Pre-solicitation_Q&A__12_Apr_18.docx

DOCX document 25 KB Posted

Attached to
Sources Sought Notice
Solicitation number
FA4890-18-R-0006
Issued by

About this file

Pre-solicitation Q&A 12 Apr 18

View the file

Other files

File Type Posted
EC-130H_A-10C_Award_Synopsis.doc DOC document
Amendment_0003.docx DOCX document
A10_EC130_Final_PWS_Version_06_dated_24_May_18.doc DOC document
Consolidated_Industry_QA_as_of_24_May_18.xlsx XLSX spreadsheet
Amendment_0002.docx DOCX document
Sign-In_Sheet_from_9_May_18.pdf PDF
EC-130A-10_Pre-Proposal_Conference_Slides_9_May_18.pptx PPTX presentation
Consolidated_Industry_QA_as_of_14_May_18.xlsx XLSX spreadsheet
Amendment_0001.docx DOCX document
A10_EC130_Final_PWS_Version_05_dated_14_May_18.doc DOC document
Solicitation_FA4890-18-R-0006_Synopsis.doc DOC document
ATCH_4-Combined_CBA_and_WD_for_DM_C2.pdf PDF
Solicitation_FA4890-18-R-0006.docx DOCX document
ATCH_5-Combined_CBA_and_WD_for_DM_BGI.pdf PDF
ATCH_2-DD_254_EC-130_A-10_Draft_Part_1.pdf PDF
ATCH_6-Combined_CBA_and_WD_for_Moody_BGI.pdf PDF
ATCH_3-DD_254_EC-130_A-10_Draft_Part_2.pdf PDF
ATCH_1-A10_EC130_Final_PWS_Version_04_dated_24_Apr_18.doc DOC document
EC-130H_A-10C_Pre-Proposal_Conference_Date_Change.docx DOCX document
A10_EC130_PWS_Version_0.2_dated_22_Mar_18_Draft_Final.doc DOC document
Pre-Solicitation_Industry_Q_and_A.xlsx XLSX spreadsheet
Pre-Solicitation_Industry_Q_and_A_Posted_20_Mar_18.pdf PDF
A-10_EC-130_PWS_Version_0.1_5_Mar_18_Draft_Final.doc DOC document
Atch_5)_DM_CBA_EC130_A10_Aug_2015.pdf PDF
Atch_3)_2015_BGI-DM_Training_Association_Final_CBA.pdf PDF
Atch_4)_2015_BGI_Moody_IAMAW_Final_CBA.pdf PDF
Atch_1)_A-10_EC-130_PWS_28__Feb_18_Draft_Final.doc DOC document
Draft_Solicitation_FA4890-18-R-0006_EC-130H_A-10C.docx DOCX document
Atch_2)_Draft_DD254.pdf PDF
EC-130H_A-10C_PreSolicitation_Notice.docx DOCX document
Draft_A-10_EC-130_PWS_9_Nov_17.doc DOC document
Draft_DD254.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No.

Solicitation Reference
Question
ANS
1.
5352.215-9001 NOTICE OF PRE-BID/PRE-PROPOSAL CONFERENCE
Will the U.S. Government (USG) please provide an SMO code for JPAS to allow Offerors to submit personal pre-registration information for the Pre-Bid/Pre-Proposal Conference?
Offerors can submit conference registration information securly through AMRDEC SAFE at https://safe.amrdec.army.mil/safe/Welcome.aspx
2.
Draft Solicitation FA4890-18-R-006 EC-130H A10C, Section 3 – Schedule of Supplies and Services
Can the USG provide the specific PWS sections that apply to each CLIN?
Appendix 1 provides the workload offerors are to use in development of manpower. Section 4 of the PWS provides the required/desired employee qualifications.
3.
Draft Solicitation FA4890-18-R-006 EC-130H A10C, Section 6.0 – Instructions for Volume I – Technical Capability (Factor I)
Throughout Section 6, the solicitation references PWS Appendix 1 in reference to determining proposed manpower.

However, the enclosed PWS Appendix 1 refers to the Technical Factor Cross-Reference Matrix. Can the USG provide the specific PWS Appendix 1 tables that apply to each CLIN in the RFP?

Appendix 1 in Section 6 of the RFP is the Cross-Reference Matrix offerors are to use to explain what section, paragraph, etc., of their proposal relates to the evaluation criteria in Section 7 of the RFP.

Appendix 1 in the PWS is the estimated workload offerors are to use in determining their proposed manpower.

4.
2015 BGI-D-M Training Association Collective Bargaining Agreement (CBA)

2015 BGI-Moody CBA 2015 C2- Davis-Monthan CBA

Existing CBAs list current wage rates only through 10-01-18 (FY19).

a. What CBA rates shall be used in cost proposal for BY and OYs 1-4?

b. Should the wage rates be escalated in OYs 1-4, and if yes, at what escalation factor?

a. Offerors shall price their proposals using the FY19 CBA rates for base year and all option years.

b. NO – offerors shall not escalate wage rates. See response to question (a) above.

5.
2015 BGI-D-M Training Association Collective Bargaining Agreement (CBA)

2015 BGI-Moody CBA 2015 C2- Davis-Monthan CBA

Existing Prime CBAs discuss sick/personal leave.

a. Is sick/personal leave completely separate from and in addition to paid vacation?

b. If an incumbent prime employee were a “5-15 years of service employee” does that mean that employee is entitled to 35 days of paid days off each year? (10 holidays, 15 days (120 hours) vacation, 10 days sick/personal)?

c. In above example 2080 hours in year – 80 hours holiday – 120 hours vacation – 80 hours sick/personal = only 1800 hrs per work year for this FT employee?

Offerors are required by FAR Part 22 and 41 U.S.C. 6707(c) to abide by all wage and fringe benefits within the Collective Bargaining Agreement(s).

6.
A10 EC130 Performance Work Statement (PWS) Version 0.2 dated 22 March 2018

Section 1.5.3.10.3, Learning Management System

Will the USG please identify what LMS is currently in use?
The current LMS system is proprietary (contractor built and managed). The information contained on the system is government owned which will be transferred to the awardee prior to performance start.
7.
A10 EC130 PWS Version 0.2 dated 22 March 2018

Section 1.5.3.10.1 CBT Courseware Tool

Will the USG please identify what courseware development tool (e.g. DreamWeaver or MS FrontPage) is the current courseware being produced in?
The computers and software are contractor furnished equipment. It is up to each offeror to propose what hardware/software they intend to use.
8.
A10 EC130 PWS Version 0.2 dated 22 March 2018

Section 1.7.5.5.10 Academic Datedbase Hardware

Can USG provide an existing incumbent HW list that supports all existing LMS, SLATE, and academic/training datedbase development/maintenance?
Incumbent contractor uses a mixture of COTS/propriety/AF-owned systems to support all LMS, SLATE, and academic/training databases.
9.
A10 EC130 PWS Version 0.2 dated 22 March 2018

Section 1.7.7 SLATE Section 1.7.5.5.10 Academic Datedbase Hardware – “All equipment for LMS, SLATE, and academic/training datedbase development/maintenance and use, shall be purchased and maintained by the contractor.”

Draft Solicitation FA4890-18-R-006 EC-130H SLATE tablet labor and SLATE equipment costs are identified under CLINs xx10 and xx11 respectively, but RFP does not appear to include CLINs for LMS and academic/training datedbase.

a. Should LMS and Academic/training datedbase labor and equipment cost be included under CLINs XX10 and xx11? Or Should this labor and equipment cost be proposed separately? If separately, what CLIN shall they be included under?

b. Can USG provide the required specifications for SLATE and specifically the handheld wireless devices that support SLATE?

c. Can USG provide the required specifications for LMS that supports SLATE?

d. Can USG provide list of existing LMS hardware and specifications in use and/or required?

e. What CLIN shall include contractor cost for the LMS hardware?

f. Can USG provide HW specific list and required specifications for all “servers both on and off base in support of the A-10C and EC-130H operations”

a. Specific hardware/software to support both A10 and EC130 operations is at the discretion of the contractor provided it meets the terms of the PWS.

All equipment/hardware/software is Contractor Furnished Equipment (CFE). Contrators are required to submit a list of all proposed CFE as part of the evaluation criteria. All CFE shall be priced as part of the Phase-In costs.

Offeror will be provided the opportunity to ask questions at the pre-proposal conference. A demonstration of the current LMS will be provided to give offerors a brief overview of the system.

b. SLATE is government owned contractor maintained. The labor to support SLATE and reoccuring cost to maintain the SLATE sytem is to be price separately IAW the RFP.

c. The LMS does not support SLATE.

d. Incumbent contractor uses a mixture of COTS/propriety/AF-owned systems to support all LMS, SLATE, and academic/training databases.

e. All equipment/hardware/software is Contractor Furnished Equipment (CFE). Contrators are required to submit a list of all proposed CFE as part of the evaluation criteria. All CFE shall be priced as part of the Phase-In costs and all CFE will be installed and operational on contract start.

f. Specific hardware required to support both EC-130/A-10 operations is at the discretion of the contractor, provided it meets the terms of the PWS.

10.
A10 EC130 PWS Version 0.2 dated 22 March 2018

Section 1.7.7 SLATE

a. Is the contractor required to purchase and install “commercial grade high speed wireless internet access” or just identify the required level of service to USG for USG purchase and install?

b. Can USG provide the existing incumbent specifications and service provided in support of “contractor shall provide commercial grade high-speed wireless internet access at all primary training locations (355 TRS, 357 FS, 47 FS.) and establish/ maintain a main infrastructure of wireless access at 355 TRS with secure dated storage of devices not in use” and/or USG specification requirements?

a. Contractor is required to provide, NOT install, commercial grade high-speed wireless internet access at all primary training locations (355 TRS, 357 FS, 47 FS.)

b. Contractor is required to provide, NOT install, commercial grade high-speed wireless internet access at all primary training locations (355 TRS, 357 FS, 47 FS.)

11.
A10 EC130 PWS Version 0.2 dated 22 March 2018

Section 1.7.6 Academic Datedbase Software

a. Does this PWS statement “Any software allocated for the Academic Datedbase and bought within the scope of this contract shall be purchased with prior coordination and approval of the CO” indicate this is a cost reimbursable CLIN?

b. Should the cost of “software allocated for the Academic Datedbase” be identified in the contractor’s proposal, including the proposed cost of that equipment?

c. Can USG provide the required software specifications?

a. All equipment/hardware/software is Contractor Furnished Equipment (CFE). Contrators are required to submit a list of all proposed CFE as part of the evaluation criteria. All CFE shall be priced as part of the Phase-In costs and all CFE will be installed and operational on contract start. NO, this is not a cost reimbursable CLIN. All CFE is part Phase-In costs.

b. A list of all CFE is to be provided in the proposal to include a cost break out. Please see the evaluation criteria in Section 7 of the RFP.

c. NO. The software is at the discretion of the contractor, provided it meets the terms of the PWS.

12.
A10 EC130 PWS Version 0.2 dated 22 March 2018

Section 3.4.7 “contractor shall provide the equipment and supplies for printing courseware products to include student guides subsequent to courseware product acceptance.”

Can USG quantify an estimated number of pages of printed courseware per year
Estimated at 125,000 pages per year based on current student throughput.
13.
A10 EC130 PWS Version 0.2 dated 22 March 2018

Section 3.5.3 LAN Server – “contractor shall provide the hardware and software equipment including server/s, switch, smart uninterruptible power supply (UPS) and computer equipment as required by the base Communication Squadron (CS) to attach to the base network”.

Should this cost be included with Phase-in costs? (like in PWS 3.2.4, 3.5.1)

Yes. All CFE is to be priced as part of the Phase-In costs.

14.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Section 3.5.4 Contract Flying Instructor Flight Uniform/Equipment – “The contractor will be responsible to purchase all flight uniforms and equipment”.
Should this cost be included with Phase-in costs? (like in PWS 3.2.4, 3.5.1)

Yes.

15.
A10 EC130 PWS Version 0.2 dated 22 March 2018. The PWS references “Optional CLIN” in approximately 14 different locations, but the RFP does not list any specific Optional CLINs other than the OPTION YEARS.
Will the USG please clarify if “Optional CLIN” refers to OPTION YEAR CLINs?
The draft RFP did not include the Optional CLIN. In the Final RFP, an Optional CLIN has been added to the Base Year and Each Option Year. This Optional CLIN is for the Live Fly Instruction. Contractors are required to price this CLIN as part of their proposal.
16.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Section 1.1 Scope of Work. Draft DD254
The solicitation states: “A phase-in period is planned for 1 Dec 18 – 31 Jan 19;” however, the DD254 identifies contract phase-in 1 Aug – 30 Sept, with contract Period of Performance (PoP) as 1 Oct – 30 Sept 19. Will the USG please clarify the PoP for Phase-In?
The DD254 has been updated to reflect the correct dates.
17.
Draft Solicitation FA4890-18-R-006 EC-130H. Section 5.0 Proposal Preparation Instructions
There is a reference to ‘Technical Volume Section 1-Prerequisite Documents’ within the paragraph titled “Pages Not Included in Page Count” but no other reference to Section 1-Prerequisite Documents Will the USG please clarify requirements, if any, for Section 1-Prerequisite Documents?
The reference ‘Technical Volume Section 1-Prerequisite Documents’ has been removed from the RFP.
18.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Table 1.29
Table 1.29 includes a math discrepancy. Total Hours row indicates 9,400; however, if you add the individual hours the total is 9,460. Please clarify.
Table 1.29 was updated with the correct number of hours.
19.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Section 4.2.7.1.1, Required Qualifications
PWS 4.2.7.1.1 Required Qualifications states “Previous EC-130H instructor/evaluator in the SME crew position. Please define “SME crew position”?
A SME crew position is Pilot, Flight Engineer, AO/ANO etc. They must be qualified in that particular position.
20.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Section 4.2.2, Instructor Qualifications. 2015 BGI-D-M Training Association CBA. 2015 BGI-Moody CBA. 2015 C2- Davis-Monthan CBA

PWS 4.2.2 Instructor Qualifications states “instructors shall meet the following requirements according to their specialty” and then goes on to list the different levels of required qualifications according to instructor specialty. However, the existing CBAs list only one type of instructor at each site “Instructor/SME” and includes language addressing “Lead Instructor” pay as required.

a. Are all instructors, regardless of PWS required qualifications/specialty, regardless of achieved qualifications/specialty, and regardless of use of those instructors on the PWS/CLIN requirements for which they are qualified, to receive the exact same CBA pay in offeror’s proposal?

b. How does USG distinguish between base or lower levels of qualifications vs. higher required qualifications regarding CBA pay structure?

c. How does that apply to offeror’s proposal?

a. Instructors are paid IAW the applicable CBA (i.e., the instructors working on the A-10 at Davis-Monthan will be paid IAW that CBA).

b. The CBA does not make that distinction.

c. Although the PWS distinguishes between the levels of qualifications, the CBA does not; therefore, it does not apply.

21.
A10 EC130 PWS Version 0.2 dated 22 March 2018. 2015 BGI-D-M Training Association CBA. 2015 BGI-Moody CBA. 2015 C2- Davis-Monthan CBA Article 15, FTU Pay for Instructor SME

For Attachment 3 (2.15 BGI-DM Trainign Association CBA) and Attachment 5 (2015 C2-Davis Monthan CBA), Article 15 states that “all FTU Instructor/SMEs shall receive FTU pay per hour above their standard hourly wage rate as follows…”. There are zero requirements for “FTU Instructor/SMEs” addressed in Appendix 1 Workload Estimates.

a. Where in PWS is requirement or qualification listed for FTU Instructor/SME?

b. Or are ALL instructor/SMEs considered FTU instructors once they have graduated from the Central Instructor Course?

c. For proposal manning purposes, what percentage (or how many total I/SME personnel) of incumbent DM Instructor/SMEs are NOT “FTU Instructor/SMEs” a/b/c. All instructors at Davis-Monthan (EC-130/A-10) receive the FTU Recognition Pay.

22.
A10 EC130 PWS Version 0.2 dated 22 March 2018. 2015 BGI-D-M Training Association CBA. 2015 C2- Davis-Monthan CBA

Davis-Monthan CBAs list a labor category and rate of pay for “Courseware Production Specialist”, but PWS does not require this position.

a. Please elaborate on function/role of incumbent Courseware Production Specialist, and verify that PWS does not require this position, or that the requirement for this labor category has not been renamed/repackaged under some other required position?

b. Is the CBA “Courseware Production Specialist” fulfilling the requirement PWS “CBT Specialist”?

Currently there is no Courseware Production Specialist utilized.

23.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Section 1.9.14, Recruitment and Retention Plan
There does not appear to be any requirement in PWS nor PWS Appendix 1 workload for a separately qualified “sensor operator” instructor. Please verify that paragraph 2 wording “sensor operators” is an error.
That reference has been removed.
24.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Appendix 1, Tables and Positions
Request USG verify following PWS Appendix 1 Tables and Positions support following CLIN requirements:

· Table A1.23 “Group/TRS” position = CLIN xx03 A-10C OSS Wing Scheduling DM

· Table A1.23 “FTU” position = CLIN xx04 A-10C FTU Scheduling DM

· Table A1.24 “FTU” position = CLIN xx14 EC-130H FTU Scheduling DM

· Table A1.25 “TRS” position = CLIN xx09 A-10C Registrar Support DM

- Table A1.23 “Group/TRS” position = CLIN xx03 A-10C OSS Wing Scheduling DM: YES

- Table A1.23 “FTU” position = CLIN xx04 A-10C FTU Scheduling DM: YES

- Table A1.24 “FTU” position = CLIN xx14 EC-130H FTU Scheduling DM: YES

- Table A1.25 “TRS” position = CLIN xx09 A-10C Registrar Support DM: YES

25.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Tables A1.23, A1.24, and A1.25
Are any of the positions listed in PWS tables A1.23, A1.24, A1.25 considered “Lead” Schedulers (for CBA Lead Scheduler pay purposes)? If yes, which ones?
The workload tables do not make that distinction.
26.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Table A1.25
a. Since Table A1.25 A-10C Registrar “TRS” position is listed within a PWS section titled “Davis-Monthan AFB Scheduler Workload”, is the TRS position to be proposed at a CBA rate? (note: no CBA listed for Registrar).

b. If yes, what CBA rate is to be used for Table A1.25 Registrar “TRS” position?

a. Yes.

b. The Registrar position was added on late in the contract performance. The registrar positon is price at the Scheduler rate.

27.
2015 BGI-D-M Training Association CBA. 2015 BGI-Moody CBA. 2015 C2- Davis-Monthan CBA

CBAs list incumbent “Word Processor II” labor category.

a. Request USG identify specific requirement, roles, responsibilities that Word Processor II would fulfill?

b. If WPII is being used to fulfill a CWD production team role, request USG identify the specific requirements of that role.

a. This is an internal contractor support position. The position is dedicated to supporting this contract only.

b. This position does not support CWD.

28.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Attachment 9, Exam Package
Attachment 9 Exam Package states “contractor will prepare and deliver examination questions for each lesson identified in the syllabus as being a testable lesson.” For labor scope purposes, request USG provide syllabus listing total number of “testable lessons” required per each requirement of ILT, ICW, A-10 TDs, EC-130 TDs
Approximately 300 EC-130H lessons and 270 A-10 lessons but can vary based on syllabus changes.
29.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Table 1.1, Training Media Chart
Table 1.1 Training System Media Chart, EC-130H Training Devices documents (Mission Kit, Gradesheets, Mission Scenarios).

a. Are all of these documents/deliverables included as part of PWS Attachment 14 “EC-130H WST Scenario Development” requirements? Or are they separate “Lesson Support Document” requirements?

b. If they are separate, what PWS Attachment defines the requirements?

a. Yes, they are included in Attachment 14 and this covers the WST (Flight deck sim) and CCMCS (Mission sim).

b. N/A

30
A10 EC130 PWS Version 0.2 dated 22 March 2018. Tables A1.15 and A1.16
Table A1.15 Note and Table A1.16 Note states “Each WST NSE is projected for a workload of 200 hours.” Does this mean that USG has estimated offeror labor for each hour of New Scenario Equivalent at 200 total labor hours per 1.0 hour of WST NSE?
Affirmative
31.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Table 1.1, training System Media Chart
“Support Documents” (for ILT and ICW/CBT) and “Lesson Support Documents” (for A-10C TD and EC-130H TD) are listed as required working document deliverables. For labor scope purposes, request USG define specific requirements of Support Documents and Lesson Support Documents for ILT, ICW, A-10 TD, and EC-130 TD packages.
The lesson supporting documents for both the A-10 and EC-130 training devices would include any document required to accomplish the training task outside of the normal courseware documents (i.e. mission planning forms, charts, maps, FLIP, performance data, weather briefings, etc.) Scenarios may require some or all of the documents to facilitate the desired training outcome.
32.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Table 1.1, training System Media Chart
Student Workbooks/Workbooks/Graphics requirements are not discussed anywhere in PWS. Request USG identify specific Student Workbook (and supporting graphics) requirements and which ILT, ICW, A-10 TD, and EC-130 TD packages they complement.
Student workbooks and associated graphics are maintained through the CWD schedule. The syllabi drives this requirement.
33.
A10 EC130 PWS Version 0.2 dated 22 March 2018. Table 1.1, training System Media Chart
Table 1.1 Training System Media Chart shows a requirement for A-10C Training Devices (FMT, HOTAS, CFT) and associated deliverables. PWS list requirements for A-10C DM HOTAS Instructor Hours (Table A1.20), but PWS does not appear to list any requirements for New Equivalent nor New Scenario Equivalent in support of A-10C Training Devices (FMT, HOTAS, CFT) deliverables.

What PWS Appendix 1 paragraph/table quantifies a development rate or new equivalent hours for A-10C TD (FMT, HOTAS, CFT) media development?

There is no requirement for scenario development for the A-10C. This is accomplished under the New Lesson Equivalent, reference Table A.1.26 (A-10C Annual Requirements Contract Year 19 – 23).

34.
A10 EC130 PWS Version 0.2 dated 22 March 2018. General Question
Can USG provide WD for Georgia and Arizona
The CBA WDs are attched to each respective CBA in the Final RFP.
35.
A10 EC130 PWS Version 0.2 dated 22 March 2018. General question
Can the last FY Training Review Panel or Board minutes be made available for review in identifying areas we may be able to develop improvements and efficiencies for?
No. However, contractors are invited to the review board but are not part of the formal process or required to attend. Contractor personnel do not write the syllabi.