Contractor's HAZMAT Questionnaire.doc
DOC document 33 KB Posted
- Solicitation number
- FA4887-11-R-0003
About this file
Hazardous Material Questionaire
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.docx | DOCX document | |
| Highway Wage determination Maricopa.docx | DOCX document | |
| ETL 09-6 Landing Zone Etc.pdf | ||
| afi32-1042.pdf | ||
| PAST PERFORMANCE QUESTIONNAIRE.doc | DOC document | |
| 11 BASE PAVEMENT SPECSMain.doc | DOC document | |
| FY 11 Bid Sch Airfield Pavements.xls | XLS spreadsheet | |
| FA4887-11-R-0003 Airfield and Base paving Solicitation Document.rtf | RTF text file | |
| SOW Airfield Paving.rtf | RTF text file | |
| FY11 Bid Sch Base Pavements.xls | XLS spreadsheet | |
| etl_08_13.pdf | ||
| SOW Base paving.rtf | RTF text file | |
| ETL 09-6 Chg 1.pdf | ||
| AF Form 3064 CP Schedule.xfdl | XFDL file | |
| ETL 4-2 Change 1.pdf | ||
| 11 AIRFIELD SPECS.docx | DOCX document | |
| BASE PVMT FORM 66 New.xls | XLS spreadsheet | |
| ETL09-2.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor's Hazardous Material Questionnaire 1.
Contractor’s Company Name:
Name of Contractor:
Phone Number:
Fax Number:
Address:
2. Contract Number:
3. Date, time and location of pre-performance conference meeting:
4. Project:
5. Quality Assurance Evaluator (QAE)/ Contracting Officer (CO)
________________________Phone#___________
6. Projected contract period:
Start Date: ________ End Date: _________
7. Will contractor be using any hazardous material (HAZMAT) during this contract?
a) If the answer is NO to the above question, sign and date below.
Contractor’s Name (print) Contractor’s Signature Date
b) If the answer is YES to the above question, sign and date below and complete item 8. Provide QAE/CO a chemical inventory and copies of all Material Safety Data Sheets (MSDS) 5 days prior to contract start date. Provide QAE/CO a monthly HAZMAT usage report (see Contractor’s Environmental Reporting Entry Form, Attachment 1) during the contract period no later than 5 days after the end-of-each month.
Contractor’s Name (print) Contractor’s Signature Date
8. Will the contractor be generating a potential waste or hazardous waste during the contract period? (Yes/No) If YES, contact the base Hazardous Waste Manager at (623) 856-6501 and/or the Pollution Prevention Chief at (623) 856-4166 for proper reporting and disposal procedures.
The point-of-contact for the HAZMO Office is Mr. Oscar Mabry, (623) 856-4748, Fax: (623) 856-4747, e-mail: oscar.mabry@luke.af.mil
Attachment 1 – Contractor’s Environmental Reporting Entry Form
File details come from the government source that posted it. Updated .