Atch 32- Schedule of Vaules Template.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Nellis/Creech AFB Multiple Award Construction Contract (MACC) Solicitation Federal contract opportunity
Solicitation number
FA486119RA001
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a schedule of values template for a construction project. The template includes line items for various construction divisions and work items to be completed for a project at Nellis/Creech AFB. Divisions listed include general requirements, existing conditions, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, special construction, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, utilities, and closeout documents. However, all values in the template are currently listed as $0.00 or in error, indicating the template requires input of estimated costs for individual line items to create a project schedule of values.

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to Nellis/Creech AFB Multiple Award Construction Contract (MACC) Solicitation, newest first.
File Type Posted
Solicitation_Amendment_FA486119RA0010008_SF_30.pdf PDF
Atch_56-_19RA001_MACC_RFI.pdf PDF
Atch_00-_MACC_Attachment_Index.pdf PDF
Solicitation_Amendment_FA486119RA0010007_SF_30.pdf PDF
Atch_00-_MACC_Attachment_Index.pdf PDF
Solicitation_Amendment_FA486119RA0010006_SF_30.pdf PDF
Atch_53-_RKMF_17-0097_VCC_SOW_Dated_29_Jul_19.pdf PDF
Atch_56-_19RA001_MACC_RFI.pdf PDF
Atch_52_Bid_Schedule,_RKMF_17-0097.pdf PDF
Atch_00-_MACC_Attachment_Index.pdf PDF
Atch_55-_19RA001_Preproposal_Site_Visit_(Slides_and_Sign-In_Sheet).pdf PDF
Atch_53-_RKMF_17-0097_VCC_SOW_Dated_11_July_19.pdf PDF
Solicitation_Amendment_FA486119RA0010002_SF_30.pdf PDF
Solicitation_Amendment_FA486119RA0010001_SF_30.pdf PDF
Atch 11- USAF Integrated Cultural Resources Mgmt Plan.pdf PDF
Atch 04- Nellis-Creech IFS appendix Electrical Req.pdf PDF
Atch 01- MACC SOW.pdf PDF
Atch 35- WD NV190001 20180001.pdf PDF
Atch 49- App E RKMF 17-0097 Site Contours.JPG JPG image
Atch 30- Progress Schedule Template.xls XLS spreadsheet
Atch 54- VCC Site Plan 2018-10-02.jpg JPG image
Atch 29- Cost Estimate Template.xlsx XLSX spreadsheet
Atch 24- VEA CONNECTION CHARGE AGREEMENT.docx DOCX document
Atch 13- UR2 S Primary and Secondary Trenching Requirements.pdf PDF
Atch 53- RKMF 17-0097 VCC SOW 20181203.pdf PDF
Atch 34- BUILDER inventory sheet.xls XLS spreadsheet
Atch 12- UM1-6C 3-Phase Pad and Vault.PDF PDF
Atch 17- Bulletin 1728F-806 UG Main VEA standard.pdf PDF
Atch 15- UM33 200 Amp 3-Phase CJE 4 inch Conduit Placement Standards.pdf PDF
Atch 43- Sample Client Authorization Letter.pdf PDF
Atch 48- App D RKMF 17-0097 Electrical.pdf PDF
Atch 27- Nuclear Gauge Request Form 2.docx DOCX document
19RA001_MACC_Attch_00-11.zip ZIP file
19RA001_MACC_Attch_00-11.zip ZIP file
Atch 46- App B RKMF 17-0097 Floor Plan.pdf PDF
Atch 40- Teaming List.pdf PDF
Atch 39- Quality Control Plan.pdf PDF
Atch 20- UM3-14 VEA Standards.pdf PDF
Atch 50- App F RKMF 17-0097 Site Utilities.JPG JPG image
Atch 22- UM33 VEA Standards.pdf PDF
Atch 16- UM33 3-Phase CJE Conduit Placement Standards.pdf PDF
Solicitation_-_FA486119RA001.pdf PDF
Atch 44- Past Performance Questionnaire.pdf PDF
Atch 18- Power Trench Sand and Backfill Requirements.pdf PDF
19RA001_MACC_Attch_25-34.zip ZIP file
Atch 06- Nellis-Creech IFS appendix Mech-Plumb Req.pdf PDF
Atch 09- ACC Sole Source EMCS Letter.pdf PDF
Atch 45- App A RKMF 17-0097 Site Plan.pdf PDF
19RA001_MACC_Attch_12-24.zip ZIP file
Atch 02- Nellis-Creech IFS appendix Fire Protection Req.pdf PDF
Show all 50

Nellis/Creech AFB Multiple Award Construction Contract (MACC) Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF VALUES
Contract No: FA4861-XX
Project No & Title: RKMF/LKTC XX-XXXX
DIVISION 01 - GENERAL REQUIREMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
1.1Project Management$0.00ERROR:#DIV/0!
1.2Supervision$0.00ERROR:#DIV/0!
1.3Project Trailer$0.00ERROR:#DIV/0!
1.4Dumpsler$0.00ERROR:#DIV/0!
1.5Temporary Fence$0.00ERROR:#DIV/0!
1.6Bond$0.00ERROR:#DIV/0!
Division 01 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 02 - EXISTING CONDITIONS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
2.1Demolition Interior (Electrical)$0.00ERROR:#DIV/0!
2.2Demolition Interior (Mechanical)$0.00ERROR:#DIV/0!
2.3Demolition (Plumbing)$0.00ERROR:#DIV/0!
2.4Demolition (Flooring)$0.00ERROR:#DIV/0!
2.5Demolition (Openings)$0.00ERROR:#DIV/0!
2.6Demolition (Concrete)$0.00ERROR:#DIV/0!
2.7Demolition (Ceilings)$0.00ERROR:#DIV/0!
2.8Demolition (Walls)$0.00ERROR:#DIV/0!
2.9Demolition (Fire Suppression)$0.00ERROR:#DIV/0!
2.10Demolition (Fire Alarm System)$0.00ERROR:#DIV/0!
2.11Demolition (Communications)$0.00ERROR:#DIV/0!
Division 02 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 03 - CONCRETE
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
3.1Concrete Pad (Generator)$0.00ERROR:#DIV/0!
3.2Concrete Ceiling {Vault)$0.00ERROR:#DIV/0!
3.3Concrete Pad (Mechanical Yard}$0.00ERROR:#DIV/0!
3.4Concrete Pad (HVAC Units)$0.00ERROR:#DIV/0!
3.5Concrete Reinforcements$0.00ERROR:#DIV/0!
3.6Expansion Joints, Contraction Joinls$0.00ERROR:#DIV/0!
Division 03 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 04 - MASONRY
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
4.1Mechanical Yard Masonrv Wall$0.00ERROR:#DIV/0!
4.2Generator Pad Masonry Wall$0.00ERROR:#DIV/0!
4.3Infill (Front Entry Area)$0.00ERROR:#DIV/0!
4.4Masonry Patch Work (Roll-up Door)$0.00ERROR:#DIV/0!
4.5Infill (Mechanical Louver Area$0.00ERROR:#DIV/0!
4.6Vault$0.00ERROR:#DIV/0!
Division 04 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 05 - METALS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
5.1Metal Stud Framing (Interior)$0.00ERROR:#DIV/0!
5.2ERROR:#DIV/0!
5.3ERROR:#DIV/0!
Division 05 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
6.1Casework (Women's Restroom)$0.00ERROR:#DIV/0!
6.2Casework (Men's Restroom)$0.00ERROR:#DIV/0!
6.3Casework (Break Room)ERROR:#DIV/0!
Division 06 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
7.1Mineral Fiber Blanket lnsulation (Interior)$0.00ERROR:#DIV/0!
7.2ERROR:#DIV/0!
7.3ERROR:#DIV/0!
Division 07 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 08 - OPENINGS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
8.1Steel Doors and Frames$0.00ERROR:#DIV/0!
8.2Rolling Service Doors$0.00ERROR:#DIV/0!
8.3Windows$0.00ERROR:#DIV/0!
Division 08 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 09 - FINISHES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
9.1Gypsum Board$0.00ERROR:#DIV/0!
9.2Paints and Coatings$0.00ERROR:#DIV/0!
9.3Epoxv Flooring$0.00ERROR:#DIV/0!
9.4Acoustlcal Ceiling$0.00ERROR:#DIV/0!
9.5Resilient Flooring & Ceramic Tile$0.00ERROR:#DIV/0!
9.6Rigid Access Flooring$0.00ERROR:#DIV/0!
Division 09 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 10 - SPECIALTIES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
10.1Toilet Accessories$0.00ERROR:#DIV/0!
10.2Interior Signage$0.00ERROR:#DIV/0!
10.3ERROR:#DIV/0!
Division 10 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 13 - SPECIAL CONSTRUCTION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
13.1Steel Deck Vault$0.00ERROR:#DIV/0!
13.2Steel I-beam (Openings)$0.00ERROR:#DIV/0!
13.3Steel louvers (Mech Yard)$0.00ERROR:#DIV/0!
13.4Steel Gale (Generator)$0.00ERROR:#DIV/0!
Division 13 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 21 - FIRE SUPPRESSION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
21.1Riser$0.00ERROR:#DIV/0!
21.2Wet Pipe Fire Sprinkler Piping$0.00ERROR:#DIV/0!
21.3Testing$0.00ERROR:#DIV/0!
Division 21 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 22 - PLUMBING
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
22.1Plumbing (Fixtures)$0.00ERROR:#DIV/0!
22.2Plumbing Piping& Materials$0.00ERROR:#DIV/0!
22.3ERROR:#DIV/0!
Division 22 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
23.1HVAC Air Handlers$0.00ERROR:#DIV/0!
23.2Acoustics Duct Silencers$0.00ERROR:#DIV/0!
23.3Exhaust & Supply Fans$0.00ERROR:#DIV/0!
23.4Boiler & Computer Room Units (CRAC)$0.00ERROR:#DIV/0!
23.5Variable Air Volume 0JAV) Boxes$0.00ERROR:#DIV/0!
23.6Fire Smoke Dampers & Louvers$0.00ERROR:#DIV/0!
23.7Testing, Adjusting & Balancing of HVAC Sys$0.00ERROR:#DIV/0!
23.8Thermal lnsulation for Mechanical Sys$0.00ERROR:#DIV/0!
23.9Duct Insulation$0.00ERROR:#DIV/0!
23.10Duct Work & Duct Work Accessories$0.00ERROR:#DIV/0!
23.11Diffusers, Registers & Grills$0.00ERROR:#DIV/0!
23.12HVAC Controls$0.00ERROR:#DIV/0!
Division 23 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 26 - ELECTRICAL
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
26.1Electrical Conduit, Fillings, Boxes$0.00ERROR:#DIV/0!
26.2Electrical Wire & Cable$0.00ERROR:#DIV/0!
26.3Interior Distribution Systems$0.00ERROR:#DIV/0!
26.4Low Voltage SwitchQear$0.00ERROR:#DIV/0!
26.5Switchboards & Panel Boards$0.00ERROR:#DIV/0!
26.6Interior lighting$0.00ERROR:#DIV/0!
26.7Electrical Exterior Underground$0.00ERROR:#DIV/0!
Division 26 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 27 - COMMUNICATIONS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
27.1Comm Piping, Fittings and Boxes$0.00ERROR:#DIV/0!
27.2Communications Wire$0.00ERROR:#DIV/0!
27.3Communications Cable Tray$0.00ERROR:#DIV/0!
27.4Testing$0.00ERROR:#DIV/0!
Division 27 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
28.1Fire Alarm System Conduit & Fittings$0.00ERROR:#DIV/0!
28.2Fire Alarm Panel and Power Boosters$0.00ERROR:#DIV/0!
28.3Fire Alarm Programming & Testing$0.00ERROR:#DIV/0!
28.4MNS Conduit and Fittings$0.00ERROR:#DIV/0!
28.5MNS Panels$0.00ERROR:#DIV/0!
28.6MNS Programming & Testing$0.00ERROR:#DIV/0!
Division 28 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 31 - EARTHWORK
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
31.1Landscaping (Demo)$0.00ERROR:#DIV/0!
31.2Landscaping (Replace)$0.00ERROR:#DIV/0!
31.3Soi! Compaction Test$0.00ERROR:#DIV/0!
Division 31 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 32 - EXTERIOR IMPROVEMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
32.1Bollards$0.00ERROR:#DIV/0!
32.2Concrete Sidewalks$0.00ERROR:#DIV/0!
32.3Fog Seal (Parking Lot)$0.00ERROR:#DIV/0!
32.4Curb Stops (Parking Lot)$0.00ERROR:#DIV/0!
32.5Restnping (Parking Lot)$0.00ERROR:#DIV/0!
Division 32 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
DIVISION 33 - UTILITIES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
33.1Natural Gas$0.00ERROR:#DIV/0!
33.2ERROR:#DIV/0!
33.3ERROR:#DIV/0!
Division 33 Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
CLOSE-OUT DOCUMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
AAs-Built DrawingsERROR:#DIV/0!
BWarranties
CO&M ManualsERROR:#DIV/0!
DERROR:#DIV/0!
Close-out Total$0.00ERROR:#DIV/0!ERROR:#DIV/0!
BID TOTAL$0.00ERROR:#DIV/0!ERROR:#DIV/0!