JMC_AV_PROJECT.pdf

PDF 3 MB Posted

Attached to
Joint Mobility Complex Audio/Video Project Federal contract opportunity
Solicitation number
FA5000-15-T-0014
Issued by
Department of the Air Force Pacific Air Forces

About this file

JMC A/V Site Photos

View the file

Other files for this federal contract opportunity

Other files attached to Joint Mobility Complex Audio/Video Project, newest first.
File Type Posted
Amendment_00007.pdf PDF
Amendment_00006.pdf PDF
Site_visit_QA_5_May_15.pdf PDF
Amendment_00005.pdf PDF
Amendment_00004.pdf PDF
Amendment_00003.pdf PDF
Amendment_00002.pdf PDF
Site_visit_QA.pdf PDF
Amendment_00001.pdf PDF
JMC_Electrical.pdf PDF
Site_Visit_Sign_In.pdf PDF
COMBO.pdf PDF
JMC_Dimensions.PPTX PPTX presentation
JMC_SOO_Final.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Joint Mobility Complex A/V Project

UNCLASSIFIED//FOUO

Design Concept

NORTH

02 OCT: 673rd Contracting Meeting Developed way ahead w Contracting Officer/NCO

08 OCT:

Provide SOO to IA personnel

20 OCT: Requirements Package approved by 673rd CONS

23 OCT:

Meeting with 673rd CONS for azimuth check 1 NOV: Request for quotes out to vendors

1 DEC:

Quotes received & evaluated

15 JAN: Work Begins

1 MAY: JMC A/V Mission Complete

View from center looking at proposed mounting location

Mounting location for video wall:

9 screens; 3 screens high x 3 screens wide. 45” – 55” individual screens would be acceptable

Developed way ahead w Contracting Officer/NCO

08 OCT:

Provide SOO to IA personnel

20 OCT: Requirements Package approved by 673rd CONS

23 OCT:

Meeting with 673rd CONS for azimuth check 1 NOV: Request for quotes out to vendors

1 DEC:

Quotes received & evaluated

15 JAN: Work Begins

1 MAY: JMC A/V Mission Complete

11’ 6” between door casings

Approximately 9’ from floor to top of emergency light

Developed way ahead w Contracting Officer/NCO

08 OCT:

Provide SOO to IA personnel

20 OCT: Requirements Package approved by 673rd CONS

23 OCT:

Meeting with 673rd CONS for azimuth check 1 NOV: Request for quotes out to vendors

1 DEC:

Quotes received & evaluated

15 JAN: Work Begins

1 MAY: JMC A/V Mission Complete

View from center looking at proposed mounting location

Video wall could be mounted to either the wall, or mezanine joists;

picture above displays joist construction. Wall frame structure is of similar steel construction

Developed way ahead w Contracting Officer/NCO

08 OCT:

Provide SOO to IA personnel

20 OCT: Requirements Package approved by 673rd CONS

23 OCT:

Meeting with 673rd CONS for azimuth check 1 NOV: Request for quotes out to vendors

1 DEC:

Quotes received & evaluated

15 JAN: Work Begins

1 MAY: JMC A/V Mission Complete

Proposed audio/video control cabinet location: must be against the wall, and either mounted to the floor or wall and immovable; fasteners must be in a location (inside the cabinet) that would prohibit tampering. Cabinet must be immovable and lockable.

Developed way ahead w Contracting Officer/NCO

08 OCT:

Provide SOO to IA personnel

20 OCT: Requirements Package approved by 673rd CONS

23 OCT:

Meeting with 673rd CONS for azimuth check 1 NOV: Request for quotes out to vendors

1 DEC:

Quotes received & evaluated

15 JAN: Work Begins

1 MAY: JMC A/V Mission Complete

Electrical room: contains one 250 amp circuit panel; has space for expansion

Developed way ahead w Contracting Officer/NCO

08 OCT:

Provide SOO to IA personnel

20 OCT: Requirements Package approved by 673rd CONS

23 OCT:

Meeting with 673rd CONS for azimuth check 1 NOV: Request for quotes out to vendors

1 DEC:

Quotes received & evaluated

15 JAN: Work Begins

1 MAY: JMC A/V Mission Complete

Additional monitors (6 each) and sound system components would need to be installed on vertical supports and/or periphery walls; every seat needs to have a comprehensive view of at least one monitor, or the video wall and be a minimum of 96” above the floor. It would be preferred that the mounts allow at least 180 degree screen articulation to allow flexibility based on audience number and seating location. Audio must provide undistorted sound throughout the room

Each support has power routed already

Developed way ahead w Contracting Officer/NCO

08 OCT:

Provide SOO to IA personnel

20 OCT: Requirements Package approved by 673rd CONS

23 OCT:

Meeting with 673rd CONS for azimuth check 1 NOV: Request for quotes out to vendors

1 DEC:

Quotes received & evaluated

15 JAN: Work Begins

1 MAY: JMC A/V Mission Complete

View looking Southwest

Developed way ahead w Contracting Officer/NCO

08 OCT:

Provide SOO to IA personnel

20 OCT: Requirements Package approved by 673rd CONS

23 OCT:

Meeting with 673rd CONS for azimuth check 1 NOV: Request for quotes out to vendors

1 DEC:

Quotes received & evaluated

15 JAN: Work Begins

1 MAY: JMC A/V Mission Complete

View looking Northwest

File details come from the government source that posted it. Updated .