Worksheet Instructions
1. Please do not modify any of the formulas within the Speadsheet.
2. Please only input the Unit/Hourly/Daily/Liter Rates on the left side of the Spreadsheet. The Right side should Auto fill once you input your Rates.
3. If a Block is Blacked Out please only input the Rate. Blocks are Blacked out because that CLIN will not be used during the specified Period of Performance or the Rate will be inputted based of #4 below.
4. Please fill in the rates for the Contingency Flying Hours and Liters in CLINs 0004, 0009, 0014, 1003, and 2003 if your proposed rate is different than the proposed rates from CLINs 0003 and 0006, 0008 and 0011, 0013 and 0016, 1002 and 1005, and 2002 and 2005.
5. Please do not modify the amount listed in the Reimbusable Expense Line. This amount is a plug figure so all proposals have the same amount.
6. The Proposed rate inputted in the Supplemental Base Fee will be the cost that will be evaluated. Since the location of the helicopters are unknown each day, this CLIN will be invoiced IAW PWS Appendix 2, Para 4.1.. This CLIN will be funded for 244 days based off the rates proposed.
7. Please only input your rates on the Base Year, Option Year 1, and Option Year 2 Tabs. The Summary Tab will Auto fill once you complete the other tabs.
8. This worksheet will be incorporated into the contract of the winning offeror.
Summary
NWS ROTARY WING AIRLIFT CONTRACT
| Description | Base Yr | Option Yr 1 | Option Yr 2 | Totals |
| Transition | $ - 0 | | | |
| Main Base Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Rotary Wing Flying Hours | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Cost Riemburseable | $ 3,263,774.00 | $ 1,722,417.00 | $ 1,774,090.00 | $ 6,760,281.00 |
| Supplemental Base Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Rotary Wing Bulk Fuel Transfer | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $3,263,774.00 | $1,722,417.00 | $1,774,090.00 | $6,760,281.00 |
Cost Summary
| Description | IGCE | % of Total |
| Transition | $ - 0 | 0.00% |
| Main Base Fee | $ - 0 | 0.00% |
| Rotary Wing Flying Hours | $ - 0 | 0.00% |
| Cost Riemburseable | $ 6,760,281.00 | 100.00% |
| Supplemental Base Fee | $ - 0 | 0.00% |
| Rotary Wing Bulk Fuel Transfer | $ - 0 | 0.00% |
| Total | $ 6,760,281.00 | 100% |
Base Year Base Year (1 Oct 15 - 31 Dec 15) - Estimated Cost Summary
| CLIN | Description | IGCE | % of Total |
| 0001 | Transition | $ - 0 | 0.00% |
| 0002 | Main Base Fee | $ - 0 | 0.00% |
| 0003 | Rotary Wing Flying Hours | $ - 0 | 0.00% |
| 0004 | Cost Riemburseable | $ 344,074.00 | 100.00% |
| 0005 | Supplemental Base Fee | $ - 0 | 0.00% |
| 0006 | Rotary Wing Bulk Fuel Transfer | $ - 0 | 0.00% |
| Total | $ 344,074.00 | 100% |
Base Year (1 Jan 16 - 31 Dec 16) - Estimated Cost Summary
| CLIN | Description | IGCE | % of Total |
| 0007 | Main Base Fee | $ - 0 | 0.00% |
| 0008 | Rotary Wing Flying Hours | $ - 0 | 0.00% |
| 0009 | Cost Riemburseable | $ 1,376,295.00 | 100.00% |
| 0010 | Supplemental Base Fee | $ - 0 | 0.00% |
| 0011 | Rotary Wing Bulk Fuel Transfer | $ - 0 | 0.00% |
| Total | $ 1,376,295.00 | 100% |
Base Year (1 Jan 17 - 31 Dec 17) - Estimated Cost Summary
| CLIN | Description | IGCE | % of Total |
| 0012 | Main Base Fee | $ - 0 | 0.00% |
| 0013 | Rotary Wing Airlift Hours | $ - 0 | 0.00% |
| 0014 | Cost Riemburseable | $ 1,543,405.00 | 100.00% |
| 0015 | Supplemental Base Fee | $ - 0 | 0.00% |
| 0016 | Rotary Wing Bulk Fuel Transfer | $ - 0 | 0.00% |
| Total | $ 1,543,405.00 | 100% |
Base Year Total (Two Years and Three Months) $ 3,263,774.00
CLIN 0001 FFP (1 Aug 15 - 30 Sep 15)
| Main Base Fee | | | | | FFP Amount | | | |
| CLIN 0001 | QTY | Unit | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Transition | 2 | Months | $ - 0 | $ - 0 | 2 | Months | $ - 0 | $ - 0 |
| Transition Total | | | $ - 0 | FFP Base Yr | | | $ - 0 |
| CLIN 0002 FFP (1 Oct 15 - 31 Dec 15) (Three Months) | | | | | | | | |
| Main Base Fee | | | | | | FFP Amount | | | |
| CLIN 0002 | QTY | Unit | Unit Price per Day | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Base fee Zone 1 - Inuvik | 3 | Months | $ - 0 | $ - 0 | $ - 0 | 3 | Months | $ - 0 | $ - 0 |
| Base fee Zone 2 -Cambridge Bay | 3 | Months | $ - 0 | $ - 0 | $ - 0 | FFP Base Yr | | | $ - 0 |
| Base fee Zone 3 - Hall Beach | 3 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base fee Zone 4 - Iqaluit | 3 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base fee Zone 5 - Goose Bay | 3 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base Year Totals | | | | $ - 0 | | | | |
| CLIN 0003 FFP (1 Oct 15 - 31 Dec 15) | | | | | | | | | |
| Rotary Wing Flying Hours | | | | | | FFP Amount | | | |
| CLIN 0003 | QTY | Unit | Hourly Rate | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Rotary Wing Flying Hours | 475 | Hours | $ - 0 | $ - 0 | $ - 0 | 3 | Months | $ - 0 | $ - 0 |
| Base Year Totals | | | | $ - 0 | FFP Base Yr | | | $ - 0 |
| CLIN 0004 CR (1 Oct 15 - 31 Dec 15) | | | | | | | | | |
| Cost Reimburseable | | | | | Cost Reimburseable Amount | | | |
| CLIN 0004 | QTY | Unit | Unit Price | Extended Amount | QTY | Unit | Unit Price | Total |
| Contingency Flying Hours | 300 | Hours | $ - 0 | $ - 0 | $ 344,074.00 | Lot | $ 1.00 | $ 344,074.00 |
| Contingency Rotary Bulk Fuel Transfer Liters | 0 | Liters | $ - 0 | $ - 0 | COST Base Yr | | | $ 344,074.00 |
| Reimburseable Expenses | $ 344,074.00 | Lot | $ 1.00 | $ 344,074.00 | | | | |
| Base Year Totals | | | $ 344,074.00 | | | | |
| CLIN 0005 CR (1 Oct 15 - 31 Dec 15) | | | | | | | | |
| Supplemental Base Fee | | | |
| CLIN 0005 | QTY | Unit | Unit Price per Day |
| Supplemental Base Fee Zone 1 - Inuvik | 0 | Days | $ - 0 |
| Supplemental Base fee Zone 2 - Cambridge Bay | 0 | Days | $ - 0 |
| Supplemental Base Fee Zone 3 - Hall Beach | 0 | Days | $ - 0 |
| Supplemental Base Fee Zone 4 - Iqaluit | 0 | Days | $ - 0 |
| Supplemental Base Fee Zone 5 - Goose Bay | 0 | Days | $ - 0 |
| Base Year Totals | | |
| CLIN 0006 CR (1 Oct 15 - 31 Dec 15) | | | |
| Rotary Wing Bulk Fuel Transfer | | | |
| CLIN 0006 | AVERAGE QTY | Unit | Unit Price per Liter |
| Rotary Bulk Fuel Transfer | 1,500,000 | Liters | $ - 0 |
| Base Year Totals | | |
| CLIN 0007 FFP (1 Jan 16 - 31 Dec 16) (First Year) | | | |
| Main Basing Fee | | | | | | FFP Amount | | | |
| CLIN 0007 | QTY | Unit | Unit Price per Day | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Base fee Zone 1 - Inuvik | 12 | Months | $ - 0 | $ - 0 | $ - 0 | 12 | Months | $ - 0 | $ - 0 |
| Base fee Zone 2 -Cambridge Bay | 12 | Months | $ - 0 | $ - 0 | $ - 0 | FFP Base Yr | | | $ - 0 |
| Base fee Zone 3 - Hall Beach | 12 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base fee Zone 4 - Iqaluit | 12 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base fee Zone 5 - Goose Bay | 12 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base Year Totals | | | | $ - 0 | | | | |
| CLIN 0008 FFP (1 Jan 16 - 31 Dec 16) | | | | | | | | | |
| Rotary Wing Flying Hours | | | | | | FFP Amount | | | |
| CLIN 0008 | QTY | Unit | Hourly Rate | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Rotary Wing Flying Hours | 2200 | Hours | $ - 0 | $ - 0 | $ - 0 | 12 | Months | $ - 0 | $ - 0 |
| Base Year Totals | | | | $ - 0 | FFP Base Yr | | | $ - 0 |
| CLIN 0009 CR (1 Jan 16 - 31 Dec 16) | | | | | | | | | |
| Cost Reimburseable | | | | | Cost Reimburseable Amount | | | |
| CLIN 0009 | QTY | Unit | Unit Price | Extended Amount | QTY | Unit | Unit Price | Total |
| Contingency Flying Hours | 900 | Hours | $ - 0 | $ - 0 | $ 1,376,295.00 | Lot | $ 1.00 | $ 1,376,295.00 |
| Contingency Rotary Bulk Fuel Transfer Liters | 500000 | Liters | $ - 0 | $ - 0 | COST Base Yr | | | $ 1,376,295.00 |
| Reimburseable Expenses | $ 1,376,295.00 | Lot | $ 1.00 | $ 1,376,295.00 | | | | |
| Base Year Totals | | | $ 1,376,295.00 | | | | |
| CLIN 0010 (1 Jan 16 - 31 Dec 16) | | | | | | | | |
| Supplemental Base Fee | | | |
| CLIN 0010 | QTY | Unit | Unit Price per Day |
| Supplemental Base Fee Zone 1 - Inuvik | 1 | Days | $ - 0 |
| Supplemental Base fee Zone 2 - Cambridge Bay | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 3 - Hall Beach | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 4 - Iqaluit | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 5 - Goose Bay | 1 | Days | $ - 0 |
| Base Year Totals | | |
| CLIN 0011 CR (1 Jan 16 - 31 Dec 16) | | | |
| Rotary Wing Bulk Fuel Transfer | | | | | FFP Amount | | | |
| CLIN 0011 | AVERAGE QTY | Unit | Unit Price per Liter | Extended Amount | QTY | Unit | Unit Price | Total |
| Rotary Bulk Fuel Transfer | 1,500,000 | Liters | $ - 0 | $ - 0 | 1,500,000 | Liter | $0.00 | $ - 0 |
| Base Year Totals | | | $ - 0 | FFP Base Yr | | | $ - 0 |
| CLIN 0012 FFP (1 Jan 17 - 31 Dec 17) (Second Year) | | | | | | | | |
| Main Base Fee | | | | | | Monthly FFP Amount | | | |
| CLIN 0012 | QTY | Unit | Unit Price per Day | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Base fee Zone 1 - Inuvik | 12 | Each | $ - 0 | $ - 0 | $ - 0 | 12 | Months | $ - 0 | $ - 0 |
| Base fee Zone 2 -Cambridge Bay | 12 | Each | $ - 0 | $ - 0 | $ - 0 | FFP Base Yr | | | $ - 0 |
| Base fee Zone 3 - Hall Beach | 12 | Each | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base fee Zone 4 - Iqaluit | 12 | Each | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base fee Zone 5 - Goose Bay | 12 | Each | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base Year Totals | | | | $ - 0 | | | | |
| CLIN 0013 FFP (1 Jan 17 - 31 Dec 17) | | | | | | | | | |
| Rotary Wing Flying Hours | | | | | | FFP Amount | | | |
| CLIN 0013 | QTY | Unit | Hourly Rate | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Rotary Wing Flying Hours | 2200 | Hours | $ - 0 | $ - 0 | $ - 0 | 12 | Months | $ - 0 | $ - 0 |
| Base Year Totals | | | | $ - 0 | FFP Base Yr | | | $ - 0 |
| CLIN 0014 CR (1 Jan 17 - 31 Dec 17) | | | | | | | | | |
| Cost Reimburseable | | | | | Cost Reimburseable Amount | | | |
| CLIN 0014 | QTY | Unit | Unit Price | Extended Amount | QTY | Unit | Unit Price | Total |
| Contingency Flying Hours | 900 | Hours | $ - 0 | $ - 0 | $ 1,543,405.00 | Lot | $ 1.00 | $ 1,543,405.00 |
| Contingency Rotary Bulk Fuel Transfer Liters | 500000 | Liters | $ - 0 | $ - 0 | COST Base Yr | | | $ 1,543,405.00 |
| Reimburseable Expenses | $ 1,543,405.00 | Lot | $ 1.00 | $ 1,543,405.00 | | | | |
| Base Year Totals | | | $ 1,543,405.00 | | | | |
| CLIN 0015 (1 Jan 17 - 31 Dec 17) | | | | | | | | |
| Supplemental Base Fee | | | |
| CLIN 0015 | QTY | Unit | Unit Price per Day |
| Supplemental Base Fee Zone 1 - Inuvik | 1 | Days | $ - 0 |
| Supplemental Base fee Zone 2 - Cambridge Bay | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 3 - Hall Beach | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 4 - Iqaluit | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 5 - Goose Bay | 1 | Days | $ - 0 |
| Base Year Totals | | |
| CLIN 0016 CR (1 Jan 17 - 31 Dec 17) | | | |
| Rotary Wing Bulk Fuel Transfer | | | | | FFP Amount | | | |
| CLIN 0016 | AVERAGE QTY | Unit | Unit Price per Liter | Extended Amount | QTY | Unit | Unit Price | Total |
| Rotary Bulk Fuel Transfer | 1,500,000 | Liters | $ - 0 | $ - 0 | 1,500,000 | Liter | $ - 0 | $ - 0 |
| Base Year Totals | | | $ - 0 | FFP Base Yr | | | $ - 0 |
Option Year 1 Option Year 1 (1 Jan 18 - 31 Dec 18) - Estimated Cost Summary
| CLIN | Description | IGCE | % of Total |
| 1001 | Main Base Fee | $ - 0 | 0.00% |
| 1002 | Rotary Wing Flying Hours | $ - 0 | 0.00% |
| 1003 | Cost Riemburseable | $ 1,722,417.00 | 100.00% |
| 1004 | Supplemental Base Fee | $ - 0 | 0.00% |
| 1005 | Rotary Wing Bulk Fuel Transfer | $ - 0 | 0.00% |
| Total | $ 1,722,417.00 | 100% |
CLIN 1001 FFP (1 Jan 18 - 31 Dec 18)
| Main Base Fee | | | | | | FFP Amount | | | |
| CLIN 1001 | QTY | Unit | Unit Price per Day | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Base fee Zone 1 - Inuvik | 12 | Months | $ - 0 | $ - 0 | $ - 0 | 12 | Months | $ - 0 | $ - 0 |
| Base fee Zone 2 -Cambridge Bay | 12 | Months | $ - 0 | $ - 0 | $ - 0 | FFP Option Yr 1 | | | $ - 0 |
| Base fee Zone 3 - Hall Beach | 12 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base fee Zone 4 - Iqaluit | 12 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base fee Zone 5 - Goose Bay | 12 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Option Year 1 Totals | | | | $ - 0 | | | | |
| CLIN 1002 FFP (1 Jan 18 - 31 Dec 18) | | | | | | | | | |
| Rotary Wing Flying Hours | | | | | | FFP Amount | | | |
| CLIN 1002 | QTY | Unit | Hourly Rate | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Rotary Wing Flying Hours | 2200 | Hours | $ - 0 | $ - 0 | $ - 0 | 12 | Months | $ - 0 | $ - 0 |
| Option Year 1 Totals | | | | $ - 0 | FFP Option Yr 1 | | | $ - 0 |
| CLIN 1003 CR (1 Jan 18 - 31 Dec 18) | | | | | | | | | |
| Cost Reimburseable | | | | | Cost Reimburseable Amount | | | |
| CLIN 1003 | QTY | Unit | Unit Price | Extended Amount | QTY | Unit | Unit Price | Total |
| Contingency Flying Hours | 900 | Hours | $ - 0 | $ - 0 | $ 1,722,417.00 | Lot | $ 1.00 | $ 1,722,417.00 |
| Contingency Rotary Bulk Fuel Transfer Liters | 500000 | Liters | $ - 0 | $ - 0 | COST Option Yr 1 | | | $ 1,722,417.00 |
| Reimburseable Expenses | $ 1,722,417.00 | Lot | $ 1.00 | $ 1,722,417.00 | | | | |
| Option Year 1 Totals | | | $ 1,722,417.00 | | | | |
| CLIN 1004 (1 Jan 18 - 31 Dec 18) | | | | | | | | |
| Supplemental Base Fee | | | |
| CLIN 1004 | QTY | Unit | Unit Price per Day |
| Supplemental Base Fee Zone 1 - Inuvik | 1 | Days | $ - 0 |
| Supplemental Base fee Zone 2 - Cambridge Bay | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 3 - Hall Beach | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 4 - Iqaluit | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 5 - Goose Bay | 1 | Days | $ - 0 |
| Option Year 1 Totals | | |
| CLIN 1005 CR (1 Jan 18 - 31 Dec 18) | | | |
| Rotary Wing Bulk Fuel Transfer | | | | | FFP Amount | | | |
| CLIN 1005 | AVERAGE QTY | Unit | Unit Price per Liter | Extended Amount | QTY | Unit | Unit Price | Total |
| Rotary Bulk Fuel Transfer | 1,500,000 | Liters | $0.00 | $ - 0 | 1,500,000 | Liter | $0.00 | $ - 0 |
| Option Year 1 Totals | | | $ - 0 | FFP Option Yr 1 | | | $ - 0 |
Option Year 2 Option Year 2 (1 Jan 19 - 31 Dec 19) - Estimated Cost Summary
| CLIN | Description | IGCE | % of Total |
| 2001 | Main Base Fee | $ - 0 | 0.00% |
| 2002 | Rotary Wing Flying Hours | $ - 0 | 0.00% |
| 2003 | Cost Riemburseable | $ 1,774,090.00 | 100.00% |
| 2004 | Supplemental Base Fee | $ - 0 | 0.00% |
| 2005 | Rotary Wing Bulk Fuel Transfer | $ - 0 | 0.00% |
| Total | $ 1,774,090.00 | 100% |
CLIN 2001 FFP (1 Jan 19 - 31 Dec 19)
| Main Base Fee | | | | | | FFP Amount | | | |
| CLIN 2001 | QTY | Unit | Unit Price per Day | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Base fee Zone 1 - Inuvik | 12 | Months | $ - 0 | $ - 0 | $ - 0 | 12 | Months | $ - 0 | $ - 0 |
| Base fee Zone 2 -Cambridge Bay | 12 | Months | $ - 0 | $ - 0 | $ - 0 | FFP Option Yr 2 | | | $ - 0 |
| Base fee Zone 3 - Hall Beach | 12 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base fee Zone 4 - Iqaluit | 12 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Base fee Zone 5 - Goose Bay | 12 | Months | $ - 0 | $ - 0 | $ - 0 | | | | |
| Option Year 2 Totals | | | | $ - 0 | | | | |
| CLIN 2002 FFP (1 Jan 19 - 31 Dec 19) | | | | | | | | | |
| Rotary Wing Flying Hours | | | | | | FFP Amount | | | |
| CLIN 2002 | QTY | Unit | Hourly Rate | Unit Price per Month | Extended Amount | QTY | Unit | Unit Price | Total |
| Rotary Wing Flying Hours | 2200 | Hours | $ - 0 | $ - 0 | $ - 0 | 12 | Months | $ - 0 | $ - 0 |
| Option Year 2 Totals | | | | $ - 0 | FFP Option Yr 2 | | | $ - 0 |
| CLIN 2003 CR (1 Jan 19 - 31 Dec 19) | | | | | | | | | |
| Cost Reimburseable | | | | | Cost Reimburseable Amount | | | |
| CLIN 2003 | QTY | Unit | Unit Price | Extended Amount | QTY | Unit | Unit Price | Total |
| Contingency Flying Hours | 900 | Hours | $ - 0 | $ - 0 | $ 1,774,090.00 | Lot | $ 1.00 | $ 1,774,090.00 |
| Contingency Rotary Bulk Fuel Transfer Liters | 500000 | Liters | $ - 0 | $ - 0 | COST Option Yr 2 | | | $ 1,774,090.00 |
| Reimburseable Expenses | $ 1,774,090.00 | Lot | $ 1.00 | $ 1,774,090.00 | | | | |
| Option Year 2 Totals | | | $ 1,774,090.00 | | | | |
| CLIN 2004 (1 Jan 19 - 31 Dec 19) | | | | | | | | |
| Supplemental Base Fee | | | |
| CLIN 2004 | QTY | Unit | Unit Price per Day |
| Supplemental Base Fee Zone 1 - Inuvik | 1 | Days | $ - 0 |
| Supplemental Base fee Zone 2 - Cambridge Bay | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 3 - Hall Beach | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 4 - Iqaluit | 1 | Days | $ - 0 |
| Supplemental Base Fee Zone 5 - Goose Bay | 1 | Days | $ - 0 |
| Option Year 2 Totals | | |
| CLIN 2005 CR (1 Jan 19 - 31 Dec 19) | | | |
| Rotary Wing Bulk Fuel Transfer | | | | | FFP Amount | | | |
| CLIN 2005 | AVERAGE QTY | Unit | Unit Price per Liter | Extended Amount | QTY | Unit | Unit Price | Total |
| Rotary Bulk Fuel Transfer Base Yr | 1,500,000 | Liters | $0.00 | $ - 0 | 1,500,000 | Liters | $0.00 | $ - 0 |
| Option Year 2 Totals | | | $ - 0 | FFP Option Yr 2 | | | $ - 0 |