Past performance Questionnaire attch 14.rtf

RTF text file 89 KB Posted

Attached to
BASE PAVEMENT
Solicitation number
FA488709R0013
Issued by

About this file

Attachment 14

Text of this file

A

PAST/PRESENT PERFORMANCE QUESTIONNAIRE

When Completed this document is source selection sensitive information iaw FAR 3.104

SECTION 1: CONTRACT IDENTIFICATION

A. Contractor:

B. Cage Code of contractor contract was awarded to:

C. Contract number:

D. Contract type:

E. Was this a competitive contract?

F. Period of performance:

G. Initial contract cost:

H. Current/final contract cost:

I. Reasons for differences between initial contract cost and final contract costs:

J. Description of service provided:

SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION

A. Customer or agency name:

B. Customer or Agency description (if applicable):

C. Geographic description of services under this contract, i.e. local, nationwide, worldwide, other Commands:

SECTION 3: EVALUATOR IDENTIFICATION

A. Evaluator's name:

B. Evaluator's phone/fax number: PHONE:

FAX:

Number of year’s evaluator worked on subject contract:

SECTION 4: EVALUATION

Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:

CODE PERFORMANCE LEVEL

B BLUE/EXCEPTIONAL - The contractor’s performance meets contractual requirements and exceeds many (requirements) to the Government’s benefit. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

P PURPLE/VERY GOOD- The contractor’s performance meets contractual requirements and exceeds some (requirements) to the Government’s benefit. The contractual performance was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

G GREEN/SATISFACTORY – The contractor’s performance meets contractual requirements. The contractual performance contained some minor problems for which corrective actions taken by the contractor appear or was satisfactory.

Y YELLOW/MARGINAL – Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

R RED/UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N NOT APPLICABLE - Unable to provide a score.

B

P

G

Y

R

N Technical Performance T1 Quality & repeatability of operations & maintenance.

T2. Quality of technical system testing and certification efforts

T3 Quality/integrity of technical data/report preparation efforts

T4 Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements

T5 Adequacy/effectiveness of environmental safety procedures

Program Management P1. Effectiveness of overall contract management (including ability to effectively lead, manage and control the program)

P2. Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes)

P3. Timeliness/effectiveness of contract problem resolution without extensive customer guidance

P4. Ability to understand/comply with customer objectives and technical requirements

P5. Ability to successfully respond to emergency and/or surge situations

P6. Quality/effectiveness of sub-contracted efforts

P7. Effectiveness of material management (including Government Furnished Property or Material)

P8. Effectiveness of acquisition management

P9. Contractor proposed alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the customer

P10. Contractor implemented responsive/flexible processes to improve quality and timeliness of support.

B

P

G

Y

R

N

Transition/phase-in T1. Contractor ability to smoothly transition resources and personnel.

T2. Contractor effectiveness on maintaining continuity of mission support while transitioning/phasing in resources and personnel to support other efforts.

Employee Retention/Attraction E1. Ability to hire/apply a qualified workforce to this effort.

E2. Ability to retain a qualified workforce on this effort.

E3. Effectiveness of employee compensation towards quality of work.

Small and Small Disadvantaged Business Participation S1. Ability to meet or exceed small business and small disadvantaged business goals set forth in the approved subcontracting plan

S2. Ability to effectively manage small business participation to meet technical performance.

Cost Performance C1 Accuracy in forecasting contract costs

C2 Ability to meet forecasted costs and perform within contract costs

C3 Ability to alert Government of unforeseen costs before they occur

C4 Sufficiency and timeliness of cost reporting

2. Please discuss each and every response for which you indicated B/E (Blue/Exceptional), Y/M (Yellow/Marginal) or R/U (Red/Unsatisfactory) in response to the questions above (use additional sheets, if necessary).

3. Government Contracts Only: Has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations?

If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules, etc.)

SECTION 5: NARRATIVE SUMMARY

What were the contractor’s greatest strengths in the performance of the contract?

What were the contractor’s greatest weaknesses in the performance of the contract?

Would you have any reservations about soliciting this contractor in the future or having them perform one of your critical and demanding programs?

Please provide any additional comments concerning this contractor’s performance, as desired.

Evaluator’s Signature Date

Thank you for your prompt response and assistance!

Please return this completed questionnaire to:

Mailing Address:56th Contracting Squadron
14100 W. Eagle Street
ATTN: Lissette Fernandez
Luke AFB, AZ 85309-1217

Or FAX to: 623-856-3438

Or e-mail to: lissette.fernandez@luke.af.mil

Telephone: 623-856-7179 ext 255

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .