JA-1_Synopsis_of_Work.pdf
PDF 42 KB Posted
- Attached to
- CDC Fire Alarm System Federal contract opportunity
- Solicitation number
- FA500419BA012
About this file
SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JA-6_Wage_Determination.pdf | ||
| Solicitation_-_FA500419BA012.pdf | ||
| JA-3_Final_Documents_Vol_2.pdf | ||
| MFR_Change_of_Solicitation_Number.pdf | ||
| JA-2_Final_Documents_Vol_1.pdf | ||
| JA-5_FTQW_18-1019_Final_Drawings_22x34.pdf | ||
| JA-4_FTQW_18-1019_Final_Drawings_11x17.pdf | ||
| JA-7_Submittal_Register.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYNOPSIS OF WORK
PROJECT TITLE: INSTALL AUDIBLE FIRE ALARM DEVICES IN CDC (B5182)
LOCATION: EIELSON AFB, ALASKA
PROJECT: FTQW 18-1019
DESCRIPTION OF WORK:
Install a new system to include both fire alarm and mass notification functions, additional equipment, as related to voice annunciating features, will be required where the complement of these systems is larger than existing systems. Interconnection of fire alarm to the base Monaco system will be provided as well as connections to the base Whelen MNS. New area smoke detection, manual pull stations and other initiation systems are designed to provide compliant coverage for interior spaces of the building, according to UFC 4‐740‐14 and other applicable codes. Locations of these new devices will allow for them to be installed in locations so they do not impact existing systems. This will allow operation of fire alarm system in facility to remain active during installation and commissioning of new system. Text signs and other systems required for the facility will also be provided within the design. Notification device installation will be separated in to two zones; Preschool Wing and Toddler Wing to allow for separate notification within each wing based on the location and nature of the initiating device/event.
Additional ancillary systems, such as roll down door operators and door hold devices, which are currently part of the system, will be re‐integrated into the new fire alarm system where these systems can be tested and commissioned. Then, when the new system is in place, these connections will be connected to the new fire alarm devices. The existing Monaco transponder will remain in place throughout the new construction phase of the project and new unit will be provided and connected to the new fire alarm system. Once the new system is commissioned and operational, the old transponder unit and other related hardware equipment, such as the antenna, will be removed and turned over to 354 CES. LOC’s and textual signs as part of MNS system will be provided at egress locations, horizontal travel paths as otherwise required by UFC 4‐021‐01.
The facility will be occupied with underage, Monday through Friday, 0630-1800. No work can be conducted in areas where children are present. It is highly recommended that work is to be completed during night, weekend, Federal Holidays and EAFB PACAF Family days, when the building is not occupied by children and an escort is not required.
No asbestos or lead-based paint was found in testing completed by the A-E design team. The Contractor shall construct as required by the contract specifications and drawings.
END OF SYNOPSIS