Contractor's HAZMAT Questionnaire attachment 4.doc

DOC document 34 KB Posted

Attached to
BASE PAVEMENT
Solicitation number
FA488709R0013
Issued by

About this file

Attachment 4

View the file

Other files

File Type Posted
Solicitation Questions and Answers April 9 2009.doc DOC document
09 NEW Base Pavements Specifications —
question and answer for base paving.doc DOC document
amendment II.doc DOC document
attachment 8 and 9 AF Forms.pdf PDF
amendment 09-R-0013-P0001.doc DOC document
Luke AFB SWPPP - current as of 28 March 08 Attch 5.doc DOC document
Solicitation Document FA488709R0013.rtf RTF text file
Dust Control Permit Attch 7.pdf PDF
09 BASE TEC PROP 2 attachement 2.doc DOC document
AF Form 3064 CP Schedule attch 8.xfdl XFDL file
Bid Schedule - Base pavements 2009 —
Contractor's Environmental Reporting Entry Form Attch 6.doc DOC document
BASE PVMT FORM 66 New Attch 10.xls XLS spreadsheet
09 NEW Base Pavements Specifications —
AF Form 3065 CP Report attch 9.xfdl XFDL file
Past performance Information attch 15.doc DOC document
dd1354 Attch 12.pdf PDF
Arizona asbestos awareness attachment 3.doc DOC document
Blank Pest. Herbicide Management Report Attch 11.xls XLS spreadsheet
Past performance Questionnaire attch 14.rtf RTF text file
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor's Hazardous Material Questionnaire 1.

Contractor’s Company Name:

Name of Contractor:

Phone Number:

Fax Number:

Address:

2. Contract Number:

3. Date, time and location of pre-performance conference meeting:

4. Project:

5. Quality Assurance Evaluator (QAE)/ Contracting Officer (CO)

________________________Phone#___________

6. Projected contract period:

Start Date: ________ End Date: _________

7. Will contractor be using any hazardous material (HAZMAT) during this contract?

a) If the answer is NO to the above question, sign and date below.

Contractor’s Name (print) Contractor’s Signature Date

b) If the answer is YES to the above question, sign and date below and complete item 8. Provide QAE/CO a chemical inventory and copies of all Material Safety Data Sheets (MSDS) 5 days prior to contract start date. Provide QAE/CO a monthly HAZMAT usage report (see Contractor’s Environmental Reporting Entry Form, Attachment 1) during the contract period no later than 5 days after the end-of-each month.

Contractor’s Name (print) Contractor’s Signature Date

8. Will the contractor be generating a potential waste or hazardous waste during the contract period? (Yes/No) If YES, contact the base Hazardous Waste Manager at (623) 856-6501 and/or the Pollution Prevention Chief at (623) 856-4166 for proper reporting and disposal procedures.

The point-of-contact for the HAZMO Office is Mr. Oscar Mabry, (623) 856-4748, Fax: (623) 856-4747, e-mail: oscar.mabry@luke.af.mil

Attachment 1 – Contractor’s Environmental Reporting Entry Form

PAGE

1A

File details come from the government source that posted it. Updated .