JA-3.1_-_FTQW_18-0209_Drawings_11x17.pdf

PDF 29 MB Posted

Attached to
F-35 Weapons Load Training Reno Federal contract opportunity
Solicitation number
FA500419BA006
Issued by
Department of the Air Force Pacific Air Forces

About this file

Drawings 11x17

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Weapons Load Training Reno, newest first.
File Type Posted
JA-7_Q&As.pdf PDF
Solicitation_Amendment_FA500419BA0060003_SF_30.pdf PDF
A-602_R1.pdf PDF
Questions_Round_2.pdf PDF
Solicitation_Amendment_FA500419BA0060002_SF_30.pdf PDF
Spec_Section_08_14_00_for_question_14.pdf PDF
As_Builts_Pt_3_of_10.pdf PDF
WEAPONS_LOAD_G-003_LOCATION_&_VICINITY_MAPS.pdf PDF
As_Builts_Pt_7_of_10.pdf PDF
As_Builts_Pt_4_of_10.pdf PDF
As_Builts_Pt_5_of_10.pdf PDF
As_Builts_Pt_6_of_10.pdf PDF
As_Builts_Pt_2_of_10.pdf PDF
Questions_and_Answers_combined.pdf PDF
As_Builts_Pt_8_of_10.pdf PDF
Q&A_B1340_Mechanical_Room_Photos.pdf PDF
Comment_13_Ref_Sheets.pdf PDF
As_Builts_Pt_9_of_10.pdf PDF
LBP_Survey_Combined.pdf PDF
As_Builts_pt_10_of_10.pdf PDF
As_Builts_Pt_1_of_10.pdf PDF
FA500419BA0060001.pdf PDF
JA-4_-_FTQW_18-0209_Submittal_Register_27_Feb_19.pdf PDF
JA-2_-_FTQW_18-0209_Bid_Schedule_27_Feb_19.pdf PDF
JA-1_-_FTQW_18-0209_Synopsis_of_Work.pdf PDF
Solicitation_-_FA500419BA006.pdf PDF
JA-6_Wage_Determination_19_Apr_19.pdf PDF
JA-5.2_-_FTQW_18-0209_Specifications_Vol2.pdf PDF
JA-5.1_-_FTQW_18-0209_Specifications_Vol1.pdf PDF
JA-3.2_-_FTQW_18-0209_Drawings_22x34.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8903-16-D-0016 / FA8903-17-F-0118

FTQW180209

FINAL DESIGN SUBMITTAL

F-35 RENOVATE WEAPONS LOAD

TRAINING OFFICE AND HANGAR

2019.01.22

SHEET TITLE

FTQW180209

FINAL DESIGN SUBMITTAL

SCHEDULE OF DRAWINGS

REF.

NUM.SHT REF.

NUM.SHT SHEET TITLE REF.

NUM.SHT SHEET TITLE REF.

NUM.SHT SHEET TITLE REF.

NUM.SHT SHEET TITLE

F-35 RENOVATE WEAPONS LOAD TRAINING OFFICE AND HANGAR

EIELSON AFB, ALASKA

2019.01.22

1 G-001 COVER SHEET

2 G-002 DRAWING INDEX

3 G-101 CODE SUMMARY

4 G-102 FIRST FLOOR LIFE SAFETY PLAN

5 G-103 MEZZANINE LIFE SAFETY PLAN

GENERAL

6 S-001 STRUCTURAL ABBREVIATIONS AND SYMBOLS

7 S-002 STRUCTURAL GENERAL NOTES, DESIGN LOADS

8 S-003 STRUCTURAL GENERAL NOTES

9 S-004 STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS

10 S-005 STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS

11 S-006 STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS

12 S-007 WIND UPLIFT MAP

13 S-101 FOUNDATION PLAN

14 S-102 MEZZANINE FRAMING PLAN

15 S-103 ROOF FRAMING PLAN

16 S-201 FRAMING ELEVATIONS

17 S-202 FRAMING ELEVATIONS

18 S-203 FRAMING ELEVATIONS

19 S-204 FRAMING ELEVATIONS

20 S-205 FRAMING ELEVATIONS

21 S-206 FRAMING ELEVATIONS

22 S-207 FRAMING ELEVATIONS

23 S-208 FRAMING ELEVATIONS

24 S-209 FRAMING ELEVATIONS

25 S-210 FRAMING ELEVATIONS

26 S-211 FRAMING ELEVATIONS

27 S-301 SECTIONS

28 S-302 SECTIONS

29 S-401 ENLARGED PLANS

30 S-501 CMU DETAILS 1

31 S-502 CMU DETAILS 2

32 S-510 CONCRETE DETAILS

33 S-521 STEEL DETAILS 1

34 S-522 STEEL DETAILS 2

35 S-523 STEEL DETAILS 3

36 S-524 STEEL DETAILS

37 S-531 STAIR DETAILS

38 S-801 MECHANICAL EQUIPMENT SUPPORT DETAILS

39 S-802 MECHANICAL EQUIPMENT SUPPORT DETAILS

40 S-803 MECHANICAL EQUIPMENT SUPPORT DETAILS

STRUCTURAL

41 A-001 ABBREVIATIONS AND SYMBOLS LEGEND

42 A-101 FIRST FLOOR DEMOLITION PLAN

43 A-102 MEZZANINE DEMOLITION PLAN

44 A-103 FIRST FLOOR PLAN

45 A-104 MEZZANINE FLOOR PLAN

46 A-105 EQUIPMENT/FURNITURE PLAN

47 A-106 FIRST FLOOR - FINISH PLAN

48 A-107 MEZZANINE - FINISH PLAN

49 A-121 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN

50 A-122 MEZZANINE FLOOR DEMOLITION REFLECTED CEILING PLAN

51 A-123 FIRST FLOOR RELECTED CEILING PLAN

52 A-124 MEZZANINE REFLECTED CEILING PLAN

53 A-141 DEMOLITION ROOF PLAN

54 A-142 ROOF PLAN

55 A-201 NORTH AND SOUTH ELEVATIONS

56 A-202 EAST AND WEST ELEVATIONS

57 A-301 BUILDING LONGITUDINAL SECTION

58 A-302 BUILDING CROSS SECTION

59 A-303 WALL SECTIONS

60 A-304 ENLARGED FIRE PUMP ROOM PLAN AND STAIR SECTION

61 A-305 WALL SECTIONS

62 A-401 ENLARGED PLANS

63 A-402 ENLARGED STAIR PLANS AND SECTIONS

64 A-403 INTERIOR ELEVATIONS

65 A-501 WALL DETAILS

66 A-502 CEILING DETAILS

67 A-503 ROOF DETAILS

68 A-504 DOOR DETAILS

69 A-505 INTERIOR DETAILS

70 A-506 DETAILS

71 A-601 ASSEMBLY TYPES

72 A-602 FINISH SCHEDULE

73 A-603 DOOR SCHEDULE AND DETAILS

ARCHITECTURAL

74 F-001 FIRE PROTECTION NOTES AND SYMBOLS

75 F-002 FIRE SYSTEM CRITERIA AND PROCEDURES

76 F-101 FIRE PROTECTION DEMOLITION FIRST FLOOR PLAN

77 F-102 FIRE PROTECTION DEMOLITION MEZZANINE PLAN

78 F-103 FIRE PROTECTION FIRST FLOOR PLAN

79 F-104 FIRE PROTECTION MEZZANINE PLAN

80 F-201 FIRE PUMP ROOM ELEVATIONS

81 F-301 FIRE PROTECTION HANGAR SECTION

82 F-401 ENLARGED PUMP ROOM FLOOR PLAN

83 F-501 FIRE PROTECTION RISER DIAGRAM

84 F-601 FIRST FLOOR PLAN - FIRE ALARM DEMOLITION

85 F-602 SECOND FLOOR PLAN - FIRE ALARM DEMOLITION

86 F-701 FIRST FLOOR PLAN - FIRE ALARM

87 F-702 SECOND FLOOR PLAN - FIRE ALARM

88 F-801 FIRE ALARM / MASS NOTIFICATION RISER DIAGRAM

89 F-901 FIRE ALARM DETAILS

90 F-902 FIRE ALARM DETAILS

FIRE PROTECTION PLUMBING

MECHANICAL

131 E-000 SYMBOLS AND ABBREVIATIONS

132 E-101 FIRST FLOOR PLAN - POWER DEMOLITION

133 E-102 SECOND FLOOR PLAN - POWER DEMOLITION

134 E-103 FIRST FLOOR PLAN - LIGHTING DEMOLITION

135 E-104 SECOND FLOOR PLAN - LIGHTING DEMOLITION

136 E-111 SITE PLAN - DEMOLITION

137 E-200 ELECTRICAL AREA CLASSIFICATION PLAN

138 E-201 FIRST FLOOR PLAN - POWER

139 E-202 SECOND FLOOR PLAN - POWER

140 E-203 FIRST FLOOR PLAN - LIGHTING

141 E-204 SECOND FLOOR PLAN - LIGHTING

142 E-211 SITE PLAN - ELECTRICAL

143 E-401 ENLARGED POWER PLANS

144 E-501 POWER ONE-LINE DIAGRAM

145 E-601 EQUIPMENT CONNECTION SCHEDULE

146 E-602 PANEL SCHEDULES

147 E-603 PANEL SCHEDULES

148 E-701 LIGHTING DETAILS

149 E-702 LIGHTING DETAILS

150 E-703 ELECTRICAL DETAILS

ELECTRICAL

151 T-000 SYMBOLS AND ABBREVIATIONS - ICT

152 T-001 ROUGH-IN AND CABLING SCHEDULES - ICT

153 T-101 FIRST FLOOR PLAN - ICT DEMOLITION

154 T-102 SECOND FLOOR PLAN - ICT DEMOLITION

155 T-201 FIRST FLOOR PLAN - ICT REVISIONS

156 T-202 SECOND FLOOR PLAN - ICT REVISIONS

157 T-501 VOICE/DATA RISER DIAGRAM

158 T-502 SECURITY RISER DIAGRAM

159 T-503 TELECOM DETAILS

TELECOMMUNICATIONS

91 M-001 MECHANICAL LEGEND

92 M-101 MECHANICAL FIRST FLOOR DEMOLITION PLAN

93 M-102 MECHANICAL FIRST FLOOR AND MEZZANINE PARTIAL DEMOLITION PLAN

94 M-103 MECHANICAL FIRST FLOOR AND MEZZANINE PARTIAL DEMOLITION PLAN

95 M-104 MECHANICAL MEZZANINE PIPING DEMOLITION PLAN

96 M-105 MECHANICAL MEZZANINE DEMOLITION PLAN

97 M-106 MECHANICAL MEZZANINE CEILING SPACE DEMOLITION PLAN

98 M-107 GLYCOL HOT WATER & STEAM PIPING DIAGRAM - DEMOLITION

99 M-201 MECHANICAL FIRST FLOOR PLAN

100 M-202 MECHANICAL MEZZANINE PLAN

101 M-301 MECHANICAL SECTIONS

102 M-302 MECHANICAL SECTIONS

103 M-303 MECHANICAL SECTIONS

104 M-304 MECHANICAL SECTIONS

105 M-305 MECHANICAL SECTIONS

106 M-401 MECHANICAL ENLARGED PLAN

107 M-402 MECHANICAL ENLARGED PLAN

108 M-403 MECHANICAL ENLARGED PLANS

109 M-501 MECHANICAL DETAILS

110 M-502 MECHANICAL DETAILS

111 M-503 MECHANICAL DETAILS

112 M-504 MECHANICAL DETAILS

113 M-505 MECHANICAL DETAILS

114 M-601 MECHANICAL SCHEDULES

115 M-602 MECHANICAL SCHEDULES

116 M-701 DIAGRAMS

117 M-702 CONTROLS

118 M-703 CONTROLS

119 M-704 CONTROLS

120 M-705 CONTROLS

121 P-001 PLUMBING LEGEND, ABBREVIATIONS AND PLUMBING DRAWING LIST

122 P-101 PLUMBING FIRST FLOOR DEMOLITION PLAN

123 P-102 PLUMBING FIRST FLOOR PARTIAL DEMOLITION PLAN

124 P-103 PLUMBING MEZZANINE DEMOLITION PLAN

125 P-201 PLUMBING FIRST FLOOR PLAN

126 P-202 PLUMBING MEZZANINE PLAN

127 P-203 PLUMBING ROOF PLAN

128 P-401 PLUMBING ENLARGED PLANS

129 P-501 PLUMBING DETAILS

130 P-601 PLUMBING SCHEDULES

Brian C. Thompson No. FP 13245

REG IS T ER ED P R O F E S S I O NA L ENGINEER

REG IS T ER ED P R O F E S S IO NA L ENGINEER

REG IS T ER ED P R O F E S S I O NA L ENGINEER

A

M/E

JASON E KWIATKOWSKI

No. CE 118884REG I S T ER ED P R O F ES S I O NA L E NGINEER

STIFF STIFFENER

STIR STIRRUP

STL STEEL

STRUC STRUCTURAL

SUPP SUPPORT

SYM SYMMETRICAL, SYMMETRY

T/ TOP OF

T&B TOP AND BOTTOM

TEMP TEMPERATURE

THK THICK, THICKNESS

THRU THROUGH

TOC TOP OF CONCRETE

TOF TOP OF FOOTING

TOS TOP OF STEEL

TR THREADED ROD

TRANS TRANSVERSE

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

VERT VERTICAL

W WIDTH, WIDE FLANGE

w/ WITH

WHS WELDED HEADED STUD

W/O WITHOUT

WP WORK POINT

WT WEIGHT

LLV LONG LEG VERTICAL

LOC LOCATION, LOCATE

LONGIT LONGITUDINAL

LP LOW POINT

LSH LONG SLOTTED HOLE

MATL MATERIAL

MAX MAXIMUM

MB MACHINE BOLT

MECH MECHANICAL

MF MOMENT FRAME

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MPH MILES PER HOUR

MTL METAL

NF NEAR FACE

NOM NOMINAL

NO, # NUMBER

N-S NORTH-SOUTH

NS NEAR SIDE, NONSHRINK

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OPNG OPENING

OPP OPPOSITE

OSH OVERSIZED HOLE

OWJ OPEN WEB JOIST

PCF POUNDS PER CUBIC FOOT

PEN PENETRATION

PERP PERPENDICULAR

PL PLATE

PLCS PLACES

PLF POUNDS PER LINEAR FOOT

PNL PANEL

PJP, PP PARTIAL JOINT

PENETRATION

PREFAB PREFABRICATED

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT

R RAD RADIUS

RD ROOF DRAIN

REF REFERENCE

REINF REINFORCING

REM REMAINDER

REQD REQUIRED

RND ROUND

RO ROUGH OPENING

RTN RETURN

SC SLIP CRITICAL

SCHED SCHEDULE

SECT SECTION

SHT SHEET

SIM SIMILAR

SJI STEEL JOIST INSTITUTE

SOG SLAB ON GRADE

SOMD SLAB ON METAL DECK

SPC SPACE, SPACED, SPACING

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

SSH SHORT SLOTTED HOLE

STAG STAGGER, STAGGERED

STD STANDARD

DO DITTO

DP DEEP

DTL DETAIL

DWG DRAWING

DWL DOWEL

EA EACH

EE EACH END

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

EMB, EMBED EMBEDMENT

ENGR ENGINEER

EQ EARTHQUAKE, EQUAL

EQUIP EQUIPMENT

ES EACH SIDE

ETC ET CETERA

E-W EAST-WEST

EXP EXPANSION

EXT EXTERIOR

FD FLOOR DRAIN

FDN FOUNDATION

FEMA FEDERAL EMERGENCY

MANAGEMENT AGENCY

FF FAR FACE, FINISH FLOOR

FIN FINISH

FLR FLOOR

FLS FIRE / LIFE SAFETY

FLG FLANGE

FOW FACE OF WALL

FS FAR SIDE

FT, ' FEET

FTG FOOTING

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GR GRADE

GRND GROUND

GWB GYPSUM WALL BOARD

HGR HANGER

HK HOOK

HKP HOUSEKEEPING PAD

HORIZ, H HORIZONTAL

HP HIGH POINT

HSB HIGH STRENGTH BOLT

HSS HOLLOW STRUCTURAL

SECTION

HT HEIGHT

IBC INTERNATIONAL BUILDING

CODE

ID INSIDE DIAMETER

IF INSIDE FACE

IN, " INCH

INCL INCLUDE

INFO INFORMATION

INT INTERIOR

IJ ISOLATION JOINT

JST JOIST

JT JOINT

K KIP (1,000 LB)

KSF KIPS PER SQUARE FOOT

KSI KIPS PER SQUARE INCH

L LENGTH, ANGLE

LB, # POUND

LF LINEAL FOOT

LL LIVE LOAD

LLBB LONG LEGS BACK TO BACK

LLH LONG LEG HORIZONTAL

& AND

@ AT

A&B ABOVE & BELOW

AB ANCHOR BOLT

ABV ABOVE

ACI AMERICAN CONCRETE

INSTITUTE

ADD'L ADDITIONAL

ADH ADHESIVE

ADJ ADJACENT, ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AISC AMERICAN INSTITUTE OF

STEEL CONSTRUCTION

AISI AMERICAN IRON AND STEEL

INSTITUTE

ALT ALTERNATE

ALUM ALUMINUM

ANCH ANCHOR, ANCHORAGE

APPROX APPROXIMATE

AR ANCHOR ROD

ARCH ARCHITECT,

ARCHITECTURAL

ARND AROUND

ASCE AMERICAN SOCIETY OF CIVIL

ENGINEERS

ASSY ASSEMBLY

ASTM AMERICAN SOCIETY FOR

TESTING AND MATERIALS

AWS AMERICAN WELDING

SOCIETY

B/ BOTTOM OF

BF BRACED FRAME

BLDG BUILDING

BLW BELOW

BM BEAM

BOD BOTTOM OF DECK

BOT BOTTOM

BRG BEARING

BTWN BETWEEN

C CHANNEL

CANT CANTILEVER

CAP CAPACITY

CC CENTER-TO-CENTER

CF COLD-FORMED

CIP CAST-IN-PLACE

CJ CONTROL JOINT,

CONSTRUCTION JOINT

CJP COMPLETE JOINT

PENETRATION

CL CENTERLINE

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUE, CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING OFFICIER

RESPONSIBLITIES

CRSI CONCRETE REINFORCED

STEEL INSTITUTE

CTR CENTER, CENTERED

CY CUBIC YARD

DBL DOUBLE

DEG, º DEGREE

DIA, Ø DIAMETER

DIAG DIAGONAL

DIAPH DIAPHRAGM

DIM DIMENSION

DIR DIRECTION

DL DEAD LOAD

DN DOWN

JASON E KWIATKOWSKI

No. CE 118884REG I S T ER ED P R O F ES S I O NA L E NGINEER

No. CE 118884REG IS T ER ED P R O F E S S IO N A L ENGINEER

No. CE 118884REG IS T ER ED P R O F E S S I O NA L ENGINEER

SHEET ID

1 2 3 4 5

D

C

B

11' - 0" 6' - 6" 6' - 0"

23' - 6" 11' - 0"6' - 6"6' - 0"

23' - 6"

JASON E KWIATKOWSKI

No. CE 118884REG IS T ER ED P R O F E S S I O NA L ENGINEER

SHEET ID

1 2 3 4 5

D

C

SHEET ID

1 2 3 4 5

D

C

12' - 0" 15' - 6" 15' - 6" 19' - 6" 11' - 6"

27' - 8" 27' - 8" 27' - 8"

83' - 0"

27' - 8" 27' - 8" 27' - 8"

27' - 8"27' - 8"27' - 8"

SHEET ID

1 2 3 4 5

D

C

NOTE: AT SIM CONDITION , ORIENTATION IS ROTATED 90°

TRANSVERSE DIAG

BRACE MEMBER

ABBREVIATIONS LEGEND

AB ANCHOR BOLT

ABS ACRYLONITRILE BUTADIENE STYRENE

ABV ABOVE

A/C AIR CONDITIONING

AC ASPHALTIC CONCRETE

ACP ACOUSTICAL CEILING PANEL

AD AREA DRAIN

ADDL ADDITIONAL

ADF ACCESSIBLE DRINKING FOUNTAIN

ADJ ADJACENT

AFF ABOVE FINISH FLOOR

AFS ABOVE FINISH SLAB

AGGR AGGREGATE

ALUM ALUMINUM

ALT ALTERNATE

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

BBQ BARBEQUE

BD BOARD

BFF BELOW FINISH FLOOR

BKBD BACK BOARD

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BM BEAM

BOD BOTTOM OF DECK

BOT F BOTTOM FACE

BOT BOTTOM

BR BEDROOM

BRG BEARING

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CER CERAMIC

CFCI CONTRACTOR FURNISHED /

CONTRACTOR INSTALLED

CG CORNER GUARD

CMPST COMPOSITE

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

CO CLEAN OUT

COL COLUMN

CONC CONCRETE

COND CONDITION

CONN CONNECTION

CONSTR CONSTRUCTION

CONT CONTINUE/CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

COP COPPER

CORR CORRIDOR

CPT CARPET

CSK COUNTERSINK

CT CERAMIC TILE

CTR CENTER

CUH CABINET UNIT HEATER

CULT CULTURED

CW COLD WATER PIPING

D DEEP/DEPTH

DBL DOUBLE

DEG DEGREE

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DN DOWN

DR DOOR

DS DOWNSPOUT

DSP DRY STANDPIPE

DW DISHWASHER

DWG DRAWING

DWR DRAWER

E EAST

EA EACH

EIFS EXTERIOR INSULATION FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRICAL

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

EPB ELECTRICAL PANEL BOARD

EPDM ETHYLENE PROPYLENE DIENE MONOMER

ES EACH SIDE

EQ EQUAL

EQUIP EQUIPMENT

EOS EDGE OF SLAB

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXP EXPOSED

EXPN EXPANSION

EXT EXTERIOR

(E) EXISTING

F FAHRENHEIT

FA FIRE ALARM

FAB FABRICATE

FB FLAT BAR

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FF & E FURNITURE, FIXTURES AND EQUIPMENT

FGL FIBERGLASS

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FIN FINISH

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLG FLOORING

FLR FLOOR

FLUOR FLUORESCENT

FLR SK FLOOR SINK

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUD

FOW FACE OF WALL

FP FIRE PROOF

FR FRAME

FRP FIBERGLASS REINFORCED

PLASTIC

FRT FIRE RETARDANT

FRZ FREEZER

FT FEET

FTD FACIAL TISSUE DISPENSER

FTG FOOTING

FURG FURRING

FUT FUTURE

G NATURAL GAS

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GEN GENERAL

GFGI GOVERNMENT FURNISHED /

GOVERNMENT INSTALLED

GFCI GOVERNMENT FURNISHED/CONTRACTOR

INSTALLED

GFRG GLASSFIBER REINFORCED GYPSUM

GFRC GLASSFIBER REINFORCED CONCRETE

GL GLASS/GLAZING

GLU LAM GLUE LAMINATED WOOD

GPM GALLONS PER MINUTE

GRAN GRANITE

GSB GYPSUM SHEATHING BOARD

GTV GATE VALVE

GWT GLAZED WALL TILE

GYP GYPSUM

GWB GYPSUM WALL BOARD

H HIGH

HB HOSE BIBB

HC HOLLOW CORE

HCP HANDICAPPED

HD HEAD

HDBD HARDBOARD

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HORIZ HORIZONTAL

HS HAND SINK

HT HEIGHT

HVAC HEATING, VENTILATION AND

AIR CONDITIONING

HW HOT WATER

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

ID INSIDE DIAMETER

INCL INCLUDED

IMP INSULATED METAL PANEL

IN INCH

INFO INFORMATION

INSUL INSULATION/INSULATED

INT INTERIOR

INV INVERT

J-BOX JUNCTION BOX

JAN JANITOR

JST JOIST

JT JOINT

KD KNOCK DOWN

KIT KITCHEN

KO KNOCK-OUT

KW KILOWATT

KWH KILOWATT HOUR

L LENGTH

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LB POUND

LBF/SF POUNDS PER SQUARE FOOT

LDG LANDING

LF LINEAR FOOT

LH LEFT HAND

LKR LOCKER

LLV LONG LEG VERTICAL

LOC LOCATION

LT LIGHT

LR LIVING ROOM

LVR LOUVER

M METER

M2 SQUARE METERS

MATL MATERIAL

MAX MAXIMUM

MB MACHINE BOLT

MBR MASTER BEDROOM

MC MEDICINE CABINET

MECH MECHANICAL

MEMB MEMBRANE

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MG MIRROR, GLASS

MID MIDDLE

MIN MINIMUM

MISC MISCELLANEOUS

MLDG MOULDING

MM MILLIMETER

MO MASONRY OPENING

MOD MODULE

MP METAL PANEL

MR MOISTURE RESISTANT

MTD MOUNTED

MTL METAL

MTG MOUNTING

MULL MULLION

MUN MUNTIN

MW MICROWAVE

N NORTH

NFS NON-FROST SUSCEPTIBLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OBS OBSCURE

OC ON CENTER

OD OUTSIDE DIAMETER

OF/CI OWNER FURNISHED/

CONTRACTOR INSTALLED

OF/OI OWNER FURNISHED/

OWNER INSTALLED

OFD OVERFLOW DRAIN

OH OVER HANG

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

OVHD OVER HEAD

PA PUBLIC ACCESS

PC PIECE

PCC PRECAST CONCRETE

PEND PENDANT

PERIM PERIMETER

PH PENTHOUSE

PLAS PLASTER

PLBG PLUMBING

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLYWD PLYWOOD

PNL PANEL

PR PAIR

PROP PROPERTY

PREFAB PREFABRICATE

PT PAINT

PTD PAPER TOWEL DISPENSER

PTD/TR PAPER TOWEL DISPENSER

AND TRASH RECEPTACLE

PTN PARTITION

PTR PAPER TOWEL RECEPTACLE

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

QT QUARRY TILE

R RISER

R RADIUS

RA RETURN AIR

RB RUBBER BASE

RB HK ROBE HOOK

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REF REFRIGERATOR

REFL REFLECTED

REG REGISTER

REINF REINFORCE

RECS RECOMMENDATIONS

REQD REQUIRED

RESIL RESILIENT

REST REST ROOM

REV REVISION

RTF RUBBER TILE FLOOR

RFG ROOFING

RLG RAILING

RH RIGHT HAND

RND ROUND

RM ROOM

RO ROUGH OPENING

RWL RAIN WATER LEADER

S SOUTH

SA SUPPLY AIR

SAB SOUND ATTENUATION BLANKET

SB SPLASH BLOCK

SC SOLID CORE

SCHED SCHEDULE

SCD SEAT COVER DISPENSER

SCP SCUPPER

SCR SHOWER CURTAIN ROD

SCRN SCREEN

SD SMOKE DETECTOR

SECT SECTION

SED SEE ELECTRICAL DRAWINGS

SF SQUARE FEET

SHT SHEET

SHR SHOWER

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SL SLOPE

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SND SANITARY NAPKIN DISPENSER

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPC SPACING

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SQ SQUARE

SSD SEE STRUCTURAL DRAWINGS

SST STAINLESS STEEL

SMD SEE MECHANICAL DRAWINGS

SMLS SEAMLESS

SS SOLID SURFACE

STA STATION

STD STANDARD

STL STEEL

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

SURR SURROUND

SUSP SUSPENDED

SVCE SERVICE

SW SWITCH

SYMM SYMMETRICAL

SYS SYSTEM

T TREAD

TB TOWEL BAR

TBD TO BE DETERMINED

TD TRENCH DRAIN

TEL TELEPHONE

TELECOM TELECOMMUNICATIONS

TEMP TEMPERATURE

TER TERRAZZO

T&G TONGUE AND GROOVE

THRES THRESHOLD

THRU THROUGH

THK THICKNESS

TK BD TACK BOARD

TMPD TEMPERED

TOC TOP OF CURB

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF SLAB

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TS TUBE STEEL

TSH TOWEL SHELF

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

TLT TOILET

UBC UNIFORM BUILDING CODE

UC UNDERCUT

UNGD UNDERGROUND

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

UNFIN UNFINISHED

UNO UNLESS OTHERWISE NOTED

UR URINAL

VAR VARIES

VB VALVE BOX

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VOL VOLUME

VP VENEER PLASTER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WIDE

W/ WITH

WC WALL COVERING

WCLR WATER COOLER

WD WOOD

WDSP WASTE DISPOSER

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WATER HEATER

W/O WITHOUT

WP WATERPROOF / WATERPROOFING

WR WATER REPELLENT

WSCT WAINSCOT

WSP WET STAND PIPE

WT WEIGHT

WWF WELDED WIRE FABRIC

A

B

C

D

E

F

M

S

G

H

I

J

K

L

N

O

P

Q

R

T

U

V

W

SYMBOLS LEGEND

ROOM DESIGNATION WALL TYPE

DOOR DESIGNATION GRIDLINE

EQUIPMENT DESIGNATION

EXTERIOR ELEVATION DESIGNATION

OPENING DESIGNATION

DETAIL DESIGNATION

REVISION DESIGNATION

BUILDING SECTION DESIGNATION

PLAN KEYNOTE

INTERIOR ELEVATION DESIGNATION

BREAK LINE

MATCHLINE

PLAN NORTH/NORTH

DATUM DESIGNATION

NORTH

AFF? CEILING HEIGHT DESIGNATION

FURNITURE DESIGNATION

WALL SECTION DESIGNATION

GRAPHIC SCALE

RM NO

ROOM NAME

XXX

X'XX"

XX

X

XXX

X

WX

X

X

AXXX

DET NO

NAME

ELEV

X

X

X

X

SIM

SIM

XX

AXXX

DET NO

AXXX

DET NO

SIM

AXXX

AXXX

0" 4' 8' 16'

WINDOW DESIGNATION?X

SEE A602

FOR FINISH SCHEDULE

SEE A603

FOR SCHEDULE

SEE A603

FOR TYPES

SEE A601 FOR

ASSEMBLY TYPES

MATERIALS LEGEND

CONCRETE CMU

SAND, MORTAR, PLASTER, TILE

BACKER BOARD

EARTH, UNCLASSIFIED FILL

BATT INSULATION

FINISHED WOOD

RIGID INSULATION

METAL

PLYWOOD/MDF

GLASS

GYPSUM WALL BOARD

CERAMIC TILE, VCT OR RESILIENT

FLOORING

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-001

AB

BR

EV

IA

TI

O

N S

A N

D S

YM

BO

LS

L

E G

E N

D

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A-

1-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

A A.3 A.6 B B.3 C

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

D01

D01

D01

D01

D01

D05

D05

D05

D01

D06

D03

D01

D02

D02

D01

D06

D01

D01D01

D01 D01

D01

D01

D02

D02

D02

11' - 0" 6' - 6" 6' - 0"

2' - 10 5/8"

27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

D04

D08 D08

D04

D04

D04

D04

D04

D04 D04

D08

D04

D08

D08 D11

D02

D08

D01

D25

D01

D19

D19

D08

D02

D20

D20

HALLWAY ABOVE

D18

D21

D22

D20

D20

D20

D23

D12

D24

D20 D28

D23

D29

D20

D28

(E) UTILIDOR PIT

D05

D18

D18

D13

D13

D20

D20

HANGAR DOOR ABOVE

B.6

STAIR TO REMAIN D

D23

D04

D02

D36

D36

D34

D35

D36

LEGEND

DEMO

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-101

FI

R

ST

F

LO

O

R D

EM

O

LI

TI

O N

P

LA

N

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A-

1-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 FIRST FLOOR - DEMOLITION

DEMOLITION GENERAL NOTES XX

D18 DEMO LADDER

D19 DEMO WOOD COAT RACK

D20 DEMO PORTION OF CONC FLOOR. SEE S-101

D21 DEMO LOWER ENCLOSURE AROUND COLUMN

D22 DEMO INTERIOR METAL WALL PANELS

D23 REMOVE EXTERIOR WALL PANELS AND SAVE FOR REINSTALLATION. DEMO INSULATION AND

INTERIOR METAL PANELS IN AREAS RECEIVING STRUCT UPGRADES, SEE STRUCT

D24 DEMO SECTIONAL DOOR. RETAIN TRACK, MOTOR AND ASSOC HARDWARE

D25 DEMO SECTIONAL DOOR, TRACK, MOTOR AND HARDWARE

D28 DEMO PORTION OF WALL FOR NEW RAIN LEADER DOWNSPOUT, SEE MECH

D29 DEMO PORTION OF WALL FOR NEW MECH GRILL/LOUVER, SEE MECH

D30 DEMO COUNTERTOP, SINK AND BASE CABINETS

D31 DEMO LIGHT FIXTURES, SEE ELEC

D32 DEMO SOFFIT

D33 DEMO PARAPETS DOWN TO DECK. REMOVE CC CHANNELS BETWEEN COLUMNS AT

ELEVATION 37'-6" AND AT ELEVATION 36'-3". CUT (3) W14X82 AND (2) W18X24 STRUCTURAL

STEEL COLUMNS AT GRIDLINES 1, 2, 3, 4, AND 5.

D34 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 6" STUD WALL

D35 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 8" CMU WALL

D36 DEMO 8" CMU WALL

D01 DEMO DOOR, FRAME AND HARDWARE

D02 DEMO STUD FRAMED WALL

D03 DEMO WINDOWS

D04 DEMO FLOOR FINISH

D05 DEMO ALL PLUMBING FIXTURES

D06 DEMO STAIR AND HANDRAILS

D07 DEMO FULLY ADHERED EPDM ROOFING ASSEMBLY DOWN TO DECK

D08 PREPARE WALL FOR NEW DOOR OPENING. INCLUDES SELECTIVE DEMO OF METAL WALL

PANELS, METAL STUDS, RIGID INSULATION, C-CHANNELS, AND 4'-0" TALL CONCRETE STEM

WALL

D09 DEMO FLOOR (CONCRETE ON METAL DECKING)

D10 DEMO CEILING AND MECH AND ELEC FIXTURES, SEE MECH AND ELEC SHEETS

D11 DEMO ENTRANCE MAT

D12 DEMO COLUMNS, CUT COLUMNS FLUSH WITH FINISH FLOOR

D13 DEMO PLATFORM, DISCONNECT AND REMOVE MECHANICAL EQUIPMENT, SEE MECH

D14 DEMO WOOD JOIST AND CEILING

D15 DEMO ROOF DRAIN

D16 DEMO ROOF HATCH

D17 CUT EXISTING CONC CURB FOR NEW DOOR OPENING

0" 4' 8' 16'

PLAN NORTH

1 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. REPORT ALL

DISCREPANCIES TO THE CONTRACTING OFFICER.

2 REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND TELECOM FOR ADDITIONAL

DEMOLITION NOTES

3 SEE SHEETS A-121 AND A-122 FOR DEMOLITION OF CEILINGS.

4 SEE A-141 FOR DEMOLITION OF ROOFING.

DEMOLITION KEY NOTES

M

AR

K D

ES

C

R

IP

TI

O

N D

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

D06

D06

D02

D01D01

D01D02

D09

11' - 0" 6' - 6" 6' - 0"

2' - 10 5/8"

27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

D03

D04

D04

D04

D02

OPEN TO

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

D14

D17

D18

D02 D01

D23

D20

3'

0" 3' - 0"

D02

D30

D29

D18

D18

D13

D13

D13

D23

B.6

D02D02

(E) MECH EQUIP

SEE MECH

EQUIPMENT

PLATFORM

(TO REMAIN)

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-102

M E

ZZ

AN

IN

E

D

EM

O

LI

TI

O

N P

LA

N

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A-

2-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 MEZZANINE DEMOLITION PLAN

0" 4' 8' 16'

PLAN NORTH

DEMOLITION GENERAL NOTES XX

D18 DEMO LADDER

D19 DEMO WOOD COAT RACK

D20 DEMO PORTION OF CONC FLOOR. SEE S-101

D21 DEMO LOWER ENCLOSURE AROUND COLUMN

D22 DEMO INTERIOR METAL WALL PANELS

D23 REMOVE EXTERIOR WALL PANELS AND SAVE FOR REINSTALLATION. DEMO INSULATION AND

INTERIOR METAL PANELS IN AREAS RECEIVING STRUCT UPGRADES, SEE STRUCT

D24 DEMO SECTIONAL DOOR. RETAIN TRACK, MOTOR AND ASSOC HARDWARE

D25 DEMO SECTIONAL DOOR, TRACK, MOTOR AND HARDWARE

D28 DEMO PORTION OF WALL FOR NEW RAIN LEADER DOWNSPOUT, SEE MECH

D29 DEMO PORTION OF WALL FOR NEW MECH GRILL/LOUVER, SEE MECH

D30 DEMO COUNTERTOP, SINK AND BASE CABINETS

D31 DEMO LIGHT FIXTURES, SEE ELEC

D32 DEMO SOFFIT

D33 DEMO PARAPETS DOWN TO DECK. REMOVE CC CHANNELS BETWEEN COLUMNS AT

ELEVATION 37'-6" AND AT ELEVATION 36'-3". CUT (3) W14X82 AND (2) W18X24 STRUCTURAL

STEEL COLUMNS AT GRIDLINES 1, 2, 3, 4, AND 5.

D34 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 6" STUD WALL

D35 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 8" CMU WALL

D36 DEMO 8" CMU WALL

D01 DEMO DOOR, FRAME AND HARDWARE

D02 DEMO STUD FRAMED WALL

D03 DEMO WINDOWS

D04 DEMO FLOOR FINISH

D05 DEMO ALL PLUMBING FIXTURES

D06 DEMO STAIR AND HANDRAILS

D07 DEMO FULLY ADHERED EPDM ROOFING ASSEMBLY DOWN TO DECK

D08 PREPARE WALL FOR NEW DOOR OPENING. INCLUDES SELECTIVE DEMO OF METAL WALL

PANELS, METAL STUDS, RIGID INSULATION, C-CHANNELS, AND 4'-0" TALL CONCRETE STEM

WALL

D09 DEMO FLOOR (CONCRETE ON METAL DECKING)

D10 DEMO CEILING AND MECH AND ELEC FIXTURES, SEE MECH AND ELEC SHEETS

D11 DEMO ENTRANCE MAT

D12 DEMO COLUMNS, CUT COLUMNS FLUSH WITH FINISH FLOOR

D13 DEMO PLATFORM, DISCONNECT AND REMOVE MECHANICAL EQUIPMENT, SEE MECH

D14 DEMO WOOD JOIST AND CEILING

D15 DEMO ROOF DRAIN

D16 DEMO ROOF HATCH

D17 CUT EXISTING CONC CURB FOR NEW DOOR OPENING

1 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. REPORT ALL

DISCREPANCIES TO THE CONTRACTING OFFICER.

2 REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND TELECOM FOR ADDITIONAL

DEMOLITION NOTES

3 SEE SHEETS A-121 AND A-122 FOR DEMOLITION OF CEILINGS.

4 SEE A-141 FOR DEMOLITION OF ROOFING.

DEMOLITION KEY NOTES

M

AR

K D

ES

C

R

IP

TI

O

N D

UP

A-202

C1

A-201

A1

A-202

C3

A-201

C1

A A.3 A.6 B B.3 C

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

BAY 1

BAY 2

BREAK ROOM

OFFICE

SUPERVISOR

ELECT

MECH

FIRE PUMP

CLASS ROOM

HALL

STORAGE

STORAGE

OFFICE

SUPERVISOR'S

OFFICE

CHANGING ROOM

WHEEL AND TIRE

SHOP

A1 A-301

C4 A-302

B1 A-401

W2

C1 A-301

C1 A-302

11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 192' - 4 5/8"

VESTIBULE

VESTIBULE

C4 A-401

A4 A-402

VESTIBULE

119 10

107B

7A

109A

111A

4B

4A

114C

125A 125B

5C

102A

9B

5' - 8"

5'

5"

102C

101 102

114D

103B

103A02

0' - 8"

1'

3"

1'

4"

0'

W1

111B

02 02 W3 W3

2B

11' - 10"

HALL

114B

1" / 12"

A1 A-302

A1 A-303

7'

6"

(E) UTILIDOR PIT

A1 A-501

TYP

A1 A-501

TYP

A4 A-302

B.6

A3 A-304

LINE OF AIRCRAFT

CLEARANCE (10'-0")

TYP

EXISTING STAIR

8" CMU

3 5/8" STUD

6" STUD 8" CMU

8" CMU D2

A-506

PLAN LEGEND

NEW CONCRETE FLOOR

XXXA

DOOR NUMBER

SEE SCHEDULE ON A603

NEW DOOR/FRAME/HARDWARE

WALK OFF MAT

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-103

FI

R

ST

F

LO

O

R P

LA

N

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A A

-1

- X

XX

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 FIRST FLOOR - NEW LAYOUT

FLOOR PLAN GENERAL NOTES

1 REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN CORRESPOND TO REFERENCE

ELEVATION 0’-0” FOR THIS FLOOR LEVEL. DEVIATIONS AND VARIANCES IN THIS ELEVATION MAY EXIST, AS INDICATED.

2 DOOR OPENINGS: ALL DOOR OPENINGS ARE DESIGNATED WITH REFERENCE NUMBERS

CORRESPONDING TO A SEPARATE DOOR SCHEDULE. THIS MAY INCLUDE MISCELLANEOUS OPENINGS

SUCH AS OVERHEAD SECTIONAL DOORS. REFER TO SHEET A-603 FOR DOOR OPENINGS.

3 WALL TYPES: ANY WALL TYPE NOT TAGGED ON THE FLOOR PLAN SHALL BE CLASSIFIED WALL TYPE 1.

UNLESS OTHERWISE NOTED. SEE SHEET A-601 FOR ALL WALL TYPES.

4 ROOM FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE ROOM NAMES/NUMBERS

CORRESPONDING TO A SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR THE ROOM

FINISH SCHEDULE.

5 MOUNTING HEIGHTS: REFER TO SHEET A-403 FOR TYPICAL MOUNTING HEIGHTS FOR FIXTURES, ACCESORY ITEMS, AND MISCELLANEOUS DEVICES

6 DEMOLITION NOTES: REFERENCE CORRESPONDING DEMOLITION SHEET A-101 FOR

CROSS-REFERENCING THE SAME FLOOR PLAN.

7 REFLECTED CEILING PLAN: REFER TO SHEET A-123 FOR THE CORRESPONDING RCP FOR THIS FLOOR

PLAN AREA.

8 EQUIPMENT PLAN: REFER TO SHEET A-105 FOR THE CORRESPONDING EQUIPMENT PLAN FOR THIS

FLOOR PLAN AREA.

9 DIMENSIONING GUIDE:

SHEET KEY NOTESXX

0" 4' 8' 16'

PLAN NORTH

01 EMERGENCY SHOWER/EYEWASH, SEE MECH

02 INFILL WALL OPENING, MATCH EXISTING WALL CONSTRUCTION. PROVIDE FIRE

RATED AS REQUIRED PER SHEET G-102

03 NEW PVC ROOF ASSEMBLY. SEE A601 FOR NEW TYPE 1

04 NEW ROOF DRAIN WITH OVERFLOW DRAIN

05 NEW METAL LADDER

06 CONC HOUSE KEEPING PAD, SEE STRUCT

07 PROVIDE NEW GUARDRAIL

08 PROVIDE ROOF HATCH IN EXISTING OPENING

09 PROVIDE BOTTLE FILLER. SEE MECH

1. AS NOTED

2. GRIDLINES

3. FACE OF CONCRETE OR MASONRY

4. FACE OF STUD

5. FACE OF HORIZONTAL FINISH

M

AR

K D

ES

C

R

IP

TI

O

N D

C1

A-201

A1

A-202

C3

A-201

C1

A A.3 A.6 B B.3 C

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

FAN ROOM

A1 A-301

C4 A-302

MECH

C1 A-301

C1 A-302

C4 A-402

11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

OPEN TO

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

121B

A3 A-305

127 12

06 06

A1 A-302

A1 A-303

3" / 12"

3" / 12"

A4 A-302

B.6

(E) MECH EQUIP

SEE MECH

CANOPY, SIM TO

D2 / A-506

A4 A-506

TYP

A1 A-304

D2 A-506

CB-12 FALL

PROTECTION

DEVICE

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-104

M

EZ

ZA

N

IN

E

FL

O

O R

P

LA

N

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A A-

4-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 MEZZANINE FLOOR PLAN

FLOOR PLAN GENERAL NOTES

1 REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN CORRESPOND TO REFERENCE

ELEVATION 0’-0” FOR THIS FLOOR LEVEL. DEVIATIONS AND VARIANCES IN THIS ELEVATION MAY EXIST, AS INDICATED.

2 DOOR OPENINGS: ALL DOOR OPENINGS ARE DESIGNATED WITH REFERENCE NUMBERS

CORRESPONDING TO A SEPARATE DOOR SCHEDULE. THIS MAY INCLUDE MISCELLANEOUS OPENINGS

SUCH AS OVERHEAD SECTIONAL DOORS. REFER TO SHEET A-603 FOR DOOR OPENINGS.

3 WALL TYPES: ANY WALL TYPE NOT TAGGED ON THE FLOOR PLAN SHALL BE CLASSIFIED WALL TYPE 1.

UNLESS OTHERWISE NOTED. SEE SHEET A-601 FOR ALL WALL TYPES.

4 ROOM FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE ROOM NAMES/NUMBERS

CORRESPONDING TO A SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR THE ROOM

FINISH SCHEDULE.

5 MOUNTING HEIGHTS: REFER TO SHEET A-403 FOR TYPICAL MOUNTING HEIGHTS FOR FIXTURES, ACCESORY ITEMS, AND MISCELLANEOUS DEVICES

6 DEMOLITION NOTES: REFERENCE CORRESPONDING DEMOLITION SHEET A-101 FOR

CROSS-REFERENCING THE SAME FLOOR PLAN.

7 REFLECTED CEILING PLAN: REFER TO SHEET A-123 FOR THE CORRESPONDING RCP FOR THIS FLOOR

PLAN AREA.

8 EQUIPMENT PLAN: REFER TO SHEET A-105 FOR THE CORRESPONDING EQUIPMENT PLAN FOR THIS

FLOOR PLAN AREA.

9 DIMENSIONING GUIDE:

SHEET KEY NOTES

0" 4' 8' 16'

PLAN NORTH

01 EMERGENCY SHOWER/EYEWASH, SEE MECH

02 INFILL WALL OPENING, MATCH EXISTING WALL CONSTRUCTION. PROVIDE FIRE

RATED AS REQUIRED PER SHEET G-102

03 NEW PVC ROOF ASSEMBLY. SEE A601 FOR NEW TYPE 1

04 NEW ROOF DRAIN WITH OVERFLOW DRAIN

05 NEW METAL LADDER

06 CONC HOUSE KEEPING PAD, SEE STRUCT

07 PROVIDE NEW GUARDRAIL

08 PROVIDE ROOF HATCH IN EXISTING OPENING

09 PROVIDE BOTTLE FILLER. SEE MECH

xx

1. AS NOTED

2. GRIDLINES

3. FACE OF CONCRETE OR MASONRY

4. FACE OF STUD

5. FACE OF HORIZONTAL FINISH

M

AR

K D

ES

C

R

IP

TI

O

N D

UP

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

BAY 1

BAY 2

BREAK ROOM

OFFICE

SUPERVISOR

ELECT

MECH

FIRE PUMP

CLASS ROOM

HALL

STORAGE

UNISEX

STORAGE

OFFICE

SUPERVISOR'S

OFFICE

CHANGING ROOM

J00045

J13008

J00108

F16-06

11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

VESTIBULE

VESTIBULE

VESTIBULE

F16-02

F16-07

F16-04

F16-01

F16-03

F16-06

F16-06

F16-06

F1 6-

BENCH2

BE

N

C H

BENCH1

TOOL1

TOOL4TOOL2

TOOL3

B.6

EQUIPMENT/FURNITURE PLAN GENERAL NOTES:

1. ALL FURNITURE ON THE FURNITURE SCHEDULE IS GFGI.

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-105

EQ

U

IP

M

EN

T /

FU

R

N

IT

U R

E

PL

AN

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A-

5-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 FIRST FLOOR - EQUIPMENT/FURNITURE PLAN

LABEL DESCRIPTION CFCI CFGI GFCI GFGI

F16-07 F-16 BEARING

WASHER

X

J00045 DEGREASER X

J00108 NITROGEN CART X

J13008 TIRE SAFETY GUARD X

TOOL1 TOOL CHEST 1 X

TOOL2 TOOL CHEST 2 X

TOOL3 TOOL CHEST 3 X

TOOL4 TOOL CHEST 4 X

LABEL DESCRIPTION CFCI CFGI GFCI GFGI

BENCH1 WORK BENCH SHORT X

BENCH2 WORK BENCH LONG X

BENCH2 WORK BENCH LONG X

F16-01 F-16 BEAD BREAKER X

F16-02 F-16 WHEEL WASHER X

F16-03 F-16 WHEEL BUILDUP X

F16-04 F-16 ULTRASONIC

WASHER

X

F16-06 TIRE STORAGE RACK X

F16-06 TIRE STORAGE RACK X

F16-06 TIRE STORAGE RACK X

F16-06 TIRE STORAGE RACK X

F16-06 TIRE STORAGE RACK X

EQUIPMENT SCHEDULEXX

0" 4' 8' 16'

PLAN NORTH

DESCRIPTION

ROOM NUMBER

TOTAL109 110 111 112 120 122 123

CHAIR, TASK WITH ARMS ON CASTERS 11 1 1 2 1 16

CHAIR, SIDE 2 2 2 6

CHAIR, CLASSROOM 12 12

CHAIR, CAFE 4 4

DESK, 60" x 30" 1 2 3 DESK, 71"x 36" 1 1 2

WORKSTATION, STANDARD 10 10

WORKSTATION, SUPERVISOR 1 1

TABLE, CAFE 1 1

TABLE, CLASSROOM 4 4

VISUAL DISPLAY BOARD, MARKER BOARD 1 1

BENCH, WOOD 1 1

LOCKERS, METAL 9 9

REFRIGERATOR 1 1

FURNITURE SCHEDULE

M

AR

K D

ES

C

R

IP

TI

O

N D

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

EPX-1

EPX-1EPX-1

SUPERVISOR'S

OFFICE

STORAGE

OFFICE

VESTIBULE

CHANGING ROOM

WHEEL AND TIRE

SHOP

VESTIBULE

BAY 1

BAY 2

FIRE PUMP

ELECT

MECH

OFFICE

SUPERVISOR

BREAK ROOM

CLASS ROOM

STORAGE

HALL

HALL

114B

VESTIBULE

10711

4A

114C

114D

4B

111A111B 109A

107B

7A

102A

2B

103B

103A

9B

125A 125B

5C124

101 102

102C

B.6

F1

F2

F2

F1

F3F3

F4

CONC

D1 A-505

F5

TYP

5' - 0" MIN

5'

0"

5' - 0"

TY

P

5'

1" M

IN

5'

0"

5' - 0"

5'

0"

TYP

5' - 0" MIN

5'

- 0

F5 F5

3' - 5 7/32"

R21.3'

5'

0"

FINISH LEGEND

CONCRETE

RUBBER MAT

WALK OFF MAT

CARPET TILE 1

VINYL TILE

CARPET TILE 2

PLYWOOD FLOORING

FINISH PLAN GENERAL NOTES:

1. ROOM FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE ROOM NAMES/NUMBERS CORRESPONDING TO A

SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR THE ROOM FINISH SCHEDULE.

2. REFLECTED CEILING PLAN: REFER TO SHEET A-123 FOR THE CORRESPONDING RCP FOR THIS FLOOR PLAN.

3. DOOR AND FRAME FINISHES: REFER TO THE DOOR SCHEDULE ON A-603 FOR DOOR AND FRAME FINISHES.

4. FLOOR TRANSITIONS: ALL FLOORING TRANSITIONS OCCUR AT CENTERLINE OF DOOR UNO.

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-106

FI

R

ST

F

LO

O

R

F I N

IS

H

P

LA

N

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A-

6-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 FIRST FLOOR - FINISH PLAN

0" 4' 8' 16'

PLAN NORTH

SHEET KEY NOTESxx

F1 4" STRIPING. 48" X 48" MIN CLEAR INTERIOR. COLOR: GREEN 34110.

F2 6" STRIPING. COLOR: ORANGE YELLOW 33538.

F3 6" DIAGONAL ALTERING BLACK AND YELLOW STRIPING, COLOR: ORANGE YELLOW 33538.

F4 3" DIAGONAL ALTERNATING BLACK AND WHITE STRIPING, COLOR: BLACK AND WHITE.

F5 TILE FLOORING. SEE A602, FINISH SCHEDULE.

M

AR

K D

ES

C

R

IP

TI

O

N D

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

FAN ROOM

MECH

11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

OPEN TO

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

121B

B.6

(E) MECH EQUIP

SEE MECH

FINISH LEGEND

CONCRETE

PLYWOOD FLOORING

GYPSUM BOARD

FINISH PLAN GENERAL NOTES:

1. ROOM FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE ROOM NAMES/NUMBERS CORRESPONDING TO A

SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR THE ROOM FINISH SCHEDULE.

2. REFLECTED CEILING PLAN: REFER TO SHEET A-123 FOR THE CORRESPONDING RCP FOR THIS FLOOR PLAN.

3. DOOR AND FRAME FINISHES: REFER TO THE DOOR SCHEDULE ON A-603 FOR DOOR AND FRAME FINISHES.

4. FLOOR TRANSITIONS: ALL FLOORING TRANSITIONS OCCUR AT CENTERLINE OF DOOR UNO.

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-107

M

EZ

ZA

N

IN

E

- F

IN

IS

H

P

LA

N

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A-

7-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 MEZZANINE FLOOR - FINISH PLAN

0" 4' 8' 16'

PLAN NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

D10 D10 D10 D10

D10 D10

D10

D10

EXP

EXP EXP

D10

11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

EXP

EXP

EXP EXP

D20

D10

D10 D31

D31

D32

D31

D31

D31

B.6

EXISTING MEZZANINE

TYP.

UNIT HEATER, SEE MECH.

GWB

EXPOSED TO

STRUCTURE

2' X 4' ACP AND GRID

LINEAR PENDANT LIGHT FIXTURE,

SEE ELECT

LIGHT FIXTURE, SURFACE

MOUNTED, SEE ELEC

SUPPLY DUCT, SEE MECH

RETURN DUCT, SEE MECH

FOAM GENERATOR, SEE

FIRE

EXP

RCP LEGEND

CEILING HEIGHT AS NOTEDX'-X''

AFF

SPRAY APPLIED FIRE PROOFING

LIGHT FIXTURE,

RECESED, SEE ELEC

ROUND PENDANT LIGHT

FIXTURE, SEE ELEC

WALL MOUNTED LIGHT

FIXTURE, SEE ELEC

DESTRATIFICATION FAN

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-121

FI

R

ST

F

LO

O

R D

EM

O

L I

TI

O N

R

EF

L E C

TE

D

C E

I L

IN

G

PL

AN

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A-

1-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 DEMOLITION RCP - FIRST FLOOR

0" 4' 8' 16'

PLAN NORTH

DEMOLITION GENERAL NOTES XX

D18 DEMO LADDER

D19 DEMO WOOD COAT RACK

D20 DEMO PORTION OF CONC FLOOR. SEE S-101

D21 DEMO LOWER ENCLOSURE AROUND COLUMN

D22 DEMO INTERIOR METAL WALL PANELS

D23 REMOVE EXTERIOR WALL PANELS AND SAVE FOR REINSTALLATION. DEMO INSULATION AND

INTERIOR METAL PANELS IN AREAS RECEIVING STRUCT UPGRADES, SEE STRUCT

D24 DEMO SECTIONAL DOOR. RETAIN TRACK, MOTOR AND ASSOC HARDWARE

D25 DEMO SECTIONAL DOOR, TRACK, MOTOR AND HARDWARE

D28 DEMO PORTION OF WALL FOR NEW RAIN LEADER DOWNSPOUT, SEE MECH

D29 DEMO PORTION OF WALL FOR NEW MECH GRILL/LOUVER, SEE MECH

D30 DEMO COUNTERTOP, SINK AND BASE CABINETS

D31 DEMO LIGHT FIXTURES, SEE ELEC

D32 DEMO SOFFIT

D33 DEMO PARAPETS DOWN TO DECK. REMOVE CC CHANNELS BETWEEN COLUMNS AT

ELEVATION 37'-6" AND AT ELEVATION 36'-3". CUT (3) W14X82 AND (2) W18X24 STRUCTURAL

STEEL COLUMNS AT GRIDLINES 1, 2, 3, 4, AND 5.

D34 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 6" STUD WALL

D35 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 8" CMU WALL

D36 DEMO 8" CMU WALL

D01 DEMO DOOR, FRAME AND HARDWARE

D02 DEMO STUD FRAMED WALL

D03 DEMO WINDOWS

D04 DEMO FLOOR FINISH

D05 DEMO ALL PLUMBING FIXTURES

D06 DEMO STAIR AND HANDRAILS

D07 DEMO FULLY ADHERED EPDM ROOFING ASSEMBLY DOWN TO DECK

D08 PREPARE WALL FOR NEW DOOR OPENING. INCLUDES SELECTIVE DEMO OF METAL WALL

PANELS, METAL STUDS, RIGID INSULATION, C-CHANNELS, AND 4'-0" TALL CONCRETE STEM

WALL

D09 DEMO FLOOR (CONCRETE ON METAL DECKING)

D10 DEMO CEILING AND MECH AND ELEC FIXTURES, SEE MECH AND ELEC SHEETS

D11 DEMO ENTRANCE MAT

D12 DEMO COLUMNS, CUT COLUMNS FLUSH WITH FINISH FLOOR

D13 DEMO PLATFORM, DISCONNECT AND REMOVE MECHANICAL EQUIPMENT, SEE MECH

D14 DEMO WOOD JOIST AND CEILING

D15 DEMO ROOF DRAIN

D16 DEMO ROOF HATCH

D17 CUT EXISTING CONC CURB FOR NEW DOOR OPENING

1 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. REPORT ALL

DISCREPANCIES TO THE CONTRACTING OFFICER.

2 REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND TELECOM FOR ADDITIONAL

DEMOLITION NOTES

3 SEE SHEETS A-121 AND A-122 FOR DEMOLITION OF CEILINGS.

4 SEE A-141 FOR DEMOLITION OF ROOFING.

DEMOLITION KEY NOTES

M

AR

K D

ES

C

R

IP

TI

O

N D

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

EXP

EXP EXP

EXP

D10

D10

D10

D10

11' - 0" 6' - 6" 6' - 0"

2' - 10 5/8"

27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

D31 D31

D31

B.6

EXP

D18

D13

D18

D13

D13

D18

UNIT HEATER, SEE MECH.

GWB

EXPOSED TO

STRUCTURE

2' X 4' ACP AND GRID

LINEAR PENDANT LIGHT FIXTURE,

SEE ELECT

LIGHT FIXTURE, SURFACE

MOUNTED, SEE ELEC

SUPPLY DUCT, SEE MECH

RETURN DUCT, SEE MECH

FOAM GENERATOR, SEE

FIRE

EXP

RCP LEGEND

CEILING HEIGHT AS NOTEDX'-X''

AFF

SPRAY APPLIED FIRE PROOFING

LIGHT FIXTURE,

RECESED, SEE ELEC

ROUND PENDANT LIGHT

FIXTURE, SEE ELEC

WALL MOUNTED LIGHT

FIXTURE, SEE ELEC

DESTRATIFICATION FAN

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-122

M E

ZZ

AN

IN

E

FL

O

O R

D

EM

O

LI

TI

O

N R

EF

LE

C T E

D C

EI

L I

N G

P

LA

N

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A-

2-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 DEMOLITION RCP - MEZZANINE

0" 4' 8' 16'

PLAN NORTH

DEMOLITION GENERAL NOTES XX

D18 DEMO LADDER

D19 DEMO WOOD COAT RACK

D20 DEMO PORTION OF CONC FLOOR. SEE S-101

D21 DEMO LOWER ENCLOSURE AROUND COLUMN

D22 DEMO INTERIOR METAL WALL PANELS

D23 REMOVE EXTERIOR WALL PANELS AND SAVE FOR REINSTALLATION. DEMO INSULATION AND

INTERIOR METAL PANELS IN AREAS RECEIVING STRUCT UPGRADES, SEE STRUCT

D24 DEMO SECTIONAL DOOR. RETAIN TRACK, MOTOR AND ASSOC HARDWARE

D25 DEMO SECTIONAL DOOR, TRACK, MOTOR AND HARDWARE

D28 DEMO PORTION OF WALL FOR NEW RAIN LEADER DOWNSPOUT, SEE MECH

D29 DEMO PORTION OF WALL FOR NEW MECH GRILL/LOUVER, SEE MECH

D30 DEMO COUNTERTOP, SINK AND BASE CABINETS

D31 DEMO LIGHT FIXTURES, SEE ELEC

D32 DEMO SOFFIT

D33 DEMO PARAPETS DOWN TO DECK. REMOVE CC CHANNELS BETWEEN COLUMNS AT

ELEVATION 37'-6" AND AT ELEVATION 36'-3". CUT (3) W14X82 AND (2) W18X24 STRUCTURAL

STEEL COLUMNS AT GRIDLINES 1, 2, 3, 4, AND 5.

D34 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 6" STUD WALL

D35 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 8" CMU WALL

D36 DEMO 8" CMU WALL

D01 DEMO DOOR, FRAME AND HARDWARE

D02 DEMO STUD FRAMED WALL

D03 DEMO WINDOWS

D04 DEMO FLOOR FINISH

D05 DEMO ALL PLUMBING FIXTURES

D06 DEMO STAIR AND HANDRAILS

D07 DEMO FULLY ADHERED EPDM ROOFING ASSEMBLY DOWN TO DECK

D08 PREPARE WALL FOR NEW DOOR OPENING. INCLUDES SELECTIVE DEMO OF METAL WALL

PANELS, METAL STUDS, RIGID INSULATION, C-CHANNELS, AND 4'-0" TALL CONCRETE STEM

WALL

D09 DEMO FLOOR (CONCRETE ON METAL DECKING)

D10 DEMO CEILING AND MECH AND ELEC FIXTURES, SEE MECH AND ELEC SHEETS

D11 DEMO ENTRANCE MAT

D12 DEMO COLUMNS, CUT COLUMNS FLUSH WITH FINISH FLOOR

D13 DEMO PLATFORM, DISCONNECT AND REMOVE MECHANICAL EQUIPMENT, SEE MECH

D14 DEMO WOOD JOIST AND CEILING

D15 DEMO ROOF DRAIN

D16 DEMO ROOF HATCH

D17 CUT EXISTING CONC CURB FOR NEW DOOR OPENING

1 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. REPORT ALL

DISCREPANCIES TO THE CONTRACTING OFFICER.

2 REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND TELECOM FOR ADDITIONAL

DEMOLITION NOTES

3 SEE SHEETS A-121 AND A-122 FOR DEMOLITION OF CEILINGS.

4 SEE A-141 FOR DEMOLITION OF ROOFING.

DEMOLITION KEY NOTES

M

AR

K D

ES

C

R

IP

TI

O

N D

M

MM

M M

M

M

A A.3 A.6 B B.3 C

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

A.F.F.10' - 0" A.F.F.9' - 6"

A1 A-301

C4 A-302

C1 A-301

C1 A-302

A.F.F.10' - 0"

11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

EXP EXPEXP

GWB

EXP

EXP EXP

A1 A-302

A1 A-303

A.F.F.9' - 6"

A.F.F.9' - 6"

A4 A-302

B.6

GYP.

GYP.

GWB GWB GWB GWB

GWB

OCCUPANCY

SENSOR

OCCUPANCY

SENSOR

OCCUPANCY

SENSOR

EXTENT OF SPRAY-APPLIED FIREPROOFING

D2 A-506A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.9' - 4"

A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"

A.F.F.9' - 0"

1-HOUR FLOOR/CEILING

PROTECTION ABOVE

VESTIBULE

SUSPENDED CEILING

PROJECTOR MOUNT,

SEE A1/A-502

UNIT HEATER, SEE MECH.

GWB

EXPOSED TO

STRUCTURE

2' X 4' ACP AND GRID

LINEAR PENDANT LIGHT FIXTURE,

SEE ELECT

LIGHT FIXTURE, SURFACE

MOUNTED, SEE ELEC

SUPPLY DUCT, SEE MECH

RETURN DUCT, SEE MECH

FOAM GENERATOR, SEE

FIRE

EXP

RCP LEGEND

CEILING HEIGHT AS NOTEDX'-X''

AFF

SPRAY APPLIED FIRE PROOFING

LIGHT FIXTURE,

RECESED, SEE ELEC

ROUND PENDANT LIGHT

FIXTURE, SEE ELEC

WALL MOUNTED LIGHT

FIXTURE, SEE ELEC

DESTRATIFICATION FAN

RCP PLAN GENERAL NOTES

1. CEILING FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE NAMES/NUMBERS CORRESPONDING TO A

SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR SCHEDULED CEILING FINISHES.

2. CEILING HEIGHTS: ALL FINISHED CELINGS DESIGNATED ON THIS PLAN SHALL BE 9'-0" AFF, UNLESS OTHERWISE NOTED

ON THE PLAN.

3. CEILING DEVICES: ALL CEILING LAYOUT PLANS SHOW MOST MAJOR MECHANICAL, FIRE PROTECTION AND ELECTRICAL

DEVICES. SEE MECHANICAL, FIRE PROTECTION AND ELECTRICAL SHEETS FOR ADDITIONAL DEVICES INCLUDED IN THE

CEILING CONFIGURATION. CONTRACTOR TO COORDINATE LAYOUT OF ALL DEVICES.

4. DEMOLITION NOTES: REFER TO CORRESPONDING SHEET A-121.

5. SEISMIC BRACING: SEE A3/A-502.

6. LIGHTING IN MECHANICAL SPACES: LOCATE FIXTURES TO AVOID MECHANICAL UNITS.

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-123

FI

R

ST

F

LO

O

R R

EF

LE

C T E

D C

E I

LI

N G

P

LA

N

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A A-

3-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 FIRST FLOOR RCP

0" 4' 8' 16'

PLAN NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

EXP

A1 A-301

C4 A-302

C1 A-301

C1 A-302

EXP

EXP

11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

FAN ROOM

BAY 2

BAY 1

MECH

WHEEL AND TIRE

SHOP

EXP

A1 A-302

A4 A-302

B.6

GWB

FG

FG FG

FG

FOAM GENERATOR,

TYPICAL

EXPDESTRATIFICATION

FAN TO REMAIN, TYP.

ROUND PENDANT LIGHT

FIXTURE, SEE ELEC.

UNIT HEATER, SEE MECH.

GWB

EXPOSED TO

STRUCTURE

2' X 4' ACP AND GRID

LINEAR PENDANT LIGHT FIXTURE,

SEE ELECT

LIGHT FIXTURE, SURFACE

MOUNTED, SEE ELEC

SUPPLY DUCT, SEE MECH

RETURN DUCT, SEE MECH

FOAM GENERATOR, SEE

FIRE

EXP

RCP LEGEND

CEILING HEIGHT AS NOTEDX'-X''

AFF

SPRAY APPLIED FIRE PROOFING

LIGHT FIXTURE,

RECESED, SEE ELEC

ROUND PENDANT LIGHT

FIXTURE, SEE ELEC

WALL MOUNTED LIGHT

FIXTURE, SEE ELEC

DESTRATIFICATION FAN

RCP PLAN GENERAL NOTES

1. CEILING FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE NAMES/NUMBERS CORRESPONDING TO A

SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR SCHEDULED CEILING FINISHES.

2. CEILING HEIGHTS: ALL FINISHED CELINGS DESIGNATED ON THIS PLAN SHALL BE 9'-0" AFF, UNLESS OTHERWISE NOTED

ON THE PLAN.

3. CEILING DEVICES: ALL CEILING LAYOUT PLANS SHOW MOST MAJOR MECHANICAL, FIRE PROTECTION AND ELECTRICAL

DEVICES. SEE MECHANICAL, FIRE PROTECTION AND ELECTRICAL SHEETS FOR ADDITIONAL DEVICES INCLUDED IN THE

CEILING CONFIGURATION. CONTRACTOR TO COORDINATE LAYOUT OF ALL DEVICES.

4. DEMOLITION NOTES: REFER TO CORRESPONDING SHEET A-121.

5. SEISMIC BRACING: SEE A3/A-502.

6. LIGHTING IN MECHANICAL SPACES: LOCATE FIXTURES TO AVOID MECHANICAL UNITS.

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

SO

LI

C

IT

A

TI

O N

N O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-124

M

EZ

ZA

N

IN

E

R

EF

LE

C

TE

D

C E I

LI

N

G P

LA

N

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A A-

4-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 MEZZANINE REFLECTED CEILING PLAN

0" 4' 8' 16'

PLAN NORTH

M

AR

K D

ES

C

R

IP

TI

O

N D

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

SLOPE SLOPE

SLOPE SLOPE SLOPE SLOPE

SLOPE SLOPE

SLOPE

SLOPE

D15

D16

D15

D15D15

D15

D15

D07

D15

D15

D07

D15

D15

VTR

VTR (DEMO)

VTR (DEMO)

11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

TYPTYP

TYPTYP

TYP

TYP

TYP

TYP

TYP

TYP

B.6

SLOPE

SLOPE

6" VTR

T.

O

. S

TE

E L

'-0

T.

O

. S

TE

E L

'-0

T.

O

. S

TE

E L

'-4

T.

O

. S

TE

E L

'-1

0"

T.

O

. S

TE

E L

'-4

T.

O

. S

TE

E L

'-0

T.

O

. S

TE

E L

'-0

T.

O

. S

TE

E L

'-0

T.

O

. S

TE

E L

'-0

T.O. STEEL

34'-0"

T.O. STEEL

34'-0"

STEEL SLOPES

TO DRAINS AT

ELEVATION 33'-0"

THIS ROOF.

D33

D33

D33

ST

F

RO

P

ISTE H

A

SS NOI ARL C

A

T

K

ER

IG RE

DE

F

49th

EAT

O LA SA

CE

TNo. AELA-7917

Scott A. Bohne

SHEET ID

AI

R

F O

R C

E C

IV

IL

E N

G

IN

EE

R

C

EN

TE

R

D R

A W

N B

Y:

D E

S

IG

N E

D B

Y:

S U

B M

IT

TE

D B

Y:

S

IZ

E

C H

E C

K E

D B

Y:

A N

S I '

D

FI

LE

N A

M E

IS

S

U E

D A

TE

C O

N

TR

A C

T N

O

S O

LI

C

IT

A

TI

O

N N

O

FI

LE

N U

M B

E R

1 2 3 4 5

D

C

B

A

PA

C

IF

IC

D

IV

IS

IO

N

C O

R

PO

R

AT

E N

O . A

EC

L

A-141

D

EM

O

LI

TI

O

N R

O O

F P L

AN

F- 3 5

R E N

O

VA

TE

W

E A

PO

N S

LO

AD

T R

AI

N

IN

G

O F F

IC

E

AN

D

H

AN

G A R

R

IM

A R

C H

IT

EC

TS

G

S

TR

EE

T, S

TE

AN

C H

O R

AG

E, A K

JR

A

G

AR

, J R

A

JE

D

.0 1.

FA

-1

6D -0

FT

Q

W

FINAL

A-

1-

EI

E L

SO

N

A

FB

, A

LA

S K A

2019.01.18

1/8" = 1'-0"B1 DEMOLITION ROOF PLAN

0" 4' 8' 16'

PLAN NORTH

ROOF DEMOLITION GENERAL NOTES XX

D18 DEMO LADDER

D19 DEMO WOOD COAT RACK

D20 DEMO PORTION OF CONC FLOOR. SEE S-101

D21 DEMO LOWER ENCLOSURE AROUND COLUMN

D22 DEMO INTERIOR METAL WALL PANELS

D23 REMOVE EXTERIOR WALL PANELS AND SAVE FOR REINSTALLATION. DEMO INSULATION AND

INTERIOR METAL PANELS IN AREAS RECEIVING STRUCT UPGRADES, SEE STRUCT

D24 DEMO SECTIONAL DOOR. RETAIN TRACK, MOTOR AND ASSOC HARDWARE

D25 DEMO SECTIONAL DOOR, TRACK, MOTOR AND HARDWARE

D28 DEMO PORTION OF WALL FOR NEW RAIN LEADER DOWNSPOUT, SEE MECH

D29 DEMO PORTION OF WALL FOR NEW MECH GRILL/LOUVER, SEE MECH

D30 DEMO COUNTERTOP, SINK AND BASE CABINETS

D31 DEMO LIGHT FIXTURES, SEE ELEC

D32 DEMO SOFFIT

D33 DEMO PARAPETS DOWN TO DECK. REMOVE CC CHANNELS BETWEEN COLUMNS AT

ELEVATION 37'-6" AND AT ELEVATION 36'-3". CUT (3) W14X82 AND (2) W18X24 STRUCTURAL

STEEL COLUMNS AT GRIDLINES 1, 2, 3, 4, AND 5.

D34 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 6" STUD WALL

D35 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 8" CMU WALL

D36 DEMO 8" CMU WALL

D01 DEMO DOOR, FRAME AND HARDWARE

D02 DEMO STUD FRAMED WALL

D03 DEMO WINDOWS

D04 DEMO FLOOR FINISH

D05 DEMO ALL PLUMBING FIXTURES

D06 DEMO STAIR AND HANDRAILS

D07 DEMO FULLY ADHERED EPDM ROOFING ASSEMBLY DOWN TO DECK

D08 PREPARE WALL FOR NEW DOOR OPENING. INCLUDES SELECTIVE DEMO OF METAL WALL

PANELS, METAL STUDS, RIGID INSULATION, C-CHANNELS, AND 4'-0" TALL CONCRETE STEM

WALL

D09 DEMO FLOOR (CONCRETE ON METAL DECKING)

D10 DEMO CEILING AND MECH AND ELEC FIXTURES, SEE MECH AND ELEC SHEETS

D11 DEMO ENTRANCE MAT

D12 DEMO COLUMNS, CUT COLUMNS FLUSH WITH FINISH FLOOR

D13 DEMO PLATFORM, DISCONNECT AND REMOVE MECHANICAL EQUIPMENT, SEE MECH

D14 DEMO WOOD JOIST AND CEILING

D15 DEMO ROOF DRAIN

D16 DEMO ROOF HATCH

D17 CUT EXISTING CONC CURB FOR NEW DOOR OPENING

DEMOLITION KEY NOTES

1 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. REPORT ALL

DISCREPANCIES TO THE CONTRACTING OFFICER.

2 REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND TELECOM FOR ADDITIONAL

DEMOLITION NOTES

3 SEE SHEETS A-121 AND A-122 FOR DEMOLITION OF CEILINGS.

4 SEE A-141 FOR DEMOLITION OF ROOFING.

M

AR

K D

ES

C

R

IP

TI

O

N D

C1

A-201

A1

A-202

C3

A-201

C1

A A.3 A.6 B B.3 C

A'B'C'D'

1.2

1.7

2.5

3.2

4.2

4.9

A1 A-301

C4 A-302

C1 A-301

C1 A-302

VTR

6" VTR.

SEE C2/A-503.

11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"

192' - 4 5/8"

TYPTYP

TYPTYP

TYP

TYP TYP

TYP

TYP

C1 A-503

C2 A-503

TYP

C4 A-503

TYP

A1 A-302

A2 A-503

A3 A-503

A1 A-503

A4 A-503

A4 A-503

1" / 12" 1" / 12"

1" / 12"1" / 12" 1" / 12"

1" / 12"

1" / 12"

1" / 12"

1/2":12" 1/2 ":1

2"

1/2 ":1

2" 1/2":12"

1/2":12" 1/2 ":1

2"

1/2 ":1

2" 1/2":12"

1/2":12" 1/2 ":1

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.