This is a Questions and Answers document addressing clarifications for a rubber removal project solicitation.
The document resolves six key inquiries regarding project execution and specifications. Water disposal from the rubber removal process will occur at a Sanitary Sewer Manhole located off Red Fire Road adjacent to the contractor's staging area at no cost. Item 0006 on the Price Schedule correctly specifies 52,500 square feet (the 25,500 figure listed in the quantity line was identified as a typographical error). For bead materials, contractors must use Type II beads in accordance with FS TT-P-1325, as these beads are not listed in the referenced UFGS 32.17.23 standard. This is a Women-Owned Small Business (WOSB) set-aside, not an 8(a) set-aside. Regarding crack repair methodology, the specification section 3.3.2 requirement to fill cracks within 1/4 inch below the pavement surface takes precedence over previously observed overband methods. For row numbering on the parking apron, contractors must follow the SOW Addendum and accompanying technical image showing circular and triangular control marking details with yellow numbers on black backgrounds. Airfield Management has directed that all 23 rows be painted with numbers on the pavement on both sides of the parking apron.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rubber Removal Q&A
1. How is the water from the removal process typically disposed of?
a. Water is dispos3ed of in a Sanitary Sewer Manhole at no cost. The manhole is off
Red Fire Rd. next to the Contractors staging area.
2. Item 0006 on the Price Schedule states 52,500sf in the description but the quantity line states 25,500 which is correct?
a. 52,500sf (25,500 was a typo)
3. SOW 6.a. states use type II beads in accordance with UFGS32.17.23. There are no type II beads listed, only Type I, III, IV.
a. FS TT-P-1325 includes Type II beads. Use Type II beads for this project.
4. Is this an 8(a) set aside.
a. NO, it is a WOSB.
5. Spec section 3.3.2 states the cracks are to be filled within 1/4 inch below the pavement surface. The previous crack repair areas shown during the site visit were done with an overband method where the crack is filled completely to the top and there is excess sealant on either side of the cracks. Which is the preferred method?
a. Follow the specification.
6. What is the size and color scheme of the row numbers being added on the apron?
a. See SOW Addendum attached and image below. Additionally, Airfield Management advised they want all 23 rows painted with numbers on the pavement on both sides of the parking apron.