Revised Attachment 5 (20260610) Bid Schedule Estimated Quantities Paving IDIQ 2026.xlsx
XLSX spreadsheet 42 KB Posted
- Attached to
- Davis-Monthan AFB Paving IDIQ Contract
- Solicitation number
- FA487726B0001
About this file
Bid Schedule Summary – Davis-Monthan AFB Paving IDIQ Contract
This is a Bid Schedule template for a Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) contract for airfield, street, and parking lot maintenance and repair services at Davis-Monthan Air Force Base in Tucson, Arizona. The contract spans five years (2026–2030), with each contract year running from July 1 through June 30. Offerors are instructed to complete only the unit prices (highlighted in yellow); existing formulas will calculate estimated amounts based on provided quantities. The schedule includes approximately 95 line items covering a comprehensive range of paving and infrastructure services, including mobilization/demobilization, asphalt and concrete work, surface preparation, drainage structures, testing, traffic control, supervision, and specialized airfield pavement services such as rubber removal and restricted area warning signs. Estimated quantities are provided for each contract year and remain consistent across all five years. A fixed fee of $2,000.00 is included for a Pre-Construction Conference, resulting in a Grand Total base price of $2,000.00 before unit prices are applied. The solicitation (FA487726B0001) is designated as a competitive 8(a) set-aside, with the closing date for submission of offers on June 11, 2026. Award will be made to the lowest responsible bidder, and the project magnitude is estimated between $5,000,000 and $10,000,000. Interested 8(a) business firms must demonstrate bonding capability as outlined in the solicitation.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Instruction to Offerors: Only complete the unit prices, which are highlighted in Yellow. Existing formulas will calculate the rest. | |||||||||||||||||||||||||||||
| 2026 - CONTRACT YEAR 1* | 2027 - CONTRACT YEAR 2* | 2028 - CONTRACT YEAR 3* | 2029 - CONTRACT YEAR 4* | 2030 CONTRACT YEAR 5* | |||||||||||||||||||||||||
| ITEM NO | DESCRIPTION | UNIT | Estimated Quantity | UNIT PRICE | Estimated Amount | ITEM NO | DESCRIPTION | UNIT | Estimated Quantity | UNIT PRICE | Estimated Amount | ITEM NO | DESCRIPTION | UNIT | Estimated Quantity | UNIT PRICE | Estimated Amount | ITEM NO | DESCRIPTION | UNIT | Estimated Quantity | UNIT PRICE | Estimated Amount | ITEM NO | DESCRIPTION | UNIT | Estimated Quantity | UNIT PRICE | Estimated Amount |
| 0001AA | Mobilization and Demobilization (Light Equipment) | EA | 3.2 | $ - 0 | $0.00 | 1001AA | Mobilization and Demobilization (Light Equipment) | EA | 3.2 | $ - 0 | $0.00 | 2001AA | Mobilization and Demobilization (Light Equipment) | EA | 3.2 | $ - 0 | $0.00 | 3001AA | Mobilization and Demobilization (Light Equipment) | EA | 3.2 | $ - 0 | $0.00 | 4001AA | Mobilization and Demobilization (Light Equipment) | EA | 3.2 | $ - 0 | $0.00 |
| 0001AB | Mobilization and Demobilization (Medium Equipment) | EA | 3.2 | $ - 0 | $0.00 | 1001AB | Mobilization and Demobilization (Medium Equipment) | EA | 3.2 | $ - 0 | $0.00 | 2001AB | Mobilization and Demobilization (Medium Equipment) | EA | 3.2 | $ - 0 | $0.00 | 3001AB | Mobilization and Demobilization (Medium Equipment) | EA | 3.2 | $ - 0 | $0.00 | 4001AB | Mobilization and Demobilization (Medium Equipment) | EA | 3.2 | $ - 0 | $0.00 |
| 0001AC | Mobilization and Demobilization (Heavy Equipment) | EA | 0.8 | $ - 0 | $0.00 | 1001AC | Mobilization and Demobilization (Heavy Equipment) | EA | 0.8 | $ - 0 | $0.00 | 2001AC | Mobilization and Demobilization (Heavy Equipment) | EA | 0.8 | $ - 0 | $0.00 | 3001AC | Mobilization and Demobilization (Heavy Equipment) | EA | 0.8 | $ - 0 | $0.00 | 4001AC | Mobilization and Demobilization (Heavy Equipment) | EA | 0.8 | $ - 0 | $0.00 |
| 0001AD | Mobilization and Demobilization (Truck Mounted Crane) | EA | 0 | $ - 0 | $0.00 | 1001AD | Mobilization and Demobilization (Truck Mounted Crane) | EA | 0 | $ - 0 | $0.00 | 2001AD | Mobilization and Demobilization (Truck Mounted Crane) | EA | 0 | $ - 0 | $0.00 | 3001AD | Mobilization and Demobilization (Truck Mounted Crane) | EA | 0 | $ - 0 | $0.00 | 4001AD | Mobilization and Demobilization (Truck Mounted Crane) | EA | 0 | $ - 0 | $0.00 |
| 0001AE | Cold Mill Asphalt Pavement, 1" to 3" thick | SY | 400 | $ - 0 | $0.00 | 1001AE | Cold Mill Asphalt Pavement, 1" to 3" thick | SY | 400 | $ - 0 | $0.00 | 2001AE | Cold Mill Asphalt Pavement, 1" to 3" thick | SY | 400 | $ - 0 | $0.00 | 3001AE | Cold Mill Asphalt Pavement, 1" to 3" thick | SY | 400 | $ - 0 | $0.00 | 4001AE | Cold Mill Asphalt Pavement, 1" to 3" thick | SY | 400 | $ - 0 | $0.00 |
| 0001AF | Remove Asphalt Pavement up to 3-inches thick | SY | 0 | $ - 0 | $0.00 | 1001AF | Remove Asphalt Pavement up to 3-inches thick | SY | 0 | $ - 0 | $0.00 | 2001AF | Remove Asphalt Pavement up to 3-inches thick | SY | 0 | $ - 0 | $0.00 | 3001AF | Remove Asphalt Pavement up to 3-inches thick | SY | 0 | $ - 0 | $0.00 | 4001AF | Remove Asphalt Pavement up to 3-inches thick | SY | 0 | $ - 0 | $0.00 |
| 0001AG | Pulverize Asphalt Pavement, 4-inch thick pavement | SY | 0 | $ - 0 | $0.00 | 1001AG | Pulverize Asphalt Pavement, 4-inch thick pavement | SY | 0 | $ - 0 | $0.00 | 2001AG | Pulverize Asphalt Pavement, 4-inch thick pavement | SY | 0 | $ - 0 | $0.00 | 3001AG | Pulverize Asphalt Pavement, 4-inch thick pavement | SY | 0 | $ - 0 | $0.00 | 4001AG | Pulverize Asphalt Pavement, 4-inch thick pavement | SY | 0 | $ - 0 | $0.00 |
| 0001AH | Pulverize Asphalt Pavement, 8-inch thick pavement | SY | 0 | $ - 0 | $0.00 | 1001AH | Pulverize Asphalt Pavement, 8-inch thick pavement | SY | 0 | $ - 0 | $0.00 | 2001AH | Pulverize Asphalt Pavement, 8-inch thick pavement | SY | 0 | $ - 0 | $0.00 | 3001AH | Pulverize Asphalt Pavement, 8-inch thick pavement | SY | 0 | $ - 0 | $0.00 | 4001AH | Pulverize Asphalt Pavement, 8-inch thick pavement | SY | 0 | $ - 0 | $0.00 |
| 0001AI | Sawcut Concrete 4"-6" Thick (quantity less than 200 LF) | LF | 0 | $ - 0 | $0.00 | 1001AI | Sawcut Concrete 4"-6" Thick (quantity less than 200 LF) | LF | 0 | $ - 0 | $0.00 | 2001AI | Sawcut Concrete 4"-6" Thick (quantity less than 200 LF) | LF | 0 | $ - 0 | $0.00 | 3001AI | Sawcut Concrete 4"-6" Thick (quantity less than 200 LF) | LF | 0 | $ - 0 | $0.00 | 4001AI | Sawcut Concrete 4"-6" Thick (quantity less than 200 LF) | LF | 0 | $ - 0 | $0.00 |
| 0001AJ | Sawcut Concrete 4"-6" Thick (quantity 200 LF or more) | LF | 0 | $ - 0 | $0.00 | 1001AJ | Sawcut Concrete 4"-6" Thick (quantity 200 LF or more) | LF | 0 | $ - 0 | $0.00 | 2001AJ | Sawcut Concrete 4"-6" Thick (quantity 200 LF or more) | LF | 0 | $ - 0 | $0.00 | 3001AJ | Sawcut Concrete 4"-6" Thick (quantity 200 LF or more) | LF | 0 | $ - 0 | $0.00 | 4001AJ | Sawcut Concrete 4"-6" Thick (quantity 200 LF or more) | LF | 0 | $ - 0 | $0.00 |
| 0001AK | Sawcut Asphalt to 4" Thick (quantity less than 200 LF) | LF | 0 | $ - 0 | $0.00 | 1001AK | Sawcut Asphalt to 4" Thick (quantity less than 200 LF) | LF | 0 | $ - 0 | $0.00 | 2001AK | Sawcut Asphalt to 4" Thick (quantity less than 200 LF) | LF | 0 | $ - 0 | $0.00 | 3001AK | Sawcut Asphalt to 4" Thick (quantity less than 200 LF) | LF | 0 | $ - 0 | $0.00 | 4001AK | Sawcut Asphalt to 4" Thick (quantity less than 200 LF) | LF | 0 | $ - 0 | $0.00 |
| 0001AL | Sawcut Asphalt to 4" Thick (quantity 200 LF or more) | LF | 0 | $ - 0 | $0.00 | 1001AL | Sawcut Asphalt to 4" Thick (quantity 200 LF or more) | LF | 0 | $ - 0 | $0.00 | 2001AL | Sawcut Asphalt to 4" Thick (quantity 200 LF or more) | LF | 0 | $ - 0 | $0.00 | 3001AL | Sawcut Asphalt to 4" Thick (quantity 200 LF or more) | LF | 0 | $ - 0 | $0.00 | 4001AL | Sawcut Asphalt to 4" Thick (quantity 200 LF or more) | LF | 0 | $ - 0 | $0.00 |
| 0001AM | Remove Concrete Sidewalk, Haul and Dispose off-base | SY | 100 | $ - 0 | $0.00 | 1001AM | Remove Concrete Sidewalk, Haul and Dispose off-base | SY | 100 | $ - 0 | $0.00 | 2001AM | Remove Concrete Sidewalk, Haul and Dispose off-base | SY | 100 | $ - 0 | $0.00 | 3001AM | Remove Concrete Sidewalk, Haul and Dispose off-base | SY | 100 | $ - 0 | $0.00 | 4001AM | Remove Concrete Sidewalk, Haul and Dispose off-base | SY | 100 | $ - 0 | $0.00 |
| 0001AN | Remove Concrete Curb/Gutter, Haul and Dispose off-base | LF | 100 | $ - 0 | $0.00 | 1001AN | Remove Concrete Curb/Gutter, Haul and Dispose off-base | LF | 100 | $ - 0 | $0.00 | 2001AN | Remove Concrete Curb/Gutter, Haul and Dispose off-base | LF | 100 | $ - 0 | $0.00 | 3001AN | Remove Concrete Curb/Gutter, Haul and Dispose off-base | LF | 100 | $ - 0 | $0.00 | 4001AN | Remove Concrete Curb/Gutter, Haul and Dispose off-base | LF | 100 | $ - 0 | $0.00 |
| 0001AO | Remove Concrete Slabs (6-10" thick), Haul and Dispose off-base | CY | 30 | $ - 0 | $0.00 | 1001AO | Remove Concrete Slabs (6-10" thick), Haul and Dispose off-base | CY | 30 | $ - 0 | $0.00 | 2001AO | Remove Concrete Slabs (6-10" thick), Haul and Dispose off-base | CY | 30 | $ - 0 | $0.00 | 3001AO | Remove Concrete Slabs (6-10" thick), Haul and Dispose off-base | CY | 30 | $ - 0 | $0.00 | 4001AO | Remove Concrete Slabs (6-10" thick), Haul and Dispose off-base | CY | 30 | $ - 0 | $0.00 |
| 0001AP | Excavation | CY | 150 | $ - 0 | $0.00 | 1001AP | Excavation | CY | 150 | $ - 0 | $0.00 | 2001AP | Excavation | CY | 150 | $ - 0 | $0.00 | 3001AP | Excavation | CY | 150 | $ - 0 | $0.00 | 4001AP | Excavation | CY | 150 | $ - 0 | $0.00 |
| 0001AQ | Hauling - on-base (4 mile round trip) | CY | 3000 | $ - 0 | $0.00 | 1001AQ | Hauling - on-base (4 mile round trip) | CY | 3000 | $ - 0 | $0.00 | 2001AQ | Hauling - on-base (4 mile round trip) | CY | 3000 | $ - 0 | $0.00 | 3001AQ | Hauling - on-base (4 mile round trip) | CY | 3000 | $ - 0 | $0.00 | 4001AQ | Hauling - on-base (4 mile round trip) | CY | 3000 | $ - 0 | $0.00 |
| 0001AR | Hauling - off-base | CY | 0 | $ - 0 | $0.00 | 1001AR | Hauling - off-base | CY | 0 | $ - 0 | $0.00 | 2001AR | Hauling - off-base | CY | 0 | $ - 0 | $0.00 | 3001AR | Hauling - off-base | CY | 0 | $ - 0 | $0.00 | 4001AR | Hauling - off-base | CY | 0 | $ - 0 | $0.00 |
| 0001AS | Embankment | CY | 30 | $ - 0 | $0.00 | 1001AS | Embankment | CY | 30 | $ - 0 | $0.00 | 2001AS | Embankment | CY | 30 | $ - 0 | $0.00 | 3001AS | Embankment | CY | 30 | $ - 0 | $0.00 | 4001AS | Embankment | CY | 30 | $ - 0 | $0.00 |
| 0001AT | Clean Fill | CY | 30 | $ - 0 | $0.00 | 1001AT | Clean Fill | CY | 30 | $ - 0 | $0.00 | 2001AT | Clean Fill | CY | 30 | $ - 0 | $0.00 | 3001AT | Clean Fill | CY | 30 | $ - 0 | $0.00 | 4001AT | Clean Fill | CY | 30 | $ - 0 | $0.00 |
| 0001AU | Surveying - 1 Man Crew | HR | 0.2 | $ - 0 | $0.00 | 1001AU | Surveying - 1 Man Crew | HR | 0.2 | $ - 0 | $0.00 | 2001AU | Surveying - 1 Man Crew | HR | 0.2 | $ - 0 | $0.00 | 3001AU | Surveying - 1 Man Crew | HR | 0.2 | $ - 0 | $0.00 | 4001AU | Surveying - 1 Man Crew | HR | 0.2 | $ - 0 | $0.00 |
| 0001AV | Surveying - 2 Man Crew | HR | 0.2 | $ - 0 | $0.00 | 1001AV | Surveying - 2 Man Crew | HR | 0.2 | $ - 0 | $0.00 | 2001AV | Surveying - 2 Man Crew | HR | 0.2 | $ - 0 | $0.00 | 3001AV | Surveying - 2 Man Crew | HR | 0.2 | $ - 0 | $0.00 | 4001AV | Surveying - 2 Man Crew | HR | 0.2 | $ - 0 | $0.00 |
| 0001AW | Surface Preparation | SY | 120000 | $ - 0 | $0.00 | 1001AW | Surface Preparation | SY | 120000 | $ - 0 | $0.00 | 2001AW | Surface Preparation | SY | 120000 | $ - 0 | $0.00 | 3001AW | Surface Preparation | SY | 120000 | $ - 0 | $0.00 | 4001AW | Surface Preparation | SY | 120000 | $ - 0 | $0.00 |
| 0001AX | Concrete Curb & Gutter | LF | 100 | $ - 0 | $0.00 | 1001AX | Concrete Curb & Gutter | LF | 100 | $ - 0 | $0.00 | 2001AX | Concrete Curb & Gutter | LF | 100 | $ - 0 | $0.00 | 3001AX | Concrete Curb & Gutter | LF | 100 | $ - 0 | $0.00 | 4001AX | Concrete Curb & Gutter | LF | 100 | $ - 0 | $0.00 |
| 0001AY | Concrete Vertical Curb | LF | 100 | $ - 0 | $0.00 | 1001AY | Concrete Vertical Curb | LF | 100 | $ - 0 | $0.00 | 2001AY | Concrete Vertical Curb | LF | 100 | $ - 0 | $0.00 | 3001AY | Concrete Vertical Curb | LF | 100 | $ - 0 | $0.00 | 4001AY | Concrete Vertical Curb | LF | 100 | $ - 0 | $0.00 |
| 0001AZ | Concrete Sidewalk (quantity less than 400 SF) | SF | 0 | $ - 0 | $0.00 | 1001AZ | Concrete Sidewalk (quantity less than 400 SF) | SF | 0 | $ - 0 | $0.00 | 2001AZ | Concrete Sidewalk (quantity less than 400 SF) | SF | 0 | $ - 0 | $0.00 | 3001AZ | Concrete Sidewalk (quantity less than 400 SF) | SF | 0 | $ - 0 | $0.00 | 4001AZ | Concrete Sidewalk (quantity less than 400 SF) | SF | 0 | $ - 0 | $0.00 |
| 0001BA | Concrete Sidewalk (quantity 400 SF or more) | SF | 100 | $ - 0 | $0.00 | 1001BA | Concrete Sidewalk (quantity 400 SF or more) | SF | 100 | $ - 0 | $0.00 | 2001BA | Concrete Sidewalk (quantity 400 SF or more) | SF | 100 | $ - 0 | $0.00 | 3001BA | Concrete Sidewalk (quantity 400 SF or more) | SF | 100 | $ - 0 | $0.00 | 4001BA | Concrete Sidewalk (quantity 400 SF or more) | SF | 100 | $ - 0 | $0.00 |
| 0001BB | Concrete Accessibility Ramp at 6-inch Curb Reveal | EA | 0 | $ - 0 | $0.00 | 1001BB | Concrete Accessibility Ramp at 6-inch Curb Reveal | EA | 0 | $ - 0 | $0.00 | 2001BB | Concrete Accessibility Ramp at 6-inch Curb Reveal | EA | 0 | $ - 0 | $0.00 | 3001BB | Concrete Accessibility Ramp at 6-inch Curb Reveal | EA | 0 | $ - 0 | $0.00 | 4001BB | Concrete Accessibility Ramp at 6-inch Curb Reveal | EA | 0 | $ - 0 | $0.00 |
| 0001BC | Concrete Accessibility Ramp at 8-inch Curb Reveal | EA | 0 | $ - 0 | $0.00 | 1001BC | Concrete Accessibility Ramp at 8-inch Curb Reveal | EA | 0 | $ - 0 | $0.00 | 2001BC | Concrete Accessibility Ramp at 8-inch Curb Reveal | EA | 0 | $ - 0 | $0.00 | 3001BC | Concrete Accessibility Ramp at 8-inch Curb Reveal | EA | 0 | $ - 0 | $0.00 | 4001BC | Concrete Accessibility Ramp at 8-inch Curb Reveal | EA | 0 | $ - 0 | $0.00 |
| 0001BD | Aggregate Base Course | CY | 150 | $ - 0 | $0.00 | 1001BD | Aggregate Base Course | CY | 150 | $ - 0 | $0.00 | 2001BD | Aggregate Base Course | CY | 150 | $ - 0 | $0.00 | 3001BD | Aggregate Base Course | CY | 150 | $ - 0 | $0.00 | 4001BD | Aggregate Base Course | CY | 150 | $ - 0 | $0.00 |
| 0001BE | Bituminous Prime Coat (quantity less than 200 GA) | GA | 0 | $ - 0 | $0.00 | 1001BE | Bituminous Prime Coat (quantity less than 200 GA) | GA | 0 | $ - 0 | $0.00 | 2001BE | Bituminous Prime Coat (quantity less than 200 GA) | GA | 0 | $ - 0 | $0.00 | 3001BE | Bituminous Prime Coat (quantity less than 200 GA) | GA | 0 | $ - 0 | $0.00 | 4001BE | Bituminous Prime Coat (quantity less than 200 GA) | GA | 0 | $ - 0 | $0.00 |
| 0001BF | Bituminous Prime Coat (quantity 200 GA or more) | GA | 0 | $ - 0 | $0.00 | 1001BF | Bituminous Prime Coat (quantity 200 GA or more) | GA | 0 | $ - 0 | $0.00 | 2001BF | Bituminous Prime Coat (quantity 200 GA or more) | GA | 0 | $ - 0 | $0.00 | 3001BF | Bituminous Prime Coat (quantity 200 GA or more) | GA | 0 | $ - 0 | $0.00 | 4001BF | Bituminous Prime Coat (quantity 200 GA or more) | GA | 0 | $ - 0 | $0.00 |
| 0001BG | Bituminous Tack Coat (quantity less than 300 GA) | GA | 0 | $ - 0 | $0.00 | 1001BG | Bituminous Tack Coat (quantity less than 300 GA) | GA | 0 | $ - 0 | $0.00 | 2001BG | Bituminous Tack Coat (quantity less than 300 GA) | GA | 0 | $ - 0 | $0.00 | 3001BG | Bituminous Tack Coat (quantity less than 300 GA) | GA | 0 | $ - 0 | $0.00 | 4001BG | Bituminous Tack Coat (quantity less than 300 GA) | GA | 0 | $ - 0 | $0.00 |
| 0001BH | Bituminous Tack Coat (quantity 300 GA or more) | GA | 0 | $ - 0 | $0.00 | 1001BH | Bituminous Tack Coat (quantity 300 GA or more) | GA | 0 | $ - 0 | $0.00 | 2001BH | Bituminous Tack Coat (quantity 300 GA or more) | GA | 0 | $ - 0 | $0.00 | 3001BH | Bituminous Tack Coat (quantity 300 GA or more) | GA | 0 | $ - 0 | $0.00 | 4001BH | Bituminous Tack Coat (quantity 300 GA or more) | GA | 0 | $ - 0 | $0.00 |
| 0001BI | Bituminous Surface Course (2") | SY | 0 | $ - 0 | $0.00 | 1001BI | Bituminous Surface Course (2") | SY | 0 | $ - 0 | $0.00 | 2001BI | Bituminous Surface Course (2") | SY | 0 | $ - 0 | $0.00 | 3001BI | Bituminous Surface Course (2") | SY | 0 | $ - 0 | $0.00 | 4001BI | Bituminous Surface Course (2") | SY | 0 | $ - 0 | $0.00 |
| 0001BJ | Bituminous Surface Course (3"- placed in 2 lifts) | SY | 0 | $ - 0 | $0.00 | 1001BJ | Bituminous Surface Course (3"- placed in 2 lifts) | SY | 0 | $ - 0 | $0.00 | 2001BJ | Bituminous Surface Course (3"- placed in 2 lifts) | SY | 0 | $ - 0 | $0.00 | 3001BJ | Bituminous Surface Course (3"- placed in 2 lifts) | SY | 0 | $ - 0 | $0.00 | 4001BJ | Bituminous Surface Course (3"- placed in 2 lifts) | SY | 0 | $ - 0 | $0.00 |
| 0001BK | Bituminous Surface Course (3"- placed in 1 lift) | SY | 1000 | $ - 0 | $0.00 | 1001BK | Bituminous Surface Course (3"- placed in 1 lift) | SY | 1000 | $ - 0 | $0.00 | 2001BK | Bituminous Surface Course (3"- placed in 1 lift) | SY | 1000 | $ - 0 | $0.00 | 3001BK | Bituminous Surface Course (3"- placed in 1 lift) | SY | 1000 | $ - 0 | $0.00 | 4001BK | Bituminous Surface Course (3"- placed in 1 lift) | SY | 1000 | $ - 0 | $0.00 |
| 0001BL | Adjust Manhole Frame and Cover to Grade | EA | 0 | $ - 0 | $0.00 | 1001BL | Adjust Manhole Frame and Cover to Grade | EA | 0 | $ - 0 | $0.00 | 2001BL | Adjust Manhole Frame and Cover to Grade | EA | 0 | $ - 0 | $0.00 | 3001BL | Adjust Manhole Frame and Cover to Grade | EA | 0 | $ - 0 | $0.00 | 4001BL | Adjust Manhole Frame and Cover to Grade | EA | 0 | $ - 0 | $0.00 |
| 0001BM | Adjust Valve Riser, Frame and Cover to Grade | EA | 25 | $ - 0 | $0.00 | 1001BM | Adjust Valve Riser, Frame and Cover to Grade | EA | 25 | $ - 0 | $0.00 | 2001BM | Adjust Valve Riser, Frame and Cover to Grade | EA | 25 | $ - 0 | $0.00 | 3001BM | Adjust Valve Riser, Frame and Cover to Grade | EA | 25 | $ - 0 | $0.00 | 4001BM | Adjust Valve Riser, Frame and Cover to Grade | EA | 25 | $ - 0 | $0.00 |
| 0001BN | Crack Seal Asphalt Pavement | LF | 30000 | $ - 0 | $0.00 | 1001BN | Crack Seal Asphalt Pavement | LF | 30000 | $ - 0 | $0.00 | 2001BN | Crack Seal Asphalt Pavement | LF | 30000 | $ - 0 | $0.00 | 3001BN | Crack Seal Asphalt Pavement | LF | 30000 | $ - 0 | $0.00 | 4001BN | Crack Seal Asphalt Pavement | LF | 30000 | $ - 0 | $0.00 |
| 0001BO | Fog Seal Asphalt Pavement | SY | 24000 | $ - 0 | $0.00 | 1001BO | Fog Seal Asphalt Pavement | SY | 24000 | $ - 0 | $0.00 | 2001BO | Fog Seal Asphalt Pavement | SY | 24000 | $ - 0 | $0.00 | 3001BO | Fog Seal Asphalt Pavement | SY | 24000 | $ - 0 | $0.00 | 4001BO | Fog Seal Asphalt Pavement | SY | 24000 | $ - 0 | $0.00 |
| 0001BP | Painted Reflective Pavement Markings | SF | 24000 | $ - 0 | $0.00 | 1001BP | Painted Reflective Pavement Markings | SF | 24000 | $ - 0 | $0.00 | 2001BP | Painted Reflective Pavement Markings | SF | 24000 | $ - 0 | $0.00 | 3001BP | Painted Reflective Pavement Markings | SF | 24000 | $ - 0 | $0.00 | 4001BP | Painted Reflective Pavement Markings | SF | 24000 | $ - 0 | $0.00 |
| 0001BQ | Painted Non-Reflective Pavement Markings | SF | 24000 | $ - 0 | $0.00 | 1001BQ | Painted Non-Reflective Pavement Markings | SF | 24000 | $ - 0 | $0.00 | 2001BQ | Painted Non-Reflective Pavement Markings | SF | 24000 | $ - 0 | $0.00 | 3001BQ | Painted Non-Reflective Pavement Markings | SF | 24000 | $ - 0 | $0.00 | 4001BQ | Painted Non-Reflective Pavement Markings | SF | 24000 | $ - 0 | $0.00 |
| 0001BR | Thermoplastic Tape Striping (4" wide) | LF | 0 | $ - 0 | $0.00 | 1001BR | Thermoplastic Tape Striping (4" wide) | LF | 0 | $ - 0 | $0.00 | 2001BR | Thermoplastic Tape Striping (4" wide) | LF | 0 | $ - 0 | $0.00 | 3001BR | Thermoplastic Tape Striping (4" wide) | LF | 0 | $ - 0 | $0.00 | 4001BR | Thermoplastic Tape Striping (4" wide) | LF | 0 | $ - 0 | $0.00 |
| 0001BS | Traffic Sign Installation | EA | 0 | $ - 0 | $0.00 | 1001BS | Traffic Sign Installation | EA | 0 | $ - 0 | $0.00 | 2001BS | Traffic Sign Installation | EA | 0 | $ - 0 | $0.00 | 3001BS | Traffic Sign Installation | EA | 0 | $ - 0 | $0.00 | 4001BS | Traffic Sign Installation | EA | 0 | $ - 0 | $0.00 |
| 0001BT | Raised Reflective Pavement Markers | EA | 0 | $ - 0 | $0.00 | 1001BT | Raised Reflective Pavement Markers | EA | 0 | $ - 0 | $0.00 | 2001BT | Raised Reflective Pavement Markers | EA | 0 | $ - 0 | $0.00 | 3001BT | Raised Reflective Pavement Markers | EA | 0 | $ - 0 | $0.00 | 4001BT | Raised Reflective Pavement Markers | EA | 0 | $ - 0 | $0.00 |
| 0001BU | Curb Mounted Reserved Parking Sign | EA | 0 | $ - 0 | $0.00 | 1001BU | Curb Mounted Reserved Parking Sign | EA | 0 | $ - 0 | $0.00 | 2001BU | Curb Mounted Reserved Parking Sign | EA | 0 | $ - 0 | $0.00 | 3001BU | Curb Mounted Reserved Parking Sign | EA | 0 | $ - 0 | $0.00 | 4001BU | Curb Mounted Reserved Parking Sign | EA | 0 | $ - 0 | $0.00 |
| 0001BV | 18" Concrete Drainage Structure | CY | 1 | $ - 0 | $0.00 | 1001BV | 18" Concrete Drainage Structure | CY | 1 | $ - 0 | $0.00 | 2001BV | 18" Concrete Drainage Structure | CY | 1 | $ - 0 | $0.00 | 3001BV | 18" Concrete Drainage Structure | CY | 1 | $ - 0 | $0.00 | 4001BV | 18" Concrete Drainage Structure | CY | 1 | $ - 0 | $0.00 |
| 0001BW | 6-Inch Thick Concrete Slab | CY | 100 | $ - 0 | $0.00 | 1001BW | 6-Inch Thick Concrete Slab | CY | 100 | $ - 0 | $0.00 | 2001BW | 6-Inch Thick Concrete Slab | CY | 100 | $ - 0 | $0.00 | 3001BW | 6-Inch Thick Concrete Slab | CY | 100 | $ - 0 | $0.00 | 4001BW | 6-Inch Thick Concrete Slab | CY | 100 | $ - 0 | $0.00 |
| 0001BX | 8-Inch Thick Concrete Slab | CY | 0 | $ - 0 | $0.00 | 1001BX | 8-Inch Thick Concrete Slab | CY | 0 | $ - 0 | $0.00 | 2001BX | 8-Inch Thick Concrete Slab | CY | 0 | $ - 0 | $0.00 | 3001BX | 8-Inch Thick Concrete Slab | CY | 0 | $ - 0 | $0.00 | 4001BX | 8-Inch Thick Concrete Slab | CY | 0 | $ - 0 | $0.00 |
| 0001BY | 6-Inch Diameter Steel Bollards (Concrete Filled) | EA | 2.4 | $ - 0 | $0.00 | 1001BY | 6-Inch Diameter Steel Bollards (Concrete Filled) | EA | 2.4 | $ - 0 | $0.00 | 2001BY | 6-Inch Diameter Steel Bollards (Concrete Filled) | EA | 2.4 | $ - 0 | $0.00 | 3001BY | 6-Inch Diameter Steel Bollards (Concrete Filled) | EA | 2.4 | $ - 0 | $0.00 | 4001BY | 6-Inch Diameter Steel Bollards (Concrete Filled) | EA | 2.4 | $ - 0 | $0.00 |
| 0001BZ | 18-Inch Diameter CMP Culvert | LF | 10 | $ - 0 | $0.00 | 1001BZ | 18-Inch Diameter CMP Culvert | LF | 10 | $ - 0 | $0.00 | 2001BZ | 18-Inch Diameter CMP Culvert | LF | 10 | $ - 0 | $0.00 | 3001BZ | 18-Inch Diameter CMP Culvert | LF | 10 | $ - 0 | $0.00 | 4001BZ | 18-Inch Diameter CMP Culvert | LF | 10 | $ - 0 | $0.00 |
| 0001CA | 12-Inch Diameter RCP Culvert | LF | 1 | $ - 0 | $0.00 | 1001CA | 12-Inch Diameter RCP Culvert | LF | 1 | $ - 0 | $0.00 | 2001CA | 12-Inch Diameter RCP Culvert | LF | 1 | $ - 0 | $0.00 | 3001CA | 12-Inch Diameter RCP Culvert | LF | 1 | $ - 0 | $0.00 | 4001CA | 12-Inch Diameter RCP Culvert | LF | 1 | $ - 0 | $0.00 |
| 0001CB | Hand Digging | MH | 300 | $ - 0 | $0.00 | 1001CB | Hand Digging | MH | 300 | $ - 0 | $0.00 | 2001CB | Hand Digging | MH | 300 | $ - 0 | $0.00 | 3001CB | Hand Digging | MH | 300 | $ - 0 | $0.00 | 4001CB | Hand Digging | MH | 300 | $ - 0 | $0.00 |
| 0001CC | Rock, Rip Rap | CY | 150 | $ - 0 | $0.00 | 1001CC | Rock, Rip Rap | CY | 150 | $ - 0 | $0.00 | 2001CC | Rock, Rip Rap | CY | 150 | $ - 0 | $0.00 | 3001CC | Rock, Rip Rap | CY | 150 | $ - 0 | $0.00 | 4001CC | Rock, Rip Rap | CY | 150 | $ - 0 | $0.00 |
| 0001CD | Decomposed Granite Ground Cover | SY | 150 | $ - 0 | $0.00 | 1001CD | Decomposed Granite Ground Cover | SY | 150 | $ - 0 | $0.00 | 2001CD | Decomposed Granite Ground Cover | SY | 150 | $ - 0 | $0.00 | 3001CD | Decomposed Granite Ground Cover | SY | 150 | $ - 0 | $0.00 | 4001CD | Decomposed Granite Ground Cover | SY | 150 | $ - 0 | $0.00 |
| 0001CE | Concrete Testing | EA | 0.2 | $ - 0 | $0.00 | 1001CE | Concrete Testing | EA | 0.2 | $ - 0 | $0.00 | 2001CE | Concrete Testing | EA | 0.2 | $ - 0 | $0.00 | 3001CE | Concrete Testing | EA | 0.2 | $ - 0 | $0.00 | 4001CE | Concrete Testing | EA | 0.2 | $0.00 | |
| 0001CF | Aggregate Base Material Sieve Analysis | EA | 1 | $ - 0 | $0.00 | 1001CF | Aggregate Base Material Sieve Analysis | EA | 1 | $ - 0 | $0.00 | 2001CF | Aggregate Base Material Sieve Analysis | EA | 1 | $ - 0 | $0.00 | 3001CF | Aggregate Base Material Sieve Analysis | EA | 1 | $ - 0 | $0.00 | 4001CF | Aggregate Base Material Sieve Analysis | EA | 1 | $ - 0 | $0.00 |
| 0001CG | Subgrade/Aggregate Base In-Place Density Test | EA | 1 | $ - 0 | $0.00 | 1001CG | Subgrade/Aggregate Base In-Place Density Test | EA | 1 | $ - 0 | $0.00 | 2001CG | Subgrade/Aggregate Base In-Place Density Test | EA | 1 | $ - 0 | $0.00 | 3001CG | Subgrade/Aggregate Base In-Place Density Test | EA | 1 | $ - 0 | $0.00 | 4001CG | Subgrade/Aggregate Base In-Place Density Test | EA | 1 | $ - 0 | $0.00 |
| 0001CH | Asphaltic Concrete In-Place Density & Thickness Test | EA | 0.2 | $ - 0 | $0.00 | 1001CH | Asphaltic Concrete In-Place Density & Thickness Test | EA | 0.2 | $ - 0 | $0.00 | 2001CH | Asphaltic Concrete In-Place Density & Thickness Test | EA | 0.2 | $ - 0 | $0.00 | 3001CH | Asphaltic Concrete In-Place Density & Thickness Test | EA | 0.2 | $ - 0 | $0.00 | 4001CH | Asphaltic Concrete In-Place Density & Thickness Test | EA | 0.2 | $ - 0 | $0.00 |
| 0001CI | Asphaltic Concrete In-Place Density & Thickness Test (Labs) | Day | 0 | $ - 0 | $0.00 | 1001CI | Asphaltic Concrete In-Place Density & Thickness Test (Labs) | Day | 0 | $ - 0 | $0.00 | 2001CI | Asphaltic Concrete In-Place Density & Thickness Test (Labs) | Day | 0 | $ - 0 | $0.00 | 3001CI | Asphaltic Concrete In-Place Density & Thickness Test (Labs) | Day | 0 | $ - 0 | $0.00 | 4001CI | Asphaltic Concrete In-Place Density & Thickness Test (Labs) | Day | 0 | $ - 0 | $0.00 |
| 0001CJ | Traffic Control | Day | 30 | $ - 0 | $0.00 | 1001CJ | Traffic Control | Day | 30 | $ - 0 | $0.00 | 2001CJ | Traffic Control | Day | 30 | $ - 0 | $0.00 | 3001CJ | Traffic Control | Day | 30 | $ - 0 | $0.00 | 4001CJ | Traffic Control | Day | 30 | $ - 0 | $0.00 |
| 0001CK | 10-Inch to 12-Inch Thick Concrete Slab (650 psi) | CY | 0 | $ - 0 | $0.00 | 1001CK | 10-Inch to 12-Inch Thick Concrete Slab (650 psi) | CY | 0 | $ - 0 | $0.00 | 2001CK | 10-Inch to 12-Inch Thick Concrete Slab (650 psi) | CY | 0 | $ - 0 | $0.00 | 3001CK | 10-Inch to 12-Inch Thick Concrete Slab (650 psi) | CY | 0 | $ - 0 | $0.00 | 4001CK | 10-Inch to 12-Inch Thick Concrete Slab (650 psi) | CY | 0 | $ - 0 | $0.00 |
| 0001CL | 1-Inch by 20-Inch Dowel Bars | EA | 0 | $ - 0 | $0.00 | 1001CL | 1-Inch by 20-Inch Dowel Bars | EA | 0 | $ - 0 | $0.00 | 2001CL | 1-Inch by 20-Inch Dowel Bars | EA | 0 | $ - 0 | $0.00 | 3001CL | 1-Inch by 20-Inch Dowel Bars | EA | 0 | $ - 0 | $0.00 | 4001CL | 1-Inch by 20-Inch Dowel Bars | EA | 0 | $ - 0 | $0.00 |
| 0001CM | Concrete Spall Repair | SF | 10000 | $ - 0 | $0.00 | 1001CM | Concrete Spall Repair | SF | 10000 | $ - 0 | $0.00 | 2001CM | Concrete Spall Repair | SF | 10000 | $ - 0 | $0.00 | 3001CM | Concrete Spall Repair | SF | 10000 | $ - 0 | $0.00 | 4001CM | Concrete Spall Repair | SF | 10000 | $ - 0 | $0.00 |
| 0001CN | Reseal Concrete Pavement Joints | LF | 10000 | $ - 0 | $0.00 | 1001CN | Reseal Concrete Pavement Joints | LF | 10000 | $ - 0 | $0.00 | 2001CN | Reseal Concrete Pavement Joints | LF | 10000 | $ - 0 | $0.00 | 3001CN | Reseal Concrete Pavement Joints | LF | 10000 | $ - 0 | $0.00 | 4001CN | Reseal Concrete Pavement Joints | LF | 10000 | $ - 0 | $0.00 |
| 0001CO | Concrete Pavement Crack Repair | LF | 10000 | $ - 0 | $0.00 | 1001CO | Concrete Pavement Crack Repair | LF | 10000 | $ - 0 | $0.00 | 2001CO | Concrete Pavement Crack Repair | LF | 10000 | $ - 0 | $0.00 | 3001CO | Concrete Pavement Crack Repair | LF | 10000 | $ - 0 | $0.00 | 4001CO | Concrete Pavement Crack Repair | LF | 10000 | $ - 0 | $0.00 |
| 0001CP | Airfield Pavement Paint Removal | SF | 10000 | $ - 0 | $0.00 | 1001CP | Airfield Pavement Paint Removal | SF | 10000 | $ - 0 | $0.00 | 2001CP | Airfield Pavement Paint Removal | SF | 10000 | $ - 0 | $0.00 | 3001CP | Airfield Pavement Paint Removal | SF | 10000 | $ - 0 | $0.00 | 4001CP | Airfield Pavement Paint Removal | SF | 10000 | $ - 0 | $0.00 |
| 0001CQ | Airfield Pavement Reflective Paint Application | SF | 10000 | $ - 0 | $0.00 | 1001CQ | Airfield Pavement Reflective Paint Application | SF | 10000 | $ - 0 | $0.00 | 2001CQ | Airfield Pavement Reflective Paint Application | SF | 10000 | $ - 0 | $0.00 | 3001CQ | Airfield Pavement Reflective Paint Application | SF | 10000 | $ - 0 | $0.00 | 4001CQ | Airfield Pavement Reflective Paint Application | SF | 10000 | $ - 0 | $0.00 |
| 0001CR | Airfield Pavement Non-Reflective Paint Application | SF | 10000 | $ - 0 | $0.00 | 1001CR | Airfield Pavement Non-Reflective Paint Application | SF | 10000 | $ - 0 | $0.00 | 2001CR | Airfield Pavement Non-Reflective Paint Application | SF | 10000 | $ - 0 | $0.00 | 3001CR | Airfield Pavement Non-Reflective Paint Application | SF | 10000 | $ - 0 | $0.00 | 4001CR | Airfield Pavement Non-Reflective Paint Application | SF | 10000 | $ - 0 | $0.00 |
| 0001CS | Airfield Pavement Restricted Area Warning Sign Paint Application | EA | 50 | $ - 0 | $0.00 | 1001CS | Airfield Pavement Restricted Area Warning Sign Paint Application | EA | 50 | $ - 0 | $0.00 | 2001CS | Airfield Pavement Restricted Area Warning Sign Paint Application | EA | 50 | $ - 0 | $0.00 | 3001CS | Airfield Pavement Restricted Area Warning Sign Paint Application | EA | 50 | $ - 0 | $0.00 | 4001CS | Airfield Pavement Restricted Area Warning Sign Paint Application | EA | 50 | $ - 0 | $0.00 |
| 0001CT | Airfield Pavement Entry Control Point (ECP) Paint Application | SF | 1 | $ - 0 | $0.00 | 1001CT | Airfield Pavement Entry Control Point (ECP) Paint Application | SF | 1 | $ - 0 | $0.00 | 2001CT | Airfield Pavement Entry Control Point (ECP) Paint Application | SF | 1 | $ - 0 | $0.00 | 3001CT | Airfield Pavement Entry Control Point (ECP) Paint Application | SF | 1 | $ - 0 | $0.00 | 4001CT | Airfield Pavement Entry Control Point (ECP) Paint Application | SF | 1 | $ - 0 | $0.00 |
| 0001CU | Supervision | DAY | 30 | $ - 0 | $0.00 | 1001CU | Supervision | DAY | 30 | $ - 0 | $0.00 | 2001CU | Supervision | DAY | 30 | $ - 0 | $0.00 | 3001CU | Supervision | DAY | 30 | $ - 0 | $0.00 | 4001CU | Supervision | DAY | 30 | $ - 0 | $0.00 |
| 0001CV | Slurry Seal Asphalt Pavement (as Liquid Road or Equivalent) | SY | 20000 | $ - 0 | $0.00 | 1001CV | Slurry Seal Asphalt Pavement (as Liquid Road or Equivalent) | SY | 20000 | $ - 0 | $0.00 | 2001CV | Slurry Seal Asphalt Pavement (as Liquid Road or Equivalent) | SY | 20000 | $ - 0 | $0.00 | 3001CV | Slurry Seal Asphalt Pavement (as Liquid Road or Equivalent) | SY | 20000 | $ - 0 | $0.00 | 4001CV | Slurry Seal Asphalt Pavement (as Liquid Road or Equivalent) | SY | 20000 | $ - 0 | $0.00 |
| 0001CW | Runway Rubber Removal | SF | 400000 | $ - 0 | $0.00 | 1001CW | Runway Rubber Removal | SF | 400000 | $ - 0 | $0.00 | 2001CW | Runway Rubber Removal | SF | 400000 | $ - 0 | $0.00 | 3001CW | Runway Rubber Removal | SF | 400000 | $ - 0 | $0.00 | 4001CW | Runway Rubber Removal | SF | 400000 | $ - 0 | $0.00 |
| 0001CX | MISC Painted Pavement Markings | SF | 3000 | $ - 0 | $0.00 | 1001CX | MISC Painted Pavement Markings | SF | 3000 | $ - 0 | $0.00 | 2001CX | MISC Painted Pavement Markings | SF | 3000 | $ - 0 | $0.00 | 3001CX | MISC Painted Pavement Markings | SF | 3000 | $ - 0 | $0.00 | 4001CX | MISC Painted Pavement Markings | SF | 3000 | $ - 0 | $0.00 |
| Total for Base Year (calculated by formula) | $0.00 | Total for Option Year 1 (calculated by formula) | $0.00 | Total for Option Year 2 (calculated by formula) | $0.00 | Total for Option Year 3 (calculated by formula) | $0.00 | Total For Option Year 4 (calculated by formula) | $0.00 | ||||||||||||||||||||
| Total for Base + All Option Years (calculated by formula) | $0.00 | ||||||||||||||||||||||||||||
| CLIN 0002 - Pre Construction Conference | $2,000.00 | ||||||||||||||||||||||||||||
| Grand Total | $2,000.00 | ||||||||||||||||||||||||||||
| * Contract year is from July 1 through June 30 |