2026_09_02_Well 12 Bid Schedule.pdf

PDF 300 KB Posted

Attached to
Luke AFB Well Maintenance
Solicitation number
FA488726Q0051
Issued by

About this file

This document is a Statement of Work (SOW) or maintenance scope schedule for Water Well #12, detailing the specific services and tasks required for well maintenance and repair operations.

The maintenance scope encompasses mobilization and demobilization activities, followed by comprehensive well servicing including turbine pump extraction (580 LF rigging time), pre- and post-downhole video surveys, well brushing, and bailing operations. Major components include inspection and repair or replacement services for the 580 VF column pipe (29 units), line shaft and oil tube in 20-foot sections (29 units), and spiders (14 units). Additional work involves reinstalling the pump with testing and waste disposal, installing 8-inch pipe from pump to waste (approximately 500 LF), and replacing the McCrometer flow meter. The scope also includes multi-stage bowl assembly replacement with a new 580 TDH assembly, 1-inch S40 PVC sounding tube (580 VF), oil drum vent pipe and dripper valve replacement with electric solenoid and manual dripper, and fuel surcharge. Optional services include water jetting, disinfection, and related procedures. The document specifies units of measure (UOM) and quantities (QUAN) for each line item, with a final total to be calculated. The work order is dated September 2, 2026, and references facility maintenance documentation files.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .