Speaker Locations.pdf

PDF 399 KB Posted

Attached to
355 CP - CAT/WOC Rooms Audio & Visual System Upgrade
Solicitation number
FA487725QA444
Issued by

About this file

This document is an electrical engineering floor plan for a Repair Command Post renovation project at Davis-Monthan Air Force Base (DMAFB), Building 2300. The detailed schematic shows a complex layout with multiple specialized rooms including a Communications Room (331 SF), Crisis Action Team (CAT) room (646 SF), Console room (694 SF), and various smaller support spaces like offices, a gym equipment area, kitchenette, and technical infrastructure zones. The plan includes extensive technical specifications for special systems, with specific requirements for NIPR and SIPR (classified) data cable routing, fire alarm system relocation, and IT infrastructure modifications. Key technical notes mandate minimum separation distances between classified and unclassified data pathways, fiber connections between server racks, and precise requirements for cable trays, conduits, and device installations, with explicit instructions to coordinate specific implementation details with DMAFB cyber security and IT consultants.

View the file

Other files

File Type Posted
Performance Work Statement - updated.pdf PDF
Drawing 2.png PNG image
Questions and Answers.pdf PDF
COMBINED SYNOPSIS SOLICITATION - COMBO.pdf PDF
Wage Determinations.pdf PDF
Drawing 1.jpg JPG image
Provisions and Clauses.pdf PDF
Site Visit Instructions.pdf PDF
COMBINED SYNOPSIS SOLICITATION - COMBO.pdf PDF
Performance Work Statement - updated.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

F

F

A A

B B

C C

331 SF

COMMUNICATIONS

ROOM

1072 SF

MECHANICAL

ROOM

202 SF

GENERATOR

646 SF

CRISIS

ACTION

TEAM - CAT

694 SF

CONSOLE

41 SF

ELEC

72 SF

CAT IT

162 SF

TRAINING

118 SF

WELLNESS

ROOM

92 SF

STORAGE

1106B

164 SF

COMMUNICATIONS

1106A

146 SF

GYM EQUIP

119 SF

OFFICE

130 SF

OFFICE

119 SF

LOUNGE

76 SF

VESTIBULE

48 SF

RESTROOM

48 SF

RESTROOM

253 SF

HALL

1105A

36 SF

JAN

1113B

279 SF

HALL

1105B

86 SF

KITCHENETTE

52 SF

SHOWER

1113A

NAOC

(R)

MTZ

(E)

IC

(R)

(R)

(R)

R C

(R)

(R) KP

(R)

IDS

(R)

KP

(R)

(R)

KP KP

(R)

PS

(R)

P

(R)

TV

TV

S

SN

N S

N S

NS NS

TV

TV

NCSC

NC

SC

TV

TVS

N

NS

N

S

N

S

NS

NS

S

N

PROVIDE (2) CABLE TRAYS STACKED ON TOP OF EACH OTHER.

(1) TRAY DEDICATED FOR SIPR AND (1) TRAY DEDICATED FOR

NIPR. PROVIDE NECESSARY CLEARANCE FOR ACCESSIBILITY.

SC

SC

SIPR CABLE TRAY

TV

N

(R)

(R)

(R)

NIPR CABLE TRAY

(E

)IT

R A

C K

(E

)IT

R A

C K

(E

)IT

R A

C K

(E) IT RACK 6

(R )I

T R

A C

K

(R )I

T R

A C

K

S

S

N

NC

NC

N

N

S

N

TV

IC

(R)

TV

84"

SC

NC

SC

NC

SC

NC

SC

NC

SC

NC

NC

SC

NC

SC

NC

SC

NC

SC

NC

SC

NC

SC SC

NC

N

N

N

N

N

N

N

N

N

S

(R)

TV TV

TV

TV

TV

TV

TV

MAG

MAG

MAG

MAG

MAG

(R)

(R)

(R)

(R)

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)S

(R) S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

S

(R)

(R)

(R)

IDS

AHU-1

S (R)

FOR SKYLIGHT ABOVE

FOR TV

CONNECTION IN

ROOM (TYPICAL 4)

FOR TV

CONNECTION IN

ROOM (TYPICAL 5)

A. CONTRACTOR TO ENGAGE NICET CERTIFIED ENGINEER FOR DESIGN/RELOCATION OF

FIRE ALARM SYSTEMS AND MASS NOTIFICATION SYSTEMS.

B. THE DEFERRED DESIGN SUBMITTAL TO ALSO INCLUDE PART NUMBERS OF THE EXISTING

STROBES AND SPEAKERS AND HAVE IN THE SUBMITTALS.

C. THE SYSTEMS ARE ON CLASS B CIRCUITS. THE INSTALLER TO LOCATE THE END OF LINE

RESISTOR FOR EACH CIRCUIT AND PICK UP THE CIRCUIT FROM THERE TO THE LAST OF

THE NEW DEVICES ON EACH CIRCUIT. A SEPARATE STROBE CIRCUIT AND A SEPARATE

SPEAKER CIRCUIT ARE REQUIRED FOR THE INSTALLATION.

D. REFER TO E0.01 AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

E. CONTRACTOR TO RELOCATE ALL EXISTING FIRE ALARM AND MNS DEVICES TO NEW

RENOVATION. PROTECT DURING CONSTRUCTION AND RELOCATE IN SAME FUNCTIONAL

AREA.

FIRE ALARM GENERAL NOTES

1. PROVIDE FIBER CONNECTION BETWEEN NEW SERVER RACK AND EXISTING IT COMM

ROOM. UTILIZE SPECIFIC CABLE TRAY FOR DATA APPLICATION (NIPR VS SIPR). ROUTE VIA

J-HOOKS DOWN CORRIDOR TO GET TO NEW CABLE TRAY.

2. RELOCATED IT RACK AND ALL ASSOCIATED CABLES, CONDUITS, ELECTRICAL

CONNECTIONS, ETC FOR A FULLY FUNCTIONING SYSTEM. RELOCATE AND EXTEND

APPROXIMATELY (10) 1" C. COORDINATE EXACT REQUIREMENTS WITH DMAFB, CYBER

SECURITY, IT CONSULTANT AND FIELD CONDITIONS PRIOR TO INSTALLATION.

3. PROVIDE (1) 2" C FROM ACCESSIBLE CEILING FOR PATHWAY OF CABLES FROM CABLE

TRAY TO RACK.

4. PROVIDE (2) 4 GANG BACK BOX AND COVER PLATE FOR PATHWAY FROM UNDER FLOOR

FLUSH MOUNTED RACEWAY TO RACK. PROVIDE 2" C FROM UNDERFLOOR RACEWAY TO

EACH BACK BOX.

5. PROVIDE (2) DATA OUTLETS FOR CONNECTION TO UHF RADIO. COORDINATE EXACT

REQUIREMENTS AND LOCATION WITH DMAFB PRIOR TO INSTALLATION.

6. PROVIDE (2) DATA OUTLETS FOR CONNECTION TO DURESS ALARM SYSTEM. COORDINATE

EXACT REQUIREMENTS AND LOCATION WITH DMAFB PRIOR TO INSTALLATION.

KEY NOTES:

A. NIPR AND SIPR DATA CABLES, CABLE TRAYS, IN FLOOR DUCT, AND ALL OTHER

ADDITIONAL PATHWAYS TO STAY A MINIMUM OF 6" APART AT ALL TIMES.

B. NIPR AND SIPR DATA BACK BOX DEVICES TO HAVE MINIMUM OF 2" SEPARATION.

C. PROVIDE J-HOOKS FOR ALL DATA CABLES WHERE CABLE TRAY IS NOT PROVIDED. ROUTE

TO NEAREST CABLE TRAY OF RESPECTIVE CABLE SECURITY TYPE. J-HOOK INSTALLATION

TO HAVE NIPR AND SIPR CABLING A MINIMUM OF 6" APART AT ALL TIMES.

D. SIPR PATHWAYS TO BE SURFACE MOUNTED FOR ALL DEVICE CONNECTIONS SUCH THAT

THE PATHYWAY IS INSPECTABLE.

E. REFER TO UFC AND AFSSI 7702 FOR ALL LOW VOLTAGE NIPR AND SIPR REQUIREMENTS.

F. REFER TO E0.01 AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

G. PROTECT ALL EXISTING MNS AND IDS SPEAKERS IN PLACE DURING CONSTRUCTION.

INSTALL IN NEW TILE IN SAME PLACE FOR NEW CONSTRUCTION.

SPECIAL SYSTEM GENERAL NOTES

22591

6422 E. SPEEDWAY BLVD. Suite 130

TUCSON, ARIZONA, 85710

(520) 323-3858

PROJECT No.

www.ZonaMEP.com

TECHNICAL ENGINEERING, PLLC.

MECHANICAL . PLUMBING . ELECTRICAL

A R C H

IT

E C T S

B U

R N

S W

A L D

-H O

P K

IN

S

S H

A M

B A

C H

A R

C H

IT

E C

T S

JOB NO:

DATE:

REVISIONS

DRAWN BY:

C O

N S U

LT

A

N T S

PR

EL

IM

IN

AR

Y

- NO

T

FO

R C

ONST

RUCTI

ON

FO

R R

EV

IE

W P

URPO

SE

S

ONLY

N or th C ou rt

A ve nu e

Tu cs on , A ri zo na

0.

5.

w w w

.b w sa rc hi te ct s.

co m

2/

/2

9:

:2

A

M

CONSTRUCTION DOCUMENTS

E1.3

SPECIAL SYSTEMS

FLOOR PLAN

2/14/2024 2137.300

AN

D a vi s- M o n th a n A

F B

R E P

A

IR

C O

M M

A N

D P

O S T

B

LD

G

S

TR

U C

TU

R

A L

Tu rn er S tr uc tu ra l

N . A lv er no n

W ay

Tu cs on , A

Z

P ho ne : 5

.3

.3

M , P

E

ZO

N

A T ec hn ic al

E ng in ee rs

E . S pe ed w ay

B lv d.

Tu cs on , A

Z

P ho ne : 5

.2

.2

B ui ld in g

FBNV23-0009

1/4" = 1'-0"E1.3

1 SPECIAL SYSTEMS FLOOR PLAN

02 13/

Expires 3/31/2024

02 14/

Expires 3/31/2024

File details come from the government source that posted it. Updated .