09 BASE TEC PROP 2 attachement 2.doc

DOC document 28 KB Posted

Attached to
BASE PAVEMENT
Solicitation number
FA488709R0013
Issued by

About this file

Attachment 2

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NUEX 08-0501, MAINTAIN BASE PAVEMENTS

TECHNICAL PROPOSAL

1. Project Management Ability

A. This area will address the contractor’s management organization, to include a description of functions, authorities and credentials of key management personnel. Provide resumes of each, showing extent of previous experience applicable to support this contract, including current and previous Asphalt/Concrete work performed. Manpower resources and utilization should show distinct evidence of quality of executive and top supervisory personnel as verified by experience, education, background, character and proven ability in a managerial capacity. Provide documentation that the construction superintendent has a minimum of ten (10) year’s experience in Asphalt/Concrete Construction and Repairs.

B. The Offerer shall submit a construction progress management plan for all delivery orders in excess of $500,000 in accordance with section 01310 of the technical specifications.

2. Technical Capabilities

A. Provide detailed information reflecting the Offerer’s prior experience in both government and non-government contracts. Emphasis should be placed on experience, quality and quantity, which insured satisfactory performance of prior contracts similar to this project.

B. Provide detailed information, location and size reflecting the Offerer’s completed construction of at least 5 Projects with a minimum of $100,000 each involving Asphalt and Concrete pavements (within the past 10 years.)

C. Provide a total of 5 references from the following

(1) Pavement Systems Owner/Developer

(2) Pavement Systems (Architect/Engineer)

(3) Municipality

TP-1

3. Subcontracting capabilities

A. The Offerer’s shall provide specific identification of proposed subcontractors. Provide a brief resume of each subcontractor, including construction experience, and type of work they will perform.

B. The Offerer shall describe the percentage of subcontracting to be accomplished. NOTE: The contractor is required to perform a minimum of 50% of the contract.

PAGE

File details come from the government source that posted it. Updated .