Application For Dust Control Permit – April 2007 1

APPLICATION FOR DUST CONTROL PERMIT

Formerly Part of "Application for an Earthmoving Permit"

There are three sections in this application:

Section 1 - Applicant Information

Section 2 - Project Information

Section 3 - Dust Control Plan

In order for the application to be complete, answer all of the questions in all three sections. Submit the completed application and the appropriate fee to the Maricopa County Air Quality Department.

To complete this application, please use the Guidance For Application For Dust Control Permit, which contains details and explanations of the information required in this application. Also, please note that if you are completing this application and you are the "applicant", then you are the responsible authority for controlling all aspects of all the work accomplished on-site from initial groundbreaking to final stabilization.

Also, as an "applicant", you are responsible for closing-out the Dust Control Permit when the project is complete and/or when you no longer have control over the day-to-day operations on the site. Refer to

Maricopa County Air Pollution Control Regulations Rule 200 (Permit Requirements) and Rule 310 (Fugitive

Dust) for more information regarding the requirements and work practices associated with this application.

Both of these rules are available at 1001 North Central Avenue or at: http://www.maricopa.gov/aq

Maricopa County Air Quality Department

Return all applications to: One Stop Shop 501 N. 44th Street, Suite 200

Phoenix, AZ 85008 Phone (602) 372-1071 Fax (602) 372-1078

Application For Dust Control Permit – April 2007 2

Would you like to pick up your permit? Yes No Contact Person_________________ Contact Phone _________________

S e c t i o n 1 – A p p l i c a n t I n f o r m a t i o n

1. Applicant: Check all that apply:

Property Owner General / Prime Contractor Developer Lessee

If you answered "yes" above, please provide the following information:

1a.Is Applicant A Wholly Owned Subsidiary Of Another Company? Yes No

For Office Use Only

District # Area #

NOV #

Permit # Fee Paid / Acreage Date Issued Approved By

NESHAP

Cross Streets

Date Stamp Here

Name:

Applicant Address:

City/State/Zip:

Phone: Fax:

E-Mail Address:

Local Mailing Address (if not the same as above):

Contractor License Number:

1b. Parent Company Name:

Address:

City/State/Zip:

State of Incorporation:

2. Property Owner / Developer, If Not Applicant:

Address:

City/State/Zip:

State of Incorporation:

Application For Dust Control Permit – April 2007 3

4. Signature Of A Responsible Official Of The Applicant:

I hereby certify that, based on information and belief formed after reasonable inquiry, the statements and information in the Application For Dust Control Permit, including Section 1-Applicant Information, Section 2-Project Information, and Section 3-Dust Control Plan, are true, accurate, and complete.

A Responsible Official Of The Applicant is the person who will be contacted or named in any enforcement action initiated by the Maricopa County Air Quality Department or the Office Of The Maricopa County Attorney.

Arizona Revised Statute §13-2704 makes it a criminal offense to knowingly make a false material statement to a public servant in connection with an application for any benefit, privilege, or license.

Signature:

Printed Name: Title:

4a. Company President / Owner:

Address:

City/State/Zip:

Phone: Fax:

5. Application Completed By, If Not Signatory:

Printed Name: Title:

Phone: Fax:

E-mail:

3. Primary Project Contact:

Title: Company Name:

On-Site Phone: Mobile: Fax:

E-Mail Address:

Application For Dust Control Permit – April 2007 4

S e c t i o n 2 – P r o j e c t I n f o r m a t i o n (See Guidance Pages 7 - 12)

6. Address Of Project Location: (If no address available include block #, assessor’s parcel #, GPS coordinates, etc.)

Address:

City/Zip:

Major Cross Street North/South:

Major Cross Street East/West:

Township: Range: Section:

Assessor’s Parcel Number(s) (if no address available):

GPS Coordinates (if no address available):

Unincorporated Area (County) Incorporated Area (City)

7. Name Of Project:

8. Description Of Project:

9. Will A Basement Or Underground Parking Be Excavated? Yes No

9a. Will Building Occur On A Pre-Existing Pad / Prepared Pad? Yes No

10. Size Of Project Or Physical Area (Acres) That Will Be Disturbed During The Duration Of This Permit, Including Staging And Stockpile Areas, And Temporary Storage Yards:

Estimated acres to be graded, if different from size of project indicated above:

Estimated cubic yards to be moved within the boundaries of the project:

Estimated amount of import material: Estimated amount of export material:

11. Project Start Date:

11a.Estimated Duration Of Project:

Application For Dust Control Permit – April 2007 5

12. Attach Project Site Drawing (A Dust Control/Demolition Permit will not be issued, unless a drawing is submitted. Attach a separate page (8½” x 11”) with a drawing showing all of the following elements:

• Entire project site boundaries

• Acres to be disturbed with linear dimensions (including staging areas, stockpiles, and storage)

• Nearest public cross-roads

• North arrow

• Planned exit locations onto paved areas accessible to the public

13. Indicate Soil Designations From Appendix F In Maricopa County Air Pollution Control Regulations Or Attach A Copy of The Site Geotechnical Report

For construction projects one acre or larger, except for routine maintenance and repair done under a block permit, designate in the table below which soil texture is naturally present on the work site and which soil texture will be imported onto the work site (if applicable). If the soil on the work site has been tested, then you should rely on the test results to complete the table and you should attach a copy of the site soil report (boring logs) to this application. If the soil on the work site has not been tested, then use Appendix F in the Maricopa County Air Pollution Control Regulations to complete the table below.

14. Is This A Re-Application? Yes Previous Permit # No

A permit is valid for 1 year after date of issuance/approval. The re-application process takes a minimum of 14 days for approval and must be approved prior to expiration of old permit. You must re-apply for a permit more than

14 days before the original permit expires.

Soil Texture Naturally Present On Work Site Soil Texture To Be Imported Onto Work Site

Application For Dust Control Permit – April 2007 6

15. Asbestos NESHAP Notification Requirements

All facilities scheduled for demolition or renovation (see definitions below) must be inspected by a currently certified

Asbestos Hazard Emergency Response Act (AHERA) Asbestos Building Inspector. There is no waiver of this requirement based on the age of the facility. The inspection must be performed within 12 months of commencement of demolition or renovation activity. Questions concerning the Asbestos NESHAP regulation should be referred to

Maricopa County’s Asbestos NESHAP Coordinator at 602-506-6708 or 602-506-0421. Forms may be obtained at http://www.maricopa.gov/aq/Asbestos/a-forms.asp.

Demolition: The wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of a facility.

Renovation: Altering a facility or one or more facility components in any way, including the stripping or removal of

RACM from a facility component.

Does The Project Include Demolition Or Renovation? Yes No (go to section 3)

If Residential Property, Has The Property Ever Been Used For A Commercial/Industrial Purpose?

Yes No

If Yes, Has An Asbestos Inspection Been Conducted By An AHERA Certified Building Inspector Within The Last 12 Months? Yes No

Date of Asbestos Inspection:

10-Day NESHAP Notification Submittal Date (Please Attach A Copy):

County Plat Number of Property (__________), (__________), (___________), (__________) Book Map Parcel Split

Is This A Residential Property? Yes No

If Yes, Is There More Than One Structure on the Property? Yes No

Please Describe Each Structure:

Application For Dust Control Permit – April 2007 7

S e c t i o n 3 – D u s t C o n t r o l P l a n (See Guidance Page 13)

When completing the following Dust Control Plan, use the Guidance For Application for Dust Control Permit - Section 3

- Instructions to help you select dust control measures and keep in mind the following:

• Categories and/or sub-categories of dust generating operations C3, C5, D1, F, and G, in the following Dust Control Plan, have primary control measures, “P”, required by Rule 310. You will need to choose a contingency measure, "C", for these dust generating operations. All sections need one P and one C.

• Where has replaced a “P”, the dust control measure cannot be used as a primary control measure.

• Where has replaced a “C”, the dust control measure cannot be used as a contingency control measure and is required to be used as a primary control measure.

• Where “Other” is listed without reference to opacity or surface stabilization standard(s) and is selected as a primary control measure, then the description must meet the criteria in the Guidance For Application For Dust Control Permit – Section 3 – Unlisted Dust Control Measures (See Guidance Page 12).

After your Application For Dust Control Permit has been approved, you must post your Dust

Control Permit and Dust Control Plan on-site.

Use In Open Areas

P C Restrict trespass by installing signs

P C Install physical barriers to prevent access: curbs, fences, gates, posts, signs, shrubs or trees

(Circle selected measure)

P C Other (so that the standards in Rule 310, Section 3/2.3 are met)

Or, explain why this control measure is not applicable

Application For Dust Control Permit – April 2007 8

Unpaved Parking Lots

P C Apply water, so that the standards in Rule 310, Section 302.1 are met (Fill Out Section I)

P C Apply water in combination with dust suppressant(s), so that one of the standards in Rule 310, Section 302.1 is met (Fill Out Section J)

P C Apply and maintain gravel, recycled asphalt, or other suitable material, so that the standards in Rule 310, Section 302.1 are met

P C Pave (Choose on of the following): Beginning Of Project* During Project* End Of Project* *Must stabilize surface prior to paving, so that the standards in Rule 310, Section 302.1 are met

P C Apply and maintain dust suppressant(s), other than water, so that the standards in Rule 310, Section 302.1 are met (Fill Out Section J)

C Limit vehicle speed to 15 m.p.h. on the site

P C Other (so that the standards in Rule 310, Section 302.1 are met)

Unpaved Haul Roads/Access Areas

P C Limit vehicle trips to no more than 20 per day per road AND limit vehicle speeds to no more than

15 m.p.h. In the space provided, list the maximum number of vehicle trips on the unpaved haul roads/access areas each day (including number of employee vehicles, dust generating equipment, haul trucks, and water trucks)

P C Apply water, so that the standards in Rule 310, Section 302.2(a) are met (Fill Out Section I)

P C Apply water in combination with dust suppressant(s), so that the standards in Rule 310, Section

302.2(a) are met (Fill Out Section J)

P C Pave (Choose one of the following): Beginning Of Project* During Project* End Of Project* *Must stabilize surface prior to paving, so that the standards in Rule 310, Section 302.2(a) are met

P C Apply and maintain surface gravel, recycled asphalt, or other suitable material, so that the standards in Rule 310, Section 302.2(a) are met

P C Apply and maintain dust suppressant(s), other than water, so that the standards in Rule 310, Section 202.2(a) are met (Fill Out Section J)

C Cease operations

P C Other (so that the standards in Rule 310, Section 302.2(a) are met)

Application For Dust Control Permit – April 2007 9

B. Disturbed Surface Areas (See Guidance Pages 17 – 18)

Before Dust Generating Operations Occur

P C Pre-water site to the depth of cuts, so that the standards in Rule 310, Section 301 are met (Fill Out Section 1)

P C Phase work to reduce the amount of disturbed surface area at any one time Attach a map delineating the phases and their extent

P C Other (so that the standards in Rule 310, Section 301 are met)

During Dust Generating Operations

P C Apply water, so that the standards in Rule 310, Section 301 are met (Fill Out Section I)

P C Apply and maintain dust suppressant(s) other than water, so that the standards n Rule 310, Section

301 are met (Fill Out Section J)

P C Apply water in combination with dust suppressant(s), so that the standards in Rule 310, Section 301 are met (Fill Out Section J)

P C Construct wind barrier fences (in conjunction with one of the above listed measures)

C Limit vehicle speed to 15 m.p.h. on the work site

P C Other (so that the standards in Rule 310, Section 301 are met)

Temporary Stabilization Including Weekends, After Work Hours, Holidays, And Periods Up-To 8 Months

P C Apply water or other dust suppressant, so that the standards in Rule 310, Section 302.3 are met (Fill Out Section I or J)

P C Apply and maintain gravel, recycled asphalt, or other suitable material, so that the standards in Rule 310, Section 302.3 are met

P C Establish vegetative ground cover (landscaping), so that the standards in Rule 310, Section 302.3 are met

P C Pave (Choose one of the following): Beginning Of Project* During Project* End Of Project*

C Restrict vehicular access to area in addition to (1) applying water or other dust suppressant(s) to establish and maintain a visitble crust or (2) establishing vegetative ground cover (landscaping), so that the standards in Rule 310, Section 302.3 are met

Application For Dust Control Permit – April 2007 10

P C Other (so that the standards in Rule 310, Section 302.3 are met)

Permanent Stabilization Of Open Areas And Vacant Lots Required Within 8 Months Of Ceasing Dust Generating Operations

P C Apply water, so that the standards in Rule 310, Section 302.3 are met (Fill Out Section I)

P C Restore area such that the vegetative ground cover and soil characteristics are similar to adjacent or nearby undisturbed native conditions (desert xeriscaping)

P C Establish vegetative ground cover (landscaping), so that the standards in Rule 310, Section 302.3 are met

P C Pave (Choose one of the following): Beginning Of Project* During Project* End Of Project* *Must stabilize surface prior to paving, so that one of the above stabilization standards is met

P C Construct building, house, structure, and / or floor

P C Apply and maintain dust suppressant(s) other than water (so that the standards in Rule 310, Section

302.3 are met) (Fill Out Section J)

P C Other (so that the standards in Rule 310, Section 302.3 are met)

Prior To And/Or During

Stacking, Loading, And Unloading Operations

P C Apply water, so that the standards in Rule 310, Section 302.3 are met (Fill Out Section I)

P C Apply water in combination with dust suppressant(s) at a frequency and intensity, so that the standards in Rule 310, Section 301 are met (Fill Out Section J)

C Pre-water and maintain surface soils in a stabilized condition where support equipment and vehicles will operate, so that the standards in Rule 310, Section 301 are met (Fill Out Section I)

C Remove material from the downwind side of the storage pile when safe to do so

C Empty loader bucket slowly and keep loader bucket close to the truck to minimize the drop height while dumping

C Other (so that the standards in Rule 310, Section 301 are met)

C. Bulk Material Handling (See Guidance Pages 18 – 19)

Application For Dust Control Permit – April 2007 11

Open Storage Piles

P C Apply water, so that the standards in Rule 310, Section 302.3 are met (Fill Out Section I)

P C Apply water in combination with dust suppressant(s), so that the standards in Rule 310, Section 302.3 are met (Fill Out Section J)

P C Cover open storage piles with tarps, plastic or other material

P C Apply water to maintain soil moisture content at a minimum of 12% (Fill Out Section I)

P C Apply water to maintain at least 70% of the optimum soil moisture content, for areas that have an optimum moisture content for compaction of less than 12% (Fill Out Section I)

P C Maintain vegetative cover, so that the standards in Rule 310, Section 302.3 are met

P C Construct wind barrier fences (in conjunction with one of the above listed measures)

P C Other (so that the standards in Rule 310, Section 308.6 are met)

On-Site Hauling Within The Boundaries Of the Work Site

And Crossing A Paved Area Accessible To the Public

P Required: Load all haul trucks such that the freeboard is not less than 3 inches AND prevent spillage or loss of bulk material from holes or other openings in the cargo compartment AND install suitable track-out control device

C Limit vehicle speed to 15 m.p.h. on the work site

On-Site Hauling Within The Boundaries Of The Work Site

P C Limit vehicle speed to 15 m.p.h. or less while traveling on the work site such that visible emissions coming-off the load do not exceed 20% opacity

P C Apply water to the top of the load, so that the standards in Rule 310, Section 301 are met (Fill Out Section I)

P C Apply dust suppressant(s) other than water to the top of the load, so that the standards in Rule 310, Section 301 are met (Fill Out Section J)

P C Cover haul trucks with a tarp or other suitable closure

Or, explain why this control measure is not applicable

Application For Dust Control Permit – April 2007 12

Off-Site Hauling Onto Paved Areas Accessible To The Public

P Required: cover haul trucks with a tarp or other suitable closure AND load all haul trucks such that the freeboard is not less than three inches AND prevent spillage or loss of bulk material from holes or other openings in the cargo compartment AND clean the interior of the cargo compartment of the empty haul trucks before leaving the site

C Apply water to the top of the load, so that the standards in Rule 310, Section 301 are met (Fill Out Section I)

C Apply dust suppressant(s) other than water to the top of the load, so that the standards in Rule 310, Section 301 are met (Fill Out Section J)

Track-out Control Device

A track-out control device must be installed if a work site has 2 acres or more of disturbed surface are or if a work site has 100 cubic yards of bulk material hauled on-site or off-site per day.

P C Required: Install at all exits to a paved area accessible to the public at least one of the following:

(Circle all that apply) gravel pad grizzly wheel wash system paved area

P C Cease operations

Cleaning Track-out/carry-out must be cleaned up immediately if track-out/carry-out extends more than 50 feet along a paved area accessible to the public.

Track-out/carry-out must be cleaned up no later than the end of the work day if track-out/carry-out extends less than 50 feet along a paved area accessible to the public.

P C Operate a street sweeper or wet broom with sufficient water (e.g. kick broom, steel bristle broom, teflon broom, vacuum) on the following schedule:

P C Manually sweep-up deposits on the following schedule:

D. Track-out, Carry-out, Spillage, And Erosion

(See Guidance Pages 19 – 20)

Application For Dust Control Permit – April 2007 13

Disturbance Operations

P Required: Pre-water site AND apply water before and during weed abatement by discing or blading, so that one of the standards in Rule 310, Section 301 are met (Fill Out Section I)

P Required: Apply water in combination with dust suppressant(s) before and during weed abatement by discing or blading, so that the standards in Rule 310, Section 301 are met (Fill Out Section J)

C Limit vehicle speed to 15 m.p.h. during discing and balding operations

Stabilization

P C Pave immediately following weed abatement

P C Apply gravel to establish and maintain a threshold friction velocity for disturbed surface areas corrected for non-erodible elements of 100 cm/second or higher

P C Apply gravel to establish and maintain a percent cover that is equal to or greater than 10% for non erodible elements

P C Apply water or other dust suppressant(s) to establish and maintain a visible crust

P C Establish vegetative ground cover (landscaping), so that the standards in Rule 310, Section 302.3 are met

P C Other (so that the standards in Rule 310, Section 308.8 are met)

E. Weed Abatement by Discing Or Blading

(See Guidance Page 21)

Application For Dust Control Permit – April 2007 14

F. Blasting Operations

P Required: Discontinue blasting, if wind gusts above 25 m.p.h.

P Required: Pre-water AND maintain surface soils in a stabilized condition where support equipment and vehicles will operate, so that the standards in Rule 310, Section 302.1 or Section 302.2 are met (Fill Out Section I)

P C Apply water or water in combination with dust suppressants, so that the standards in Rule 310, Section 302.1 or Section 302.2 are met (Fill Out Section I or J)

P C Apply water in combination with dust suppressant(s), so that the standards in Rule 310, Section

302.2 are met (Fill Out Section J)

P Required: Apply water or water in combination with dust suppressant(s) to demolition debris immediately following demolition activity, so that the standards in Rule 310, Section 301 are met

P Required: Apply water or water in combination with dust suppressant(s) to all surrounding areas and to all disturbed soil surfaces immediately following demolotion activity, so that the standards in Rule 310, Section 301 are met (Fill Out Section I or J)

C Thoroughly clean debris from paved and other surfaces following demolition activity

When Dust

Generating Operation Is Occurring

P C Cease dust generating operation for the duration of the wind event when the 60-minute average wind speed is greater than 25 m.p.h. and stabilize work area, if dust generating operation is ceased for the remainder of the work day

G. Demolition Activities

H. Wind Event

Application For Dust Control Permit – April 2007 15

P C Apply water or other suitable dust suppressant at least twice per hour (once per hour if outside the nonattainment area), so that the standards in Rule 310, Section 301 are met (Fill Out Section I Or J)

P C Apply water to maintain soil moisture content at a minimum of 12%, as determined by ASTM Method D2216-98 or other equivalent method as approved by the Control Officer and the Administrator Of the Environmental Protection Agency (Fill Out Section I)

P C Maintain at least 70% of the optimum soil moisture content for areas that have an optimum moisture content for compaction of less than 12%, as determined by ASTM Method D2216-98, or other equivalent method as approved by the Control Officer or the Administrator Of The Environmental Protection Agency (Fill Out Section I)

P C Apply water or other suitable dust suppressant(s) at least twice (once if outside the nonattainment area) per hour and contstruct fences or three-foot to five-foot wind barriers with 50% or less porosity adjacent to roadways or urban areas to reduce the amount of windblown material leaving the site

Temporary Disturbed Surface Areas

After Work Hours, Weekends, And Holidays

P C Apply and maintain surface gravel or dust suppressant(s), so that one of the stabilization standards in Rule 310, Section 302.3 is met (Fill Out Section I or J)

P C Apply water or water in combination with dust suppressant(s) to all disturbed surface areas three times per day, so that one of the stabilization standards in Rule 310, Section 302.3 is met. If there is evidence of windblown dust, increase watering frequency to a minimum of four times per day.

P C Apply water or water in combination with dust suppressant(s) on open storage piles at least twice per hour (once per hour if outside the nonattainment area) to maintain a visible crust

P C Cover open storage piles with tarps, plastic, or other material such that wind will not remove the Coverings

C Other (so that one of the stabilization standards in Rule 310, Section 302.3 is met)

Application For Dust Control Permit – April 2007 16

For each of the different project phases, indicate how the water is to be stored on or supplied to the project site and how the water will be applied to control dust generation throughout the project lifetime. “Water supply” means how water will be supplied to the site (e.g. (2) 3/000 gal. water towers). “Water application system” means how water will be applied to the site (e.g. 1 fire hose, (3) 1,000 gal. water trucks). Minimum water availability means water supply in conjunction with the water supply system.

Soil Rating:

Project Phase – Site Clearing/Removal of Vegetation/Debris/Demolition

Total Acres Disturbed Minimum Water Available 0 – 2 acres 500 – 1,000 gallons per day 2 – 10 acres 1,000 – 5,000 gallons per day

10 – 100 acres 5,000 – 50,000 gallons per day > 100 acres > 50,000 gallons per day 0 – 2 acres 300 – 600 gallons per day 2 – 10 acres 600 – 3,000 gallons per day

10 – 100 acres 3,000 – 30,000 gallons per day > 100 acres > 30,000 gallons per day

Average Daily Disturbance in Acres Number of Gallons per acre per day

Supply Size/Number Application Size/Number

Metered Hydrant Hose Water Tower Water Truck Water Pond Water Pull Other Water Buffalo

Other

Soil Texture Rating

Severe (clay, silty clay, sandy clay)

Moderate (all other

Classifications)

I. Water (See Guidance Pages 21-25)

Application For Dust Control Permit – April 2007 17

Project Phase – Mass Grading (Includes basements) Minimum Water Available

(November – February_ Minimum Water Available

(March – October) 5,000 gallons per acre per day 10,000 gallons per acre per day and and 30 gallons per cubic yard of material moved 30 gallons per cubic yard of material moved

5,000 gallons per acre per day 10,000 gallons per acre per day And And

30 gallons per cubic yard of material moved

30 gallons per cubic yard of material moved

Soil Texture Rating

Severe (clay, silty clay, sandy clay)

Moderate (all other classifications)

Average Daily Disturbance in Acres Number of Gallons per acre per day

Daily Minimum Water Availability

(Number of Acres Disturbed X Number of Gallons per day)

Water Pond Water Pull

Project Phase – Underground Utilities

2 – 10 acres 1,000 – 5,000 gallons per day

10 – 100 acres 5,000 – 50,000 gallons per day > 100 acres > 50,000 gallons per day 0 – 2 acres 300 – 600 gallons per day 2 – 10 acres 600 – 3,000 gallons per day

10 -100 acres 3,000 – 30,000 gallons per day

Average Daily Disturbance in Acres Number of Gallons per acre per day

Water Pond Water Pull Other Water Buffalo

Other

Soil Texture Rating

Severe (clay, silty clay, sandy clay)

Moderate classifications)

Application For Dust Control Permit – April 2007 18

Project Phase – Unpaved Haul Roads/Access

0 – 2 acres 375 – 750 gallons per day 2 – 10 acres 750 – 3,500 gallons per day

10 – 100 acres 3,500 – 35,000 gallons per day > 100 acres > 35,000 gallons per day 0 – 2 acres 225 – 400 gallons per day 2 – 10 acres 400 – 2,250 gallons per day

10 – 100 acres 2,250 – 22,250 gallons per day > 100 acres > 22,500 gallons per day

Water Pond Water Pull

Project Phase – Vertical/Paved (This pertains to Dust Control during the vertical phase of the project)

0 – 2 acres 250 – 500 gallons per day 2 – 10 acres 500 – 2,500 gallons per day

10 – 100 acres 2,500 – 25,000 gallons per day > 100 acres > 25,000 gallons per day 0 – 2 acres 150 – 300 gallons per day 2 – 10 acres 300 – 1,500 gallons per day

10 – 100 acres 1,500 – 15,000 gallons per day > 100 acres > 15,000 gallons per day

Water Pond Water Pull Other Water Buffalo

Other

Soil Texture Rating

Severe (clay, silty clay, sandy clay)

Moderate

Severe (clay, silty clay, sandy clay)

Moderate

Application For Dust Control Permit – April 2007 19

Project Phase – Staging/Parking Areas/Open Areas Including Landscaping Installation

0 – 2 acres 375 – 750 gallons per day 2 – 10 acres 750 – 3,500 gallons per day

10 – 100 acres 3,500 – 35,000 gallons per day > 100 acres > 35,000 gallons per day 0 – 2 acres 225 – 400 gallons per day 2 – 10 acres 400 – 2,250 gallons per day

10 – 100 acres 2,250 – 22,500 gallons per day > 100 acres > 22,500 gallons per day

Water Pond Water Pull

Project Phase – Structure Excavation (Includes stem walls, footings, culverts, abutments, caissons)

2 – 10 acres 1,000 – 5,000 gallons per day

10 – 100 acres 5,000 – 50,000 gallons per day > 100 acres > 50,000 gallons per day 0 – 2 acres 300 – 600 gallons per day 2 – 10 acres 600 – 3,000 gallons per day

Water Pond Water Pull

Severe (clay, silty clay, sandy clay)

Moderate

Severe (clay, silty clay, sandy clay)

Moderate

Application For Dust Control Permit – April 2007 20

Project Phase – Fine Grading

2 – 10 acres 1,000 – 5,000 gallons per day

10 – 100 acres 5,000 – 50,000 gallons per day > 100 acres > 50,000 gallons per day 0 – 2 acres 300 – 600 gallons per day 2 – 10 acres 600 – 3,000 gallons per day

Average Daily Disturbance in Acres Number of Gallons per acre per day

Water Pond Water Pull

Import/Export Operations

Number of Yards Involved in this Phase Number of Days for Operation

Number of Yards Imported/Exported x 30 gallons of water per yard = (Total Gallons required)

Total Gallons required divided by number of days =

Water Pond Water Pull

Severe (clay, silty clay, sandy clay)

Moderate

Application For Dust Control Permit – April 2007 21

J.

D us t S up pr es sa nt s (S ee G ui da nc e

P ag es

5-

A lth ou gh w at er is a d us t s up pr es sa nt , t he in fo rm at io n re qu ire d by

T ab le J s ho ul d no in cl ud e in fo rm at io n on w at er s up pl y an d w at er a pp lic at io n.

T he in fo rm at io n re qu ire d by

T ab le J is fo r a ll ot he r d us t s up pr es sa nt s th at y ou u se . F ill o ut th e ap pl ic ab le a re as in th e ta bl e be lo w a nd a tta ch in fo rm at io n on e nv iro nm en ta l i m pa ct s an d ap pr ov al s of c er tif ic at io ns re la te d to a pp ro pr ia te a nd s af e us e fo r g ro un d ap pl ic at io n.

A ls o, a tta ch p ro du ct sp ec ifi ca tio n(

s) a nd a pp lic at io n sh ee t(s

) o r l ab el in st ru ct io ns

In te ns ity

A pp lic at io n

Fr eq ue nc y*

Pr od uc t

M an uf ac tu re r N am e pp lic at io n Se ct io n

B is tu rb ed

S ur fa ce

A re as

C ul k

M at er ia l H an dl g

C ar ry ou t, Sp ill ag e, E ro si on

E

W ee d

A ba te m en t B y is ci ng o r B la di ng

F la st in g O pe ra tio ns

G em ol iti on

A ct iv iti es

H

W d

Ev en t

V eh ic le s/ M ot or iz ed

E qu ip m en t

H ow o fte n th e su rfa ce w ill re ce iv e a co m pl et e ap pl ic at io n of d us t s up pr es sa nt

(e .g

. 3 ti m es a d ay

T he a m ou nt u se d ov er a p er io d of ti m e (e

.g . g al lo ns /m in ut e)

File details come from the government source that posted it. Updated .