Revised Attachment 5 - Bid Schedule Estimated Quantities Paving IDIQ 2026.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Davis-Monthan AFB Paving IDIQ Contract
Solicitation number
FA487726B0001
Issued by

About this file

This is a Bid Schedule with estimated quantities for a five-year Indefinite Delivery Indefinite Quantity (IDIQ) paving contract at Davis-Monthan Air Force Base in Tucson, Arizona. Offerors are instructed to complete only the yellow-highlighted unit price fields, with existing formulas calculating estimated amounts for each line item across contract years 2026-2030. The contract covers comprehensive airfield, street, and parking lot maintenance and repair services including mobilization/demobilization of equipment, asphalt and concrete pavement work, surface preparation, sidewalk and curb installation, drainage structures, utility adjustments, pavement markings and striping, traffic control, quality testing, and specialized airfield services such as runway rubber removal and airfield pavement paint applications. Estimated quantities vary by service type and year, ranging from minimal quantities for some items (zero units in some categories) to substantial volumes for others, such as 120,000 square yards annually for surface preparation, 30,000 linear feet annually for crack seal asphalt pavement, and 4,000,000 square feet annually for runway rubber removal.

The contract structure includes identical estimated quantities across all five contract years, allowing for consistent unit pricing throughout the performance period. A fixed Pre-Construction Conference fee of $2,000 is included as a separate line item (CLIN 0002). All totals for individual years and the complete base plus option year period are calculated by formula based on the unit prices entered. This template enables the government to evaluate competitive bids using the lowest price criterion while maintaining the flexibility of an IDIQ contract to order services as needed over the five-year term.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Instruction to Offerors: Only complete the unit prices, which are highlighted in Yellow. Existing formulas will calculate the rest.
2026 - CONTRACT YEAR 1*2027 - CONTRACT YEAR 2*2028 - CONTRACT YEAR 3*2029 - CONTRACT YEAR 4*2030 CONTRACT YEAR 5*
ITEM NODESCRIPTIONUNITEstimated QuantityUNIT PRICEEstimated AmountITEM NODESCRIPTIONUNITEstimated QuantityUNIT PRICEEstimated AmountITEM NODESCRIPTIONUNITEstimated QuantityUNIT PRICEEstimated AmountITEM NODESCRIPTIONUNITEstimated QuantityUNIT PRICEEstimated AmountITEM NODESCRIPTIONUNITEstimated QuantityUNIT PRICEEstimated Amount
0001AAMobilization and Demobilization (Light Equipment)EA3.2$ - 0$0.001001AAMobilization and Demobilization (Light Equipment)EA3.2$ - 0$0.002001AAMobilization and Demobilization (Light Equipment)EA3.2$ - 0$0.003001AAMobilization and Demobilization (Light Equipment)EA3.2$ - 0$0.004001AAMobilization and Demobilization (Light Equipment)EA3.2$ - 0$0.00
0001ABMobilization and Demobilization (Medium Equipment)EA3.2$ - 0$0.001001ABMobilization and Demobilization (Medium Equipment)EA3.2$ - 0$0.002001ABMobilization and Demobilization (Medium Equipment)EA3.2$ - 0$0.003001ABMobilization and Demobilization (Medium Equipment)EA3.2$ - 0$0.004001ABMobilization and Demobilization (Medium Equipment)EA3.2$ - 0$0.00
0001ACMobilization and Demobilization (Heavy Equipment)EA0.8$ - 0$0.001001ACMobilization and Demobilization (Heavy Equipment)EA0.8$ - 0$0.002001ACMobilization and Demobilization (Heavy Equipment)EA0.8$ - 0$0.003001ACMobilization and Demobilization (Heavy Equipment)EA0.8$ - 0$0.004001ACMobilization and Demobilization (Heavy Equipment)EA0.8$ - 0$0.00
0001ADMobilization and Demobilization (Truck Mounted Crane)EA0$ - 0$0.001001ADMobilization and Demobilization (Truck Mounted Crane)EA0$ - 0$0.002001ADMobilization and Demobilization (Truck Mounted Crane)EA0$ - 0$0.003001ADMobilization and Demobilization (Truck Mounted Crane)EA0$ - 0$0.004001ADMobilization and Demobilization (Truck Mounted Crane)EA0$ - 0$0.00
0001AECold Mill Asphalt Pavement, 1" to 3" thickSY400$ - 0$0.001001AECold Mill Asphalt Pavement, 1" to 3" thickSY400$ - 0$0.002001AECold Mill Asphalt Pavement, 1" to 3" thickSY400$ - 0$0.003001AECold Mill Asphalt Pavement, 1" to 3" thickSY400$ - 0$0.004001AECold Mill Asphalt Pavement, 1" to 3" thickSY400$ - 0$0.00
0001AFRemove Asphalt Pavement up to 3-inches thickSY0$ - 0$0.001001AFRemove Asphalt Pavement up to 3-inches thickSY0$ - 0$0.002001AFRemove Asphalt Pavement up to 3-inches thickSY0$ - 0$0.003001AFRemove Asphalt Pavement up to 3-inches thickSY0$ - 0$0.004001AFRemove Asphalt Pavement up to 3-inches thickSY0$ - 0$0.00
0001AGPulverize Asphalt Pavement, 4-inch thick pavementSY0$ - 0$0.001001AGPulverize Asphalt Pavement, 4-inch thick pavementSY0$ - 0$0.002001AGPulverize Asphalt Pavement, 4-inch thick pavementSY0$ - 0$0.003001AGPulverize Asphalt Pavement, 4-inch thick pavementSY0$ - 0$0.004001AGPulverize Asphalt Pavement, 4-inch thick pavementSY0$ - 0$0.00
0001AHPulverize Asphalt Pavement, 8-inch thick pavementSY0$ - 0$0.001001AHPulverize Asphalt Pavement, 8-inch thick pavementSY0$ - 0$0.002001AHPulverize Asphalt Pavement, 8-inch thick pavementSY0$ - 0$0.003001AHPulverize Asphalt Pavement, 8-inch thick pavementSY0$ - 0$0.004001AHPulverize Asphalt Pavement, 8-inch thick pavementSY0$ - 0$0.00
0001AISawcut Concrete 4"-6" Thick (quantity less than 200 LF)LF0$ - 0$0.001001AISawcut Concrete 4"-6" Thick (quantity less than 200 LF)LF0$ - 0$0.002001AISawcut Concrete 4"-6" Thick (quantity less than 200 LF)LF0$ - 0$0.003001AISawcut Concrete 4"-6" Thick (quantity less than 200 LF)LF0$ - 0$0.004001AISawcut Concrete 4"-6" Thick (quantity less than 200 LF)LF0$ - 0$0.00
0001AJSawcut Concrete 4"-6" Thick (quantity 200 LF or more)LF0$ - 0$0.001001AJSawcut Concrete 4"-6" Thick (quantity 200 LF or more)LF0$ - 0$0.002001AJSawcut Concrete 4"-6" Thick (quantity 200 LF or more)LF0$ - 0$0.003001AJSawcut Concrete 4"-6" Thick (quantity 200 LF or more)LF0$ - 0$0.004001AJSawcut Concrete 4"-6" Thick (quantity 200 LF or more)LF0$ - 0$0.00
0001AKSawcut Asphalt to 4" Thick (quantity less than 200 LF)LF0$ - 0$0.001001AKSawcut Asphalt to 4" Thick (quantity less than 200 LF)LF0$ - 0$0.002001AKSawcut Asphalt to 4" Thick (quantity less than 200 LF)LF0$ - 0$0.003001AKSawcut Asphalt to 4" Thick (quantity less than 200 LF)LF0$ - 0$0.004001AKSawcut Asphalt to 4" Thick (quantity less than 200 LF)LF0$ - 0$0.00
0001ALSawcut Asphalt to 4" Thick (quantity 200 LF or more)LF0$ - 0$0.001001ALSawcut Asphalt to 4" Thick (quantity 200 LF or more)LF0$ - 0$0.002001ALSawcut Asphalt to 4" Thick (quantity 200 LF or more)LF0$ - 0$0.003001ALSawcut Asphalt to 4" Thick (quantity 200 LF or more)LF0$ - 0$0.004001ALSawcut Asphalt to 4" Thick (quantity 200 LF or more)LF0$ - 0$0.00
0001AMRemove Concrete Sidewalk, Haul and Dispose off-baseSY100$ - 0$0.001001AMRemove Concrete Sidewalk, Haul and Dispose off-baseSY100$ - 0$0.002001AMRemove Concrete Sidewalk, Haul and Dispose off-baseSY100$ - 0$0.003001AMRemove Concrete Sidewalk, Haul and Dispose off-baseSY100$ - 0$0.004001AMRemove Concrete Sidewalk, Haul and Dispose off-baseSY100$ - 0$0.00
0001ANRemove Concrete Curb/Gutter, Haul and Dispose off-baseLF100$ - 0$0.001001ANRemove Concrete Curb/Gutter, Haul and Dispose off-baseLF100$ - 0$0.002001ANRemove Concrete Curb/Gutter, Haul and Dispose off-baseLF100$ - 0$0.003001ANRemove Concrete Curb/Gutter, Haul and Dispose off-baseLF100$ - 0$0.004001ANRemove Concrete Curb/Gutter, Haul and Dispose off-baseLF100$ - 0$0.00
0001AORemove Concrete Slabs (6-10" thick), Haul and Dispose off-baseCY30$ - 0$0.001001AORemove Concrete Slabs (6-10" thick), Haul and Dispose off-baseCY30$ - 0$0.002001AORemove Concrete Slabs (6-10" thick), Haul and Dispose off-baseCY30$ - 0$0.003001AORemove Concrete Slabs (6-10" thick), Haul and Dispose off-baseCY30$ - 0$0.004001AORemove Concrete Slabs (6-10" thick), Haul and Dispose off-baseCY30$ - 0$0.00
0001APExcavationCY150$ - 0$0.001001APExcavationCY150$ - 0$0.002001APExcavationCY150$ - 0$0.003001APExcavationCY150$ - 0$0.004001APExcavationCY150$ - 0$0.00
0001AQHauling - on-base (4 mile round trip)CY3000$ - 0$0.001001AQHauling - on-base (4 mile round trip)CY3000$ - 0$0.002001AQHauling - on-base (4 mile round trip)CY3000$ - 0$0.003001AQHauling - on-base (4 mile round trip)CY3000$ - 0$0.004001AQHauling - on-base (4 mile round trip)CY3000$ - 0$0.00
0001ARHauling - off-baseCY0$ - 0$0.001001ARHauling - off-baseCY0$ - 0$0.002001ARHauling - off-baseCY0$ - 0$0.003001ARHauling - off-baseCY0$ - 0$0.004001ARHauling - off-baseCY0$ - 0$0.00
0001ASEmbankmentCY30$ - 0$0.001001ASEmbankmentCY30$ - 0$0.002001ASEmbankmentCY30$ - 0$0.003001ASEmbankmentCY30$ - 0$0.004001ASEmbankmentCY30$ - 0$0.00
0001ATClean FillCY30$ - 0$0.001001ATClean FillCY30$ - 0$0.002001ATClean FillCY30$ - 0$0.003001ATClean FillCY30$ - 0$0.004001ATClean FillCY30$ - 0$0.00
0001AUSurveying - 1 Man CrewHR0.2$ - 0$0.001001AUSurveying - 1 Man CrewHR0.2$ - 0$0.002001AUSurveying - 1 Man CrewHR0.2$ - 0$0.003001AUSurveying - 1 Man CrewHR0.2$ - 0$0.004001AUSurveying - 1 Man CrewHR0.2$ - 0$0.00
0001AVSurveying - 2 Man CrewHR0.2$ - 0$0.001001AVSurveying - 2 Man CrewHR0.2$ - 0$0.002001AVSurveying - 2 Man CrewHR0.2$ - 0$0.003001AVSurveying - 2 Man CrewHR0.2$ - 0$0.004001AVSurveying - 2 Man CrewHR0.2$ - 0$0.00
0001AWSurface PreparationSY120000$ - 0$0.001001AWSurface PreparationSY120000$ - 0$0.002001AWSurface PreparationSY120000$ - 0$0.003001AWSurface PreparationSY120000$ - 0$0.004001AWSurface PreparationSY120000$ - 0$0.00
0001AXConcrete Curb & GutterLF100$ - 0$0.001001AXConcrete Curb & GutterLF100$ - 0$0.002001AXConcrete Curb & GutterLF100$ - 0$0.003001AXConcrete Curb & GutterLF100$ - 0$0.004001AXConcrete Curb & GutterLF100$ - 0$0.00
0001AYConcrete Vertical CurbLF100$ - 0$0.001001AYConcrete Vertical CurbLF100$ - 0$0.002001AYConcrete Vertical CurbLF100$ - 0$0.003001AYConcrete Vertical CurbLF100$ - 0$0.004001AYConcrete Vertical CurbLF100$ - 0$0.00
0001AZConcrete Sidewalk (quantity less than 400 SF)SF0$ - 0$0.001001AZConcrete Sidewalk (quantity less than 400 SF)SF0$ - 0$0.002001AZConcrete Sidewalk (quantity less than 400 SF)SF0$ - 0$0.003001AZConcrete Sidewalk (quantity less than 400 SF)SF0$ - 0$0.004001AZConcrete Sidewalk (quantity less than 400 SF)SF0$ - 0$0.00
0001BAConcrete Sidewalk (quantity 400 SF or more)SF100$ - 0$0.001001BAConcrete Sidewalk (quantity 400 SF or more)SF100$ - 0$0.002001BAConcrete Sidewalk (quantity 400 SF or more)SF100$ - 0$0.003001BAConcrete Sidewalk (quantity 400 SF or more)SF100$ - 0$0.004001BAConcrete Sidewalk (quantity 400 SF or more)SF100$ - 0$0.00
0001BBConcrete Accessibility Ramp at 6-inch Curb RevealEA0$ - 0$0.001001BBConcrete Accessibility Ramp at 6-inch Curb RevealEA0$ - 0$0.002001BBConcrete Accessibility Ramp at 6-inch Curb RevealEA0$ - 0$0.003001BBConcrete Accessibility Ramp at 6-inch Curb RevealEA0$ - 0$0.004001BBConcrete Accessibility Ramp at 6-inch Curb RevealEA0$ - 0$0.00
0001BCConcrete Accessibility Ramp at 8-inch Curb RevealEA0$ - 0$0.001001BCConcrete Accessibility Ramp at 8-inch Curb RevealEA0$ - 0$0.002001BCConcrete Accessibility Ramp at 8-inch Curb RevealEA0$ - 0$0.003001BCConcrete Accessibility Ramp at 8-inch Curb RevealEA0$ - 0$0.004001BCConcrete Accessibility Ramp at 8-inch Curb RevealEA0$ - 0$0.00
0001BDAggregate Base CourseCY150$ - 0$0.001001BDAggregate Base CourseCY150$ - 0$0.002001BDAggregate Base CourseCY150$ - 0$0.003001BDAggregate Base CourseCY150$ - 0$0.004001BDAggregate Base CourseCY150$ - 0$0.00
0001BEBituminous Prime Coat (quantity less than 200 GA)GA0$ - 0$0.001001BEBituminous Prime Coat (quantity less than 200 GA)GA0$ - 0$0.002001BEBituminous Prime Coat (quantity less than 200 GA)GA0$ - 0$0.003001BEBituminous Prime Coat (quantity less than 200 GA)GA0$ - 0$0.004001BEBituminous Prime Coat (quantity less than 200 GA)GA0$ - 0$0.00
0001BFBituminous Prime Coat (quantity 200 GA or more)GA0$ - 0$0.001001BFBituminous Prime Coat (quantity 200 GA or more)GA0$ - 0$0.002001BFBituminous Prime Coat (quantity 200 GA or more)GA0$ - 0$0.003001BFBituminous Prime Coat (quantity 200 GA or more)GA0$ - 0$0.004001BFBituminous Prime Coat (quantity 200 GA or more)GA0$ - 0$0.00
0001BGBituminous Tack Coat (quantity less than 300 GA)GA0$ - 0$0.001001BGBituminous Tack Coat (quantity less than 300 GA)GA0$ - 0$0.002001BGBituminous Tack Coat (quantity less than 300 GA)GA0$ - 0$0.003001BGBituminous Tack Coat (quantity less than 300 GA)GA0$ - 0$0.004001BGBituminous Tack Coat (quantity less than 300 GA)GA0$ - 0$0.00
0001BHBituminous Tack Coat (quantity 300 GA or more)GA0$ - 0$0.001001BHBituminous Tack Coat (quantity 300 GA or more)GA0$ - 0$0.002001BHBituminous Tack Coat (quantity 300 GA or more)GA0$ - 0$0.003001BHBituminous Tack Coat (quantity 300 GA or more)GA0$ - 0$0.004001BHBituminous Tack Coat (quantity 300 GA or more)GA0$ - 0$0.00
0001BIBituminous Surface Course (2")SY0$ - 0$0.001001BIBituminous Surface Course (2")SY0$ - 0$0.002001BIBituminous Surface Course (2")SY0$ - 0$0.003001BIBituminous Surface Course (2")SY0$ - 0$0.004001BIBituminous Surface Course (2")SY0$ - 0$0.00
0001BJBituminous Surface Course (3"- placed in 2 lifts)SY0$ - 0$0.001001BJBituminous Surface Course (3"- placed in 2 lifts)SY0$ - 0$0.002001BJBituminous Surface Course (3"- placed in 2 lifts)SY0$ - 0$0.003001BJBituminous Surface Course (3"- placed in 2 lifts)SY0$ - 0$0.004001BJBituminous Surface Course (3"- placed in 2 lifts)SY0$ - 0$0.00
0001BKBituminous Surface Course (3"- placed in 1 lift)SY1000$ - 0$0.001001BKBituminous Surface Course (3"- placed in 1 lift)SY1000$ - 0$0.002001BKBituminous Surface Course (3"- placed in 1 lift)SY1000$ - 0$0.003001BKBituminous Surface Course (3"- placed in 1 lift)SY1000$ - 0$0.004001BKBituminous Surface Course (3"- placed in 1 lift)SY1000$ - 0$0.00
0001BLAdjust Manhole Frame and Cover to GradeEA0$ - 0$0.001001BLAdjust Manhole Frame and Cover to GradeEA0$ - 0$0.002001BLAdjust Manhole Frame and Cover to GradeEA0$ - 0$0.003001BLAdjust Manhole Frame and Cover to GradeEA0$ - 0$0.004001BLAdjust Manhole Frame and Cover to GradeEA0$ - 0$0.00
0001BMAdjust Valve Riser, Frame and Cover to GradeEA25$ - 0$0.001001BMAdjust Valve Riser, Frame and Cover to GradeEA25$ - 0$0.002001BMAdjust Valve Riser, Frame and Cover to GradeEA25$ - 0$0.003001BMAdjust Valve Riser, Frame and Cover to GradeEA25$ - 0$0.004001BMAdjust Valve Riser, Frame and Cover to GradeEA25$ - 0$0.00
0001BNCrack Seal Asphalt PavementLF30000$ - 0$0.001001BNCrack Seal Asphalt PavementLF30000$ - 0$0.002001BNCrack Seal Asphalt PavementLF30000$ - 0$0.003001BNCrack Seal Asphalt PavementLF30000$ - 0$0.004001BNCrack Seal Asphalt PavementLF30000$ - 0$0.00
0001BOFog Seal Asphalt PavementSY24000$ - 0$0.001001BOFog Seal Asphalt PavementSY24000$ - 0$0.002001BOFog Seal Asphalt PavementSY24000$ - 0$0.003001BOFog Seal Asphalt PavementSY24000$ - 0$0.004001BOFog Seal Asphalt PavementSY24000$ - 0$0.00
0001BPPainted Reflective Pavement MarkingsSF24000$ - 0$0.001001BPPainted Reflective Pavement MarkingsSF24000$ - 0$0.002001BPPainted Reflective Pavement MarkingsSF24000$ - 0$0.003001BPPainted Reflective Pavement MarkingsSF24000$ - 0$0.004001BPPainted Reflective Pavement MarkingsSF24000$ - 0$0.00
0001BQPainted Non-Reflective Pavement MarkingsSF24000$ - 0$0.001001BQPainted Non-Reflective Pavement MarkingsSF24000$ - 0$0.002001BQPainted Non-Reflective Pavement MarkingsSF24000$ - 0$0.003001BQPainted Non-Reflective Pavement MarkingsSF24000$ - 0$0.004001BQPainted Non-Reflective Pavement MarkingsSF24000$ - 0$0.00
0001BRThermoplastic Tape Striping (4" wide)LF0$ - 0$0.001001BRThermoplastic Tape Striping (4" wide)LF0$ - 0$0.002001BRThermoplastic Tape Striping (4" wide)LF0$ - 0$0.003001BRThermoplastic Tape Striping (4" wide)LF0$ - 0$0.004001BRThermoplastic Tape Striping (4" wide)LF0$ - 0$0.00
0001BSTraffic Sign InstallationEA0$ - 0$0.001001BSTraffic Sign InstallationEA0$ - 0$0.002001BSTraffic Sign InstallationEA0$ - 0$0.003001BSTraffic Sign InstallationEA0$ - 0$0.004001BSTraffic Sign InstallationEA0$ - 0$0.00
0001BTRaised Reflective Pavement MarkersEA0$ - 0$0.001001BTRaised Reflective Pavement MarkersEA0$ - 0$0.002001BTRaised Reflective Pavement MarkersEA0$ - 0$0.003001BTRaised Reflective Pavement MarkersEA0$ - 0$0.004001BTRaised Reflective Pavement MarkersEA0$ - 0$0.00
0001BUCurb Mounted Reserved Parking SignEA0$ - 0$0.001001BUCurb Mounted Reserved Parking SignEA0$ - 0$0.002001BUCurb Mounted Reserved Parking SignEA0$ - 0$0.003001BUCurb Mounted Reserved Parking SignEA0$ - 0$0.004001BUCurb Mounted Reserved Parking SignEA0$ - 0$0.00
0001BV18" Concrete Drainage StructureCY1$ - 0$0.001001BV18" Concrete Drainage StructureCY1$ - 0$0.002001BV18" Concrete Drainage StructureCY1$ - 0$0.003001BV18" Concrete Drainage StructureCY1$ - 0$0.004001BV18" Concrete Drainage StructureCY1$ - 0$0.00
0001BW6-Inch Thick Concrete SlabCY100$ - 0$0.001001BW6-Inch Thick Concrete SlabCY100$ - 0$0.002001BW6-Inch Thick Concrete SlabCY100$ - 0$0.003001BW6-Inch Thick Concrete SlabCY100$ - 0$0.004001BW6-Inch Thick Concrete SlabCY100$ - 0$0.00
0001BX8-Inch Thick Concrete SlabCY0$ - 0$0.001001BX8-Inch Thick Concrete SlabCY0$ - 0$0.002001BX8-Inch Thick Concrete SlabCY0$ - 0$0.003001BX8-Inch Thick Concrete SlabCY0$ - 0$0.004001BX8-Inch Thick Concrete SlabCY0$ - 0$0.00
0001BY6-Inch Diameter Steel Bollards (Concrete Filled)EA2.4$ - 0$0.001001BY6-Inch Diameter Steel Bollards (Concrete Filled)EA2.4$ - 0$0.002001BY6-Inch Diameter Steel Bollards (Concrete Filled)EA2.4$ - 0$0.003001BY6-Inch Diameter Steel Bollards (Concrete Filled)EA2.4$ - 0$0.004001BY6-Inch Diameter Steel Bollards (Concrete Filled)EA2.4$ - 0$0.00
0001BZ18-Inch Diameter CMP CulvertLF10$ - 0$0.001001BZ18-Inch Diameter CMP CulvertLF10$ - 0$0.002001BZ18-Inch Diameter CMP CulvertLF10$ - 0$0.003001BZ18-Inch Diameter CMP CulvertLF10$ - 0$0.004001BZ18-Inch Diameter CMP CulvertLF10$ - 0$0.00
0001CA12-Inch Diameter RCP CulvertLF1$ - 0$0.001001CA12-Inch Diameter RCP CulvertLF1$ - 0$0.002001CA12-Inch Diameter RCP CulvertLF1$ - 0$0.003001CA12-Inch Diameter RCP CulvertLF1$ - 0$0.004001CA12-Inch Diameter RCP CulvertLF1$ - 0$0.00
0001CBHand DiggingMH300$ - 0$0.001001CBHand DiggingMH300$ - 0$0.002001CBHand DiggingMH300$ - 0$0.003001CBHand DiggingMH300$ - 0$0.004001CBHand DiggingMH300$ - 0$0.00
0001CCRock, Rip RapCY150$ - 0$0.001001CCRock, Rip RapCY150$ - 0$0.002001CCRock, Rip RapCY150$ - 0$0.003001CCRock, Rip RapCY150$ - 0$0.004001CCRock, Rip RapCY150$ - 0$0.00
0001CDDecomposed Granite Ground CoverSY150$ - 0$0.001001CDDecomposed Granite Ground CoverSY150$ - 0$0.002001CDDecomposed Granite Ground CoverSY150$ - 0$0.003001CDDecomposed Granite Ground CoverSY150$ - 0$0.004001CDDecomposed Granite Ground CoverSY150$ - 0$0.00
0001CEConcrete TestingEA0.2$ - 0$0.001001CEConcrete TestingEA0.2$ - 0$0.002001CEConcrete TestingEA0.2$ - 0$0.003001CEConcrete TestingEA0.2$ - 0$0.004001CEConcrete TestingEA0.2$0.00
0001CFAggregate Base Material Sieve AnalysisEA1$ - 0$0.001001CFAggregate Base Material Sieve AnalysisEA1$ - 0$0.002001CFAggregate Base Material Sieve AnalysisEA1$ - 0$0.003001CFAggregate Base Material Sieve AnalysisEA1$ - 0$0.004001CFAggregate Base Material Sieve AnalysisEA1$ - 0$0.00
0001CGSubgrade/Aggregate Base In-Place Density TestEA1$ - 0$0.001001CGSubgrade/Aggregate Base In-Place Density TestEA1$ - 0$0.002001CGSubgrade/Aggregate Base In-Place Density TestEA1$ - 0$0.003001CGSubgrade/Aggregate Base In-Place Density TestEA1$ - 0$0.004001CGSubgrade/Aggregate Base In-Place Density TestEA1$ - 0$0.00
0001CHAsphaltic Concrete In-Place Density & Thickness TestEA0.2$ - 0$0.001001CHAsphaltic Concrete In-Place Density & Thickness TestEA0.2$ - 0$0.002001CHAsphaltic Concrete In-Place Density & Thickness TestEA0.2$ - 0$0.003001CHAsphaltic Concrete In-Place Density & Thickness TestEA0.2$ - 0$0.004001CHAsphaltic Concrete In-Place Density & Thickness TestEA0.2$ - 0$0.00
0001CIAsphaltic Concrete In-Place Density & Thickness Test (Labs)Day0$ - 0$0.001001CIAsphaltic Concrete In-Place Density & Thickness Test (Labs)Day0$ - 0$0.002001CIAsphaltic Concrete In-Place Density & Thickness Test (Labs)Day0$ - 0$0.003001CIAsphaltic Concrete In-Place Density & Thickness Test (Labs)Day0$ - 0$0.004001CIAsphaltic Concrete In-Place Density & Thickness Test (Labs)Day0$ - 0$0.00
0001CJTraffic ControlDay30$ - 0$0.001001CJTraffic ControlDay30$ - 0$0.002001CJTraffic ControlDay30$ - 0$0.003001CJTraffic ControlDay30$ - 0$0.004001CJTraffic ControlDay30$ - 0$0.00
0001CK10-Inch to 12-Inch Thick Concrete Slab (650 psi)CY0$ - 0$0.001001CK10-Inch to 12-Inch Thick Concrete Slab (650 psi)CY0$ - 0$0.002001CK10-Inch to 12-Inch Thick Concrete Slab (650 psi)CY0$ - 0$0.003001CK10-Inch to 12-Inch Thick Concrete Slab (650 psi)CY0$ - 0$0.004001CK10-Inch to 12-Inch Thick Concrete Slab (650 psi)CY0$ - 0$0.00
0001CL1-Inch by 20-Inch Dowel BarsEA0$ - 0$0.001001CL1-Inch by 20-Inch Dowel BarsEA0$ - 0$0.002001CL1-Inch by 20-Inch Dowel BarsEA0$ - 0$0.003001CL1-Inch by 20-Inch Dowel BarsEA0$ - 0$0.004001CL1-Inch by 20-Inch Dowel BarsEA0$ - 0$0.00
0001CMConcrete Spall RepairSF10000$ - 0$0.001001CMConcrete Spall RepairSF10000$ - 0$0.002001CMConcrete Spall RepairSF10000$ - 0$0.003001CMConcrete Spall RepairSF10000$ - 0$0.004001CMConcrete Spall RepairSF10000$ - 0$0.00
0001CNReseal Concrete Pavement JointsLF10000$ - 0$0.001001CNReseal Concrete Pavement JointsLF10000$ - 0$0.002001CNReseal Concrete Pavement JointsLF10000$ - 0$0.003001CNReseal Concrete Pavement JointsLF10000$ - 0$0.004001CNReseal Concrete Pavement JointsLF10000$ - 0$0.00
0001COConcrete Pavement Crack RepairLF10000$ - 0$0.001001COConcrete Pavement Crack RepairLF10000$ - 0$0.002001COConcrete Pavement Crack RepairLF10000$ - 0$0.003001COConcrete Pavement Crack RepairLF10000$ - 0$0.004001COConcrete Pavement Crack RepairLF10000$ - 0$0.00
0001CPAirfield Pavement Paint RemovalSF10000$ - 0$0.001001CPAirfield Pavement Paint RemovalSF10000$ - 0$0.002001CPAirfield Pavement Paint RemovalSF10000$ - 0$0.003001CPAirfield Pavement Paint RemovalSF10000$ - 0$0.004001CPAirfield Pavement Paint RemovalSF10000$ - 0$0.00
0001CQAirfield Pavement Reflective Paint ApplicationSF10000$ - 0$0.001001CQAirfield Pavement Reflective Paint ApplicationSF10000$ - 0$0.002001CQAirfield Pavement Reflective Paint ApplicationSF10000$ - 0$0.003001CQAirfield Pavement Reflective Paint ApplicationSF10000$ - 0$0.004001CQAirfield Pavement Reflective Paint ApplicationSF10000$ - 0$0.00
0001CRAirfield Pavement Non-Reflective Paint ApplicationSF10000$ - 0$0.001001CRAirfield Pavement Non-Reflective Paint ApplicationSF10000$ - 0$0.002001CRAirfield Pavement Non-Reflective Paint ApplicationSF10000$ - 0$0.003001CRAirfield Pavement Non-Reflective Paint ApplicationSF10000$ - 0$0.004001CRAirfield Pavement Non-Reflective Paint ApplicationSF10000$ - 0$0.00
0001CSAirfield Pavement Restricted Area Warning Sign Paint ApplicationEA50$ - 0$0.001001CSAirfield Pavement Restricted Area Warning Sign Paint ApplicationEA50$ - 0$0.002001CSAirfield Pavement Restricted Area Warning Sign Paint ApplicationEA50$ - 0$0.003001CSAirfield Pavement Restricted Area Warning Sign Paint ApplicationEA50$ - 0$0.004001CSAirfield Pavement Restricted Area Warning Sign Paint ApplicationEA50$ - 0$0.00
0001CTAirfield Pavement Entry Control Point (ECP) Paint ApplicationSF1$ - 0$0.001001CTAirfield Pavement Entry Control Point (ECP) Paint ApplicationSF1$ - 0$0.002001CTAirfield Pavement Entry Control Point (ECP) Paint ApplicationSF1$ - 0$0.003001CTAirfield Pavement Entry Control Point (ECP) Paint ApplicationSF1$ - 0$0.004001CTAirfield Pavement Entry Control Point (ECP) Paint ApplicationSF1$ - 0$0.00
0001CUSupervisionDAY30$ - 0$0.001001CUSupervisionDAY30$ - 0$0.002001CUSupervisionDAY30$ - 0$0.003001CUSupervisionDAY30$ - 0$0.004001CUSupervisionDAY30$ - 0$0.00
0001CVSlurry Seal Asphalt Pavement (as Liquid Road or Equivalent)SY20000$ - 0$0.001001CVSlurry Seal Asphalt Pavement (as Liquid Road or Equivalent)SY20000$ - 0$0.002001CVSlurry Seal Asphalt Pavement (as Liquid Road or Equivalent)SY20000$ - 0$0.003001CVSlurry Seal Asphalt Pavement (as Liquid Road or Equivalent)SY20000$ - 0$0.004001CVSlurry Seal Asphalt Pavement (as Liquid Road or Equivalent)SY20000$ - 0$0.00
0001CWRunway Rubber RemovalSF4000000$ - 0$0.001001CWRunway Rubber RemovalSF4000000$ - 0$0.002001CWRunway Rubber RemovalSF4000000$ - 0$0.003001CWRunway Rubber RemovalSF4000000$ - 0$0.004001CWRunway Rubber RemovalSF4000000$ - 0$0.00
0001CXMISC Painted Pavement MarkingsSF3000$ - 0$0.001001CXMISC Painted Pavement MarkingsSF3000$ - 0$0.002001CXMISC Painted Pavement MarkingsSF3000$ - 0$0.003001CXMISC Painted Pavement MarkingsSF3000$ - 0$0.004001CXMISC Painted Pavement MarkingsSF3000$ - 0$0.00
Total for Base Year (calculated by formula)$0.00Total for Option Year 1 (calculated by formula)$0.00Total for Option Year 2 (calculated by formula)$0.00Total for Option Year 3 (calculated by formula)$0.00Total For Option Year 4 (calculated by formula)$0.00
Total for Base + All Option Years (calculated by formula)$0.00
CLIN 0002 - Pre Construction Conference$2,000.00
Grand Total$2,000.00
* Contract year is from July 1 through June 30

File details come from the government source that posted it. Updated .