JA-5.1_-_FTQW_18-0209_Specifications_Vol1.pdf
PDF 14 MB Posted
- Attached to
- F-35 Weapons Load Training Reno Federal contract opportunity
- Solicitation number
- FA500419BA006
About this file
Specifications Vol 1
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
Volume 1 (Division 00 - 12)
A-E TITLE I SERVICES TO
FINAL CONSTRUCTION DESIGN DOCUMENTS FOR F-35
RENOVATE WEAPONS LOAD TRAINING OFFICE & HANGAR (B1340)
EIELSON AFB, ALASKA
FTQW180209
FA8903-16-D-0016/FA8903-17-F-0118
FINAL SUBMITTAL
January 24, 2019
Prepared By:
Reid Middleton, Inc.
www.reidmiddleton.com
402017.017
Structural: Reid Middleton, Inc.
4300 B Street, Suite 302 Anchorage, Alaska 99503
Electrical: Stantec Consulting Services, Inc.
725 East Fireweed Lane, Suite 200 Anchorage, AK 99503-2245
Architect: RIM Architects 645 G Street, Suite 401 Anchorage, AK 99501
Mechanical: Notkin Mechanical Engineers 2301 Fifth Avenue, Suite 401 Seattle, WA 98121
Fire Protection AEGIS 13024 Beverly Park Road, Suite 202 Mukilteo, WA 98275
Cost Engineer ProDims LLC 520 Kirkland Way, Suite 201 Kirkland, WA 98033
SPECIFICATION SUBMITTED BY: Reid Middleton, Inc. DATE: 1/24/19
SPECIFICATION APPROVED BY: DATE:_______
F- 35 Renovat e Weapons Load Tr ai ni ng Of f i ce & Hangar ( B1340) FTQW180209 Ei el son AFB, Al aska
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LI ST OF DRAWI NGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRI CTI ONS
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 01. 00 10 PROJECT SCHEDULE
01 32 16. 00 20 SMALL PROJECT CONSTRUCTI ON PROGRESS SCHEDULES
01 33 00 SUBMI TTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 42 00. 10 EXPLANATI ONS: DRAWI NGS AND SPECI FI CATI ONS
01 45 00. 00 10 QUALI TY CONTROL
01 45 35 SPECI AL I NSPECTI ONS
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 58 00 PROJECT I DENTI FI CATI ON
01 60 00 MATERI AL AND EQUI PMENT
01 73 29 CUTTI NG AND PATCHI NG
01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
01 91 00. 15 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 61 13 EXCAVATI ON AND HANDLI NG OF CONTAMI NATED MATERI AL
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 05 23. 16 STRUCTURAL WELDI NG
05 12 00 STRUCTURAL STEEL
05 40 00 COLD- FORMED METAL FRAMI NG
05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS
05 51 00 METAL STAI RS
05 51 33 METAL LADDERS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 21 13 BOARD AND BLOCK I NSULATI ON
PROJECT TABLE OF CONTENTS Page 1 ewelborn Text Box Volume 1 Division 00 - Division 12 ewelborn Text Box Volume 2 Division 13 - Division 33
07 21 16 MI NERAL FI BER BLANKET I NSULATI ON
07 22 00 ROOF AND DECK I NSULATI ON
07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM
07 41 63 FABRI CATED ROOF PANEL ASSEMBLI ES
07 42 13 METAL WALL PANELS
07 54 19 POLYVI NYL- CHLORI DE ROOFI NG
07 60 00 FLASHI NG AND SHEET METAL
07 81 00 SPRAY- APPLI ED FI REPROOFI NG
07 84 00 FIRESTOPPING
07 92 00 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 36 13 SECTI ONAL OVERHEAD DOORS
08 41 13 ALUMI NUM- FRAMED ENTRANCES AND STOREFRONTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMI C, QUARRY, AND GLASS TI LI NG
09 51 00 ACOUSTI CAL CEI LI NGS
09 65 00 RESI LI ENT FLOORI NG
09 67 23. 15 FUEL RESI STI VE RESI NOUS FLOORI NG, 3- COAT SYSTEM
09 68 00 CARPETING
09 90 00 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00. 20 I NTERI OR SI GNAGE
10 26 00 WALL AND DOOR PROTECTI ON
10 28 13 TOI LET ACCESSORI ES
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WI NDOW SHADES
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT
13 48 00. 00 10 SEI SMI C PROTECTI ON FOR MECHANI CAL EQUI PMENT
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13. 00 10 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON
21 13 18. 00 10 PREACTI ON AND DELUGE SPRI NKLER SYSTEMS, FI RE PROTECTI ON
21 13 20. 00 20 LOW- LEVEL HI GH EXPANSI ON FOAM FI RE EXTI NGUI SHI NG FOR
AI RCRAFT HANGARS
21 30 00 FI RE PUMPS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
PROJECT TABLE OF CONTENTS Page 2
22 05 48. 00 20 MECHANI CAL SOUND, VI BRATI ON, AND SEI SMI C CONTROL
22 07 19. 00 40 PLUMBI NG PI PI NG I NSULATI ON
22 15 14. 00 40 GENERAL SERVI CE COMPRESSED- AI R SYSTEMS, LOW PRESSURE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
23 05 48. 00 40 VI BRATI ON AND SEI SMI C CONTROLS FOR HVAC PI PI NG AND
EQUIPMENT
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC
23 09 23. 02 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG
CONTROL SYSTEMS
23 21 13. 00 20 LOW TEMPERATURE WATER ( LTW) GLYCOL HEATI NG SYSTEM
23 22 26. 00 20 STEAM SYSTEM AND TERMI NAL UNI TS
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT
26 08 00 APPARATUS I NSPECTI ON AND TESTI NG
26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 24 13 SWITCHBOARDS
26 27 13. 10 30 ELECTRI C METERS
26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON
26 29 23 VARI ABLE FREQUENCY DRI VE SYSTEMS UNDER 600 VOLTS
26 51 00 I NTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 10 05 ELECTRONI C SECURI TY SYSTEMS ( ESS)
28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 13 11 CONCRETE PAVEMENT FOR AI RFI ELDS AND OTHER HEAVY- DUTY
PAVEMENTS
32 92 19 SEEDING
DI VI SI ON 33 - UTI LI TI ES
33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 3
DOCUMENT 00 01 15
LI ST OF DRAWI NGS
02/11
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "
1. 2 CONTRACT DRAWI NGS
Cont r act dr awi ngs ar e as f ol l ows:
Dr awi ng No. Dr awi ng Ti t l e
G-001 Cover Sheet
G-002 Dr awi ng I ndex
G-101 Code Summar y
G-102 Fi r st Fl oor Li f e Saf et y Pl an
G-103 Mezzani ne Li f e Saf et y Pl an
S-001 St r uct ur al Abbr evi at i ons And Symbol s
S-002 St r uct ur al Gener al Not es, Desi gn Loads
S-003 St r uct ur al Gener al Not es
S-004 St at ement Of St r uct ur al Speci al I nspect i ons
S-005 St at ement Of St r uct ur al Speci al I nspect i ons
S-006 St at ement Of St r uct ur al Speci al I nspect i ons
S-007 Wi nd Upl i f t Map
S-101 Foundat i on Pl an
S-102 Mezzani ne Fr ami ng Pl an
S-103 Roof Fr ami ng Pl an
S-201 Fr ami ng El evat i ons
S-202 Fr ami ng El evat i ons
DOCUMENT 00 01 15 Page 1
Dr awi ng No. Dr awi ng Ti t l e
S-203 Fr ami ng El evat i ons
S-204 Fr ami ng El evat i ons
S-205 Fr ami ng El evat i ons
S-206 Fr ami ng El evat i ons
S-207 Fr ami ng El evat i ons
S-208 Fr ami ng El evat i ons
S-209 Fr ami ng El evat i ons
S-210 Fr ami ng El evat i ons
S-211 Fr ami ng El evat i ons
S-301 Sections
S-302 Sections
S-401 Enl ar ged Pl ans
S-501 CMU Det ai l s 1
S-502 CMU Det ai l s 2
S-510 Concr et e Det ai l s
S-521 St eel Det ai l s 1
S-522 St eel Det ai l s 2
S-523 St eel Det ai l s 3
S-524 St eel Det ai l s
S-531 St ai r Det ai l s
S-801 Mechani cal Equi pment Suppor t Det ai l s
S-802 Mechani cal Equi pment Suppor t Det ai l s
S-803 Mechani cal Equi pment Suppor t Det ai l s
A-001 Abbr evi at i ons And Symbol s Legend
A-101 Fi r st Fl oor Demol i t i on Pl an
A-102 Mezzani ne Demol i t i on Pl an
DOCUMENT 00 01 15 Page 2
Dr awi ng No. Dr awi ng Ti t l e
A-103 Fi r st Fl oor Pl an
A-104 Mezzani ne Fl oor Pl an
A-105 Equi pment / Fur ni t ur e Pl an
A-106 Fi r st Fl oor - Fi ni sh Pl an
A-107 Mezzani ne - Fi ni sh Pl an
A-121 Fi r st Fl oor Demol i t i on Ref l ect ed Cei l i ng Pl an
A-122 Mezzani ne Fl oor Demol i t i on Ref l ect ed Cei l i ng Pl an
A-123 Fi r st Fl oor Ref l ect ed Cei l i ng Pl an
A-124 Mezzani ne Ref l ect ed Cei l i ng Pl an
A-141 Demol i t i on Roof Pl an
A-142 Roof Pl an
A-201 Nor t h And Sout h El evat i ons
A-202 East And West El evat i ons
A-301 Bui l di ng Longi t udi nal Sect i on
A-302 Bui l di ng Cr oss Sect i on
A-303 Wal l Sect i ons
A-305 Wal l Sect i ons
A-306 Enl ar ged Pl ans
A-401 Enl ar ged Pl ans
A-402 Enl ar ged St ai r Pl ans And Sect i ons
A-403 I nt er i or El evat i ons
A-501 Wal l Det ai l s
A-502 Cei l i ng Det ai l s
A-503 Roof Det ai l s
A-504 Door Det ai l s
A-505 Door And Wi ndow Det ai l s
A-506 Details
DOCUMENT 00 01 15 Page 3
Dr awi ng No. Dr awi ng Ti t l e
A-601 Assembl y Types
A-602 Fi ni sh Schedul e
A-603 Door Schedul e And Det ai l s
F-001 Fi r e Pr ot ect i on Not es And Symbol s
F-002 Fi r e Syst em Cr i t er i a And Pr ocedur es
F-101 Fi r e Pr ot ect i on Demol i t i on Fi r st Fl oor Pl an
F-102 Fi r e Pr ot ect i on Demol i t i on Mezzani ne Pl an
F-103 Fi r e Pr ot ect i on Fi r st Fl oor Pl an
F-104 Fi r e Pr ot ect i on Mezzani ne Pl an
F-201 Fi r e Pump Room El evat i ons
F-301 Fi r e Pr ot ect i on Hangar Sect i on
F-401 Enl ar ged Pump Room Fl oor Pl an
F-501 Fi r e Pr ot ect i on Ri ser Di agr am
F-601 Fi r st Fl oor Pl an - Fi r e Al ar m Demol i t i on
F-602 Second Fl oor Pl an - Fi r e Al ar m Demol i t i on
F-701 Fi r st Fl oor Pl an - Fi r e Al ar m
F-702 Second Fl oor Pl an - Fi r e Al ar m
F-801 Fi r e Al ar m / Mass Not i f i cat i on Ri ser Di agr am
F-901 Fi r e Al ar m Det ai l s
F-902 Fi r e Al ar m Det ai l s
M-001 Mechani cal Legend
M-101 Mechani cal Fi r st Fl oor Demol i t i on Pl an
M-102 Mechani cal Fi r st Fl oor And Mezzani ne Par t i al Demol i t i on Pl an
M-103 Mechani cal Fi r st Fl oor And Mezzani ne Par t i al Demol i t i on Pl an
M-104 Mechani cal Mezzani ne Pi pi ng Demol i t i on Pl an
M-105 Mechani cal Mezzani ne Demol i t i on Pl an
M-106 Mechani cal Mezzani ne Cei l i ng Space Demol i t i on Pl an
M-107 Gl ycol Hot Wat er & St eam Pi pi ng Di agr am - Demol i t i on
DOCUMENT 00 01 15 Page 4
Dr awi ng No. Dr awi ng Ti t l e
M-201 Mechani cal Fi r st Fl oor Pl an
M-202 Mechani cal Mezzani ne Pl an
M-301 Mechani cal Sect i ons
M-302 Mechani cal Sect i ons
M-303 Mechani cal Sect i ons
M-304 Mechani cal Sect i ons
M-305 Mechani cal Sect i ons
M-401 Mechani cal Enl ar ged Pl an
M-402 Mechani cal Enl ar ged Pl an
M-403 Mechani cal Enl ar ged Pl ans
M-501 Mechani cal Det ai l s
M-502 Mechani cal Det ai l s
M-503 Mechani cal Det ai l s
M-504 Mechani cal Det ai l s
M-505 Mechani cal Det ai l s
M-601 Mechani cal Schedul es
M-602 Mechani cal Schedul es
M-701 Diagrams
M-702 Controls
M-703 Controls
M-704 Controls
M-705 Controls
P-001 Pl umbi ng Legend, Abbr evi at i ons And Pl umbi ng Dr awi ng Li st
P-101 Pl umbi ng Fi r st Fl oor Demol i t i on Pl an
P-102 Pl umbi ng Fi r st Fl oor Par t i al Demol i t i on Pl an
P-103 Pl umbi ng Mezzani ne Demol i t i on Pl an
DOCUMENT 00 01 15 Page 5
Dr awi ng No. Dr awi ng Ti t l e
P-201 Pl umbi ng Fi r st Fl oor Pl an
P-202 Pl umbi ng Mezzani ne Pl an
P-203 Pl umbi ng Roof Pl an
P-401 Pl umbi ng Enl ar ged Pl ans
P-501 Pl umbi ng Det ai l s
P-601 Pl umbi ng Schedul es
E-000 Symbol s And Abbr evi at i ons
E-101 Fi r st Fl oor Pl an - Power Demol i t i on
E-102 Second Fl oor Pl an - Power Demol i t i on
E-103 Fi r st Fl oor Pl an - Li ght i ng Demol i t i on
E-104 Second Fl oor Pl an - Li ght i ng Demol i t i on
E-111 Si t e Pl an - Demol i t i on
E-200 El ect r i cal Ar ea Cl assi f i cat i on Pl an
E-201 Fi r st Fl oor Pl an - Power
E-202 Second Fl oor Pl an - Power
E-203 Fi r st Fl oor Pl an - Li ght i ng
E-204 Second Fl oor Pl an - Li ght i ng
E-211 Si t e Pl an - El ect r i cal
E-401 Enl ar ged Power Pl ans
E-501 Power One- Li ne Di agr am
E-601 Equi pment Connect i on Schedul e
E-602 Panel Schedul es
E-603 Panel Schedul es
E-701 Li ght i ng Det ai l s
E-702 Li ght i ng Det ai l s
E-703 El ect r i cal Det ai l s
DOCUMENT 00 01 15 Page 6
Dr awi ng No. Dr awi ng Ti t l e
T-000 Symbol s And Abbr evi at i ons - I CT
T-001 Rough- I n And Cabl i ng Schedul es - I CT
T-101 Fi r st Fl oor Pl an - I CT Demol i t i on
T-102 Second Fl oor Pl an - I CT Demol i t i on
T-201 Fi r st Fl oor Pl an - I CT Revi si ons
T-202 Second Fl oor Pl an - I CT Revi si ons
T-501 Voi ce/ Dat a Ri ser Di agr am
T-502 Secur i t y Ri ser Di agr am
T-503 Tel ecom Det ai l s
1. 3 SUPPLEMENTARY DRAWI NGS
These suppl ement ar y dr awi ngs may not be a par t of t he cont r act but ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on.
1. 3. 1 Ref er ence Dr awi ngs
The f ol l owi ng r ef er ence dr awi ngs ar e i nt ended onl y t o show t he or i gi nal const r uct i on. Dr awi ngs ar e t he pr oper t y of t he Gover nment and shal l not be used f or any pur pose ot her t han t hat i nt ended by t he cont r act .
Pr oj ect Name Document Ref er ence Sheet Ti t l e
Faci l i t y Fl oor Coat i ng, Pr oj ect No. 87- 0112
Sheet 1 of 3 Cover Sheet
Faci l i t y Fl oor Coat i ng, Pr oj ect No. 87- 0112
Sheet 2 of 3 Locat i on Pl an, Schedul e of Drawings
Faci l i t y Fl oor Coat i ng, Pr oj ect No. 87- 0112
Ref er ence No. C- 1, Sheet 3 of
Si ngl e Li ne Fl oor Pl an
Mai nt enance Dock Dr awi ng Code AF39- 04- 35, Sheet Ref er ence No. C- 1, Si t e Pl an
Mai nt enance Dock Dr awi ng Code AF39- 04- 35, Sheet Ref er ence No. C- 2, Gr adi ng Pl an
Mai nt enance Dock Dr awi ng Code AF39- 04- 35, Sheet Ref er ence No. C- 3, Details
Mai nt enance Dock Dr awi ng Code AF39- 04- 35, Sheet Ref er ence No. C- 4, Details
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. A- 1, Sheet 6
Fl oor Pl an
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. A- 2, Sheet 7
Elevations
DOCUMENT 00 01 15 Page 7
Pr oj ect Name Document Ref er ence Sheet Ti t l e
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. A- 3, Sheet 8
Bui l di ng Sect i ons
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. A- 4, Sheet 9
Roof Pl an / Det ai l s
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. A- 5, Sheet 1
Wal l Sect i ons/ Det ai l s
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. A- 6, Sheet 1
Enl ar ged Pl an - I nt er i or Elevations
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. A- 7, Sheet 1
Door Det ai l s
Mai nt enance Dock Dr awi ng Code AF39- 04- 35, Sheet Ref er ence No. A- 8, Mi sc. Det ai l s
Mai nt enance Dock Dr awi ng Code AF39- 04- 35, Sheet Ref er ence No. E- 1, Si t e Pl an
Mai nt enance Dock Dr awi ng Code AF39- 04- 35, Sheet Ref er ence No. E- 2, Si t e Pl an Det ai l s
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 3, Sheet 3
One Li ne Di agr am and Symbol Li st
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 4, Sheet 3
Li ght i ng Pl an
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 5, Sheet 3
Power Pl an
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 6, Sheet 3
Gr oundi ng Pl an
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 7, Sheet 4
Fi r e Al ar m
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 8, Sheet 4
Panel Schedul es
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 9, Sheet 4
Mot or Cont r ol Cent er
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 10, Sheet
El em. Di agr ams
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 11, Sheet
Roof De- I c i ng Syst em
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 12, Sheet
Power Det ai l s
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. E- 13, Sheet
Mi sc. Det ai l s
Mai nt enance Dock Dr awi ng Code AF39- 04- 35, Sheet Ref er ence No. E- 14, Taxi way Li ght i ng
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 1, Sheet 2
Equi pment Schedul e, Legend, Not es
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 2, Sheet 2
Fl oor Pl an - Pl umbi ng
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 3, Sheet 2
Par t i al Pl umbi ng Pl ans and Details
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 4, Sheet 2
Pl umbi ng - Sect i ons and Details
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 5, Sheet 2
Fl oor Pl an - HVAC
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 6, Sheet 2
Par t i al Fl oor Pl ans - HVAC
DOCUMENT 00 01 15 Page 8
Pr oj ect Name Document Ref er ence Sheet Ti t l e
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 7, Sheet 2
Fl ow Di agr am - HVAC
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 8, Sheet 2
Sect i ons and Det ai l s - HVAC
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 9, Sheet 2
Sect i ons and Det ai l s - HVAC
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 10, Sheet
Fl oor Pl ans - Fi r e Protection
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 11, Sheet
Fi r e Pr ot ect i on Sect i ons and Det ai l s
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 12, Sheet
Sect i ons and Det ai l s
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. M- 13, Sheet
Envi r onment al Cont r ol s and Addi t i ve No. 1A
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. S- 1, Sheet 1
Foundat i on and Fl oor - Sl ab Pl an and Det ai l s
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. S- 2, Sheet 1
Foundat i on and Sl ab Det ai l s
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. S- 3, Sheet 1
Roof Fr ami ng Pl an and Sections
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. S- 4, Sheet 1
Bui l di ng El evat i ons and Sections
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. S- 5, Sheet 1
Mezzani ne Sl ab Pl ans and Details
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. S- 6, Sheet 1
Tr uss and Fr ami ng Det ai l s
Mai nt enance Dock Dr awi ng No. AF39- 04- 35, Ref er ence No. S- 7, Sheet 2
St eel Fr ami ng Det ai l s
Mai nt enance Dock Dr awi ng No. AF16- 06- 3614, Ref er ence No. T- I , Sheet
Cover Sheet - Locat i on and Vi ci ni t y Map
Mai nt enance Dock Dr awi ng No. AF16- 06- 3614, Ref er ence No. T- 2, Sheet
Index/Legend
Repl ace Exhaust Syst em, Bl dg 1340, Pr oj ect No. 02-
Ref er ence No. 5702, Sheet 1 of 3
Exhaust Syst em Layout
Repl ace Exhaust Syst em, Bl dg 1340, Pr oj ect No. 02-
Ref er ence No. 5702, Sheet 2 of 3
Exhaust Syst em Layout
Repl ace Exhaust Syst em, Bl dg 1340, Pr oj ect No. 02-
Ref er ence No. 5702, Sheet 3 of 3
Exhaust Syst em Layout
Repl ace Under gr ound St or age Tanks, Pr oj ect No.
FTQ
Ref er ence No. G1 I ndex of Dr awi ngs
Repl ace Under gr ound St or age Tanks, Pr oj ect No.
FTQ
Dr awi ng No. AF16- 06- 4034, Ref er ence No. G2, Sheet
Locat i on and Vi ci ni t y Map
Repl ace Under gr ound St or age Tanks, Pr oj ect No.
FTQ
Dr awi ng No. AF33- 27- 17, Ref er ence No. G3, Sheet 2
Tank Schedul e
Repl ace Under gr ound St or age Tanks, Pr oj ect No.
FTQ
Dr awi ng No. AF33- 27- 17, Ref er ence No. C3, Sheet 6
Locat i on Pl an
Repl ace Under gr ound St or age Tanks, Pr oj ect No.
FTQ
Dr awi ng No. AF33- 27- 17, Ref er ence No. C11, Sheet 1
Typi cal Det ai l s
Repl ace Under gr ound St or age Tanks, Pr oj ect No.
FTQ
Dr awi ng No. AF33- 27- 17, Ref er ence No. Cp1, Sheet 3
Cat hodi c Pr ot ect i on Det ai l s
Repl ace Under gr ound St or age Tanks, Pr oj ect No.
FTQ
Dr awi ng No. AF33- 27- 17, Ref er ence No. E1, Sheet 18
El ect r i cal Det ai l s
DOCUMENT 00 01 15 Page 9
Pr oj ect Name Document Ref er ence Sheet Ti t l e
Repl ace Under gr ound St or age Tanks, Pr oj ect No.
FTQ
Dr awi ng No. AF33- 27- 17, Ref er ence No. S1, Sheet 15
Typi cal Det ai l s
Repl ace Under gr ound St or age Tanks, Pr oj ect No.
FTQ
Dr awi ng No. AF33- 27- 17, Ref er ence No. S2, Sheet 16
Tank I nf or mat i on
Repl ace Under gr ound St or age Tanks, Pr oj ect No.
FTQ
Dr awi ng No. AF33- 27- 17, Ref er ence No. S3, Sheet 17
St r uct ur al Det ai l s
Upgr ade Fi r e Det ect i on Syst em, Pr oj ect No. FTQW 93
Sheet 1 of 16 Cover Sheet
Upgr ade Fi r e Det ect i on Syst em, Pr oj ect No. FTQW 93
Ref er ence No. E1, Sheet 3 of
Legend, Not es and Abbreviations
Upgr ade Fi r e Det ect i on Syst em, Pr oj ect No. FTQW 93
Ref er ence No. E9, Sheet 11 of
Fi r st Fl oor Pl an
Upgr ade Fi r e Det ect i on Syst em, Pr oj ect No. FTQW 93
Ref er ence No. E10, Sheet 12 of 16
Par t i al Pl ans
Upgr ade Fi r e Det ect i on Syst em, Pr oj ect No. FTQW 93
Ref er ence No. T2, Sheet 2 of
Maps, Schedul e of Dr awi ngs
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. A- 1, Sheet 4 of
1st . Fl oor Pl an, Fi n.
Not es, and Dr . Sched.
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. A- 2, Sheet 5 of
2nd Fl oor Pl an and Wi ndow Elevations
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. A- 3, Sheet 6 of
El evat i ons and Cr oss Section
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. A- 4, Sheet 7 of
Wal l Sect i ons
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. A- 5, Sheet 8 of
Wal l Sect i ons
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. A- 6, Sheet 9 of
Wi ndow and Door Det ai l s
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. A- 7, Sheet 10 of 29
Mi sc. Det ai l s
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. A- 8, Sheet 11 of 29
Roof Pl an and Det ai l s
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. A- 9, Sheet 12 of 29
Par t i al Ref . Cl g. Pl . and Bl dg. Sect
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. C1, Sheet 3 of
Si t e Pl an and Det ai l s
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. E1, Sheet 26 of
Power Ri ser and Legend and Details
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. E2, Sheet 27 of
1st Fl oor El ect r i cal Pl an
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. E3, Sheet 28 of
2nd Fl oor El ect r i cal Pl an
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. E4, Sheet 29 of
El ect r i cal Det ai l s
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. M1, Sheet 19 of
Legend, Schedul es, and Details
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. M2, Sheet 20 of
Mechani cal Demol i t i on Pl an
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. M3, Sheet 21 of
Fi r st Fl oor Mechani cal Pl an
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. M4, Sheet 22 of
Second Fl oor Pi pi ng Pl an
DOCUMENT 00 01 15 Page 10
Pr oj ect Name Document Ref er ence Sheet Ti t l e
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. M5, Sheet 23 of
Vent i l at i on Pl an
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. M6, Sheet 24 of
Fi r e Pr ot ect i on Pl ans
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. M7, Sheet 25 of
Mi sc. Det ai l s and Fan Elevations
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. S- 1, Sheet 13 of 29
St r uct ur al Pl ans
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. S- 2, Sheet 14 of 29
St r uct ur al El evat i ons
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. S- 3, Sheet 15 of 29
St r uct ur al Det ai l s
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. S- 4, Sheet 16 of 29
St r uct ur al Det ai l s
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. S- 5, Sheet 17 of 29
Mezzani ne Pl an and Det ai l s
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. S- 6, Sheet 18 of 29
St r uct ur al Fr ami ng and Details
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
T- 1, Sheet 1 of 29 Ti t l e Sheet
Upgr ade Hangar , Pr oj ect No. FTQW 91- 3008
Ref er ence No. T- 2, Sheet 2 of
Schedul e of Dr awi ngs
- - End of Document - -
DOCUMENT 00 01 15 Page 11
SECTI ON 01 11 00
SUMMARY OF WORK
04/18
PART 1 GENERAL
1. 1 WORK COVERED BY CONTRACT DOCUMENTS
1. 1. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes r enovat i on of t he Weapons Load Tr ai ni ng bui l di ng and i nci dent al r el at ed wor k.
1. 1. 2 Location
The wor k i s l ocat ed at Bui l di ng 1340, Ei el son AFB, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 2 NOTI FI CATI ON OF COMMENCEMENT OF WORK
Pr i or t o excavat i on on- si t e, t he cont r act or shal l coor di nat e wi t h al l of t he or gani zat i ons l i s t ed on AF For m 103, Base Ci v i l Engi neer i ng Wor k Cl ear ance Request . The compl et ed f or m shal l be submi t t ed t o t he Cont r act i ng Of f i cer and a copy shal l be kept at t he wor k s i t e at al l t i mes.
The Cont r act or shal l not i f y t he Cont r act i ng Of f i cer t hat wor k wi l l begi n a mi ni mum of seven ( 7) days pr i or t o commenci ng wor k.
1. 3 GOVERNMENT OCCUPANCY
The Gover nment wi l l occupy pr emi ses dur i ng ent i r e per i od of const r uct i on f or t he conduct of i t s nor mal oper at i ons.
The Cont r act or shal l per f or m t he wor k under t hi s cont r act i n such a manner t hat adj acent Ai r For ce act i v i t i es may pr oceed unhi nder ed. Pr i or t o begi nni ng on- si t e wor k t he Cont r act or shal l meet wi t h t he Cont r act i ng Of f i cer and t echni cal r epr esent at i ves f r om Base Ci v i l Engi neer i ng t o schedul e t he wor k of t hi s cont r act .
Cooper at e wi t h Gover nment t o mi ni mi ze conf l i c t and t o f aci l i t at e i t s oper at i ons. I n case of conf l i c t accept Cont r act i ng Of f i cer ' s di r ect i on as f i nal and adj ust use of pr emi ses accor di ngl y.
Mai nt ai n I BC compl yi ng access t o and t hr ough cor r i dor s, st ai r ways, and bui l di ng exi t s at al l t i mes.
Coor di nat e Wor k i n and use of pr emi ses wi t h t he Gover nment .
1. 4 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed
SECTI ON 01 11 00 Page 1 dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.
Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k. Ref er ence Sect i on 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS f or di ggi ng per mi t r equi r ement s.
I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound, or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.
1. 6 GOVERNMENT- FURNI SHED MATERI AL AND EQUI PMENT
Pur suant t o Cont r act Cl ause FAR 52. 245- 1 Gover nment Pr oper t y, t he Gover nment wi l l f ur ni sh t he f ol l owi ng mat er i al s and equi pment f or i nst al l at i on by t he Cont r act or : See equi pment schedul e on Sheet A- 105.
Quant i t i es i ndi cat ed f or t he above- l i s t ed i t ems mar ked wi t h an ast er i sk ar e est i mat es. I t i s t he i nt ent i on of t he Gover nment t o f ur ni sh al l quant i t i es of t he ast er i sk i t ems r equi r ed t o compl et e t he wor k as speci f i ed, and t he var i ous quant i t i es wi l l be adj ust ed when necessar y. Quant i t i es st at ed f or t he above i t ems not mar ked wi t h an ast er i sk ar e al l t hat wi l l be f ur ni shed by t he Gover nment . Pr ovi de any addi t i onal quant i t i es t hat ar e r equi r ed.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 2
SECTI ON 01 14 00
WORK RESTRI CTI ONS
04/18
PART 1 GENERAL
1. 1 SUBMITTALS
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
1. 2 SPECI AL SCHEDULI NG REQUI REMENTS
a. Have mat er i al s, equi pment , and per sonnel r equi r ed t o per f or m t he wor k at t he s i t e pr i or t o t he commencement of t he wor k. Speci f i c i t ems of wor k t o whi ch t hi s r equi r ement appl i es i ncl ude:
( 1) HEF syst em commi ssi oni ng
b. The bui l di ng heat i ng and el ect r i cal syst emswi l l r emai n i n oper at i on dur i ng t he ent i r e const r uct i on per i od. The Cont r act or must conduct hi s oper at i ons so as t o cause t he l east possi bl e i nt er f er ence wi t h nor mal oper at i ons of t he act i v i t y.
c. Per mi ssi on t o i nt er r upt any Act i v i t y r oads, r ai l r oads, or ut i l i t y ser vi ce must be r equest ed i n wr i t i ng a mi ni mum of 15 cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on.
1. 3 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 3. 1 Act i v i t y Regul at i ons
Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear har d hat s i n desi gnat ed ar eas. Do not ent er any r est r i c t ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Mar k Cont r act or equi pment f or i dent i f i cat i on.
1. 3. 1. 1 No Smoki ng Pol i cy
Smoki ng i s pr ohi bi t ed wi t hi n and out s i de of al l bui l di ngs on i nst al l at i on, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on. Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.
1. 3. 2 Wor ki ng Hour s
Regul ar wor ki ng hour s must consi st of an 8 1/ 2 hour per i od est abl i shed by t he Cont r act i ng Of f i cer , bet ween 7 a. m. and 4: 30 p. m. , Monday t hr ough Fr i day, excl udi ng Gover nment hol i days.
SECTI ON 01 14 00 Page 1
1. 3. 3 Wor k Out si de Regul ar Hour s
Wor k out s i de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .
Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out s i de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer .
1. 3. 4 Ut i l i t y Cut over s and I nt er r upt i ons
a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es r equi r ed par agr aph WORK OUTSI DE REGULAR HOURS.
b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser v i ce.
c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, ai r condi t i oni ng, heat i ng, f i r e al ar m, and compr essed ai r ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK
OUTSI DE REGULAR HOURS.
d. Oper at i on of St at i on Ut i l i t i es: The Cont r act or must not oper at e nor di st ur b t he set t i ng of cont r ol devi ces i n t he st at i on ut i l i t i es syst em, i ncl udi ng wat er , sewer , el ect r i cal , and st eam ser v i ces. The Gover nment wi l l oper at e t he cont r ol devi ces as r equi r ed f or nor mal conduct of t he wor k. The Cont r act or must not i f y t he Cont r act i ng Of f i cer gi v i ng r easonabl e advance not i ce when such oper at i on i s r equi r ed.
1. 4 ACCESS TO CONTROLLED AREAS
The Cont r act or shal l compl y wi t h al l Ei el son AFB secur i t y and access t o cont r ol l ed ar ea pr ocedur es and r equi r ement s when and i f necessar y access i s absol ut el y necessar y. I ni t i al pr ocedur es and r equi r ement s wi l l be pr ovi ded t o t he Cont r act or at t he Pr e- Const r uct i on Conf er ence.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 14 00 Page 2
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
04/18
PART 1 GENERAL
1. 1 SUBMITTALS
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Vi ew Locat i on Map; G
Pr ogr ess and Compl et i on Pi ct ur es; G
SD- 04 Sampl es
Col or Boar ds; G
1. 2 COLOR BOARDS FOR AI R FORCE PROJECTS
Submi t t hr ee set s of col or boar ds wi t hi n 90 cal endar days af t er Cont r act Awar d. Each set of boar ds must i ncl ude sampl es of col or s and f i ni shes of i nt er i or sur f aces, such as wal l s, f l oor s, and cei l i ngs. Pr esent t he sampl es on 8 by 10- 1/ 2 i nches boar ds ( modul es) wi t h a maxi mum spr ead of 24 by 31- 1/ 2 i nches f or f ol dout s. Desi gn modul es t o f i t i n a st andar d l oose- l eaf , t hr ee- r i ng bi nder . Wher e speci al f i ni shes such as ar chi t ect ur al concr et e, car pet , or pr ef i ni shed t ext ur ed met al panel s ar e r equi r ed, submi t sampl es not l ess t han 12 i nches squar e wi t h t he boar d. I f mor e space i s needed, mor e t han one boar d per set may be submi t t ed.
Cer t i f y t hat t he col or sampl es have been r evi ewed i n det ai l , and t hat t he col or sampl es ar e i n st r i c t accor dance wi t h cont r act dr awi ngs and speci f i cat i ons, except as may be ot her wi se expl i c i t l y st at ed. Submi t t al of col or sampl es does not r el i eve t he Cont r act or of t he r esponsi bi l i t y t o submi t sampl es r equi r ed el sewher e her ei n.
1. 3 VI EW LOCATI ON MAP
Submi t , pr i or t o or wi t h t he f i r s t di gi t al phot ogr aph submi t t al s, a sket ch or dr awi ng i ndi cat i ng t he r equi r ed phot ogr aphi c l ocat i ons. Updat e as r equi r ed i f t he l ocat i ons ar e moved.
1. 4 PROGRESS AND COMPLETI ON PI CTURES
Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600x1200x24 bi t t r ue col or 300 DPI mi ni mum r esol ut i on i n JPEG f i l e f or mat showi ng t he sequence and pr ogr ess of wor k.
Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e pr oj ect f r om a mi ni mum of t en v i ews f r om poi nt s l ocat ed by t he Cont r act i ng Of f i cer . Submi t wi t h t he mont hl y i nvoi ce t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) , cumul at i ve of al l phot os t o dat e. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es. Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he v i ew
SECTI ON 01 30 00 Page 1 l ocat i on sket ch. Al so pr ovi de t he v i ew l ocat i on sket ch on t he CD or DVD as a di gi t al f i l e. I ncl ude a dat e desi gnat or i n f i l e names. Cr oss r ef er ence submi t t al s i n t he appr opr i at e dai l y r epor t . Phot ogr aphs pr ovi ded ar e f or unr est r i c t ed use by t he Gover nment .
1. 5 PRECONSTRUCTION
Af t er awar d of t he cont r act but pr i or t o commencement of any wor k at t he s i t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he val ue engi neer i ng and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k, and cl ear expect at i ons of t he " I nt er i m DD For m 1354" Submi t t al . Maj or subcont r act or s who wi l l engage i n t he wor k must al so at t end.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
SECTI ON 01 30 00 Page 2
SECTI ON 01 32 01. 00 10
PROJECT SCHEDULE
02/15
PART 1 GENERAL
1. 1 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr oj ect Schedul e; G
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
Pr epar e f or appr oval a Pr oj ect Schedul e, as speci f i ed her ei n, pur suant t o FAR Cl ause 52. 236- 15 Schedul es f or Const r uct i on Cont r act s. Show i n t he schedul e t he pr oposed sequence t o per f or m t he wor k and dat es cont empl at ed f or st ar t i ng and compl et i ng al l schedul e act i v i t i es. The schedul i ng of t he ent i r e pr oj ect i s r equi r ed. The schedul i ng of const r uct i on i s t he r esponsi bi l i t y of t he Cont r act or . Pr ovi de a schedul e t hat i s a f or war d pl anni ng as wel l as a pr oj ect moni t or i ng t ool . Use t he Cr i t i cal Pat h Met hod ( CPM) of net wor k cal cul at i on t o gener at e al l Pr oj ect Schedul es.
3. 2 PROJECT SCHEDULE
3. 2. 1 Level of Det ai l Requi r ed
Devel op t he Pr oj ect Schedul e t o t he appr opr i at e l evel of det ai l t o addr ess maj or mi l est ones and t o al l ow f or sat i sf act or y pr oj ect pl anni ng and execut i on. Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l wi l l r esul t i n i t s di sappr oval . The Cont r act Cl auses wi l l di ct at e t he appr opr i at e l evel of det ai l .
3. 2. 2 Pr ocur ement Act i v i t i es
I ncl ude act i v i t i es associ at ed wi t h t he cr i t i cal submi t t al s and t hei r appr oval s, pr ocur ement , f abr i cat i on, and del i ver y of l ong l ead mat er i al s, equi pment , f abr i cat ed assembl i es, and suppl i es. Long l ead pr ocur ement act i v i t i es ar e t hose wi t h an ant i c i pat ed pr ocur ement sequence of over 90 cal endar days.
3. 2. 3 Mandat or y Tasks
I ncl ude t he f ol l owi ng act i v i t i es/ t asks i n t he i ni t i al pr oj ect schedul e and al l updat es.
SECTI ON 01 32 01. 00 10 Page 1
a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each) .
b. Submi ssi on of mechani cal / el ect r i cal / i nf or mat i on syst ems l ayout dr awi ngs.
c. Long pr ocur ement act i v i t i es.
d. Submi ssi on and appr oval of O & M manual s.
e. Submi ssi on and appr oval of as- bui l t dr awi ngs.
f . Submi ssi on and appr oval of DD1354 dat a and i nst al l ed equi pment l i s t s.
g. Submi ssi on and appr oval of t est i ng and ai r bal ance ( TAB) .
h. Submi ssi on of TAB speci al i s t desi gn r evi ew r epor t .
i . Submi ssi on and appr oval of f i r e pr ot ect i on speci al i s t .
j . Submi ssi on and appr oval of Bui l di ng Commi ssi oni ng Pl an, t est dat a, and r epor t s: Devel op t he schedul e l ogi c associ at ed wi t h t est i ng and commi ssi oni ng of mechani cal syst ems t o a l evel of det ai l consi st ent wi t h t he cont r act commi ssi oni ng r equi r ement s. Al l t asks associ at ed wi t h al l bui l di ng t est i ng and commi ssi oni ng wi l l be compl et ed pr i or t o submi ssi on of bui l di ng commi ssi oni ng r epor t and subsequent cont r act completion.
k. Ai r and wat er bal anci ng.
l . Bui l di ng commi ssi oni ng - Funct i onal Per f or mance Test i ng.
m. Cont r ol s t est i ng pl an submi ssi on.
n. Cont r ol s t est i ng.
o. Per f or mance Ver i f i cat i on t est i ng.
p. Ot her syst ems t est i ng, i f r equi r ed.
q. Cont r act or ' s pr e- f i nal i nspect i on.
r . Cor r ect i on of punch l i s t f r om Cont r act or ' s pr e- f i nal i nspect i on.
s. Gover nment ' s pr e- f i nal i nspect i on.
t . Cor r ect i on of punch l i s t f r om Gover nment ' s pr e- f i nal i nspect i on.
u. Fi nal i nspect i on.
3. 2. 4 Gover nment Act i v i t i es
Show Gover nment and ot her agency act i v i t i es t hat coul d i mpact pr ogr ess.
These act i v i t i es i ncl ude, but ar e not l i mi t ed t o: envi r onment al per mi t appr oval s by St at e r egul at or s, i nspect i ons, ut i l i t y t i e- i n, Gover nment Fur ni shed Equi pment ( GFE) and Not i ce t o Pr oceed ( NTP) f or phasi ng requirements.
SECTI ON 01 32 01. 00 10 Page 2
3. 2. 5 Cont r act Mi l est ones and Const r ai nt s
Mi l est one act i v i t i es ar e t o be used f or s i gni f i cant pr oj ect event s i ncl udi ng, but not l i mi t ed t o, pr oj ect phasi ng, pr oj ect st ar t and end act i v i t i es, or i nt er i m compl et i on dat es. The use of ar t i f i c i al f l oat const r ai nt s such as " zer o f r ee f l oat " or " zer o t ot al f l oat " ar e pr ohi bi t ed.
Mandat or y const r ai nt s t hat i gnor e or ef f ect net wor k l ogi c ar e pr ohi bi t ed.
No const r ai ned dat es ar e al l owed i n t he schedul e ot her t han t hose speci f i ed her ei n. Submi t addi t i onal const r ai nt s t o t he Cont r act i ng Of f i cer f or appr oval on a case by case basi s.
3. 2. 5. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt
The f i r st act i v i t y i n t he pr oj ect schedul e must be a st ar t mi l est one t i t l ed " NTP Acknowl edged, " whi ch must have a " St ar t On" const r ai nt dat e equal t o t he dat e t hat t he NTP i s acknowl edged.
3. 2. 5. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt
The l ast act i v i t y i n t he schedul e must be a f i ni sh mi l est one t i t l ed " End Project."
Const r ai n t he pr oj ect schedul e t o t he Cont r act Compl et i on Dat e i n such a way t hat i f t he schedul e cal cul at es an ear l y f i ni sh, t hen t he f l oat cal cul at i on f or " End Pr oj ect " mi l est one r ef l ect s posi t i ve f l oat on t he l ongest pat h. I f t he pr oj ect schedul e cal cul at es a l at e f i ni sh, t hen t he " End Pr oj ect " mi l est one f l oat cal cul at i on r ef l ect s negat i ve f l oat on t he l ongest pat h. The Gover nment i s under no obl i gat i on t o accel er at e Gover nment act i v i t i es t o suppor t a Cont r act or ' s ear l y compl et i on.
3. 2. 5. 3 I nt er i m Compl et i on Dat es and Const r ai nt s
Const r ai n cont r act ual l y speci f i ed i nt er i m compl et i on dat es t o show negat i ve f l oat when t he cal cul at ed l at e f i ni sh dat e of t he l ast act i v i t y i n t hat phase i s l at er t han t he speci f i ed i nt er i m compl et i on dat e.
3. 2. 5. 3. 1 St ar t Phase
Use a st ar t mi l est one as t he f i r s t act i v i t y f or a pr oj ect phase. Cal l t he st ar t mi l est one " St ar t Phase X" wher e " X" r ef er s t o t he phase of wor k.
3. 2. 5. 3. 2 End Phase
Use a f i ni sh mi l est one as t he l ast act i v i t y f or a pr oj ect phase. Cal l t he f i ni sh mi l est one " End Phase X" wher e " X" r ef er s t o t he phase of wor k.
3. 2. 6 Calendars
Schedul e act i v i t i es on a Cal endar t o whi ch t he act i v i t y l ogi cal l y bel ongs.
Devel op cal endar s t o accommodat e any cont r act def i ned wor k per i od such as a 7- day cal endar f or Gover nment Accept ance act i v i t i es, concr et e cur e t i mes, et c. Devel op t he def aul t Cal endar t o mat ch t he physi cal wor k pl an wi t h non- wor k per i ods i dent i f i ed i ncl udi ng weekends and hol i days. Devel op sSeasonal Cal endar ( s) and assi gn t o seasonal l y af f ect ed act i v i t i es as applicable.
SECTI ON 01 32 01. 00 10 Page 3
3. 2. 7 Open Ended Logi c
Onl y t wo open ended act i v i t i es ar e al l owed: t he f i r st act i v i t y " NTP Acknowl edged" may have no pr edecessor l ogi c, and t he l ast act i v i t y - " End Pr oj ect " may have no successor l ogi c.
Pr edecessor open ended l ogi c may be al l owed i n a t i me i mpact anal yses upon t he Cont r act i ng Of f i cer ' s appr oval .
3. 2. 8 Def aul t Pr ogr ess Dat a Di sal l owed
Act ual St ar t and Fi ni sh dat es must not aut omat i cal l y updat e wi t h def aul t mechani sms i ncl uded i n t he schedul i ng sof t war e. Updat i ng of t he per cent compl et e and t he r emai ni ng dur at i on of any act i v i t y must be i ndependent f unct i ons. Di sabl e pr ogr am f eat ur es t hat cal cul at e one of t hese par amet er s f r om t he ot her . Act i v i t y Act ual St ar t ( AS) and Act ual Fi ni sh ( AF) dat es assi gned dur i ng t he updat i ng pr ocess must mat ch t hose dat es pr ovi ded i n t he Cont r act or Qual i t y Cont r ol Repor t s. Fai l ur e t o document t he AS and AF dat es i n t he Dai l y Qual i t y Cont r ol r epor t wi l l r esul t i n di sappr oval of t he Cont r act or ' s schedul e.
3. 2. 9 Out - of - Sequence Pr ogr ess
Act i v i t i es t hat have pr ogr essed bef or e al l pr ecedi ng l ogi c has been sat i sf i ed ( Out - of - Sequence Pr ogr ess) wi l l be al l owed onl y on a case- by- case basi s subj ect t o appr oval by t he Cont r act i ng Of f i cer . Pr opose l ogi c cor r ect i ons t o el i mi nat e out of sequence pr ogr ess or j ust i f y not changi ng t he sequenci ng f or appr oval pr i or t o submi t t i ng an updat ed pr oj ect schedul e. Addr ess out of sequence pr ogr ess or l ogi c changes i n t he Nar r at i ve Repor t and i n t he per i odi c schedul e updat e meet i ngs.
3. 2. 10 Added and Del et ed Act i v i t i es
Do not del et e act i v i t i es f r om t he pr oj ect schedul e or add new act i v i t i es t o t he schedul e wi t hout appr oval f r om t he Cont r act i ng Of f i cer . Act i v i t y I D and descr i pt i on changes ar e consi der ed new act i v i t i es and cannot be changed wi t hout Cont r act i ng Of f i cer appr oval .
3. 2. 11 Or i gi nal Dur at i ons
Act i v i t y Or i gi nal Dur at i ons ( OD) must be r easonabl e t o per f or m t he wor k i t em. OD changes ar e pr ohi bi t ed unl ess j ust i f i cat i on i s pr ovi ded and appr oved by t he Cont r act i ng Of f i cer .
3. 2. 12 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps
Lags must be r easonabl e as det er mi ned by t he Gover nment and not used i n pl ace of r eal i st i c or i gi nal dur at i ons, must not be i n pl ace t o ar t i f i c i al l y absor b f l oat , or t o r epl ace pr oper schedul e l ogi c.
a. Leads ( negat i ve l ags) ar e pr ohi bi t ed.
b. St ar t t o Fi ni sh ( SF) r el at i onshi ps ar e pr ohi bi t ed.
3. 2. 13 Ret ai ned Logi c
Schedul e cal cul at i ons must r et ai n t he l ogi c bet ween pr edecessor s and successor s ( " r et ai ned l ogi c" mode) even when t he successor act i v i t y( s) st ar t s and t he pr edecessor act i v i t y( s) has not f i ni shed ( out - of - sequence
SECTI ON 01 32 01. 00 10 Page 4 pr ogr ess) . Sof t war e f eat ur es t hat i n ef f ect sever t he t i e bet ween pr edecessor and successor act i v i t i es when t he successor has st ar t ed and t he pr edecessor l ogi c i s not sat i sf i ed ( " pr ogr ess over r i de" ) ar e not be al l owed.
3. 2. 14 Per cent Compl et e
Updat e t he per cent compl et e f or each act i v i t y st ar t ed, based on t he r eal i st i c assessment of ear ned val ue. Act i v i t i es whi ch ar e compl et e but f or r emai ni ng mi nor punch l i s t wor k and whi ch do not r est r ai n t he i ni t i at i on of successor act i v i t i es may be decl ar ed 100 per cent compl et e t o al l ow f or pr oper schedul e management .
3. 2. 15 Remai ni ng Dur at i on
Updat e t he r emai ni ng dur at i on f or each act i v i t y based on t he number of est i mat ed wor k days i t wi l l t ake t o compl et e t he act i v i t y. Remai ni ng dur at i on may not mat hemat i cal l y cor r el at e wi t h per cent age f ound under par agr aph ent i t l ed Per cent Compl et e.
3. 2. 16 Cost Loadi ng of Cl oseout Act i v i t i es
Cost l oad t he " Cor r ect i on of punch l i s t f r om Gover nment pr e- f i nal i nspect i on" act i v i t y( i es) not l ess t han 1 per cent of t he pr esent cont r act val ue. Act i v i t y( i es) may be decl ar ed 100 per cent compl et e upon t he Gover nment ' s ver i f i cat i on of compl et i on and cor r ect i on of al l punch l i s t wor k i dent i f i ed dur i ng Gover nment pr e- f i nal i nspect i on( s) .
3. 3 PROJECT SCHEDULE SUBMI SSI ONS
Pr ovi de t he submi ssi ons as descr i bed bel ow. I f t he Cont r act or f ai l s or r ef uses t o f ur ni sh t he i nf or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.