PWS_Draft_NWS_Main-Supp_Rotary_Wing_SS.pdf

PDF 213 KB Posted

Attached to
North Warning System Rotary Wing Airlift Services
Solicitation number
FA4890-14-R-0002
Issued by

About this file

Attachment 2 - Draft PWS Main Rotary

View the file

Other files

File Type Posted
FA4890-14-R-0002_NWS_Rotary_Wing_Solicitation.pdf PDF
Attachment_2_-_Aircraft_Unavailablility_Record.docx DOCX document
Attachment_1_-_NWS_PWS_Rotary_Wing_as_of_06_Mar_15.docx DOCX document
Attachment_3_-_List_of_Aircraft.docx DOCX document
Attachment_6_-_Cost_Summary_Report.xlsx XLSX spreadsheet
Attachment_1b_to_PWS_-_Aircraft_Business_Licence_Application_Form.pdf PDF
Attachment_4_-_WAWF.docx DOCX document
Attachment_1a_to_PWS_-_MOU_Between_DND_-_PCA.pdf PDF
Attachment_5_-_Rotary_NWS_Flight_Log.docx DOCX document
CLIN_Structure.xlsx XLSX spreadsheet
NWS_Rotary_Wing_Synopsis.doc DOC document
Draft_Solicitation_Q_ _A's.docx DOCX document
past_three_years_of_bulk_fuel_transfer.xls XLS spreadsheet
Helipad_Types_NWS.pdf PDF
Attachment_2_-_Aircraft_Unavailablility_Record.docx DOCX document
Attachment_5_-_Rotary_NWS_Flight_Log.docx DOCX document
Attachment_1_-_NWS_PWS_Rotary_Wing_as_of_14_Oct_14.docx DOCX document
Attachment_4_-_WAWF.docx DOCX document
Attachment_3_-_List_of_Aircraft.docx DOCX document
CLIN_Structure.xlsx XLSX spreadsheet
FA4890-14-R-0002_Draft_NWS_Rotary_Wing_RFP.doc DOC document
Attachment_6_-_Cost_Summary_Report.xlsx XLSX spreadsheet
NWS_Industry_Day_Sign_In_Sheet.pdf PDF
NWS_Industry_Day_Briefing_ver.1.pptx PPTX presentation
Draft_PWS_-_NWS_Main-Supp_Rotary_Wing_as_of_(5_Aug_14).docx DOCX document
Industry_Day_Announcement_-_Amendment_1.docx DOCX document
Industry_Day_Announcement.pdf PDF
ATTACHMENT_1_for_Main_Rotary.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTH WARNING SYSTEM AIRLIFT

Rotary-Wing Airlift Services

PERFORMANCE WORK STATEMENT

The PWS applies to rotary airlift services to the North Warning System in Canada. PWS has three distinct requirements, (main rotary-wing airlift, supplemental rotary-wing airlift support and bulk fuel rotary-wing airlift services). Appendix 1 contains specific main rotary wing airlift requirements, Appendix 2 contains specific supplemental rotary airlift support requirements, Appendix 3 contains specific bulk fuel rotary-wing airlift requirements and Appendix 4 lists approximate site locations.

1.0 DESCRIPTION OF SERVICES

1.1. The Contractor shall provide all personnel, services, equipment, tools, oil, facilities, supervision and direct materials necessary for the performance of the air transportation services hereunder, including sufficient number of ground personnel for adequate maintenance and ground operation, except as otherwise noted in this contract. The Contractor’s price includes all costs of performance (including spares, aircraft basing, lodging, crew rotation costs, and aircraft heaters sufficient to support operations in the Arctic environment) and costs for fuel handlers, except for items covered under reimbursable expenses.

1.2. Prior to contract start the Contractor shall furnish the Contracting Officer/Contracting

Officer’s Representative (CO/COR) with the name, address, and telephone number of an agent who will serve as a liaison between the Contractor and the CO/COR. The agent must have authority to schedule contract services. The agent shall be available by telephone at all times.

1.3. During the last week of each month, the O&M Contractor will provide the Contractor with a tentative flight schedule for the following month. At least 24 hours prior to the scheduled departure time, the O&M Contractor and the Contractor shall mutually agree to the actual flight departure time.

1.4. Contractor uncontrollable delays/diversions. In the event a flight is delayed/diverted because of weather or other uncontrollable factors, a minimum waiting period of four (4) hours is required before a flight can be canceled. The final decision for flight cancellation due to weather rests with the aircraft commander. Canceled flights shall be rescheduled and operated within 24 hours or as mutually agreed between the Contractor and the Operations and Maintenance (O&M)

Contractor on the direction of the Government. If the crew must remain overnight (RON) through no fault of the Contractor or at the specific request of the CO/COR or HQ ACC AMIC

Det 1 Representative, the Contractor will be reimbursed per diem rates consistent with Treasury

Board of Canada, www.tbs-sct.gc.ca. Food and lodging arrangements are the Contractor’s responsibility at the Base of Operations. The Government will reimburse the Contractor in accordance with the contract schedule.

1.5. Flight delays/diversions caused by such events as maintenance and crew problems are considered Contractor controllable delays and shall be at the Contractor’s expense.

1.5.1. The contractor shall maintain a 95% reliability rate computed monthly by subtracting the total number of contractor-controllable delayed departures at the originating and en route stations from the contractor’s total number of scheduled departures and stating this as a percentage of total departures. Provide a matrix as specified in Attachment ___.

1.5.2. A delay shall be deemed to have occurred at the originating or en route station if the contractor’s aircraft departs the blocks more than 20 minutes (120 minutes when the flight was added to the monthly schedule with less than 48 hour notice) after the scheduled departure time, except in those instances when the aircraft arrives at the next scheduled destination on time.

Delays at originating and en route stations caused by factors beyond the control and without fault or negligence of the contractor shall be considered as contractor-uncontrollable; a delay for any other reason shall be considered contractor-controllable. An Aircraft Unavailability Record will be completed and as specified in Attachment ___. The contractor-uncontrollable delay time experienced at the origination and en route stations on a mission shall be added to the scheduled departure time at the next en route station for purposes of determining the scheduled departure time at that station on that mission. When an aircraft is unavailable for a period of more than 48 hours with no substitution pursuant to FAR 52.212-4, the government’s financial obligation under the appropriate “Basing Fee” CLIN will be reduced by the pro-rated cost directly equal to the number of days that the aircraft was not available.

1.5.3. Failure to maintain a 95% schedule reliability rate will be reason for terminating the contract pursuant to FAR 52.212-4; however, nothing in this paragraph shall limit the right of the

Government to terminate this contract for cause for other reasons or to limit any other rights and remedies provided the Government by law or under this contract.

1.5.4 The contractor may refuse any mission for safety reasons. However, missions must be rescheduled and flown as agreed to by NWS O&M Contractor.

1.6. The Contractor will obtain a flight number from the O&M Contractor prior to leaving the base of operations. This flight number will remain unchanged until the aircraft returns to where the mission originated. Note that each trip must be assigned a new flight number (the next number in sequence).

1.7. The type of aircraft will depend on weather, urgency of requirements, estimated time to perform the work, distances to and between sites and absolute limitations of civil twilight.

Aircraft performing the “main rotary” and “supplemental” missions must have precision sling capability to the designated point . Aircraft performing the “main rotary” mission will be IFR capable and be crewed by two pilots 1 Oct-31 Mar.

1.8. The Contractor shall be required to carry a survival kit and two fire extinguishers on the aircraft.

1.9. The Contractor shall be responsible for the removal from all North Warning System (NWS) sites all hazardous, unused and waste materials owned or generated in the operations of the

Contractor owned aircraft. Examples of such materials include, but are not limited to;

unserviceable aircraft component and parts, used engine fluids, and any used or unusable petroleum, oil, and lubricants (POL) products.

1.10. The Contractor shall provide a daily flight log within 24 hours upon completion of each mission to the NWS O&M Contractor through the Logistic Support Site (LSS) Manager, if possible. Flight Log will include any required per diem, lodging and landing fees. In addition, the contractor shall perform a visual fuel sampling, a clear and bright test, each time NWS fuel is taken and the flight log will be annotated to reflect fuel sampling has been accomplished. If commercial fuel is acquired, then the contractor shall annotate the cost and location of where the fuel was purchased. (CDRL)

1.10.1. On days when there is no mission scheduled and when the scheduled mission can not be performed due to weather at the distant site, the pilot will, on a weekly basis, report the weather conditions at all the sites within that zone. This applies to the “main rotary” and “supplemental” missions. The contractor will consolidate inputs from the zones and forward to ACC AMIC Det-

1 (NWSO) along with the twice-monthly invoice package. (CDRL)

1.11. PROHIBITED ACTIVITIES

1.11.1 All air carrier employees are prohibited from possessing alcoholic beverages on any North

Warning System site.

1.11.2 Weapons are normally prohibited on North Warning Sites. The Contractor must ensure that weapons are secured at all times in a designated area as determined by the O&M Contractor.

1.11.3 Smoking is allowed in designated areas only.

1.12 Reserved

1.13 LIABILITY FOR PERSONAL CARGO.

Contractor shall be responsible for the loss and/or damage to the passenger baggage and personal equipment while such items are in his custody or on board his aircraft. Liability for these items is limited to the actual value thereof, not to exceed $2,800.00 US per passenger. In the event it should become necessary to off load passengers at any location or station, other than at the direction of the Contracting Officer, the Contractor shall be responsible for such off loading, passenger care, and safeguarding personal baggage from loss, theft, and/or weather damage, reloading, and all costs incident to such services until such time as the Contractor moves or causes to be moved such passengers to their intended destination or to such other location as directed by the Contracting Officer. The Contracting Officer shall be notified immediately of any off loading.

1.14. RESPONSIBILITY FOR GOVERNMENT CARGO.

To the extent insurance required by this contract is not required for payment of third party claims, the balance of said insurance shall apply to Government cargo loss, damage or destruction thereto. In the event of an accident, the Contractor shall be responsible for providing continuous protection of all cargo aboard the aircraft and for delivery of the cargo to the point designated by the COR or HQ ACC AMIC Detachment 1 personnel.

1.15. ORDERS.

The CO will issue all task orders. After task orders are issued, the North Warning System

Operations and Maintenance contractor (NWS O&M) will provide the Contractor with a tentative flight schedule for the following month. The Contractor will coordinate downtime for scheduled maintenance (not to exceed 48 continuous hours without CO/COR, AMIC Det 1 personnel approval) with the LSS manager for inclusion on the monthly schedule. At least 24 hours prior to the scheduled departure time, the O&M Contractor and the Contractor shall mutually agree to the actual flight departure time. The Contractor shall not initiate any action to perform any work under this contract, which would exceed the amount on the task order. The nature of NWS will occasionally require flights to be added to the monthly schedule after publication. The contractor shall have the aircraft positioned and ready to take on passengers or cargo in accordance with this PWS and shall meet all scheduled take-off times. ACC AMIC

Det-1 personnel retain the authority to amend any direction given to the contractor by the O&M contractor.

1.16. MINISTRY OF TRANSPORTATION (Transport Canada)

Following the completion of any Civil Aviation Agency inspection, copies of the inspection report shall be forwarded to the Contracting Officer, HQ ACC AMIC/PKB, 11817 Canon Blvd.

Ste. 306, Newport News, VA USA 23606.

2. SERVICE DELIVERY SUMMARY

PERFORMANCE

OBJECTIVE

PWS PARAGRAPH PERFORMANCE

THRESHOLD

METHODS OF

SURVEILLANCE

Perform all scheduled missions.

1.1 100% of the time. 100% Inspection, Monthly Summary

Report

The Contractor shall maintain on-time schedule reliability.

1.4.1 95% of the time on an l(Quarterly) basis

100% Inspection, Monthly Summary

Report

On-time delivery and accuracy of CDRLs

1.9, 4.9 98% on time delivery 100% Inspection

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1. The Canadian Government, through the NWS O&M Contractor, shall provide:

3.1.1. 115V electricity and electrical hook-up, at all NWS sites.

3.1.2. Coordination of all hazardous material shipments with the Contractor.

3.1.3. Aviation fuel will be provided at no cost to the airlift Contractor.

3.1.4 Government or O&M contractor personnel will provide the contractor a list of personnel authorized for flight prior to boarding. The contractor shall not permit any unauthorized personnel to board the aircraft.

3.2. FUEL

3.2.1 When fuel is obtained at NWS sites, the Contractor is required to take a fuel sample test and supply results to O&M Contractor. Samples will be taken downstream from aircraft refueling system filter separator unit on a weekly basis or prior to the next refueling operation at any unattended airstrip, including SRR sites designated as refueling locations, depending on frequency of refueling requirement. Results shall include testing for water, particle and fiber. In addition, provide matched weight monitors using a mini-monitor type kit to provide correlation sample for laboratory analysis. Note that laboratory analysis is the responsibility of the NWS

O&M Contractor. Contractor shall carry a field test kit or mini-monitor kit to perform the above on-site aviation fuel test per the American Society for Test Material (ASTM). Note: Except for

Zone 5 and when operationally preferable, fuel shall be taken from NWS sites whenever available. Missions shall be coordinated between the O&M contractor and the airlift contractor to minimize the use of commercial fuel. ACC AMIC Det-1 personnel may relax or restrict this requirement further based on available cost reimbursable funding at any time.

3.2.2 To obtain fuel from the NWS sites, the Contractor must have a portable refueling pump with dry-break female adapters to accommodate 2 ½ inch, 2 inch, 1 ½ inch and 1 inch Kamvalok or Emco Wheaton pipe fittings provided at helipads and/or other locations, i.e. beach tankage.

3.2.3 The Contractor shall obtain written authorization from National Defence Headquarters, Attn: Director Aerospace and Engineering Project Management (DAEPM), Radar &

Communications System (R&CS 2-4), MGen George R. Pearkes Building, Ottawa, Ontario K1A

0K2 prior to establishing a fuel “cache” at any NWS sites. The request shall reference applicable contract number.

3.2.4 The aviation fuel currently in use at NWS sites is JET A-1 (A-3) fuel with three additives consisting of a fuel system icing inhibitor (FSII), static dissipater and a corrosion inhibitor. This fuel has a pour point of -52C degrees and has been designated as JET A-1 (A-3). This specification is subject to change, but will be coordinated with the contractor in advance to ensure compatibility.

3.3. Hangar space for maintenance repairs and overnight storage of aircraft is available at

Cambridge Bay and Hall Beach LSS sites.

3.4. Food and lodging is provided at Cambridge Bay and Hall Beach for Contractor personnel involved in the performance of this contract. The Contractor is responsible for their toiletries and towels. (Washer and dryers are available.) When operating from Iqaluit, Inuvik, or Goose Bay, food and lodging will be at the Contractor’s expense on a NON-cost reimbursable basis. Food and lodging at all other locations will be at the Contractor’s expense on a cost reimbursable basis by the government when government accommodations are not available.

3.5. Landing Fees. In the event the Contractor is directed by the CO/COR or HQ ACC AMIC

Detachment 1 personnel to stop at a commercial airport, or other points, and is assessed a landing fee, the government will reimburse the Contractor for such landing fees and all en route navigational service charges.

4. GENERAL INFORMATION

4.1 Reserved.

4.2 NOTICE OF ACCIDENTS

4.2.1. DOD Missions. When a Contractor’s aircraft is involved in an accident or incident in support of a DOD mission as defined in 49 CFR, Part 830, the Contractor will transmit the following information by the most expeditious means available, to the Transportation Branch

(757-225-2377) at HQ ACC AMIC/PLGT, 11817 Canon Blvd. Ste. 502, Newport News, VA

USA 23606. On the next business day, notify the CO at HQ ACC AMIC/PKB (757-225-3913), the COR at HQ ACC AMIC/PLG (757-764-9490), the PWGSC (819-956-5708) and the HQ

ACC AMIC Detachment 1 (819-939-4500/613-296-2149).

4.2.1.1 Carrier and trip number

4.2.1.2 Aircraft type and number

4.2.1.3 Date and time of the accident

4.2.1.4 Last point of departure and point of intended landing of the aircraft.

4.2.1.5 Nature of the accident and the extent of known damage to the aircraft.

4.2.1.6 Total number of crewmembers and passengers on board.

4.2.1.7 Number of injured and fatalities aboard the aircraft.

4.2.1.8 Condition of baggage or government-owned material, if any, on board.

4.2.2 Notice of Accidents - Non - DOD Missions. When a contractor's aircraft is involved in an accident or incident in support of a non-DOD mission, as defined in 49 CFR, Part 830, the contractor will transmit the information in paragraph 4.2.1 above, by the most expeditious means available on the next business day to HQ ACC AMIC/PLGT (757-225-2377), the CO at HQ

ACC AMIC/PKB (757-225-3913), the COR at HQ ACC AMIC/PLG (757-764-9490), the

PWGSC (819-956-5708) and the HQ ACC AMIC Detachment 1 (613-998-8857).

4.2.3. Aircraft Medical Incidents. Report all aircraft medical incidents in flight, or while DOD passengers are under control of the aircraft captain, to HQ ACC AMIC Detachment 1 (819-939-

4500/613-296-2149), the CO at HQ ACC AMIC/PKB (757-225-3913), and the COR at HQ ACC

AMIC/PLG (757-764-9490) within 48 hours.

4.2.4. DOD Casualties. In cases where a death occurs on a Contractor’s aircraft, the following information shall be furnished via telephone to the numbers listed below: Name, Social Security

Number (SSN) and component of service identified as Army-USA, Air Force USAF, Navy-

USN, Marine Corps-USMC, Coast Guard-USCG. The following is a list of phone numbers for service casualty offices:

US Army: (800) 626-3317 US Navy: (800) 368-3202

US Marines: (800) 847-1597 US Air Force: (800) 433-0048

Coast Guard (USCG):

Atlantic Area Op’s Center: (757) 398-6390 (accidents east of Mississippi River)

Pacific Area Op’s Center: (510) 437-3701 (accidents west of Mississippi River)

A scanned informational copy shall be provided via email to the Transportation Branch (757-

225-2377) at HQ ACC AMIC/PLGT at accamic.lg@langley.af.mil.

4.3. RESERVED

4.4 INSURANCE

The contractor shall procure and maintain a level of insurance coverage commensurate with the commercial standard and in accordance with the Government of Canada’s statutory limits during the entire period of performance under this contract.

4.5. NOTICE OF POST-AWARD/ PRE-PERFORMANCE CONFERENCE

The Contractor shall attend a Post-Award conference conducted by the CCC (PWGSC) with the

HQ ACC AMIC Contracting Officer, Contracting Officers Representative and HQ ACC

Detachment 1 personnel in attendance. The Contractor shall be notified of the exact time and location of the conference at least 2 weeks prior to the scheduled conference date. The contractor shall bear all costs associated with attendance of the conference, including travel and per diem.

4.6. PERFORMANCE OF SERVICE DURING CRISIS DECLARED BY THE PRESIDENT

OR SECRETARY OF DEFENSE OR OVERSEAS COMBATANT COMMANDER

In the event of a declared crisis, the Contractor is not relieved from the requirements of this contract. The contractor providing services designated as essential by the North Warning System

Office (NWSO) or Air Combat Command (ACC) is expected to use all means at its disposal to continue to provide services, in accordance with the terms and conditions of the contract during periods of crisis, or until appropriately released by the contracting officer.

4.7. In the event the contractor is contacted by a third party for search and rescue or medical evacuation (SAR/MEDEVAC), the contractor is authorized to provide support, at their discretion, only after clearing the SAR with the appropriate SAR authority in Canada and the

O&M contractor (to deconflict with NWS mission requirements). Flying hours and cost reimbursables will be billed to the requesting agency. Basing fee, if applicable, will not be affected while supporting SAR/MEDEVAC. The contractor will notify the CO/COR, or AMIC

Det 1 personnel as soon as practical to include details including nature of the event, requesting agency, pickup/dropoff locations.

4.8. RESERVED

4.9. Cost Summary Report - The Contractor shall submit a bi-monthly flying/cost summary report containing the following information: (CDRL)

4.9.1. Total hours billed on current invoice and copy of flight logs for that period.

4.9.2. Total passengers and total cargo carried.

4.9.3. Total of reimbursable expenses on current invoices and applicable receipts.

4.9.4 Contract year to date total of hours/miles and reimbursable expenses expended per CLIN and SUBCLIN and remaining balances per contract.

4.10. The contractor shall provide a notice, by CLIN, when 75 % of the estimated quantity or total funded amount have been used. This notice shall be sent via fax or e-mail simultaneously to the HQ ACC AMIC/PKB, PWGSC, CCC, and HQ ACC AMIC/PLGT and AMIC Detachment 1.

4.11. RESERVED

4.12. The airlift contractor shall supervise loading the aircraft and be responsible for proper weight and balance of all cargo loaded on the aircraft. Actual weight shall be used for each mission when transporting passengers and or cargo. Actual weight is defined as interrogated or scaled weight when transporting passengers. Scaled weight shall be used when loading and transporting cargo. An additive weight of 20 lbs. per person may be used for hand carried baggage.

APPENDIX 1

Main Rotary -Wing Airlift

1. SPECIFICATIONS FOR HELICOPTER AIRLIFT - INUVIK & CAMBRIDGE BAY

1.1 Cargo and Personnel Movement. The Contractor shall provide a rotary wing aircraft equipped with removable and/or foldable passenger seating which provides seating with seat belts for a minimum of eight passengers. The helicopter must also have the capacity of transporting on each flight any combination of passenger(s) and/or cargo totaling a payload minimum of 1,450 pounds; i.e. four passengers weighing 800 pounds and tools and equipment weighing 650 pounds (note, the O&M contractor does not have the authority to demand additional capacity above these minimums). This payload does not include helicopter crewmembers and Contractor equipment required for the performance of this contract. The aircraft shall be capable of transporting the total payload a range of 150 GCSM nonstop under

IFR conditions. The aircraft and crew shall be capable of IFR flight between the period 01

October to 15 March, inclusive. The aircraft shall be in compliance with established Canadian

Safety requirements and be equipped with tie-down devices to restrain the movement of cargo.

1.2 All flights shall normally originate at either Inuvik or Cambridge Bay; alternatively, flights may originate from BAR-2, PIN-M, PIN-3, CAM-3 to support work projects. Requests for cross-zone flying shall be submitted in advance to the Contracting Officer Representative (COR) or

HQ ACC/AMIC, Detachment 1 personnel, for evaluation and approval. Inuvik flights fly to and from, Komokuk Beach (Bar-1), Stokes Point (Bar-B), Shingle Point (Bar-2), Tuktoyuktuk (Bar-

3), Storm Hills (Bar-BA3), Liverpool Bay (Bar-DA1), Nicholson Peninsula (Bar-4), Horton

River (Bar-E), Cape Parry (Pin-M), Keats Point (Pin-1BD), and Croker River (Pin-1BG) by any combination of routes.

1.3 Cambridge Bay missions fly to Harding River (Pin-2A), Bernard Harbour (Pin-CB), Lady

Franklin PT (Pin-3), Edinburgh Island (Pin-DA), Cape Peel West (Pin-EB), Sturt PT

North (Cam-A3A), Jenny Lind Island (Cam-1A), Hat Island (Cam-B), Gladman Point

(Cam-2), the communities of GJOA Haven (Cam-CB), Shepherd Bay (Cam-3) and Simpson

Lake (Cam-D) and Coppermine and return to Cambridge Bay by any combination of routes.

2.0 SPECIFICATIONS FOR HELICOPTER AIRLIFT - IQALUIT, GOOSE BAY, AND HALL

BEACH

2.1 Cargo and personnel movement. The Contractor shall provide a rotary wing aircraft equipped with removable and/or foldable passenger seating which provides seating with sat belts for up to eight passengers. The helicopter must also have the capacity of transporting on each flight any combination of passenger(s) and/or cargo totaling a payload of 1,450 pounds; i.e. four passengers weighing 800 pounds and tools and equipment weighing 650 pounds. This payload does not include helicopter crewmembers and Contractor equipment required for the performance of this contract.

2.2 The aircraft shall be capable of transporting the total payload a range of 150 GCSM, except for Iqaluit which requires 350 nautical miles, nonstop under IFR conditions. The aircraft and crew shall be capable of IFR flight between the period, 01 October to 15 March, inclusive. The aircraft shall be in compliance with established Canadian Safety requirements and be equipped with tie-down devices to restrain the movement of cargo.

2.3 All flights normally originate at Iqaluit, Goose Bay, or Hall Beach; alternatively, flights may originate from FOX-3, DYE-M, BAF-3, LAB-2, LAB-6 to support work projects. Requests for cross-zone flying shall be submitted in advance to the Contracting Officer Representative (COR) or HQ ACC/AMIC, Detachment 1 personnel, for evaluation and approval. At Iqaluit passengers and cargo move from, to and between Cape Hooper (Fox-4), Broughton Island (Fox-5), Cape

Dyer (Dye M), Cape Mercy (Baf-2), Brevoort Island (Baf-3), Loks Land (Baf-4A), Resolution

Island (Baf-5), the communities of Pangnirtung and Broughton Island and return to Iqaluit by any combination of routes.

2.4 At Goose Bay passengers and cargo move from, to and between Cape Kakaviak (Lab-1), Saglek (Lab-2), Cape Kiglapait (Lab-3), Big Bay (Lab-4), Tukialik Bay (Lab-5), Cartwright

(Lab-6), the communities of Nain, Hopedale and Makovik and return to Goose Bay NFLD by

2.5 At Hall Beach, passengers and cargo move from, to and between Nadluardjuk Lake (Fox-B), Dewar Lakes (Fox-3), Kangok Fiord (Fox-CA), Pelly Bay (Cam-4), Cape McLoughlin (Cam-

5A), Lailor River (Cam-FA), Rowley Island (Fox-1), Bray Island (Fox-A), Longstaff Bluff (Fox-

2), including Spence Bay and Pelly Mission and return to Hall Beach by any combination of routes.

APPENDIX 2

ROTARY SUPPLEMENTAL AIRLIFT SERVICES

ZONE DEFINITIONS

1.0. INUVIK (ZONE#1) , CAMBRIDGE BAY (ZONE # 2) and Hall Beach (ZONE #3).

Requests for cross-zone flying shall be submitted in advance to the Contracting Officer

Representative (COR) or HQ ACC/AMIC, Detachment 1 personnel, for evaluation and approval. For positioning/depositioning, Inuvik and Goose Bay shall be considered as the original point of origin for the start and finish of supplemental rotary operations for this PWS.

Inuvik, Hall Beach, Cambridge Bay, Iqaluit and Goose Bay will be considered as the base of operations for all work accomplished under this PWS. Specific basing will be per direction of

ACC AMIC Det-1 personnel in consultation with DND and the O&M contractor and is subject to change during the period of performance.

1.1. Inuvik missions fly to and from, Komokuk Beach (Bar-1), Stokes Point (Bar-B), Shingle

Point (Bar-2), Tuktoyuktuk (Bar-3), Storm Hills (Bar-BA3), Liverpool Bay (Bar-DA1), Nicholson Peninsula (Bar-4), Horton River (Bar-E), Cape Parry (Pin-M), Keats Point (Pin-1BD), and Croker River (Pin-1BG) by any combination of routes. All LRR sites and many local communities may be used as staging locations to support specific work projects.

1.2. Cambridge Bay Missions missions fly to Harding River (Pin-2A), Bernard Harbour (Pin-

CB), Lady Franklin PT (Pin-3), Edinburgh Island (Pin-DA), Cape Peel West (Pin-EB), Sturt PT

North (Cam-A3A), Jenny Lind Island (Cam-1A), Cambridge Bay (Cam-M), Hat Island (Cam-B), Gladman Point (Cam-2), Shepherd Bay (Cam-3), Simpson Lake (Cam-D), and the communities of GJOA Haven (Cam-CB), and Coppermine and return to Inuvik by any combination of routes.

1.3 At Hall Beach, passengers and cargo move from, to and between Nadluardjuk Lake (Fox-B), Dewar Lakes (Fox-3), Kangok Fiord (Fox-CA), Pelly Bay (Cam-4), Cape McLoughlin (Cam-

5A), Lailor River (Cam-FA), Rowley Island (Fox-1), Bray Island (Fox-A), Longstaff Bluff (Fox-

2), including Spence Bay and Pelly Mission and return to Hall Beach by any combination of routes.

2.0. GOOSE BAY (ZONE #5) AND IQALUIT AREA (ZONE #4)

2.1. At Goose Bay passengers and cargo move from, to and between Cape Kakaviak (Lab-1), Saglek (Lab-2), Cape Kiglapait (Lab-3), Big Bay (Lab-4), Tukialik Bay (Lab-5), Cartwright

(Lab-6), the communities of Nain, Hopedale and Makkovik and return to Goose Bay by any combination of routes. In addition, Iqaluit passengers and cargo move from, to and between

Cape Hooper (Fox-4), Broughton Island (Fox-5), Cape Dyer (Dye-M), Cape Mercy (Baf-2), Brevoort Island (Baf-3), Loks Land (Baf-4A), Resolution Island (Baf-5) including the community of Pangnirtung, Iqaluit (LSS-Q) and Resolute Bay (Baf-5) and return to Iqaluit by

APPENDIX 3

Rotary Wing Bulk Fuel Airlift

1.0 SPECIFICATIONS FOR ANNUAL BULK FUEL TRANSFER

1.1 The Contractor shall provide annual Bulk Fuel resupply airlift support to NWS SRR sites using contractor-furnished rotary wing aircraft capable of transporting internal container/bladder, with a minimum of 1,500 liters of fuel per trip. The helicopters shall be equipped with a minimum of two (2) seats with seat belts for the Bulk Fuel technician and laborer who will accompany the crew during resupply operations. The helicopters shall be capable of flying a distance of 150 Great Circle Statue Miles nonstop. The helicopters shall be in compliance with established Canadian safety requirements and be equipped with tie down devices to restrain the movement of cargo. The Contractor shall have sufficient helicopters to perform simultaneous operations at two locations.

1.2 The Bulk Fuel airlift service shall be performed on a continuous basis covering all North

Warning System (NWS) SRR sites until resupply of all sites has been completed. The resupply shall normally begin with one aircraft in Zone 1, Inuvik, NWT, and one aircraft in Zone 5, Goose

Bay, Labrador. The aircraft work their respective ways toward Zone 3, Hall Beach, NU.

Refueling will continue at each SRR site until the transfer quantity is reached. Refueling will then begin at the next SRR site tank listed and continue until the transfer quantity is reached. In case of adverse weather conditions, the aircraft captain and O&M Contractor representative shall mutually select the next site . Extenuating circumstances may require the aircraft to move fuel to

LRR sites as directed by the CO/COR or AMIC Det 1 personnel.

1.3 The Contractor shall airlift bulk fuel from designated tanks to the SRR site tanks. Helicopter pads are available at all designated helicopter refueling sites.

1.4 The primary period of operation for this service is 15 April through 30 September of each year. The actual performance dates depend on the scheduling, weather and other uncontrollable events. For the primary period of operations, the Contractor must be available to provide service on a 24-hour (12 hour duty day) 7-day per week basis.

1.5 The Contractor shall provide the following:

1.5.1 The Contractor shall provide a minimum of three (3) each fuel transfer pumps, with a minimum capacity of 190 liters per minute, explosive proof diesel engine with suction and discharge hose and dry-break couplings. One (1) is required at the beach storage tank to pump the fuel into the helicopter fuel transfer tank and the other is required at the summit storage tank to pump fuel from the helicopter fuel transfer tank. One (1) additional pump is required as backup to reduce work stoppage should a pump mechanical failure occur. All dry-break adapters for pump and hoses are required. In-line filtering system is also required. The Contractor shall have a minimum of 50 feet (2 X 25 ft) of hose to support the beach pumping operation.

1.5.2 The Contractor shall have immediately available sufficient spill response materials and equipment which would allow the initial spill response (containment and initial cleanup) of one full load of fuel being transferred (1,500 liters). Contractor shall submit an Environmental

Response Plan to North Warning System Office and the O&M Contractor when performance starts.

1.5.3 The Contractor shall provide a sufficient number of fuel handlers for the refueling operation.

Fuel Tank Locations and Capacities:

Zone Type Site Code Site Name Fuel Storage

Location

Est.

Transfer

Qty

(Litres)

Est. Distance

From

Storage to

SRR Tank

(Miles)

1 SRR Bar-4 Nicholas Peninsula Beach Tank 60,000 2.5

1 SRR Bar-BA3 Storm Hills Bar-3 Tank 60,000 45

1 SRR Bar-DA1 Liverpool Bay Beach Tank 62,000 0.06

1 SRR Bar-E Horton River Beach Tank 60,000 1.2

1 SRR Pin-1BD Keats Point Beach Tank 62,000 6.2

1 SRR Pin -1BG Croker River Beach Tank 62,000 3.1

Estimated Hours 190

Zone 1 Staging Locations - Tuktoyuktuk and Pin-M. In emergencies only Paulutuk will operate in place of Pin-M

2 SRR Cam-1A Jenny Lind Island Beach Tank 62,000 7.7

2 SRR Cam-2 Gladman Point Beach Tank 62,000 3

2 SRR

Cam-

A3A Sturt Point North

Cam-M (LSS-C)

Tank 60,000 36

2 SRR Cam-B Hat Island Beach Tank 62,000 1

2 SRR Cam-D Simpson Lake Cam-3 Tank 60,000 37.3

2 SRR Pin -2A Harding River Beach Tank 62,000 9.3

2 SRR Pin -CB Bernard Harbour Beach Tank 62,000 6.2

2 SRR Pin -DA Edinburgh Island Beach Tank 62,000 1.2

2 SRR Pin -EB Cape Peel West Beach Tank 60,000 5

Estimated Hours 370

Zone 2 Staging Locations - Coppermine, Cam-M (LSS-C) and Gjoa Haven. If Pin-3 and Cam-3 is functioning it will operate in place of Gjoa Haven.

3 SRR Cam-4 Pelly Bay MOU Pelly Bay 60,000 7

3 SRR Cam-5A

Cape

McLoughlin Fox-M (LSS-F) Tank 62,000 109

3 SRR Cam-FA Lailor River Fox-M (LSS-F) Tank 62,000 62

3 SRR Fox-1 Rowley Island Beach Tank 62,000 1.9

3 SRR Fox-2 Longstaff Bluff Beach Tank 62,000 1.9

3 SRR Fox-A Bray Island Fox-2 Tank 65,000 56

3 SRR Fox-B

Naduardjuk

Lake Fox-2 Tank 62,000 52.8

3 SRR Fox-CA Kangok Fiord Beach Tank 62,000 8.1

Estimated Hours 540

Zone 3 Staging Locations - Gjoa Haven, Pelly Bay (Mission) and Fox-M (LSS-F). If Cam-3 is functioning it will be used in place of Gjoa Haven.

Zone

Type

Site Code

Site Name

Fuel Storage Location

Est.

Transfer

Qty

(Litres)

Est. Distance

From

Storage to

SRR Tank

(Miles)

4 SRR Baf-2 Cape Mercy Beach Tank 62,000 1.7

4 SRR Baf-4A Loks Land Beach Tank 62,000 4.3

4 SRR Baf-5

Resolution

Island Beach Tank 62,000 1

4 SRR Fox-4 Cape Hooper Beach Tank 62,000 1

4 SRR Fox-5

Broughton

Island

MOU Broughton

Island 65,000 6.2

Estimated Hours 180

Zone 4 Staging Locations – If Fox-M (LSS-F), or Fox-3 is functioning, Fox-2 will be used instead of Broughton Island, Pangnirtung and Iqaluit. If Fox-3/Dye-M are functioning, they will be used in place of Broughton Island and Pangnirtung.

5 SRR Lab-1 Cape Kakaviak Beach Tank 62,000 4.3

5 SRR Lab-3 Cape Kiglapait Beach Tank 62,000 3.1

5 SRR Lab-4 Big Bay Beach Tank 62,000 3.7

5 SRR Lab-5 Tukialik Bay Beach Tank 62,000 2.5

Estimated Hours 125

Zone 5 Staging Locations - Nain, Hopedale and Makkovic. If Lab-2 is functioning it will used in place of Nain. If Lab-6 is functioning it can be used for staging.

Note: Using any LRR as a staging location is dependent on the O&M Contractor’s other operations and maintenance activities and will be scheduled accordingly.

APPENDIX 4

APPROXIMATE SITE LOCATIONS

Zone Type Site Code Site Name Latitude Longitude

1 SRR Bar-1 Komokuk Beach 69 35' 42.6" 140 10' 48.9"

1 LRR Bar-2 Shingle Point 68 55' 34.0" 137 15' 55.0"

1 SRR Bar-3 Tuktoyaktuk 69 26' 36.8" 132 59' 56.6"

1 SRR Bar-4 Nicholas Peninsula 69 55' 29.0" 128 58' 27.4"

1 SRR Bar-B Stokes Point 69 19' 48.7" 138 44' 13.4"

1 SRR Bar-BA3 Storm Hills 68 58' 39.4" 133 56' 29.6"

1 SRR Bar-DA1 Liverpool Bay 69 36' 15.1" 130 53' 37.7"

1 SRR Bar-E Horton River 70 00' 57.1" 126 56' 37.5"

1 LSS LSS-I Inuvik 68 18' 15" 133 28' 58.0"

1 SRR Pin-1BD Keats Point 69 40' 21.8" 121 40' 21.3"

1 SRR Pin-1BG Croker River 69 15' 31.5" 119 13' 13.8"

1 LRR Pin-M Cape Parry 70 10' 17.0" 124 43' 30.0"

2 SRR Cam-1A Jenny Lind Island 68 44' 57.9" 101 51' 10.0"

2 SRR Cam-2 Gladman Point 68 40' 48.9" 97 48' 40.5"

2 LRR Cam-3 Shepherd Bay 68 47' 34.0" 93 26' 27.0"

2 SRR Cam-A3A Sturt Point North 68 57' 48.0" 103 51' 10.0"

2 SRR Cam-B Hat Island 68 19' 05.5" 100 04' 12.7"

2 SRR Cam-CB Gjoa Haven 68 38' 08" 95 50' 59"

2 SRR Cam-D Simpson Lake 68 35' 41.3" 91 57' 25.5"

2 LSS LSS-C Cambridge Bay 69 07' 18.0" 105 08' 07.0"

2 SRR Pin-2A Harding River 68 50' 07.3" 116.57' 58.4"

2 LRR Pin-3 Lady Franklin 68 28' 45.0" 113 13' 32.0"

2 SRR Pin-CB Bernard Harbour 68 45' 19.3" 114 56' 23.4"

2 SRR Pin-DA Edinburgh Island 68 29' 10.1" 110 51' 53.5"

2 SRR Pin-EB Cape Peel West 69 01' 08.7" 107 49' 23.1"

3 SRR Cam-4 Pelly Bay 68 26' 13.4" 89 43' 33.3"

3 SRR Cam-5A Cape McLoughlin 68 39' 52.7" 85 35' 28.8"

3 SRR Cam-FA Lailor River 69 06' 39.0" 83 32' 23.0"

3 SRR Fox-1 Rowley Island 69 04' 01.9" 79 03' 53.9"

3 SRR Fox-2 Longstaff Bluff 68 53' 54.6" 75 08' 27.4"

3 LRR Fox-3 Dewar Lakes 68 39' 01.0" 71 14' 05.0"

3 SRR Fox-A Bray Island 69 13' 26.2" 77 13' 49.1"

3 SRR Fox-B Naduardjuk Lake 68 37' 11.3" 73 12' 41.0"

3 SRR Fox-CA Kangok Fiord 68 38' 51.5" 69 07' 45.5"

3 LSS LSS-F Hall Beach 68 46' 27.0" 81 14' 27.0"

4 SRR Baf-2 Cape Mercy 64 57' 27.5" 63 34' 40.4"

4 LRR Baf-3 Brevoort 63 20' 20.0" 64 09' 28.0"

4 SRR Baf-4A Loks Land 62 30' 22.7" 64 31' 04.5"

4 SRR Baf-5 Resolution Island 61 35' 47.6" 64 38' 19.2"

4 LRR Dye-M Cape Dyer 66 39' 52.0" 61 21' 27.0"

4 SRR Fox-4 Cape Hooper 68 28' 20.9" 66 47' 55.4"

4 SRR Fox-5 Broughton Island 67 32' 07.7" 63 47' 20.1"

4 LSS LSS-Q Iqaluit 63 45' 23" 68 33' 21"

5 SRR Lab-1 Cape Kakaviak 59 59' 05.6" 64 09' 53.7"

5 LRR Lab-2 Saglek 58 29' 17.0" 62 35' 08.0"

5 SRR Lab-3 Cape Kiglapait 57 08' 08.9" 61 28' 32.0"

5 SRR Lab-4 Big Bay 55 44' 20.2" 60 25' 47.4"

5 SRR Lab-5 Tukialik Bay 54 42' 47.2" 58 21' 28.1"

5 LRR Lab-6 Cartwright 53 33' 08" 56 49' 46"

5 LSS LSS-G Goose Bay 53 19' 09" 60 25' 33"

Pangnirtung 66 08' 43" 65 42' 47"

Coppermine 67 49' 00" 115 08' 36"

FOX-M 68 46' 27" 81 14' 27"

Pelly Bay 68 32' 04" 89 48' 29"

Nain 56 32' 57" 61 40' 49"

Hopedale 55 26' 54" 60 13' 43"

Makkovik 55 04' 37" 59 11' 11"

File details come from the government source that posted it. Updated .