A-602_R1.pdf

PDF 132 KB Posted

Attached to
F-35 Weapons Load Training Reno Federal contract opportunity
Solicitation number
FA500419BA006
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Weapons Load Training Reno, newest first.
File Type Posted
JA-7_Q&As.pdf PDF
Solicitation_Amendment_FA500419BA0060003_SF_30.pdf PDF
Questions_Round_2.pdf PDF
Solicitation_Amendment_FA500419BA0060002_SF_30.pdf PDF
Spec_Section_08_14_00_for_question_14.pdf PDF
As_Builts_Pt_5_of_10.pdf PDF
As_Builts_Pt_6_of_10.pdf PDF
As_Builts_Pt_2_of_10.pdf PDF
Questions_and_Answers_combined.pdf PDF
As_Builts_Pt_8_of_10.pdf PDF
Q&A_B1340_Mechanical_Room_Photos.pdf PDF
As_Builts_Pt_3_of_10.pdf PDF
WEAPONS_LOAD_G-003_LOCATION_&_VICINITY_MAPS.pdf PDF
As_Builts_Pt_7_of_10.pdf PDF
As_Builts_Pt_4_of_10.pdf PDF
Comment_13_Ref_Sheets.pdf PDF
As_Builts_Pt_9_of_10.pdf PDF
LBP_Survey_Combined.pdf PDF
As_Builts_pt_10_of_10.pdf PDF
As_Builts_Pt_1_of_10.pdf PDF
FA500419BA0060001.pdf PDF
JA-1_-_FTQW_18-0209_Synopsis_of_Work.pdf PDF
Solicitation_-_FA500419BA006.pdf PDF
JA-6_Wage_Determination_19_Apr_19.pdf PDF
JA-5.2_-_FTQW_18-0209_Specifications_Vol2.pdf PDF
JA-4_-_FTQW_18-0209_Submittal_Register_27_Feb_19.pdf PDF
JA-2_-_FTQW_18-0209_Bid_Schedule_27_Feb_19.pdf PDF
JA-3.1_-_FTQW_18-0209_Drawings_11x17.pdf PDF
JA-5.1_-_FTQW_18-0209_Specifications_Vol1.pdf PDF
JA-3.2_-_FTQW_18-0209_Drawings_22x34.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERIOR MATERIALS FINISH LEGEND

FL

OO

RS

W

AL

LS

CE

ILI

NG

MI

SC

EL

LA

NE

OU

S

EM-1

CODE MATERIAL MANUFACTURER STYLE COLOR NOTES

ENTRANCE MAT CONSTRUCTION SPECIALTIES PEDIMAT 9325 "GRAPHITE"

SIZE

RB-1 RESILIENT BASE BURKE COVE BASE 217 CHARCOAL

P-1 PAINT SW7005 "PURE WHITE"

P-2 SW6126 "NAVAJO WHITE"

SHERWIN-WILLIAMS

BA

SE

PAINT SHERWIN-WILLIAMS

P-3 SW7650 "ELLIE GRAY"PAINT SHERWIN-WILLIAMS

GT-2

CT-1 CERAMIC WALL TILE

GROUT

CROSSVILLE

LATICRETE

COLOR BY NUMBERS

SANDED GROUT

WT02 SATIN - TEA FOR 2

89 SMOKE GREY

STANDARD LAMINATEPL-1 PLASTIC LAMINATE WILSONART 10776-60 "KENSINGTON MAPLE"

SS-1 SOLID SURFACE HI-MACS BY LG-HAUSYS M104 "ROMA"

4" X 12"

FRP-1 FIBERGLASS REINFORCED PANEL KEMLITE ARTIZAN FRP GRIZEL 211

FOR USE WITH CT-1

PROVIDE 1/4" ALUMINUM "L" TRIM AT TOP OF

WAINSCOT; STACKED BOND INSTALLATION. TILE

WAINSCOT TO EXTEND TO THE FLOOR

PROVIDE 1/4" ALUMINUM "L" TRIM AT TOP OF WAINSCOT

CONC-1 EXPOSED CONCRETE - CLEAR-

EGGSHELL FINISH

EGGSHELL FINISH

EGGSHELL FINISH

ACP-1 ACOUSTIC CEILING PANEL ARMSTRONG COMMERCIAL ULITMA TEGULAR #1944 WHITE 24" X 48"

GWB PAINTED GYPSUM - - P-1 EGGSHELL FINISH

COUNTERTOP MATERIAL; PROVIDE EASED EDGES

THE MATERIALS FINISH LEGEND INFORMATION LISTED ABOVE LISTS COLORS, PATTERNS AND TEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIED AND FIELD APPLIED COLORS. WHERE COLOR IS SHOWN BEING SPECIFIC TO ONE MANUFACTURER, AN EQUIVALENT COLOR BY ANOTHER MANUFACTURER MAY BE SUBMITTED FOR APPROVAL. MANUFACTURERS AND MATERIALS SPECIFIED ARE NOT INTENDED TO LIMIT THE SELECTION OF EQUAL COLORS FROM OTHER MANUFACTURERS.

FINE TEXTURE, PRELUDE 15/16" GRID (WHITE)

CPT-1 CARPET TILE SIGHT 78111SHAW 24" X 24"

4" HIGH

PT-1 MOSAIC PORCELAIN TILE

MAT-1 RUBBER MAT

DALTILE KEYSTONE COLLECTION DK14 MOONLIGHT

JOHNSONITE DEFIANT 80 FAWN 24" X 24" RAISED ROUND TEXTURE

GT-1 GROUT LATICRETE SANDED GROUT XXXXX FOR USE WITH PT-1

CG-1 CORNER GUARDS AS SPECIFIED LOCATE AT ALL GWB OUTSIDE CORNERS

CPT-2

VNL-1

CABINET FACES

VCT

CARPET TILE SHAW

SCAPE TILE 5T080

CENTRAL LINE TILE 5T176 SCENIC CITRON 72516 9" X 36"

1. ALL DISCREPANCIES BETWEEN INFORMATION IN THE DRAWINGS AND ACTIAL CONDITIONS SHALL BE BROUGHT TO THE GOVERNMENT'S ATTENTION IMMEDIATELY FOR CLARIFICATION AND RESOLUTION.

2. DIMENSIONS ARE FACE OF FINISH (FOF) UNLESS NOTED OTHERWISE, TYP.

3. PROVIDE SCHEDULED PLASTIC LAMINATE ON ALL EXPOSED AND SEMI-EXPOSED SURFACES.

4. PLASTIC LAMINATE TO BE APPLIED IN FULL, UNINTERRUPTED SHEETS. FIT CORNERS AND JOINTS HAIRLINE. SLIGHTLY BEVEL ALL ARISES/OUTSIDE CORNERS.

5. LOCATE COUNTERTOP BUTT JOINTS MINIMUM 2 FEET FROM ANY SINK CUT-OUTS.

6. PROVIDE SPACERS AS NEEDED TO ALLOW CLEARANCE FOR CABINETS, DRAWERS, AND APPLIANCES TO OPEN PROPERLY.

7. COUNTERTOPS WITHOUT SPLASHES SHALL BE SCRIBED TO FIT WALL W/CLEAR SILICONE BEAD AT WALL.

8. VERIFY ALL EQUIPMENT DIMENSIONS TO ENSURE PROPER FIT PRIOR TO FABRICATION

9. FIELD VERIFY ALL CASEWORK LOCATIONS/OPENINGS PRIOR TO FABRICATION.

10. UNO, PROVIDE SATIN STAINLESS STEEL WIRE PULLS, SELF-CLOSING, 165 DEGREE SWING, EUROPEAN HINGES, 100 LB RATING AT DRAWERS.

11. PROVIDE 20 GA BACKER PLATE FOR SUPPORT AT ALL CASEWORK CONNECTED TO WALLS.

12. PROVIDE "CUSTOM GRADE" CASEWORK & COMPLY WITH AWI/AWMAC QUALITY STANDARDS.

13. CABINET CONSTRUCTIONS STYLE IS FULL FLUSH OVERLAY WITH CUSTOM QUALITY COUNTERTOPS.

14. ALL FASTENERS TO BE CONCEALED, UNO.

15. ALL CUTS SHALL BE SMOOTH AND EXACT, WITH JOINTS ACCURATELY MATCHED, TIGHTLY FITTED, AND SECURELY ATTACHED.

16. SUSBTRATES TO RECEIVE PLASTIC LAMINATE COUNTERTOPS OR QUARTZ SLAB SURFACE: FABRICATE FROM PLYWOOD TO CONFORM TO THE CONFIGURATIONS INDICATED. SEE ELEVATIONS AND DETAILS FOR

LOCATIONS.

17. AT SINK LOCATIONS USE MARINE PLYWOOD MADE WITH EXTERIOR GLUE.

18. EXPOSED GLUE LINES SHALL BE FREE OF SQUEEZE-OUT.

19. USE SILICONE SEALANT AT CABINET BOX/WALL JOINTS AND CONNECTIONS.

20. BASE CABINETS TO BE 24" DEEP AND IN LENGTHS AS NOTED. PROVIDE 4" KICK WITH STANDARD RECESS AT CAB FRONTS AND RECESS AT FINISHED ENDS. WHERE CABINET BOXES ARE CLOSED, PROVIDE WHITE

MELAMINE INTERIOR & SHELVES. WHERE CABINET BOXES ARE OPEN, PROVIDE COLOR PLASTIC LAMINATE INTERIOR & SHELVES TO MATCH VERTICAL SURFACES.

21. UPPER CABINETS TO BE 14" DEEP AND IN LENGTHS AS NOTED. WHERE CABINET BOXES ARE CLOSED, PROVIDE WHITE MELAMINE INTERIOR & SHELVES. WHERE CABINET BOXES ARE OPEN, PROVIDE COLOR

PLASTIC LAMINATE INTERIOR & SHELVES TO MATCH VERTICAL SURFACES.

22. FINISH ALL EXPOSED ENDS, UPPER CABINET BOTTOM FACE & BACKS WITH PLASTIC LAMINATE THAT MATCHES VERTICAL FRONT WHERE CASEWORK DOES NOT ABUT TO SOLID WALL SURFACE.

23. BASKSPLASHES TO BE USED IN WET LOCATIONS ONLY. ALL OTHER COUNTERTOP LOCATIONS SHALL NOT HAVE BACKSPLASHES.

CASEWORK GENERAL NOTES:

1. ALL ADHESIVES AND SEALANTS USED IN THE BUILDING INTERIOR (INSIDE OF THE EXTERIOR MOISTURE BARRIER) MUST NOT EXCEED THE VOC CONTENT LIMIT OF : ADHESIVES, SEALANTS & SEALANT PRIMERS: SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) RULE #1168 REQUIREMENTS EFFECT ON JANUARY 1, 2003 AND RULE AMENDMENT DATED OCTOBER 3, 2003. AEROSOL ADHESIVES:

GREEN SEAL STANDARD GC-36 REQUIREMENTS IN EFFECT OCTOBER 19, 2000.

2. INTERIOR PAINTS AND COATINGS APPLIED ON-SITE MUST MEET THE LIMITATIONS AND RESTRICTIONS ON CHEMICAL COMPONENTS SET BY THE FOLLOWING STANDARDS: "TOPCOAT PAINTS:GREEN SEAL STANDARD GS-11, PAINTS" FIRST EDITION MAY 20, 1993. "ALL OTHER ARCHITECTURAL COATINGS, PRIMERS AND UNDERCOATS: SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD) RULE #

1113, ARCHITECTURAL COATINGS, " RULES IN EFFECT ON JANUARY 1, 2004.

SUSTAINABILE FINISH NOTES: INTERIOR MATERIALS LEGEND ABBREVIATIONS:

ACP ACOUSTIC CEILING PANEL

CT CERAMIC TILE

EPX EPOXY PAINT

EXP EXPOSED STRUCTURE

FRP FIBERGLASS REINFORCED PANEL

PL PLASTIC LAMINATE

P PAINT

RB RESILIENT BASE

EM ENTRANCE MAT

VNL VINYL

UTILITY ROOM

0' - 10"

0'

- 2

1/4" THICK CLEAR NON-

GLARE ACRYLIC

PLAQUE, TO BE

PAINTED IN SSF-1

(EDGES AND FACE TO

REMAIN CLEAR)

SSF-2 5/8" VINYL LETTERS,

CENTERED HORIZONTALLY

IN SIGN

SSF-3 TACTILE GRADE 2

BRAILLE BEAD TRANSLATION,

CENTERED BELOW ROOM

NAME, RAISED MIN. 1/32", 22

PT

RESTROOM

0' - 5" 0'

- 6

0'

- 1

1/ 8"

0'

- 0

5/ 8"

0' - 0 3/4"

1/4" THICK CLEAR NON-

GLARE ACRYLIC PLAQUE,

TO BE BACK-PAINTED SSF-

1 (EDGES AND FACE TO

REMAIN CLEAR)

SSF-2 PICTOGRAPH

SSF-2 1/32" RAISED

LETTERS, FONT TBD

SSF-3 TACTILE GRADE 2

BRAILLE BEADS,

RAISED MIN. 1/32", 22 PT

TYPE A TYPE B

EQ EQ

Xxxx

EQ EQ

STAIR 1

EXIT206

MAX

1' - 6"

2"

5'

- 0

6".

SIGNAGE MOUNTING HEIGHTS, TYPICAL

5'

- 0

SIGN MOUNT LOCATION 1

SIGN LOCATION FOR ADA COMPLIANCE. MOUNT

SIGN ON LATCH SIDE OF DOOR. CENTER SIGN

HORIZONTALLY WITHIN THE 18" CLEARANCE FOR

ADA. SIGN SHOULD BE MOUNTED SO THAT

BRAILLE LINE IS 60" AFF MAXIMUM.

SIGN MOUNT LOCATION 2

CENTER SIGN ON DOOR. FIELD ADJUSTMENTS MAY BE

NEEDED TO ACCOMODATE EXISTING OBSTACLES.

SIGNS SPECIFIED WITH THIS MOUNT SHOULD BE

INSTALLED SO THAT BRAILLE LINE IS 60" AFF MAXIMUM

UNLESS OTHERWISE NOTED. ALSO USE THIS LOCATION

WHEN SIGN MOUNT LOCATION 1 CANNOT BE ACHIEVED.

SIGNAGE MATERIALS

REFERENCE NAME SIGNAGE SPECIAL FINISHES

SSF-1 SHERWIN WILLIAMS SW7068 GRIZZLE GRAY, SATIN FINISH.

SSF-2 SHERWIN WILLIAMS SW7005 PURE WHITE

SSF-3 RAISED BRAILLE BEADS TO MATCH SSF-2 MATERIAL

SSF-4 SHERWIN WILLIAMS SW7588 SHOW STOPPER

N DOORS ONLY

1' -8" AT TYPE

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

S O

LI

C

IT

A

TI

O

N N

O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-602

FI

N

IS

H

S C

H E D

U

LE

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A-

2-

EI

E L

SO

N

A

FB

, A

LA

S K A

FINISH SCHEDULE

ROOM

NO ROOM NAME

WALL FINISH BASE FINISH FLOOR CEILING

NOTES & REMARKS (SEE NOTES)NORTH EAST SOUTH WEST NORTH EAST SOUTH WEST MAT. FIN. MAT. FIN.

101 BAY 1 P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 EPX-1 EXP

102 BAY 2 P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 EPX-1 EXP

103 FIRE PUMP P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CONC-1 GWB P-1

105 MECH P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CONC-1 EXP P-1

106 ELECT P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CONC-1 EXP P-1

107 VESTIBULE P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 EM-1/VCT GWB P-1

109 OFFICE P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CPT-1/CPT-2 ACP-1

110 SUPERVISOR P-1 P-1 P-1 P-3 RB-1 RB-1 RB-1 RB-1 CPT-1 ACP-1

111 BREAK ROOM P-1 P-1 P-1 P-2 RB-1 RB-1 RB-1 RB-1 VNL-1 ACP-1

112 CLASS ROOM P-1 P-3 P-1 P-1 RB-1 RB-1 RB-1 RB-1 VNL-1 ACP-1

113 STORAGE P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CONC-1 EXP P-1

114 HALL P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 VNL-1 GWB P-1

114B HALL P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 VNL-1 GWB P-1

115 UNISEX P-1 / CT-1 P-1 / CT-1 P-1 / CT-1 P-1 / CT-1 CT-1 CT-1 CT-1 CT-1 CT-1 GWB P-1 116 UNISEX P-1 / CT-1 P-1 / CT-1 P-1 / CT-1 P-1 / CT-1 CT-1 CT-1 CT-1 CT-1 CT-1 GWB P-1 117 UNISEX P-1 / CT-1 P-1 / CT-1 P-1 / CT-1 P-1 / CT-1 CT-1 CT-1 CT-1 CT-1 CT-1 GWB P-1 118 JAN P-1 / FRP-1 P-1 / FRP-1 P-1 / FRP-1 P-1 / FRP-1 RB-1 RB-1 RB-1 RB-1 CONC-1 GWB P-1

119 VESTIBULE P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CONC-1/EM-1/

VCT

GWB P-1

120 OFFICE P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CPT-1 ACP-1

121 STORAGE P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CONC-1 EXP P-1

122 SUPERVISOR'S OFFICE P-2 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CPT-1 GWB ACP-1 PAINTED GWB ON RCP PLAN

123 CHANGING ROOM P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CONC-1 GWB P-1

124 WHEEL AND TIRE SHOP P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 MAT-1 EXP

125 VESTIBULE P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CONC-1 GWB P-1

126 MECH P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CONC-1 EXP P-1

127 FAN ROOM P-1 P-1 P-1 P-1 RB-1 RB-1 RB-1 RB-1 CONC-1 EXP P-1

NTS

SIGNAGE TYPES

NTS

SIGNAGE MOUNTING

SIGNAGE SCHEDULE.

ROOM

NO ROOM NAME

SIGN

TYPE SIGN TEXT COMMENTS

101 BAY 1 A BAY 1 MOUNT LOCATION 2

102 BAY 2 A BAY 2 MOUNT LOCATION 2

103 FIRE PUMP A FIRE PUMP MOUNT LOCATION 1

107 VESTIBULE A VESTIBULE MOUNT LOCATION 1

109 OFFICE A OFFICE MOUNT LOCATION 1

110 SUPERVISOR A SUPERVISOR MOUNT LOCATION 1

111 BREAK ROOM A BREAK ROOM MOUNT LOCATION 1

112 CLASS ROOM A CLASS ROOM (2) MOUNT LOCATION 2

113 STORAGE A STORAGE MOUNT LOCATION 1

114 HALL A HALL (2) MOUNT LOCATION 1

114B HALL A HALL (2) MOUNT LOCATION 1

115 UNISEX B UNISEX MOUNT LOCATION 2

116 UNISEX B UNISEX MOUNT LOCATION 2

117 UNISEX B UNISEX MOUNT LOCATION 2

118 JAN A JANITOR MOUNT LOCATION 2

119 VESTIBULE A VESTIBULE (2) MOUNT LOCATION 1

120 OFFICE A OFFICE (2) MOUNT LOCATION 1

121 STORAGE A STORAGE MOUNT LOCATION 2

122 SUPERVISOR'S OFFICE A SUPERVISOR MOUNT LOCATION 1

123 CHANGING ROOM A CHANGING ROOM (2) MOUNT LOCATION 1

124 WHEEL AND TIRE SHOP A WHEEL AND TIRE SHOP MOUNT LOCATION 1

125 VESTIBULE A VESTIBULE (2) MOUNT LOCATION 1

126 MECH A MECHANICAL MOUNT LOCATION 1

127 FAN ROOM A FAN ROOM MOUNT LOCATION 1

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

G

EN

ER

AL

R

EV

IS

IO

N

S 2 1

JU

N

Sheets
A-602 - FINISH SCHEDULE

File details come from the government source that posted it.