RFIs,_23_Feb_2017.docx

DOCX document 13 KB Posted

Attached to
MECHANICAL IDIQ Federal contract opportunity
Solicitation number
FA488717R0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

RFIs, 23 FEB 2017

View the file

Other files for this federal contract opportunity

Other files attached to MECHANICAL IDIQ, newest first.
File Type Posted
FA4887-17-R-0004_Splash_Pad_RFI,_13_April_2017.docx DOCX document
RFI,_15_Mar_2017.docx DOCX document
Attachment_20_-_Sample_Project_SOW,_Rev_1_w_rev_lines.docx DOCX document
Amendment_0001.docx DOCX document
Attachment_20_-_Sample_Project_SOW,_Rev_1_w_rev_lines.docx DOCX document
RFIs_7_Mar_2017,_FBO.docx DOCX document
RFIs,_3_Mar_2017.docx DOCX document
Attendees_Site_Visit_16_Feb_2017.docx DOCX document
B1_Questions_and_Answers_from_16_Feb_2017_9_am_Site_Visit,_FBO_21_Feb_2017.docx DOCX document
Attachment_18_-_DoD_Unified_Facilities_Criteria_(link).docx DOCX document
Attachment_21_-_Financial_Information_Request.docx DOCX document
Attachment_005_-_Architectural_Design_Compatibility.pdf PDF
Attachment_2_-_AZ160032_AZ32_WDOL_Maricopa,_20_Jan_2017.docx DOCX document
Attachment_19_-_AFI_33-118_Radio_Communications.pdf PDF
Attachment_027_-_Luke_AFB_Disc_Submittal_Guidelines.pdf PDF
Attachment_008_-_Luke_Mechanical_Submittal_Register.xlsx XLSX spreadsheet
Attachment_011_-_AF_3000_Material_Approval.pdf PDF
Attachment_10_-_AF_Form_3065_Progress_Report.pdf PDF
Attachment_1_-_SOW_MECHANICAL-IDIQ_FINAL_26_Jan_2017.doc DOC document
Attachment_13_-_Contractors_Environmental_Reporting_Entry_Form.doc DOC document
Attachment_9_-_AF_Form_3064_Progress_Schedule.xlsx XLSX spreadsheet
Attachment_026_-_CoE_Design_Submittal_Requirements_Manual.pdf PDF
Attachment_015_-_Luke_Mechanical_Specifications.pdf PDF
Attachment_22_-_Bonding_Information_Request.docx DOCX document
Attachment_24_-_Resume_Template.doc DOC document
Attachment_16_-_DD_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Attachment_14,_SH,_23_Jun_-_3052_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Attachment_6_-_Luke_AFB_Design_and_Construction_Standards.doc DOC document
Attachment_25_-_solicitation_cross_reference_matrix_3_Jan_2017.doc DOC document
Attachment_7_-_Engineering_Technical_Letter_(ETL_02-12).pdf PDF
Attachment_004_-_Luke_Landscape_Design_&_Mx_Standards.pdf PDF
Attachment_17_-_USACE_Safety_and_Health_Requirements.pdf PDF
Attachment_23_-_Base_Access_Instructions.pdf PDF
FA4887-17-R-0001_Mechanical_Solicitation.docx DOCX document
Attachment_3_-_AZ160031_AZ31_WDOL_Coconino,_6_Jan_2017.docx DOCX document
Attachment_020_-_Sample_Project_SOW.docx DOCX document
Attachment_12_-_Hazardous_Material_Questionaire.doc DOC document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please request additional pictures and drawings referenced below via email to julie.kocinski@us.af.mil. Files will be sent directly to the requestor via AMRDEC SAFE.

Q: Please clarify whether a new Distech Control System is to be included in the Sample Project or if Distech Control System has already been installed. Please also clarify if Sample Project should include front end graphics and JACE and the preference for integration.

A: "The existing air handlers are currently controlled by a Staefa control system. This system is to be replaced with a new Distech control system that provides points as shown in UFC 3-410-01 Appendix D, Minimum Points List. A new JACE will be required. New front end graphics will be required.

The building gets its chilled water from the Central Chilled Water Plant (B547). There is a control valve to modulate the amount of chilled water going to the building. This CHW goes through a Heat Exchanger to provide the building loop with chilled water. Currently, Chiller Plant Water Valve, Heat Exchanger and Chilled Water Pump are on a Distech Control.

The new Distech system will not tie into the existing building system. A new Comm port is required for the new JACE to communicate to the front end."

Q: Sample Project SOW Item 2.7.3 states that, “…The seals shall control enough leakage to be able to maintain the required 0.05 IWC negative pressure…” During the site visit it was stated that the pressure differential needed to be “0.02.” Please clarify whether the preference is for 0.05 or 0.02.

A: The pressure requirement is 0.05 iwc as stated in UFC 4-010-01.

Q: Should the Sample Project include full mechanical specifications from Mechanical Engineer or will noted drawings be sufficient?

A: The Luke Mechanical Specifications included in the RFP will be used for all projects. For proposal purposes, we require that a table of contents is submitted to include all sections that are relevant to the Sample Project. Choose the sections that are found in the Luke Mechanical Specifications.