JA-3.1_-_FTQW_18-0209_Drawings_11x17.pdf
PDF 29 MB Posted
- Attached to
- F-35 Weapons Load Training Reno Federal contract opportunity
- Solicitation number
- FA500419BA006
About this file
Drawings 11x17
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8903-16-D-0016 / FA8903-17-F-0118
FTQW180209
FINAL DESIGN SUBMITTAL
F-35 RENOVATE WEAPONS LOAD
TRAINING OFFICE AND HANGAR
2019.01.22
SHEET TITLE
FTQW180209
FINAL DESIGN SUBMITTAL
SCHEDULE OF DRAWINGS
REF.
NUM.SHT REF.
NUM.SHT SHEET TITLE REF.
NUM.SHT SHEET TITLE REF.
NUM.SHT SHEET TITLE REF.
NUM.SHT SHEET TITLE
F-35 RENOVATE WEAPONS LOAD TRAINING OFFICE AND HANGAR
EIELSON AFB, ALASKA
2019.01.22
1 G-001 COVER SHEET
2 G-002 DRAWING INDEX
3 G-101 CODE SUMMARY
4 G-102 FIRST FLOOR LIFE SAFETY PLAN
5 G-103 MEZZANINE LIFE SAFETY PLAN
GENERAL
6 S-001 STRUCTURAL ABBREVIATIONS AND SYMBOLS
7 S-002 STRUCTURAL GENERAL NOTES, DESIGN LOADS
8 S-003 STRUCTURAL GENERAL NOTES
9 S-004 STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS
10 S-005 STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS
11 S-006 STATEMENT OF STRUCTURAL SPECIAL INSPECTIONS
12 S-007 WIND UPLIFT MAP
13 S-101 FOUNDATION PLAN
14 S-102 MEZZANINE FRAMING PLAN
15 S-103 ROOF FRAMING PLAN
16 S-201 FRAMING ELEVATIONS
17 S-202 FRAMING ELEVATIONS
18 S-203 FRAMING ELEVATIONS
19 S-204 FRAMING ELEVATIONS
20 S-205 FRAMING ELEVATIONS
21 S-206 FRAMING ELEVATIONS
22 S-207 FRAMING ELEVATIONS
23 S-208 FRAMING ELEVATIONS
24 S-209 FRAMING ELEVATIONS
25 S-210 FRAMING ELEVATIONS
26 S-211 FRAMING ELEVATIONS
27 S-301 SECTIONS
28 S-302 SECTIONS
29 S-401 ENLARGED PLANS
30 S-501 CMU DETAILS 1
31 S-502 CMU DETAILS 2
32 S-510 CONCRETE DETAILS
33 S-521 STEEL DETAILS 1
34 S-522 STEEL DETAILS 2
35 S-523 STEEL DETAILS 3
36 S-524 STEEL DETAILS
37 S-531 STAIR DETAILS
38 S-801 MECHANICAL EQUIPMENT SUPPORT DETAILS
39 S-802 MECHANICAL EQUIPMENT SUPPORT DETAILS
40 S-803 MECHANICAL EQUIPMENT SUPPORT DETAILS
STRUCTURAL
41 A-001 ABBREVIATIONS AND SYMBOLS LEGEND
42 A-101 FIRST FLOOR DEMOLITION PLAN
43 A-102 MEZZANINE DEMOLITION PLAN
44 A-103 FIRST FLOOR PLAN
45 A-104 MEZZANINE FLOOR PLAN
46 A-105 EQUIPMENT/FURNITURE PLAN
47 A-106 FIRST FLOOR - FINISH PLAN
48 A-107 MEZZANINE - FINISH PLAN
49 A-121 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN
50 A-122 MEZZANINE FLOOR DEMOLITION REFLECTED CEILING PLAN
51 A-123 FIRST FLOOR RELECTED CEILING PLAN
52 A-124 MEZZANINE REFLECTED CEILING PLAN
53 A-141 DEMOLITION ROOF PLAN
54 A-142 ROOF PLAN
55 A-201 NORTH AND SOUTH ELEVATIONS
56 A-202 EAST AND WEST ELEVATIONS
57 A-301 BUILDING LONGITUDINAL SECTION
58 A-302 BUILDING CROSS SECTION
59 A-303 WALL SECTIONS
60 A-304 ENLARGED FIRE PUMP ROOM PLAN AND STAIR SECTION
61 A-305 WALL SECTIONS
62 A-401 ENLARGED PLANS
63 A-402 ENLARGED STAIR PLANS AND SECTIONS
64 A-403 INTERIOR ELEVATIONS
65 A-501 WALL DETAILS
66 A-502 CEILING DETAILS
67 A-503 ROOF DETAILS
68 A-504 DOOR DETAILS
69 A-505 INTERIOR DETAILS
70 A-506 DETAILS
71 A-601 ASSEMBLY TYPES
72 A-602 FINISH SCHEDULE
73 A-603 DOOR SCHEDULE AND DETAILS
ARCHITECTURAL
74 F-001 FIRE PROTECTION NOTES AND SYMBOLS
75 F-002 FIRE SYSTEM CRITERIA AND PROCEDURES
76 F-101 FIRE PROTECTION DEMOLITION FIRST FLOOR PLAN
77 F-102 FIRE PROTECTION DEMOLITION MEZZANINE PLAN
78 F-103 FIRE PROTECTION FIRST FLOOR PLAN
79 F-104 FIRE PROTECTION MEZZANINE PLAN
80 F-201 FIRE PUMP ROOM ELEVATIONS
81 F-301 FIRE PROTECTION HANGAR SECTION
82 F-401 ENLARGED PUMP ROOM FLOOR PLAN
83 F-501 FIRE PROTECTION RISER DIAGRAM
84 F-601 FIRST FLOOR PLAN - FIRE ALARM DEMOLITION
85 F-602 SECOND FLOOR PLAN - FIRE ALARM DEMOLITION
86 F-701 FIRST FLOOR PLAN - FIRE ALARM
87 F-702 SECOND FLOOR PLAN - FIRE ALARM
88 F-801 FIRE ALARM / MASS NOTIFICATION RISER DIAGRAM
89 F-901 FIRE ALARM DETAILS
90 F-902 FIRE ALARM DETAILS
FIRE PROTECTION PLUMBING
MECHANICAL
131 E-000 SYMBOLS AND ABBREVIATIONS
132 E-101 FIRST FLOOR PLAN - POWER DEMOLITION
133 E-102 SECOND FLOOR PLAN - POWER DEMOLITION
134 E-103 FIRST FLOOR PLAN - LIGHTING DEMOLITION
135 E-104 SECOND FLOOR PLAN - LIGHTING DEMOLITION
136 E-111 SITE PLAN - DEMOLITION
137 E-200 ELECTRICAL AREA CLASSIFICATION PLAN
138 E-201 FIRST FLOOR PLAN - POWER
139 E-202 SECOND FLOOR PLAN - POWER
140 E-203 FIRST FLOOR PLAN - LIGHTING
141 E-204 SECOND FLOOR PLAN - LIGHTING
142 E-211 SITE PLAN - ELECTRICAL
143 E-401 ENLARGED POWER PLANS
144 E-501 POWER ONE-LINE DIAGRAM
145 E-601 EQUIPMENT CONNECTION SCHEDULE
146 E-602 PANEL SCHEDULES
147 E-603 PANEL SCHEDULES
148 E-701 LIGHTING DETAILS
149 E-702 LIGHTING DETAILS
150 E-703 ELECTRICAL DETAILS
ELECTRICAL
151 T-000 SYMBOLS AND ABBREVIATIONS - ICT
152 T-001 ROUGH-IN AND CABLING SCHEDULES - ICT
153 T-101 FIRST FLOOR PLAN - ICT DEMOLITION
154 T-102 SECOND FLOOR PLAN - ICT DEMOLITION
155 T-201 FIRST FLOOR PLAN - ICT REVISIONS
156 T-202 SECOND FLOOR PLAN - ICT REVISIONS
157 T-501 VOICE/DATA RISER DIAGRAM
158 T-502 SECURITY RISER DIAGRAM
159 T-503 TELECOM DETAILS
TELECOMMUNICATIONS
91 M-001 MECHANICAL LEGEND
92 M-101 MECHANICAL FIRST FLOOR DEMOLITION PLAN
93 M-102 MECHANICAL FIRST FLOOR AND MEZZANINE PARTIAL DEMOLITION PLAN
94 M-103 MECHANICAL FIRST FLOOR AND MEZZANINE PARTIAL DEMOLITION PLAN
95 M-104 MECHANICAL MEZZANINE PIPING DEMOLITION PLAN
96 M-105 MECHANICAL MEZZANINE DEMOLITION PLAN
97 M-106 MECHANICAL MEZZANINE CEILING SPACE DEMOLITION PLAN
98 M-107 GLYCOL HOT WATER & STEAM PIPING DIAGRAM - DEMOLITION
99 M-201 MECHANICAL FIRST FLOOR PLAN
100 M-202 MECHANICAL MEZZANINE PLAN
101 M-301 MECHANICAL SECTIONS
102 M-302 MECHANICAL SECTIONS
103 M-303 MECHANICAL SECTIONS
104 M-304 MECHANICAL SECTIONS
105 M-305 MECHANICAL SECTIONS
106 M-401 MECHANICAL ENLARGED PLAN
107 M-402 MECHANICAL ENLARGED PLAN
108 M-403 MECHANICAL ENLARGED PLANS
109 M-501 MECHANICAL DETAILS
110 M-502 MECHANICAL DETAILS
111 M-503 MECHANICAL DETAILS
112 M-504 MECHANICAL DETAILS
113 M-505 MECHANICAL DETAILS
114 M-601 MECHANICAL SCHEDULES
115 M-602 MECHANICAL SCHEDULES
116 M-701 DIAGRAMS
117 M-702 CONTROLS
118 M-703 CONTROLS
119 M-704 CONTROLS
120 M-705 CONTROLS
121 P-001 PLUMBING LEGEND, ABBREVIATIONS AND PLUMBING DRAWING LIST
122 P-101 PLUMBING FIRST FLOOR DEMOLITION PLAN
123 P-102 PLUMBING FIRST FLOOR PARTIAL DEMOLITION PLAN
124 P-103 PLUMBING MEZZANINE DEMOLITION PLAN
125 P-201 PLUMBING FIRST FLOOR PLAN
126 P-202 PLUMBING MEZZANINE PLAN
127 P-203 PLUMBING ROOF PLAN
128 P-401 PLUMBING ENLARGED PLANS
129 P-501 PLUMBING DETAILS
130 P-601 PLUMBING SCHEDULES
Brian C. Thompson No. FP 13245
REG IS T ER ED P R O F E S S I O NA L ENGINEER
REG IS T ER ED P R O F E S S IO NA L ENGINEER
REG IS T ER ED P R O F E S S I O NA L ENGINEER
A
M/E
JASON E KWIATKOWSKI
No. CE 118884REG I S T ER ED P R O F ES S I O NA L E NGINEER
STIFF STIFFENER
STIR STIRRUP
STL STEEL
STRUC STRUCTURAL
SUPP SUPPORT
SYM SYMMETRICAL, SYMMETRY
T/ TOP OF
T&B TOP AND BOTTOM
TEMP TEMPERATURE
THK THICK, THICKNESS
THRU THROUGH
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOS TOP OF STEEL
TR THREADED ROD
TRANS TRANSVERSE
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
VERT VERTICAL
W WIDTH, WIDE FLANGE
w/ WITH
WHS WELDED HEADED STUD
W/O WITHOUT
WP WORK POINT
WT WEIGHT
LLV LONG LEG VERTICAL
LOC LOCATION, LOCATE
LONGIT LONGITUDINAL
LP LOW POINT
LSH LONG SLOTTED HOLE
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MF MOMENT FRAME
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MPH MILES PER HOUR
MTL METAL
NF NEAR FACE
NOM NOMINAL
NO, # NUMBER
N-S NORTH-SOUTH
NS NEAR SIDE, NONSHRINK
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OPNG OPENING
OPP OPPOSITE
OSH OVERSIZED HOLE
OWJ OPEN WEB JOIST
PCF POUNDS PER CUBIC FOOT
PEN PENETRATION
PERP PERPENDICULAR
PL PLATE
PLCS PLACES
PLF POUNDS PER LINEAR FOOT
PNL PANEL
PJP, PP PARTIAL JOINT
PENETRATION
PREFAB PREFABRICATED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
R RAD RADIUS
RD ROOF DRAIN
REF REFERENCE
REINF REINFORCING
REM REMAINDER
REQD REQUIRED
RND ROUND
RO ROUGH OPENING
RTN RETURN
SC SLIP CRITICAL
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SOG SLAB ON GRADE
SOMD SLAB ON METAL DECK
SPC SPACE, SPACED, SPACING
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
SSH SHORT SLOTTED HOLE
STAG STAGGER, STAGGERED
STD STANDARD
DO DITTO
DP DEEP
DTL DETAIL
DWG DRAWING
DWL DOWEL
EA EACH
EE EACH END
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
EMB, EMBED EMBEDMENT
ENGR ENGINEER
EQ EARTHQUAKE, EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
ETC ET CETERA
E-W EAST-WEST
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FDN FOUNDATION
FEMA FEDERAL EMERGENCY
MANAGEMENT AGENCY
FF FAR FACE, FINISH FLOOR
FIN FINISH
FLR FLOOR
FLS FIRE / LIFE SAFETY
FLG FLANGE
FOW FACE OF WALL
FS FAR SIDE
FT, ' FEET
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GR GRADE
GRND GROUND
GWB GYPSUM WALL BOARD
HGR HANGER
HK HOOK
HKP HOUSEKEEPING PAD
HORIZ, H HORIZONTAL
HP HIGH POINT
HSB HIGH STRENGTH BOLT
HSS HOLLOW STRUCTURAL
SECTION
HT HEIGHT
IBC INTERNATIONAL BUILDING
CODE
ID INSIDE DIAMETER
IF INSIDE FACE
IN, " INCH
INCL INCLUDE
INFO INFORMATION
INT INTERIOR
IJ ISOLATION JOINT
JST JOIST
JT JOINT
K KIP (1,000 LB)
KSF KIPS PER SQUARE FOOT
KSI KIPS PER SQUARE INCH
L LENGTH, ANGLE
LB, # POUND
LF LINEAL FOOT
LL LIVE LOAD
LLBB LONG LEGS BACK TO BACK
LLH LONG LEG HORIZONTAL
& AND
@ AT
A&B ABOVE & BELOW
AB ANCHOR BOLT
ABV ABOVE
ACI AMERICAN CONCRETE
INSTITUTE
ADD'L ADDITIONAL
ADH ADHESIVE
ADJ ADJACENT, ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AISC AMERICAN INSTITUTE OF
STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL
INSTITUTE
ALT ALTERNATE
ALUM ALUMINUM
ANCH ANCHOR, ANCHORAGE
APPROX APPROXIMATE
AR ANCHOR ROD
ARCH ARCHITECT,
ARCHITECTURAL
ARND AROUND
ASCE AMERICAN SOCIETY OF CIVIL
ENGINEERS
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
AWS AMERICAN WELDING
SOCIETY
B/ BOTTOM OF
BF BRACED FRAME
BLDG BUILDING
BLW BELOW
BM BEAM
BOD BOTTOM OF DECK
BOT BOTTOM
BRG BEARING
BTWN BETWEEN
C CHANNEL
CANT CANTILEVER
CAP CAPACITY
CC CENTER-TO-CENTER
CF COLD-FORMED
CIP CAST-IN-PLACE
CJ CONTROL JOINT,
CONSTRUCTION JOINT
CJP COMPLETE JOINT
PENETRATION
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUE, CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICIER
RESPONSIBLITIES
CRSI CONCRETE REINFORCED
STEEL INSTITUTE
CTR CENTER, CENTERED
CY CUBIC YARD
DBL DOUBLE
DEG, º DEGREE
DIA, Ø DIAMETER
DIAG DIAGONAL
DIAPH DIAPHRAGM
DIM DIMENSION
DIR DIRECTION
DL DEAD LOAD
DN DOWN
JASON E KWIATKOWSKI
No. CE 118884REG I S T ER ED P R O F ES S I O NA L E NGINEER
No. CE 118884REG IS T ER ED P R O F E S S IO N A L ENGINEER
No. CE 118884REG IS T ER ED P R O F E S S I O NA L ENGINEER
SHEET ID
1 2 3 4 5
D
C
B
11' - 0" 6' - 6" 6' - 0"
23' - 6" 11' - 0"6' - 6"6' - 0"
23' - 6"
JASON E KWIATKOWSKI
No. CE 118884REG IS T ER ED P R O F E S S I O NA L ENGINEER
SHEET ID
1 2 3 4 5
D
C
SHEET ID
1 2 3 4 5
D
C
12' - 0" 15' - 6" 15' - 6" 19' - 6" 11' - 6"
27' - 8" 27' - 8" 27' - 8"
83' - 0"
27' - 8" 27' - 8" 27' - 8"
27' - 8"27' - 8"27' - 8"
SHEET ID
1 2 3 4 5
D
C
NOTE: AT SIM CONDITION , ORIENTATION IS ROTATED 90°
TRANSVERSE DIAG
BRACE MEMBER
ABBREVIATIONS LEGEND
AB ANCHOR BOLT
ABS ACRYLONITRILE BUTADIENE STYRENE
ABV ABOVE
A/C AIR CONDITIONING
AC ASPHALTIC CONCRETE
ACP ACOUSTICAL CEILING PANEL
AD AREA DRAIN
ADDL ADDITIONAL
ADF ACCESSIBLE DRINKING FOUNTAIN
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AFS ABOVE FINISH SLAB
AGGR AGGREGATE
ALUM ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BBQ BARBEQUE
BD BOARD
BFF BELOW FINISH FLOOR
BKBD BACK BOARD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOD BOTTOM OF DECK
BOT F BOTTOM FACE
BOT BOTTOM
BR BEDROOM
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CER CERAMIC
CFCI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CG CORNER GUARD
CMPST COMPOSITE
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUE/CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COP COPPER
CORR CORRIDOR
CPT CARPET
CSK COUNTERSINK
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
CULT CULTURED
CW COLD WATER PIPING
D DEEP/DEPTH
DBL DOUBLE
DEG DEGREE
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DSP DRY STANDPIPE
DW DISHWASHER
DWG DRAWING
DWR DRAWER
E EAST
EA EACH
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
EPB ELECTRICAL PANEL BOARD
EPDM ETHYLENE PROPYLENE DIENE MONOMER
ES EACH SIDE
EQ EQUAL
EQUIP EQUIPMENT
EOS EDGE OF SLAB
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
(E) EXISTING
F FAHRENHEIT
FA FIRE ALARM
FAB FABRICATE
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE, FIXTURES AND EQUIPMENT
FGL FIBERGLASS
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FINISH
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FLR SK FLOOR SINK
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FP FIRE PROOF
FR FRAME
FRP FIBERGLASS REINFORCED
PLASTIC
FRT FIRE RETARDANT
FRZ FREEZER
FT FEET
FTD FACIAL TISSUE DISPENSER
FTG FOOTING
FURG FURRING
FUT FUTURE
G NATURAL GAS
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GEN GENERAL
GFGI GOVERNMENT FURNISHED /
GOVERNMENT INSTALLED
GFCI GOVERNMENT FURNISHED/CONTRACTOR
INSTALLED
GFRG GLASSFIBER REINFORCED GYPSUM
GFRC GLASSFIBER REINFORCED CONCRETE
GL GLASS/GLAZING
GLU LAM GLUE LAMINATED WOOD
GPM GALLONS PER MINUTE
GRAN GRANITE
GSB GYPSUM SHEATHING BOARD
GTV GATE VALVE
GWT GLAZED WALL TILE
GYP GYPSUM
GWB GYPSUM WALL BOARD
H HIGH
HB HOSE BIBB
HC HOLLOW CORE
HCP HANDICAPPED
HD HEAD
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HS HAND SINK
HT HEIGHT
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
HW HOT WATER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
ID INSIDE DIAMETER
INCL INCLUDED
IMP INSULATED METAL PANEL
IN INCH
INFO INFORMATION
INSUL INSULATION/INSULATED
INT INTERIOR
INV INVERT
J-BOX JUNCTION BOX
JAN JANITOR
JST JOIST
JT JOINT
KD KNOCK DOWN
KIT KITCHEN
KO KNOCK-OUT
KW KILOWATT
KWH KILOWATT HOUR
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LB POUND
LBF/SF POUNDS PER SQUARE FOOT
LDG LANDING
LF LINEAR FOOT
LH LEFT HAND
LKR LOCKER
LLV LONG LEG VERTICAL
LOC LOCATION
LT LIGHT
LR LIVING ROOM
LVR LOUVER
M METER
M2 SQUARE METERS
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MBR MASTER BEDROOM
MC MEDICINE CABINET
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MG MIRROR, GLASS
MID MIDDLE
MIN MINIMUM
MISC MISCELLANEOUS
MLDG MOULDING
MM MILLIMETER
MO MASONRY OPENING
MOD MODULE
MP METAL PANEL
MR MOISTURE RESISTANT
MTD MOUNTED
MTL METAL
MTG MOUNTING
MULL MULLION
MUN MUNTIN
MW MICROWAVE
N NORTH
NFS NON-FROST SUSCEPTIBLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OBS OBSCURE
OC ON CENTER
OD OUTSIDE DIAMETER
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
OF/OI OWNER FURNISHED/
OWNER INSTALLED
OFD OVERFLOW DRAIN
OH OVER HANG
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
OVHD OVER HEAD
PA PUBLIC ACCESS
PC PIECE
PCC PRECAST CONCRETE
PEND PENDANT
PERIM PERIMETER
PH PENTHOUSE
PLAS PLASTER
PLBG PLUMBING
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
PR PAIR
PROP PROPERTY
PREFAB PREFABRICATE
PT PAINT
PTD PAPER TOWEL DISPENSER
PTD/TR PAPER TOWEL DISPENSER
AND TRASH RECEPTACLE
PTN PARTITION
PTR PAPER TOWEL RECEPTACLE
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
QT QUARRY TILE
R RISER
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RB HK ROBE HOOK
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFRIGERATOR
REFL REFLECTED
REG REGISTER
REINF REINFORCE
RECS RECOMMENDATIONS
REQD REQUIRED
RESIL RESILIENT
REST REST ROOM
REV REVISION
RTF RUBBER TILE FLOOR
RFG ROOFING
RLG RAILING
RH RIGHT HAND
RND ROUND
RM ROOM
RO ROUGH OPENING
RWL RAIN WATER LEADER
S SOUTH
SA SUPPLY AIR
SAB SOUND ATTENUATION BLANKET
SB SPLASH BLOCK
SC SOLID CORE
SCHED SCHEDULE
SCD SEAT COVER DISPENSER
SCP SCUPPER
SCR SHOWER CURTAIN ROD
SCRN SCREEN
SD SMOKE DETECTOR
SECT SECTION
SED SEE ELECTRICAL DRAWINGS
SF SQUARE FEET
SHT SHEET
SHR SHOWER
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SL SLOPE
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SND SANITARY NAPKIN DISPENSER
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPC SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SQ SQUARE
SSD SEE STRUCTURAL DRAWINGS
SST STAINLESS STEEL
SMD SEE MECHANICAL DRAWINGS
SMLS SEAMLESS
SS SOLID SURFACE
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SURR SURROUND
SUSP SUSPENDED
SVCE SERVICE
SW SWITCH
SYMM SYMMETRICAL
SYS SYSTEM
T TREAD
TB TOWEL BAR
TBD TO BE DETERMINED
TD TRENCH DRAIN
TEL TELEPHONE
TELECOM TELECOMMUNICATIONS
TEMP TEMPERATURE
TER TERRAZZO
T&G TONGUE AND GROOVE
THRES THRESHOLD
THRU THROUGH
THK THICKNESS
TK BD TACK BOARD
TMPD TEMPERED
TOC TOP OF CURB
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF SLAB
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TS TUBE STEEL
TSH TOWEL SHELF
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
TLT TOILET
UBC UNIFORM BUILDING CODE
UC UNDERCUT
UNGD UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS OTHERWISE NOTED
UR URINAL
VAR VARIES
VB VALVE BOX
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VOL VOLUME
VP VENEER PLASTER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WIDE
W/ WITH
WC WALL COVERING
WCLR WATER COOLER
WD WOOD
WDSP WASTE DISPOSER
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WATER HEATER
W/O WITHOUT
WP WATERPROOF / WATERPROOFING
WR WATER REPELLENT
WSCT WAINSCOT
WSP WET STAND PIPE
WT WEIGHT
WWF WELDED WIRE FABRIC
A
B
C
D
E
F
M
S
G
H
I
J
K
L
N
O
P
Q
R
T
U
V
W
SYMBOLS LEGEND
ROOM DESIGNATION WALL TYPE
DOOR DESIGNATION GRIDLINE
EQUIPMENT DESIGNATION
EXTERIOR ELEVATION DESIGNATION
OPENING DESIGNATION
DETAIL DESIGNATION
REVISION DESIGNATION
BUILDING SECTION DESIGNATION
PLAN KEYNOTE
INTERIOR ELEVATION DESIGNATION
BREAK LINE
MATCHLINE
PLAN NORTH/NORTH
DATUM DESIGNATION
NORTH
AFF? CEILING HEIGHT DESIGNATION
FURNITURE DESIGNATION
WALL SECTION DESIGNATION
GRAPHIC SCALE
RM NO
ROOM NAME
XXX
X'XX"
XX
X
XXX
X
WX
X
X
AXXX
DET NO
NAME
ELEV
X
X
X
X
SIM
SIM
XX
AXXX
DET NO
AXXX
DET NO
SIM
AXXX
AXXX
0" 4' 8' 16'
WINDOW DESIGNATION?X
SEE A602
FOR FINISH SCHEDULE
SEE A603
FOR SCHEDULE
SEE A603
FOR TYPES
SEE A601 FOR
ASSEMBLY TYPES
MATERIALS LEGEND
CONCRETE CMU
SAND, MORTAR, PLASTER, TILE
BACKER BOARD
EARTH, UNCLASSIFIED FILL
BATT INSULATION
FINISHED WOOD
RIGID INSULATION
METAL
PLYWOOD/MDF
GLASS
GYPSUM WALL BOARD
CERAMIC TILE, VCT OR RESILIENT
FLOORING
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-001
AB
BR
EV
IA
TI
O
N S
A N
D S
YM
BO
LS
L
E G
E N
D
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A-
1-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
A A.3 A.6 B B.3 C
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
D01
D01
D01
D01
D01
D05
D05
D05
D01
D06
D03
D01
D02
D02
D01
D06
D01
D01D01
D01 D01
D01
D01
D02
D02
D02
11' - 0" 6' - 6" 6' - 0"
2' - 10 5/8"
27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
D04
D08 D08
D04
D04
D04
D04
D04
D04 D04
D08
D04
D08
D08 D11
D02
D08
D01
D25
D01
D19
D19
D08
D02
D20
D20
HALLWAY ABOVE
D18
D21
D22
D20
D20
D20
D23
D12
D24
D20 D28
D23
D29
D20
D28
(E) UTILIDOR PIT
D05
D18
D18
D13
D13
D20
D20
HANGAR DOOR ABOVE
B.6
STAIR TO REMAIN D
D23
D04
D02
D36
D36
D34
D35
D36
LEGEND
DEMO
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-101
FI
R
ST
F
LO
O
R D
EM
O
LI
TI
O N
P
LA
N
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A-
1-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 FIRST FLOOR - DEMOLITION
DEMOLITION GENERAL NOTES XX
D18 DEMO LADDER
D19 DEMO WOOD COAT RACK
D20 DEMO PORTION OF CONC FLOOR. SEE S-101
D21 DEMO LOWER ENCLOSURE AROUND COLUMN
D22 DEMO INTERIOR METAL WALL PANELS
D23 REMOVE EXTERIOR WALL PANELS AND SAVE FOR REINSTALLATION. DEMO INSULATION AND
INTERIOR METAL PANELS IN AREAS RECEIVING STRUCT UPGRADES, SEE STRUCT
D24 DEMO SECTIONAL DOOR. RETAIN TRACK, MOTOR AND ASSOC HARDWARE
D25 DEMO SECTIONAL DOOR, TRACK, MOTOR AND HARDWARE
D28 DEMO PORTION OF WALL FOR NEW RAIN LEADER DOWNSPOUT, SEE MECH
D29 DEMO PORTION OF WALL FOR NEW MECH GRILL/LOUVER, SEE MECH
D30 DEMO COUNTERTOP, SINK AND BASE CABINETS
D31 DEMO LIGHT FIXTURES, SEE ELEC
D32 DEMO SOFFIT
D33 DEMO PARAPETS DOWN TO DECK. REMOVE CC CHANNELS BETWEEN COLUMNS AT
ELEVATION 37'-6" AND AT ELEVATION 36'-3". CUT (3) W14X82 AND (2) W18X24 STRUCTURAL
STEEL COLUMNS AT GRIDLINES 1, 2, 3, 4, AND 5.
D34 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 6" STUD WALL
D35 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 8" CMU WALL
D36 DEMO 8" CMU WALL
D01 DEMO DOOR, FRAME AND HARDWARE
D02 DEMO STUD FRAMED WALL
D03 DEMO WINDOWS
D04 DEMO FLOOR FINISH
D05 DEMO ALL PLUMBING FIXTURES
D06 DEMO STAIR AND HANDRAILS
D07 DEMO FULLY ADHERED EPDM ROOFING ASSEMBLY DOWN TO DECK
D08 PREPARE WALL FOR NEW DOOR OPENING. INCLUDES SELECTIVE DEMO OF METAL WALL
PANELS, METAL STUDS, RIGID INSULATION, C-CHANNELS, AND 4'-0" TALL CONCRETE STEM
WALL
D09 DEMO FLOOR (CONCRETE ON METAL DECKING)
D10 DEMO CEILING AND MECH AND ELEC FIXTURES, SEE MECH AND ELEC SHEETS
D11 DEMO ENTRANCE MAT
D12 DEMO COLUMNS, CUT COLUMNS FLUSH WITH FINISH FLOOR
D13 DEMO PLATFORM, DISCONNECT AND REMOVE MECHANICAL EQUIPMENT, SEE MECH
D14 DEMO WOOD JOIST AND CEILING
D15 DEMO ROOF DRAIN
D16 DEMO ROOF HATCH
D17 CUT EXISTING CONC CURB FOR NEW DOOR OPENING
0" 4' 8' 16'
PLAN NORTH
1 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. REPORT ALL
DISCREPANCIES TO THE CONTRACTING OFFICER.
2 REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND TELECOM FOR ADDITIONAL
DEMOLITION NOTES
3 SEE SHEETS A-121 AND A-122 FOR DEMOLITION OF CEILINGS.
4 SEE A-141 FOR DEMOLITION OF ROOFING.
DEMOLITION KEY NOTES
M
AR
K D
ES
C
R
IP
TI
O
N D
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
D06
D06
D02
D01D01
D01D02
D09
11' - 0" 6' - 6" 6' - 0"
2' - 10 5/8"
27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
D03
D04
D04
D04
D02
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
D14
D17
D18
D02 D01
D23
D20
3'
0" 3' - 0"
D02
D30
D29
D18
D18
D13
D13
D13
D23
B.6
D02D02
(E) MECH EQUIP
SEE MECH
EQUIPMENT
PLATFORM
(TO REMAIN)
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-102
M E
ZZ
AN
IN
E
D
EM
O
LI
TI
O
N P
LA
N
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A-
2-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 MEZZANINE DEMOLITION PLAN
0" 4' 8' 16'
PLAN NORTH
DEMOLITION GENERAL NOTES XX
D18 DEMO LADDER
D19 DEMO WOOD COAT RACK
D20 DEMO PORTION OF CONC FLOOR. SEE S-101
D21 DEMO LOWER ENCLOSURE AROUND COLUMN
D22 DEMO INTERIOR METAL WALL PANELS
D23 REMOVE EXTERIOR WALL PANELS AND SAVE FOR REINSTALLATION. DEMO INSULATION AND
INTERIOR METAL PANELS IN AREAS RECEIVING STRUCT UPGRADES, SEE STRUCT
D24 DEMO SECTIONAL DOOR. RETAIN TRACK, MOTOR AND ASSOC HARDWARE
D25 DEMO SECTIONAL DOOR, TRACK, MOTOR AND HARDWARE
D28 DEMO PORTION OF WALL FOR NEW RAIN LEADER DOWNSPOUT, SEE MECH
D29 DEMO PORTION OF WALL FOR NEW MECH GRILL/LOUVER, SEE MECH
D30 DEMO COUNTERTOP, SINK AND BASE CABINETS
D31 DEMO LIGHT FIXTURES, SEE ELEC
D32 DEMO SOFFIT
D33 DEMO PARAPETS DOWN TO DECK. REMOVE CC CHANNELS BETWEEN COLUMNS AT
ELEVATION 37'-6" AND AT ELEVATION 36'-3". CUT (3) W14X82 AND (2) W18X24 STRUCTURAL
STEEL COLUMNS AT GRIDLINES 1, 2, 3, 4, AND 5.
D34 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 6" STUD WALL
D35 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 8" CMU WALL
D36 DEMO 8" CMU WALL
D01 DEMO DOOR, FRAME AND HARDWARE
D02 DEMO STUD FRAMED WALL
D03 DEMO WINDOWS
D04 DEMO FLOOR FINISH
D05 DEMO ALL PLUMBING FIXTURES
D06 DEMO STAIR AND HANDRAILS
D07 DEMO FULLY ADHERED EPDM ROOFING ASSEMBLY DOWN TO DECK
D08 PREPARE WALL FOR NEW DOOR OPENING. INCLUDES SELECTIVE DEMO OF METAL WALL
PANELS, METAL STUDS, RIGID INSULATION, C-CHANNELS, AND 4'-0" TALL CONCRETE STEM
WALL
D09 DEMO FLOOR (CONCRETE ON METAL DECKING)
D10 DEMO CEILING AND MECH AND ELEC FIXTURES, SEE MECH AND ELEC SHEETS
D11 DEMO ENTRANCE MAT
D12 DEMO COLUMNS, CUT COLUMNS FLUSH WITH FINISH FLOOR
D13 DEMO PLATFORM, DISCONNECT AND REMOVE MECHANICAL EQUIPMENT, SEE MECH
D14 DEMO WOOD JOIST AND CEILING
D15 DEMO ROOF DRAIN
D16 DEMO ROOF HATCH
D17 CUT EXISTING CONC CURB FOR NEW DOOR OPENING
1 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. REPORT ALL
DISCREPANCIES TO THE CONTRACTING OFFICER.
2 REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND TELECOM FOR ADDITIONAL
DEMOLITION NOTES
3 SEE SHEETS A-121 AND A-122 FOR DEMOLITION OF CEILINGS.
4 SEE A-141 FOR DEMOLITION OF ROOFING.
DEMOLITION KEY NOTES
M
AR
K D
ES
C
R
IP
TI
O
N D
UP
A-202
C1
A-201
A1
A-202
C3
A-201
C1
A A.3 A.6 B B.3 C
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
BAY 1
BAY 2
BREAK ROOM
OFFICE
SUPERVISOR
ELECT
MECH
FIRE PUMP
CLASS ROOM
HALL
STORAGE
STORAGE
OFFICE
SUPERVISOR'S
OFFICE
CHANGING ROOM
WHEEL AND TIRE
SHOP
A1 A-301
C4 A-302
B1 A-401
W2
C1 A-301
C1 A-302
11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 192' - 4 5/8"
VESTIBULE
VESTIBULE
C4 A-401
A4 A-402
VESTIBULE
119 10
107B
7A
109A
111A
4B
4A
114C
125A 125B
5C
102A
9B
5' - 8"
5'
5"
102C
101 102
114D
103B
103A02
0' - 8"
1'
3"
1'
4"
0'
W1
111B
02 02 W3 W3
2B
11' - 10"
HALL
114B
1" / 12"
A1 A-302
A1 A-303
7'
6"
(E) UTILIDOR PIT
A1 A-501
TYP
A1 A-501
TYP
A4 A-302
B.6
A3 A-304
LINE OF AIRCRAFT
CLEARANCE (10'-0")
TYP
EXISTING STAIR
8" CMU
3 5/8" STUD
6" STUD 8" CMU
8" CMU D2
A-506
PLAN LEGEND
NEW CONCRETE FLOOR
XXXA
DOOR NUMBER
SEE SCHEDULE ON A603
NEW DOOR/FRAME/HARDWARE
WALK OFF MAT
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-103
FI
R
ST
F
LO
O
R P
LA
N
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A A
-1
- X
XX
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 FIRST FLOOR - NEW LAYOUT
FLOOR PLAN GENERAL NOTES
1 REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN CORRESPOND TO REFERENCE
ELEVATION 0’-0” FOR THIS FLOOR LEVEL. DEVIATIONS AND VARIANCES IN THIS ELEVATION MAY EXIST, AS INDICATED.
2 DOOR OPENINGS: ALL DOOR OPENINGS ARE DESIGNATED WITH REFERENCE NUMBERS
CORRESPONDING TO A SEPARATE DOOR SCHEDULE. THIS MAY INCLUDE MISCELLANEOUS OPENINGS
SUCH AS OVERHEAD SECTIONAL DOORS. REFER TO SHEET A-603 FOR DOOR OPENINGS.
3 WALL TYPES: ANY WALL TYPE NOT TAGGED ON THE FLOOR PLAN SHALL BE CLASSIFIED WALL TYPE 1.
UNLESS OTHERWISE NOTED. SEE SHEET A-601 FOR ALL WALL TYPES.
4 ROOM FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE ROOM NAMES/NUMBERS
CORRESPONDING TO A SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR THE ROOM
FINISH SCHEDULE.
5 MOUNTING HEIGHTS: REFER TO SHEET A-403 FOR TYPICAL MOUNTING HEIGHTS FOR FIXTURES, ACCESORY ITEMS, AND MISCELLANEOUS DEVICES
6 DEMOLITION NOTES: REFERENCE CORRESPONDING DEMOLITION SHEET A-101 FOR
CROSS-REFERENCING THE SAME FLOOR PLAN.
7 REFLECTED CEILING PLAN: REFER TO SHEET A-123 FOR THE CORRESPONDING RCP FOR THIS FLOOR
PLAN AREA.
8 EQUIPMENT PLAN: REFER TO SHEET A-105 FOR THE CORRESPONDING EQUIPMENT PLAN FOR THIS
FLOOR PLAN AREA.
9 DIMENSIONING GUIDE:
SHEET KEY NOTESXX
0" 4' 8' 16'
PLAN NORTH
01 EMERGENCY SHOWER/EYEWASH, SEE MECH
02 INFILL WALL OPENING, MATCH EXISTING WALL CONSTRUCTION. PROVIDE FIRE
RATED AS REQUIRED PER SHEET G-102
03 NEW PVC ROOF ASSEMBLY. SEE A601 FOR NEW TYPE 1
04 NEW ROOF DRAIN WITH OVERFLOW DRAIN
05 NEW METAL LADDER
06 CONC HOUSE KEEPING PAD, SEE STRUCT
07 PROVIDE NEW GUARDRAIL
08 PROVIDE ROOF HATCH IN EXISTING OPENING
09 PROVIDE BOTTLE FILLER. SEE MECH
1. AS NOTED
2. GRIDLINES
3. FACE OF CONCRETE OR MASONRY
4. FACE OF STUD
5. FACE OF HORIZONTAL FINISH
M
AR
K D
ES
C
R
IP
TI
O
N D
C1
A-201
A1
A-202
C3
A-201
C1
A A.3 A.6 B B.3 C
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
FAN ROOM
A1 A-301
C4 A-302
MECH
C1 A-301
C1 A-302
C4 A-402
11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
121B
A3 A-305
127 12
06 06
A1 A-302
A1 A-303
3" / 12"
3" / 12"
A4 A-302
B.6
(E) MECH EQUIP
SEE MECH
CANOPY, SIM TO
D2 / A-506
A4 A-506
TYP
A1 A-304
D2 A-506
CB-12 FALL
PROTECTION
DEVICE
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-104
M
EZ
ZA
N
IN
E
FL
O
O R
P
LA
N
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A A-
4-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 MEZZANINE FLOOR PLAN
FLOOR PLAN GENERAL NOTES
1 REFERENCE ELEVATION: ALL ELEVATIONS NOTED ON THIS PLAN CORRESPOND TO REFERENCE
ELEVATION 0’-0” FOR THIS FLOOR LEVEL. DEVIATIONS AND VARIANCES IN THIS ELEVATION MAY EXIST, AS INDICATED.
2 DOOR OPENINGS: ALL DOOR OPENINGS ARE DESIGNATED WITH REFERENCE NUMBERS
CORRESPONDING TO A SEPARATE DOOR SCHEDULE. THIS MAY INCLUDE MISCELLANEOUS OPENINGS
SUCH AS OVERHEAD SECTIONAL DOORS. REFER TO SHEET A-603 FOR DOOR OPENINGS.
3 WALL TYPES: ANY WALL TYPE NOT TAGGED ON THE FLOOR PLAN SHALL BE CLASSIFIED WALL TYPE 1.
UNLESS OTHERWISE NOTED. SEE SHEET A-601 FOR ALL WALL TYPES.
4 ROOM FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE ROOM NAMES/NUMBERS
CORRESPONDING TO A SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR THE ROOM
FINISH SCHEDULE.
5 MOUNTING HEIGHTS: REFER TO SHEET A-403 FOR TYPICAL MOUNTING HEIGHTS FOR FIXTURES, ACCESORY ITEMS, AND MISCELLANEOUS DEVICES
6 DEMOLITION NOTES: REFERENCE CORRESPONDING DEMOLITION SHEET A-101 FOR
CROSS-REFERENCING THE SAME FLOOR PLAN.
7 REFLECTED CEILING PLAN: REFER TO SHEET A-123 FOR THE CORRESPONDING RCP FOR THIS FLOOR
PLAN AREA.
8 EQUIPMENT PLAN: REFER TO SHEET A-105 FOR THE CORRESPONDING EQUIPMENT PLAN FOR THIS
FLOOR PLAN AREA.
9 DIMENSIONING GUIDE:
SHEET KEY NOTES
0" 4' 8' 16'
PLAN NORTH
01 EMERGENCY SHOWER/EYEWASH, SEE MECH
02 INFILL WALL OPENING, MATCH EXISTING WALL CONSTRUCTION. PROVIDE FIRE
RATED AS REQUIRED PER SHEET G-102
03 NEW PVC ROOF ASSEMBLY. SEE A601 FOR NEW TYPE 1
04 NEW ROOF DRAIN WITH OVERFLOW DRAIN
05 NEW METAL LADDER
06 CONC HOUSE KEEPING PAD, SEE STRUCT
07 PROVIDE NEW GUARDRAIL
08 PROVIDE ROOF HATCH IN EXISTING OPENING
09 PROVIDE BOTTLE FILLER. SEE MECH
xx
1. AS NOTED
2. GRIDLINES
3. FACE OF CONCRETE OR MASONRY
4. FACE OF STUD
5. FACE OF HORIZONTAL FINISH
M
AR
K D
ES
C
R
IP
TI
O
N D
UP
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
BAY 1
BAY 2
BREAK ROOM
OFFICE
SUPERVISOR
ELECT
MECH
FIRE PUMP
CLASS ROOM
HALL
STORAGE
UNISEX
STORAGE
OFFICE
SUPERVISOR'S
OFFICE
CHANGING ROOM
J00045
J13008
J00108
F16-06
11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
VESTIBULE
VESTIBULE
VESTIBULE
F16-02
F16-07
F16-04
F16-01
F16-03
F16-06
F16-06
F16-06
F1 6-
BENCH2
BE
N
C H
BENCH1
TOOL1
TOOL4TOOL2
TOOL3
B.6
EQUIPMENT/FURNITURE PLAN GENERAL NOTES:
1. ALL FURNITURE ON THE FURNITURE SCHEDULE IS GFGI.
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-105
EQ
U
IP
M
EN
T /
FU
R
N
IT
U R
E
PL
AN
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A-
5-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 FIRST FLOOR - EQUIPMENT/FURNITURE PLAN
LABEL DESCRIPTION CFCI CFGI GFCI GFGI
F16-07 F-16 BEARING
WASHER
X
J00045 DEGREASER X
J00108 NITROGEN CART X
J13008 TIRE SAFETY GUARD X
TOOL1 TOOL CHEST 1 X
TOOL2 TOOL CHEST 2 X
TOOL3 TOOL CHEST 3 X
TOOL4 TOOL CHEST 4 X
LABEL DESCRIPTION CFCI CFGI GFCI GFGI
BENCH1 WORK BENCH SHORT X
BENCH2 WORK BENCH LONG X
BENCH2 WORK BENCH LONG X
F16-01 F-16 BEAD BREAKER X
F16-02 F-16 WHEEL WASHER X
F16-03 F-16 WHEEL BUILDUP X
F16-04 F-16 ULTRASONIC
WASHER
X
F16-06 TIRE STORAGE RACK X
F16-06 TIRE STORAGE RACK X
F16-06 TIRE STORAGE RACK X
F16-06 TIRE STORAGE RACK X
F16-06 TIRE STORAGE RACK X
EQUIPMENT SCHEDULEXX
0" 4' 8' 16'
PLAN NORTH
DESCRIPTION
ROOM NUMBER
TOTAL109 110 111 112 120 122 123
CHAIR, TASK WITH ARMS ON CASTERS 11 1 1 2 1 16
CHAIR, SIDE 2 2 2 6
CHAIR, CLASSROOM 12 12
CHAIR, CAFE 4 4
DESK, 60" x 30" 1 2 3 DESK, 71"x 36" 1 1 2
WORKSTATION, STANDARD 10 10
WORKSTATION, SUPERVISOR 1 1
TABLE, CAFE 1 1
TABLE, CLASSROOM 4 4
VISUAL DISPLAY BOARD, MARKER BOARD 1 1
BENCH, WOOD 1 1
LOCKERS, METAL 9 9
REFRIGERATOR 1 1
FURNITURE SCHEDULE
M
AR
K D
ES
C
R
IP
TI
O
N D
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
EPX-1
EPX-1EPX-1
SUPERVISOR'S
OFFICE
STORAGE
OFFICE
VESTIBULE
CHANGING ROOM
WHEEL AND TIRE
SHOP
VESTIBULE
BAY 1
BAY 2
FIRE PUMP
ELECT
MECH
OFFICE
SUPERVISOR
BREAK ROOM
CLASS ROOM
STORAGE
HALL
HALL
114B
VESTIBULE
10711
4A
114C
114D
4B
111A111B 109A
107B
7A
102A
2B
103B
103A
9B
125A 125B
5C124
101 102
102C
B.6
F1
F2
F2
F1
F3F3
F4
CONC
D1 A-505
F5
TYP
5' - 0" MIN
5'
0"
5' - 0"
TY
P
5'
1" M
IN
5'
0"
5' - 0"
5'
0"
TYP
5' - 0" MIN
5'
- 0
F5 F5
3' - 5 7/32"
R21.3'
5'
0"
FINISH LEGEND
CONCRETE
RUBBER MAT
WALK OFF MAT
CARPET TILE 1
VINYL TILE
CARPET TILE 2
PLYWOOD FLOORING
FINISH PLAN GENERAL NOTES:
1. ROOM FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE ROOM NAMES/NUMBERS CORRESPONDING TO A
SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR THE ROOM FINISH SCHEDULE.
2. REFLECTED CEILING PLAN: REFER TO SHEET A-123 FOR THE CORRESPONDING RCP FOR THIS FLOOR PLAN.
3. DOOR AND FRAME FINISHES: REFER TO THE DOOR SCHEDULE ON A-603 FOR DOOR AND FRAME FINISHES.
4. FLOOR TRANSITIONS: ALL FLOORING TRANSITIONS OCCUR AT CENTERLINE OF DOOR UNO.
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-106
FI
R
ST
F
LO
O
R
F I N
IS
H
P
LA
N
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A-
6-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 FIRST FLOOR - FINISH PLAN
0" 4' 8' 16'
PLAN NORTH
SHEET KEY NOTESxx
F1 4" STRIPING. 48" X 48" MIN CLEAR INTERIOR. COLOR: GREEN 34110.
F2 6" STRIPING. COLOR: ORANGE YELLOW 33538.
F3 6" DIAGONAL ALTERING BLACK AND YELLOW STRIPING, COLOR: ORANGE YELLOW 33538.
F4 3" DIAGONAL ALTERNATING BLACK AND WHITE STRIPING, COLOR: BLACK AND WHITE.
F5 TILE FLOORING. SEE A602, FINISH SCHEDULE.
M
AR
K D
ES
C
R
IP
TI
O
N D
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
FAN ROOM
MECH
11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
121B
B.6
(E) MECH EQUIP
SEE MECH
FINISH LEGEND
CONCRETE
PLYWOOD FLOORING
GYPSUM BOARD
FINISH PLAN GENERAL NOTES:
1. ROOM FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE ROOM NAMES/NUMBERS CORRESPONDING TO A
SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR THE ROOM FINISH SCHEDULE.
2. REFLECTED CEILING PLAN: REFER TO SHEET A-123 FOR THE CORRESPONDING RCP FOR THIS FLOOR PLAN.
3. DOOR AND FRAME FINISHES: REFER TO THE DOOR SCHEDULE ON A-603 FOR DOOR AND FRAME FINISHES.
4. FLOOR TRANSITIONS: ALL FLOORING TRANSITIONS OCCUR AT CENTERLINE OF DOOR UNO.
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-107
M
EZ
ZA
N
IN
E
- F
IN
IS
H
P
LA
N
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A-
7-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 MEZZANINE FLOOR - FINISH PLAN
0" 4' 8' 16'
PLAN NORTH
M
AR
K D
ES
C
R
IP
TI
O
N D
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
D10 D10 D10 D10
D10 D10
D10
D10
EXP
EXP EXP
D10
11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
EXP
EXP
EXP EXP
D20
D10
D10 D31
D31
D32
D31
D31
D31
B.6
EXISTING MEZZANINE
TYP.
UNIT HEATER, SEE MECH.
GWB
EXPOSED TO
STRUCTURE
2' X 4' ACP AND GRID
LINEAR PENDANT LIGHT FIXTURE,
SEE ELECT
LIGHT FIXTURE, SURFACE
MOUNTED, SEE ELEC
SUPPLY DUCT, SEE MECH
RETURN DUCT, SEE MECH
FOAM GENERATOR, SEE
FIRE
EXP
RCP LEGEND
CEILING HEIGHT AS NOTEDX'-X''
AFF
SPRAY APPLIED FIRE PROOFING
LIGHT FIXTURE,
RECESED, SEE ELEC
ROUND PENDANT LIGHT
FIXTURE, SEE ELEC
WALL MOUNTED LIGHT
FIXTURE, SEE ELEC
DESTRATIFICATION FAN
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-121
FI
R
ST
F
LO
O
R D
EM
O
L I
TI
O N
R
EF
L E C
TE
D
C E
I L
IN
G
PL
AN
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A-
1-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 DEMOLITION RCP - FIRST FLOOR
0" 4' 8' 16'
PLAN NORTH
DEMOLITION GENERAL NOTES XX
D18 DEMO LADDER
D19 DEMO WOOD COAT RACK
D20 DEMO PORTION OF CONC FLOOR. SEE S-101
D21 DEMO LOWER ENCLOSURE AROUND COLUMN
D22 DEMO INTERIOR METAL WALL PANELS
D23 REMOVE EXTERIOR WALL PANELS AND SAVE FOR REINSTALLATION. DEMO INSULATION AND
INTERIOR METAL PANELS IN AREAS RECEIVING STRUCT UPGRADES, SEE STRUCT
D24 DEMO SECTIONAL DOOR. RETAIN TRACK, MOTOR AND ASSOC HARDWARE
D25 DEMO SECTIONAL DOOR, TRACK, MOTOR AND HARDWARE
D28 DEMO PORTION OF WALL FOR NEW RAIN LEADER DOWNSPOUT, SEE MECH
D29 DEMO PORTION OF WALL FOR NEW MECH GRILL/LOUVER, SEE MECH
D30 DEMO COUNTERTOP, SINK AND BASE CABINETS
D31 DEMO LIGHT FIXTURES, SEE ELEC
D32 DEMO SOFFIT
D33 DEMO PARAPETS DOWN TO DECK. REMOVE CC CHANNELS BETWEEN COLUMNS AT
ELEVATION 37'-6" AND AT ELEVATION 36'-3". CUT (3) W14X82 AND (2) W18X24 STRUCTURAL
STEEL COLUMNS AT GRIDLINES 1, 2, 3, 4, AND 5.
D34 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 6" STUD WALL
D35 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 8" CMU WALL
D36 DEMO 8" CMU WALL
D01 DEMO DOOR, FRAME AND HARDWARE
D02 DEMO STUD FRAMED WALL
D03 DEMO WINDOWS
D04 DEMO FLOOR FINISH
D05 DEMO ALL PLUMBING FIXTURES
D06 DEMO STAIR AND HANDRAILS
D07 DEMO FULLY ADHERED EPDM ROOFING ASSEMBLY DOWN TO DECK
D08 PREPARE WALL FOR NEW DOOR OPENING. INCLUDES SELECTIVE DEMO OF METAL WALL
PANELS, METAL STUDS, RIGID INSULATION, C-CHANNELS, AND 4'-0" TALL CONCRETE STEM
WALL
D09 DEMO FLOOR (CONCRETE ON METAL DECKING)
D10 DEMO CEILING AND MECH AND ELEC FIXTURES, SEE MECH AND ELEC SHEETS
D11 DEMO ENTRANCE MAT
D12 DEMO COLUMNS, CUT COLUMNS FLUSH WITH FINISH FLOOR
D13 DEMO PLATFORM, DISCONNECT AND REMOVE MECHANICAL EQUIPMENT, SEE MECH
D14 DEMO WOOD JOIST AND CEILING
D15 DEMO ROOF DRAIN
D16 DEMO ROOF HATCH
D17 CUT EXISTING CONC CURB FOR NEW DOOR OPENING
1 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. REPORT ALL
DISCREPANCIES TO THE CONTRACTING OFFICER.
2 REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND TELECOM FOR ADDITIONAL
DEMOLITION NOTES
3 SEE SHEETS A-121 AND A-122 FOR DEMOLITION OF CEILINGS.
4 SEE A-141 FOR DEMOLITION OF ROOFING.
DEMOLITION KEY NOTES
M
AR
K D
ES
C
R
IP
TI
O
N D
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
EXP
EXP EXP
EXP
D10
D10
D10
D10
11' - 0" 6' - 6" 6' - 0"
2' - 10 5/8"
27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
D31 D31
D31
B.6
EXP
D18
D13
D18
D13
D13
D18
UNIT HEATER, SEE MECH.
GWB
EXPOSED TO
STRUCTURE
2' X 4' ACP AND GRID
LINEAR PENDANT LIGHT FIXTURE,
SEE ELECT
LIGHT FIXTURE, SURFACE
MOUNTED, SEE ELEC
SUPPLY DUCT, SEE MECH
RETURN DUCT, SEE MECH
FOAM GENERATOR, SEE
FIRE
EXP
RCP LEGEND
CEILING HEIGHT AS NOTEDX'-X''
AFF
SPRAY APPLIED FIRE PROOFING
LIGHT FIXTURE,
RECESED, SEE ELEC
ROUND PENDANT LIGHT
FIXTURE, SEE ELEC
WALL MOUNTED LIGHT
FIXTURE, SEE ELEC
DESTRATIFICATION FAN
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-122
M E
ZZ
AN
IN
E
FL
O
O R
D
EM
O
LI
TI
O
N R
EF
LE
C T E
D C
EI
L I
N G
P
LA
N
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A-
2-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 DEMOLITION RCP - MEZZANINE
0" 4' 8' 16'
PLAN NORTH
DEMOLITION GENERAL NOTES XX
D18 DEMO LADDER
D19 DEMO WOOD COAT RACK
D20 DEMO PORTION OF CONC FLOOR. SEE S-101
D21 DEMO LOWER ENCLOSURE AROUND COLUMN
D22 DEMO INTERIOR METAL WALL PANELS
D23 REMOVE EXTERIOR WALL PANELS AND SAVE FOR REINSTALLATION. DEMO INSULATION AND
INTERIOR METAL PANELS IN AREAS RECEIVING STRUCT UPGRADES, SEE STRUCT
D24 DEMO SECTIONAL DOOR. RETAIN TRACK, MOTOR AND ASSOC HARDWARE
D25 DEMO SECTIONAL DOOR, TRACK, MOTOR AND HARDWARE
D28 DEMO PORTION OF WALL FOR NEW RAIN LEADER DOWNSPOUT, SEE MECH
D29 DEMO PORTION OF WALL FOR NEW MECH GRILL/LOUVER, SEE MECH
D30 DEMO COUNTERTOP, SINK AND BASE CABINETS
D31 DEMO LIGHT FIXTURES, SEE ELEC
D32 DEMO SOFFIT
D33 DEMO PARAPETS DOWN TO DECK. REMOVE CC CHANNELS BETWEEN COLUMNS AT
ELEVATION 37'-6" AND AT ELEVATION 36'-3". CUT (3) W14X82 AND (2) W18X24 STRUCTURAL
STEEL COLUMNS AT GRIDLINES 1, 2, 3, 4, AND 5.
D34 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 6" STUD WALL
D35 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 8" CMU WALL
D36 DEMO 8" CMU WALL
D01 DEMO DOOR, FRAME AND HARDWARE
D02 DEMO STUD FRAMED WALL
D03 DEMO WINDOWS
D04 DEMO FLOOR FINISH
D05 DEMO ALL PLUMBING FIXTURES
D06 DEMO STAIR AND HANDRAILS
D07 DEMO FULLY ADHERED EPDM ROOFING ASSEMBLY DOWN TO DECK
D08 PREPARE WALL FOR NEW DOOR OPENING. INCLUDES SELECTIVE DEMO OF METAL WALL
PANELS, METAL STUDS, RIGID INSULATION, C-CHANNELS, AND 4'-0" TALL CONCRETE STEM
WALL
D09 DEMO FLOOR (CONCRETE ON METAL DECKING)
D10 DEMO CEILING AND MECH AND ELEC FIXTURES, SEE MECH AND ELEC SHEETS
D11 DEMO ENTRANCE MAT
D12 DEMO COLUMNS, CUT COLUMNS FLUSH WITH FINISH FLOOR
D13 DEMO PLATFORM, DISCONNECT AND REMOVE MECHANICAL EQUIPMENT, SEE MECH
D14 DEMO WOOD JOIST AND CEILING
D15 DEMO ROOF DRAIN
D16 DEMO ROOF HATCH
D17 CUT EXISTING CONC CURB FOR NEW DOOR OPENING
1 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. REPORT ALL
DISCREPANCIES TO THE CONTRACTING OFFICER.
2 REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND TELECOM FOR ADDITIONAL
DEMOLITION NOTES
3 SEE SHEETS A-121 AND A-122 FOR DEMOLITION OF CEILINGS.
4 SEE A-141 FOR DEMOLITION OF ROOFING.
DEMOLITION KEY NOTES
M
AR
K D
ES
C
R
IP
TI
O
N D
M
MM
M M
M
M
A A.3 A.6 B B.3 C
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
A.F.F.10' - 0" A.F.F.9' - 6"
A1 A-301
C4 A-302
C1 A-301
C1 A-302
A.F.F.10' - 0"
11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
EXP EXPEXP
GWB
EXP
EXP EXP
A1 A-302
A1 A-303
A.F.F.9' - 6"
A.F.F.9' - 6"
A4 A-302
B.6
GYP.
GYP.
GWB GWB GWB GWB
GWB
OCCUPANCY
SENSOR
OCCUPANCY
SENSOR
OCCUPANCY
SENSOR
EXTENT OF SPRAY-APPLIED FIREPROOFING
D2 A-506A.F.F.9' - 0"
A.F.F.9' - 0"
A.F.F.9' - 4"
A.F.F.9' - 0"
A.F.F.9' - 0"
A.F.F.9' - 0"
A.F.F.9' - 0"
1-HOUR FLOOR/CEILING
PROTECTION ABOVE
VESTIBULE
SUSPENDED CEILING
PROJECTOR MOUNT,
SEE A1/A-502
UNIT HEATER, SEE MECH.
GWB
EXPOSED TO
STRUCTURE
2' X 4' ACP AND GRID
LINEAR PENDANT LIGHT FIXTURE,
SEE ELECT
LIGHT FIXTURE, SURFACE
MOUNTED, SEE ELEC
SUPPLY DUCT, SEE MECH
RETURN DUCT, SEE MECH
FOAM GENERATOR, SEE
FIRE
EXP
RCP LEGEND
CEILING HEIGHT AS NOTEDX'-X''
AFF
SPRAY APPLIED FIRE PROOFING
LIGHT FIXTURE,
RECESED, SEE ELEC
ROUND PENDANT LIGHT
FIXTURE, SEE ELEC
WALL MOUNTED LIGHT
FIXTURE, SEE ELEC
DESTRATIFICATION FAN
RCP PLAN GENERAL NOTES
1. CEILING FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE NAMES/NUMBERS CORRESPONDING TO A
SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR SCHEDULED CEILING FINISHES.
2. CEILING HEIGHTS: ALL FINISHED CELINGS DESIGNATED ON THIS PLAN SHALL BE 9'-0" AFF, UNLESS OTHERWISE NOTED
ON THE PLAN.
3. CEILING DEVICES: ALL CEILING LAYOUT PLANS SHOW MOST MAJOR MECHANICAL, FIRE PROTECTION AND ELECTRICAL
DEVICES. SEE MECHANICAL, FIRE PROTECTION AND ELECTRICAL SHEETS FOR ADDITIONAL DEVICES INCLUDED IN THE
CEILING CONFIGURATION. CONTRACTOR TO COORDINATE LAYOUT OF ALL DEVICES.
4. DEMOLITION NOTES: REFER TO CORRESPONDING SHEET A-121.
5. SEISMIC BRACING: SEE A3/A-502.
6. LIGHTING IN MECHANICAL SPACES: LOCATE FIXTURES TO AVOID MECHANICAL UNITS.
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-123
FI
R
ST
F
LO
O
R R
EF
LE
C T E
D C
E I
LI
N G
P
LA
N
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A A-
3-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 FIRST FLOOR RCP
0" 4' 8' 16'
PLAN NORTH
M
AR
K D
ES
C
R
IP
TI
O
N D
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
EXP
A1 A-301
C4 A-302
C1 A-301
C1 A-302
EXP
EXP
11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
FAN ROOM
BAY 2
BAY 1
MECH
WHEEL AND TIRE
SHOP
EXP
A1 A-302
A4 A-302
B.6
GWB
FG
FG FG
FG
FOAM GENERATOR,
TYPICAL
EXPDESTRATIFICATION
FAN TO REMAIN, TYP.
ROUND PENDANT LIGHT
FIXTURE, SEE ELEC.
UNIT HEATER, SEE MECH.
GWB
EXPOSED TO
STRUCTURE
2' X 4' ACP AND GRID
LINEAR PENDANT LIGHT FIXTURE,
SEE ELECT
LIGHT FIXTURE, SURFACE
MOUNTED, SEE ELEC
SUPPLY DUCT, SEE MECH
RETURN DUCT, SEE MECH
FOAM GENERATOR, SEE
FIRE
EXP
RCP LEGEND
CEILING HEIGHT AS NOTEDX'-X''
AFF
SPRAY APPLIED FIRE PROOFING
LIGHT FIXTURE,
RECESED, SEE ELEC
ROUND PENDANT LIGHT
FIXTURE, SEE ELEC
WALL MOUNTED LIGHT
FIXTURE, SEE ELEC
DESTRATIFICATION FAN
RCP PLAN GENERAL NOTES
1. CEILING FINISHES: ALL ROOMS ARE DESIGNATED WITH REFERENCE NAMES/NUMBERS CORRESPONDING TO A
SEPARATE ROOM FINISH SCHEDULE. REFER TO SHEET A-602 FOR SCHEDULED CEILING FINISHES.
2. CEILING HEIGHTS: ALL FINISHED CELINGS DESIGNATED ON THIS PLAN SHALL BE 9'-0" AFF, UNLESS OTHERWISE NOTED
ON THE PLAN.
3. CEILING DEVICES: ALL CEILING LAYOUT PLANS SHOW MOST MAJOR MECHANICAL, FIRE PROTECTION AND ELECTRICAL
DEVICES. SEE MECHANICAL, FIRE PROTECTION AND ELECTRICAL SHEETS FOR ADDITIONAL DEVICES INCLUDED IN THE
CEILING CONFIGURATION. CONTRACTOR TO COORDINATE LAYOUT OF ALL DEVICES.
4. DEMOLITION NOTES: REFER TO CORRESPONDING SHEET A-121.
5. SEISMIC BRACING: SEE A3/A-502.
6. LIGHTING IN MECHANICAL SPACES: LOCATE FIXTURES TO AVOID MECHANICAL UNITS.
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
SO
LI
C
IT
A
TI
O N
N O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-124
M
EZ
ZA
N
IN
E
R
EF
LE
C
TE
D
C E I
LI
N
G P
LA
N
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A A-
4-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 MEZZANINE REFLECTED CEILING PLAN
0" 4' 8' 16'
PLAN NORTH
M
AR
K D
ES
C
R
IP
TI
O
N D
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
SLOPE SLOPE
SLOPE SLOPE SLOPE SLOPE
SLOPE SLOPE
SLOPE
SLOPE
D15
D16
D15
D15D15
D15
D15
D07
D15
D15
D07
D15
D15
VTR
VTR (DEMO)
VTR (DEMO)
11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
TYPTYP
TYPTYP
TYP
TYP
TYP
TYP
TYP
TYP
B.6
SLOPE
SLOPE
6" VTR
T.
O
. S
TE
E L
'-0
T.
O
. S
TE
E L
'-0
T.
O
. S
TE
E L
'-4
T.
O
. S
TE
E L
'-1
0"
T.
O
. S
TE
E L
'-4
T.
O
. S
TE
E L
'-0
T.
O
. S
TE
E L
'-0
T.
O
. S
TE
E L
'-0
T.
O
. S
TE
E L
'-0
T.O. STEEL
34'-0"
T.O. STEEL
34'-0"
STEEL SLOPES
TO DRAINS AT
ELEVATION 33'-0"
THIS ROOF.
D33
D33
D33
ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
SHEET ID
AI
R
F O
R C
E C
IV
IL
E N
G
IN
EE
R
C
EN
TE
R
D R
A W
N B
Y:
D E
S
IG
N E
D B
Y:
S U
B M
IT
TE
D B
Y:
S
IZ
E
C H
E C
K E
D B
Y:
A N
S I '
D
FI
LE
N A
M E
IS
S
U E
D A
TE
C O
N
TR
A C
T N
O
S O
LI
C
IT
A
TI
O
N N
O
FI
LE
N U
M B
E R
1 2 3 4 5
D
C
B
A
PA
C
IF
IC
D
IV
IS
IO
N
C O
R
PO
R
AT
E N
O . A
EC
L
A-141
D
EM
O
LI
TI
O
N R
O O
F P L
AN
F- 3 5
R E N
O
VA
TE
W
E A
PO
N S
LO
AD
T R
AI
N
IN
G
O F F
IC
E
AN
D
H
AN
G A R
R
IM
A R
C H
IT
EC
TS
G
S
TR
EE
T, S
TE
AN
C H
O R
AG
E, A K
JR
A
G
AR
, J R
A
JE
D
.0 1.
FA
-1
6D -0
FT
Q
W
FINAL
A-
1-
EI
E L
SO
N
A
FB
, A
LA
S K A
2019.01.18
1/8" = 1'-0"B1 DEMOLITION ROOF PLAN
0" 4' 8' 16'
PLAN NORTH
ROOF DEMOLITION GENERAL NOTES XX
D18 DEMO LADDER
D19 DEMO WOOD COAT RACK
D20 DEMO PORTION OF CONC FLOOR. SEE S-101
D21 DEMO LOWER ENCLOSURE AROUND COLUMN
D22 DEMO INTERIOR METAL WALL PANELS
D23 REMOVE EXTERIOR WALL PANELS AND SAVE FOR REINSTALLATION. DEMO INSULATION AND
INTERIOR METAL PANELS IN AREAS RECEIVING STRUCT UPGRADES, SEE STRUCT
D24 DEMO SECTIONAL DOOR. RETAIN TRACK, MOTOR AND ASSOC HARDWARE
D25 DEMO SECTIONAL DOOR, TRACK, MOTOR AND HARDWARE
D28 DEMO PORTION OF WALL FOR NEW RAIN LEADER DOWNSPOUT, SEE MECH
D29 DEMO PORTION OF WALL FOR NEW MECH GRILL/LOUVER, SEE MECH
D30 DEMO COUNTERTOP, SINK AND BASE CABINETS
D31 DEMO LIGHT FIXTURES, SEE ELEC
D32 DEMO SOFFIT
D33 DEMO PARAPETS DOWN TO DECK. REMOVE CC CHANNELS BETWEEN COLUMNS AT
ELEVATION 37'-6" AND AT ELEVATION 36'-3". CUT (3) W14X82 AND (2) W18X24 STRUCTURAL
STEEL COLUMNS AT GRIDLINES 1, 2, 3, 4, AND 5.
D34 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 6" STUD WALL
D35 PREPARE WALL FOR NEW DOOR INCLUDING PARTIAL DEMO OF 8" CMU WALL
D36 DEMO 8" CMU WALL
D01 DEMO DOOR, FRAME AND HARDWARE
D02 DEMO STUD FRAMED WALL
D03 DEMO WINDOWS
D04 DEMO FLOOR FINISH
D05 DEMO ALL PLUMBING FIXTURES
D06 DEMO STAIR AND HANDRAILS
D07 DEMO FULLY ADHERED EPDM ROOFING ASSEMBLY DOWN TO DECK
D08 PREPARE WALL FOR NEW DOOR OPENING. INCLUDES SELECTIVE DEMO OF METAL WALL
PANELS, METAL STUDS, RIGID INSULATION, C-CHANNELS, AND 4'-0" TALL CONCRETE STEM
WALL
D09 DEMO FLOOR (CONCRETE ON METAL DECKING)
D10 DEMO CEILING AND MECH AND ELEC FIXTURES, SEE MECH AND ELEC SHEETS
D11 DEMO ENTRANCE MAT
D12 DEMO COLUMNS, CUT COLUMNS FLUSH WITH FINISH FLOOR
D13 DEMO PLATFORM, DISCONNECT AND REMOVE MECHANICAL EQUIPMENT, SEE MECH
D14 DEMO WOOD JOIST AND CEILING
D15 DEMO ROOF DRAIN
D16 DEMO ROOF HATCH
D17 CUT EXISTING CONC CURB FOR NEW DOOR OPENING
DEMOLITION KEY NOTES
1 CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. REPORT ALL
DISCREPANCIES TO THE CONTRACTING OFFICER.
2 REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION AND TELECOM FOR ADDITIONAL
DEMOLITION NOTES
3 SEE SHEETS A-121 AND A-122 FOR DEMOLITION OF CEILINGS.
4 SEE A-141 FOR DEMOLITION OF ROOFING.
M
AR
K D
ES
C
R
IP
TI
O
N D
C1
A-201
A1
A-202
C3
A-201
C1
A A.3 A.6 B B.3 C
A'B'C'D'
1.2
1.7
2.5
3.2
4.2
4.9
A1 A-301
C4 A-302
C1 A-301
C1 A-302
VTR
6" VTR.
SEE C2/A-503.
11' - 0" 6' - 6" 6' - 0" 2' - 10 5/8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8" 27' - 8"
192' - 4 5/8"
TYPTYP
TYPTYP
TYP
TYP TYP
TYP
TYP
C1 A-503
C2 A-503
TYP
C4 A-503
TYP
A1 A-302
A2 A-503
A3 A-503
A1 A-503
A4 A-503
A4 A-503
1" / 12" 1" / 12"
1" / 12"1" / 12" 1" / 12"
1" / 12"
1" / 12"
1" / 12"
1/2":12" 1/2 ":1
2"
1/2 ":1
2" 1/2":12"
1/2":12" 1/2 ":1
2"
1/2 ":1
2" 1/2":12"
1/2":12" 1/2 ":1
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.