAUL M3 963 1,112
02320 1108 15 KM HAUL M3 1,425 1,646
02320 1109 20 KM HAUL M3 1,818 2,099
02320 1110 30 KM HAUL M3 2,653 3,064
02320 1111 ADD HAULING COST PER 10 KM M3 884 1,021
02340 0000
02340 2000
02340 2100
02340 2101 SOIL STABILIZATION: LIME SLURRY 10 PCT
BY VOLUMN
M3 7,816 8,472
02340 2200
02340 2201 MAXIMUM OUTPUT M 2,990 3,365
02340 2202 MINIMUM OUTPUT M 1,793 2,019
02360 0000 SOIL TREATMENT
02360 1000
02360 1100
02360 1101 SOIL POISONING EA 8,644 10,755
02370 0000
SOIL STABILIZATION: LIME
SOIL STABILIZATION: VIBROFLOATION
TERMITE PRETREATMENT
SOIL TREATMENT
EROSION & SEDIMENTATION CONTROL
TRIM BOTTOM OF EXCAVATION
HAULING
HAULING
HAULING - INCLUDES TIME FOR LOADING, TRAVEL, DUMP AND MISC; NOTE ---
PRICING DOES NOT INCLUDE COST FOR EXCAVATION AND LOADING
SOIL STABILIZATION
SOIL STABILIZATION
EXCAVATING, TRENCH
EXCAVATION BY HAND; NOTE --- ONLY AROUND OBSTRUCTIONS AND UTILITIES
EXCAVATION BY MACHINE; NOTE --- INCLUDES LOADING ON TRUCK
DIVISION 02 SITE WORK Page 13
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02370 1000
02370 1100
02370 1101 3/8 TO 1/4 CY PIECES M3 30,610 35,307
02370 1200
02370 1201 GALVANIZED STEEL MESH BOXES STONE
FILLED, LIGHT WEIGHT
M3 24,309 26,136
02370 1202 GALVANIZED STEEL MESH BOXES STONE
FILLED, MIDDLE WEIGHT
M3 34,179 36,748
02370 1203 GALVANIZED STEEL MESH BOXES STONE
FILLED, HEAVY WEIGHT
M3 46,940 50,468
02370 2000
02370 2100
02370 2101 JUTE MESH M2 294 305
02370 2102 PLASTIC NETTING M2 175 186
02370 2103 POLYPROPYLENE MESH M2 735 746
02370 2200
02370 2201 NON-WOVEN FILTER FABRIC, 10MM THICK M2 867 933
02370 2202 IMPERVIOUS SHEET M2 2,456 2,640
02370 2300
02370 2301 SOIL CEMENT -INCLUDES MATERIALS AND
PLACEMENT (PORTLAND CEMENT CONTENT
7 PCT)
M3 47,043 52,584
02400 0000
02445 0000
02445 1000
02445 1100
02445 1101 24 IN (61CM) DIA. CASING -.25 IN WALL M 79,233 85,791
02445 1102 36 IN (91CM) DIA. CASING -.375 IN WALL M 134,038 143,872
02445 1103 48 IN (122CM) DIA. CASING -.375 IN WALL M 174,723 187,365
02445 1200
02445 1201 4 IN (100 MM) NOM SIZE ELEC CONDUIT M 34,100 37,052
02445 1202 24 IN (61CM) DIA. CASING -.25 IN WALL M 99,920 108,772
02445 1203 36 IN (91CM) DIA. CASING -.375 IN WALL M 178,367 193,116
02445 1204 48 IN (122CM) DIA. CASING -.375 IN WALL M 220,998 238,699
02450 0000
02455 0000
02455 1000
02455 1100
02455 1110
02455 1111 D=300MM EA 79,136 86,347
02455 1112 D=350MM EA 92,350 99,931
02455 1113 D=400MM EA 110,240 118,363
02455 1114 D=450MM EA 130,324 139,131
02455 1115 D=500MM EA 158,009 167,528
02455 1116 D=600MM EA 204,192 214,680
02455 1120
02455 1121 D=300MM EA 152,003 164,857
NETTING - 100 SY (83.6M2) PER ROLL 4 FT (1.2M) WIDE - STAPLED
RIP-RAP
RANDOM - FILTER STONE DUMPED FROM TRUCKS - MACHINE PLACED SLOPE
PROTECTION (KEYED)
GALVANIZED STEEL MESH BOXES, STONE FILLED
EROSION CONTROL
SHEETING FOR EROSION CONTROL
SOIL CEMENT SURFACING
TUNNELING, BORING & JACKING
BORING OR JACKING CONDUITS
PRE BORING WITH DROP HAMMER
L=10M
L=20M
HORIZONTAL BORING
ROADWORK
RAILROAD WORK
PRECAST CONCRETE PILE; NOTE --- INCLUDES ALL MATERIAL COST
FOUNDATION & LOAD BEARING ELEMENTS
DRIVEN PILES
DIVISION 02 SITE WORK Page 14
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR BASE - SABER CONTRACTING SYSTEM
02455 1122 D=350MM EA 178,543 192,166
02455 1123 D=400MM EA 214,325 229,031
02455 1124 D=450MM EA 257,455 274,270
02455 1125 D=500MM EA 311,686 329,641
02455 1126 D=600MM EA 400,176 419,100
02455 1130
02455 1131 D=350MM EA 256,187 273,715
02455 1132 D=400MM EA 312,367 332,146
02455 1133 D=450MM EA 376,949 399,863
02455 1134 D=500MM EA 461,372 486,766
02455 1135 D=600MM EA 592,740 619,245
02455 1200
02455 1210
02455 1211 D=300MM EA 76,631 90,454
02455 1212 D=350MM EA 89,516 104,574
02455 1213 D=400MM EA 106,635 124,270
02455 1214 D=450MM EA 125,345 147,290
02455 1215 D=500MM EA 152,663 176,290
02455 1216 D=600MM EA 196,416 227,424
02455 1220
02455 1221 D=300MM EA 146,968 173,109
02455 1222 D=350MM EA 172,109 202,711
02455 1223 D=400MM EA 207,370 240,430
02455 1224 D=450MM EA 246,772 291,778
02455 1225 D=500MM EA 301,030 347,105
02455 1226 D=600MM EA 385,002 443,969
02455 1230
02455 1231 D=350MM EA 246,584 289,453
02455 1232 D=400MM EA 300,597 351,434
02455 1233 D=450MM EA 360,216 427,286
02455 1234 D=500MM EA 445,406 512,933
02455 1235 D=600MM EA 572,341 652,676
02455 1300
02455 1310
02455 1311 D=400MM EA 156,980 176,788
02455 1312 D=450MM EA 175,012 194,991
02455 1313 D=500MM EA 201,899 222,391
02455 1314 D=600MM EA 244,776 265,410
02455 1320
02455 1321 D=400MM EA 295,151 330,064
02455 1322 D=450MM EA 330,757 365,898
02455 1323 D=500MM EA 381,340 416,709
02455 1324 D=600MM EA 467,436 503,175
02455 1330
02455 1331 D=450MM EA 495,509 548,063
02455 1332 D=500MM EA 572,066 625,133
02455 1333 D=600MM EA 701,040 754,620
02500 0000
02510 0000
L=30M
PREBORING WITH AUGER AND BUCKET
L=10M
L=20M
L=30M
PREBORING WITH CEMENT MILK
L=10M
L=20M
L=30M
WATER DISTRIBUTION
UTILITY SERVICES
DIVISION 02 SITE WORK Page 15
DIVISION 02 SITE WORK
BASIC SUFFIX DESCRIPTION
UNIT
MEAS
REG TIME
YEN
NON-REG
YEN
DEMO
RATE
MISAWA AIR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .