Amendment 3 Solicitation FA489726Q0010.pdf
PDF 8 MB Posted
- Attached to
- Runway Rubber Removal and Stripping (Amended) Federal contract opportunity
- Solicitation number
- FA489726Q0010
About this file
Solicitation Summary: FA489726Q0010
This is a sealed bid Invitation for Bid (IFB) for construction services issued by the U.S. Air Force at Mountain Home Air Force Base in Idaho. The solicitation is set aside 100 percent for Women-Owned Small Businesses (WOSB) with a NAICS code of 237310 (Highway, Street, and Bridge Construction) and a size standard of $45 million in annual receipts. The project requires runway rubber removal and maintenance of airfield markings at Mountain Home AFB, with the contractor required to begin performance within 10 calendar days of award and complete all work within 90 calendar days.
The base requirement (Item 0001) involves removing rubber from runways 30 and 12 (approximately 420,000 square feet) as a firm fixed-price job. Item 0002 requires striping new Instrument Control and Wing Tip Clearance markings in yellow and black. Five additional bid options are available: Option Line Item 1001 (Edge Markings LOLA C, approximately 84,000 sf); Option Line Item 1002 (Clean and Seal LOLA C cracks, 1/4"-1 3/4"); Option Line Item 1003 (Clean and Seal LOLA C cracks, 1 3/4"-4"); Option Line Item 2001 (Remove and Restripe apron edge lines, approximately 52,500 sf); and Option Line Item 2002 (Remove and Restripe Tow Only Lines). All line items use firm fixed pricing. Sealed offers are due by 04:00 PM local time on May 27, 2026, with a 20 percent bid guarantee required. The Government will award to the lowest responsive bidder. Performance and payment bonds are required within 10 calendar days of award. The estimated contract magnitude is between $1,000,000 and $5,000,000.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER, 1. SOLICITATION 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE 1 OF 39
AND AWARD NUMBER 0 SEALED BID (IFB) INVITATION
(Construction, Alteration, or Repair)
FA489726Q0010 FOR BID
0 NEGOTIATED (RFP) REQUEST
FOR PROPOSAL
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
QYZH 26-0014
?. ISSUED BY CODE: IFA4897 8. ADDRESS OFFER TO
FA4897 366 CONS LGCP 366 CES CERF
366 GUNFIGHTER ST STE 498, ADMINISTRATIVE ONLY NO REQUISITIONS AF BPN NO MILSBILLS PROCESSES, 1010 LIBERATOR ST
MOUNTAIN HOME AFB, ID 83648-5296 MOUNTAIN HOME AFB, ID 83648-5442
UNITED STATES UNITED STATES
ALEXSIA BEST, Email: alexsia.best@us.af.mil Telephone: 2088289080 YAN HAMPP, Email: yan.hampp@us.af.mil Telephone: 2088283870
9. FOR
la. NAME lb. TELEPHONE NUMBER (include area code) (NO COLLECT CALLS)
INFORMATION ALEXSIA BEST 2088289080
CALL:
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
1 0.THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (TiUe, identifying number, date)
Project Title: Maintain Airfield Markings and Rubber Removal Project Location: Mountain home AFB
Runway rubber removal and maintenance
11. The contractor shall begin performance within _J_Q_ calendar days and complete it within � calendar days after receiving D award,� notice to proceed. This performance period is� mandatory D negotiable. (See FAR 52.211-10 ).
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? 12b. CALENDAR DAYS (ff "YES", indicate within how many calendar days after award in Item 12b.) 10
�YES □ NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and _1_ copies to perform the work required are due at the place specified in Item 8 by 04:00 PM (hour) local time 27 May 2026 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee � is, D is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _!!Q_ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
Computer generated. STANDARD FORM 1442 (REV. 1212022) Prescribed by GSA-FAR (48CFR) 53.236-1 (d)
Created On:
17 Apr 2026, 09:45 AM Mountain Daylight Time
Section A - Solicitation/Contract Form
Runway Rubber Removal
NAICS: 237310
Size Standard: USD 45,000,000.00 Annual receipts
Small Business Type: Women Owned Small Business
Set Aside Percent: 100
Product Service Code: Z2BD
FA489726Q0010
52.236-27 Site Visit (Construction). (Alternate I) (Feb 1995) Alternate I (Feb 1995)
FA489726Q0010
Alternate I. If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of the basic (Feb 1995) provision:
(b) Site Visit will be updated in an amendment soon
FAR Clauses Incorporated by Reference
Number
52.203-18
52.204-7 52.212-1
T1lle
Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation.
System for Award Management-Registration. (Deviation 2026-00038) Instructions to Offerors-Commercial Products and Commercial Services. (Deviation 2026-00038)
DFARS Clauses Incorporated by Reference
Number T1lle
252.204-7024 Notice on the Use of the Supplier Performance Risk System.
FAR Clauses Incorporated by Full Text
52.228-1 Bid Guarantee.
Bid Guarantee (Sept 1996)
Effecllve Date
Jan 2017
Feb 2026 Feb 2026
Effecllve Date
Mar 2023
(Sep 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
Alternate/ Variation
Deviation Effective Date
Alternate/ Variation
Deviation Effective Date
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the
Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the
United States. The Contracting Officer will return bid guarantees, other than bid bonds-
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20_ percent of the bid price or$=, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 1 O days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of clause)
Supplemental Clauses Incorporated by Full Text
5352.209-9001 Po18ntial Organizational Conflict of Interest {Jul2023)
File details come from the government source that posted it. Updated .