Atch 07- Nellis-Creech IFS appendix Utility Meter Req.pdf

PDF 104 KB Posted

Attached to
Nellis/Creech AFB Multiple Award Construction Contract (MACC) Solicitation Federal contract opportunity
Solicitation number
FA486119RA001
Issued by
Department of the Air Force Air Combat Command

About this file

This document outlines utility meter requirements for construction projects at Nellis and Creech Air Force Bases. Key requirements include installing electric, natural gas, and water meters that are compliant with the Advanced Metering and Reading System specifications. Meters must have MODBUS/TCP communication protocols and be connected to the base network via Ethernet cables. Electric meters listed as compliant with AMRS include models from Electro Industries, Schneider Electric, and other manufacturers. Gas and water meters must have pulse outputs connected to electric meters or pulse accumulator devices. The document provides detailed technical specifications for acceptable meter types and installation standards. Contractors must verify equipment and coordinate connections with the Energy Management Control System office.

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to Nellis/Creech AFB Multiple Award Construction Contract (MACC) Solicitation, newest first.
File Type Posted
Solicitation_Amendment_FA486119RA0010008_SF_30.pdf PDF
Atch_48-_App_D_RKMF_17-0097_Electrical_REVISED_13Aug19.pdf PDF
Atch_00-_MACC_Attachment_Index.pdf PDF
Atch_50-_App_F_RKMF_17-0097_Site_Utilities_REVISED_8-9-19.JPG JPG image
Atch_00-_MACC_Attachment_Index.pdf PDF
Atch_00-_MACC_Attachment_Index.pdf PDF
Solicitation_Amendment_FA486119RA0010005_SF_30.pdf PDF
Solicitation_Amendment_FA486119RA0010004_SF_30.pdf PDF
Atch_52_Bid_Schedule,_RKMF_17-0097.pdf PDF
Atch_00-_MACC_Attachment_Index.pdf PDF
Solicitation_Amendment_FA486119RA0010003_SF_30.pdf PDF
Atch_55-_19RA001_Preproposal_Site_Visit_(Slides_and_Sign-In_Sheet).pdf PDF
Atch_53-_RKMF_17-0097_VCC_SOW_Dated_11_July_19.pdf PDF
Atch 09- ACC Sole Source EMCS Letter.pdf PDF
Atch 45- App A RKMF 17-0097 Site Plan.pdf PDF
19RA001_MACC_Attch_12-24.zip ZIP file
Atch 02- Nellis-Creech IFS appendix Fire Protection Req.pdf PDF
Atch 31- Progess Report Template.pdf PDF
Atch 08- Environmental Permit Guidance.pdf PDF
Atch 42- Subcontractor Teaming Partner Consent Form.pdf PDF
Atch 26- Nuclear Gauge Form 1.xlsx XLSX spreadsheet
Atch 03- Nellis-Creech IFS appendix Comm Req.pdf PDF
Atch 52- Bid Schedule RKMF 17-0097.pdf PDF
Atch 10- NAFB Plan 32-7086 Hazardous Materials Management Plan.pdf PDF
Atch 19- UG 17-2 3-Phase Delta-Wye Pad Mounted Transformer Loop Feed.pdf PDF
Atch 21- UG17-2 VEA Standards.pdf PDF
Atch 51- App G RKMF 17-0097 Site Comm.JPG JPG image
Atch 11- USAF Integrated Cultural Resources Mgmt Plan.pdf PDF
Atch 04- Nellis-Creech IFS appendix Electrical Req.pdf PDF
Atch 01- MACC SOW.pdf PDF
Atch 35- WD NV190001 20180001.pdf PDF
Atch 49- App E RKMF 17-0097 Site Contours.JPG JPG image
Atch 30- Progress Schedule Template.xls XLS spreadsheet
Atch 54- VCC Site Plan 2018-10-02.jpg JPG image
Atch 29- Cost Estimate Template.xlsx XLSX spreadsheet
Atch 24- VEA CONNECTION CHARGE AGREEMENT.docx DOCX document
Atch 13- UR2 S Primary and Secondary Trenching Requirements.pdf PDF
Atch 53- RKMF 17-0097 VCC SOW 20181203.pdf PDF
Atch 34- BUILDER inventory sheet.xls XLS spreadsheet
Atch 12- UM1-6C 3-Phase Pad and Vault.PDF PDF
Atch 17- Bulletin 1728F-806 UG Main VEA standard.pdf PDF
Atch 15- UM33 200 Amp 3-Phase CJE 4 inch Conduit Placement Standards.pdf PDF
Atch 32- Schedule of Vaules Template.xlsx XLSX spreadsheet
Atch 25- NTTR Visit Request.pdf PDF
19RA001_MACC_Attch_25-34.zip ZIP file
19RA001_MACC_Attch_12-24.zip ZIP file
Atch 14- UM3-14 1-Phase CJE Conduit Placement Standards.pdf PDF
Atch 00- MACC Attachment Index.pdf PDF
Atch 05- Nellis-Creech IFS appendix Lighting Req.pdf PDF
Atch 23- UM48-2 Multi-Grounds.pdf PDF
Show all 50

Nellis/Creech AFB Multiple Award Construction Contract (MACC) Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NELLIS AND CREECH AFB

INSTALLATION FACILITIES STANDARDS (IFS)

UTILITY METER REQUIREMENTS

22 JAN 2019

This document is an appendix to Nellis & Creech Air Force Bases IFS which is located here:

https://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/nellis-creech-afb-ifs

1. Installed Equipment: All design and construction shall be in compliance with the most recent versions of the following:

1.1 Air Force Facility Metering Policy Memorandum (06 May 2010)

1.2 Advanced Meter Reading System (AMRS) Meter Specifications (06 Feb 2018)

See attachment at end of document (Pages 4 to 6)

1.3 Electric Meters Unified Facilities Guide Specification (UFGS) section 26 27 13.10 30

1.4 Natural-Gas Metering UFGS section 33 51 13.00 30

1.5 Water Utility Metering UFGS section 33 12 33.00 30

1.6 Nellis and Creech AFB Installation Facilities Standards (IFS)

2. Any discrepancies between code or standards provisions and the contract documents shall immediately be brought to the Contracting Officer’s attention, and the more stringent requirements shall apply unless otherwise directed. Contractors shall be responsible for obtaining any copies of all items referenced in this paragraph. The most current versions of UFGS can be found at http://www.wbdg.org/ccb/ccb.php. The most current AMRS Meter Specification is attached to this document.

2.1 VLAN Connection: All meter installs are required to be connected to the base VLAN with following exceptions:

2.1.1 HVAC systems less than 10 tons. Total tonnage is calculated by summing all air condition units installed on the facility.

2.1.2 When a VLAN connection is not available in the facility.

2.2 Electric Meter: Contractor shall install meters that are UFGS compliant and will function on the AMRS platform. The AMRS native Data Access communication protocol is “MODBUS/TCP”.

https://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/nellis-creech-afb-ifs http://www.wbdg.org/ccb/ccb.php

2.2.1 The installed electric meter must be listed in the AMRS Meter Specifications as listed in section 1.2.

2.2.2 The contractor shall install a RJ45 jack, within 6 feet of the meter, and install Ethernet Cat

5/6 cable from the communication switches to the RJ45 jack.

2.2.3 The meter should comply with the most current AMRS Meter Specifications as listed in section 1.2.

2.2.4 All new and replacement meter installations, shall be provided with voltage and current safety disconnect devices or equivalent, so that the meter assembly can be worked on safely over the life of the meter installation and not require utility outages for servicing.

2.2.5 The Contractor shall include all disconnects, mounting hardware, enclosures, wiring and conduit, and safety equipment as required and appropriate to complete the task and provide fully functioning meters and a meter data management system. The Contractor shall provide all wiring equipment, and conduit required to connect the new meter to a ”RJ 45” connector VLAN drop that will allow transmission of the metering data to the AMRS platform. Electric Meter shall not be mounted on or attached to outdoor transformers.

2.2.6 All current, power, and voltage circuit termination points for wires entering the meter or enclosure must be clearly marked, to avoid installation error and simplify future identification of wires for maintenance purposes. These identifying markings shall be reflected on the As-Built drawings.

2.2.7 Meter voltage taps shall be downstream of building main breaker.

2.2.8 Meter installation shall comply with UFGS section 26 27 13.10 30

2.3 Gas Meter: Contractor shall install an “Elster American Standard” meter with “KY” or

“KYZ” pulse output or approved equal.

2.3.1 Meter shall be a positive displacement type.

2.3.2 Meter shall have an odometer style display.

2.3.3 The contractor shall use one of two options to connect the meter pulse output to the

AMRS platform.

2.3.3.1 Using a “KY” or “KYZ” pulse interface, the contractor shall connect to the advanced electric meter’s “KY” or “KYZ” input terminals. The contractor shall be responsible for ensuring that the pulse output interface is compatible with the existing advanced electric meter. The Contractor shall provide all wiring, equipment and conduit required to connect the new meter to the advanced electric meter’s “KY” or “KYZ” input terminals.

2.3.3.2 Using a “KY” or “KYZ” pulse interface, the contractor shall connect to a Pulse Accumulator and “MODBUS/TCP” Converter. The contractor shall provide the accumulator and converter equipment. Connect the resulting output to a “RJ 45” connector VLAN drop. The Contractor shall provide all wiring, equipment and conduit required to connect the new meter to a “RJ 45” connector VLAN drop that will allow transmission of the metering data to the AMRS platform.

2.3.4 The meter should comply with the most current AMRS Meter Specifications as listed in

2.3.5 Meter installation shall comply with UFGS section 33 51 13.00 30

2.4 Water Meter: Contractor shall install a "McCrometer” water meter with pulse output or approved equal.

2.4.1 The water meter shall meet or exceed the flow characteristics of the following chart with special emphasis on the “Typical Low Flow (95% Minimum).

Meter Size Typical Low

Flow (95% Minimum)

Typical Operating Range (100% ± 2%)

Maximum Continuous Operation

Maximum Intermittent Flow

3/4” 1/2 GPM 1 to 30 GPM 25 GPM 35 GPM 1” 3/4 GPM 1-1/2 to 50 GPM 35 GPM 55 GPM 1-1/2” 1-1/2 GPM 2 to 100 GPM 70 GPM 110 GPM 2” 2 GPM 3 to 160 GPM 115 GPM 175 GPM 3” 2-1/2 GPM 4 to 350 GPM 240 GPM 390 GPM 4” 3-1/2 GPM 5 to 650 GPM 450 GPM 715 GPM 6” 5 GPM 15 to 1300 GPM 910 GPM 1430 GPM

2.4.2 Contractor shall use one of two options to connect the meter pulse output to the AMRS platform.

2.4.2.1 Using a “KY” or “KYZ” pulse interface, the contractor shall connect to the advanced electric meter’s “KY” or “KYZ” input terminals. The contractor shall be responsible for ensuring that the pulse output interface is compatible with the existing advanced electric meter. The Contractor shall provide all wiring, equipment and conduit required to connect the new meter to the advanced electric meter’s “KY” or “KYZ” input terminals.

2.4.2.2 Using a “KY” or “KYZ” pulse interface, the contractor shall connect to a Pulse

Accumulator and “MODBUS/TCP” Converter. The contractor shall provide the accumulator and converter equipment. Connect the resulting output to a “RJ 45” connector VLAN drop. The Contractor shall provide all wiring, equipment and conduit required to connect the new meter to a “RJ 45” connector VLAN drop that will allow transmission of the metering data to the AMRS platform.

2.4.3 The meter should comply with the most current AMRS Meter Specifications as listed in

2.4.4 Meter installation shall comply with UFGS section 33 12 33.00 30

3. Contractor shall verify exact equipment and coordinate connection details with Energy

Management Control System (EMCS) personnel in Base Civil Engineer (BCE) office (99 CES personnel in Building 812).

4. Meters shall be tested, adjusted and commissioned in accordance with manufacturer’s recommendations and also in accordance with the UFGS.

5. Standalone meters may be used on facilities with less than 10 tons of installed cooling

AND having no access to a communication rack in the facility. Total tonnage is calculated by summing all air condition units installed in the facility.

6. Meters shall be installed inside of buildings, typically in mechanical room near service entrance. Exterior meters may be allowed on a case basis and shall receive approval from BCE office. If approved, exterior meters shall be installed in a lockable weatherproof enclosure or shall be exterior rated type.

Attachment:

AMRS Meter Specifications v.2.6.18 (06 February 2018)

1.0 AMRS AMRS Electric Meter Specifications

The AMRS Compliant Electric Meter shall meet Department of Defense cybersecurity in addition to the following requirements:

• Current Inputs:

• Nominal 5A (Class 0.2s)

• Measured Current: 50mA to 10A

• Withstand: 20A Continuous

• Poly Phase (3 voltages and 3 currents)

• Internal storage for recording 2 values or channels for 90 days, configurable using manufacturer supplied configuration software. Must support interval consumption (15 minute) and demand (15 minute block average)

• Clear and concise manufacturer’s published procedure or method for extracting the internally recorded values, register sets (buffer) or channel data via Modbus and Ethernet

• Shall support time of use recording

• Onboard ethernet communications, base 10/100 with RJ45 connector or pigtail with receptacle connector

• Modbus/TCP communication protocol is required.

• Front display with ability to display all measured values

• Minimum of two external dry contact inputs that shall count pulses from other devices

• Minimum of one (1) external RS485 serial port

• The above requirements are for new, electric meter installations.

• Firmware version must be approved in the AMRS ATO, contact Contracting Officer to request approved version upon award

1.1 New Meter Installations

All new meter installations, including relocated existing meters, shall be provided with voltage and current safety disconnect devices or equivalent so that the meter assembly can be worked on safely over the life of the meter installation and not require utility outages for servicing. All new meter installations, including relocated existing meters, shall include the installation of new properly sized split or solid core current transformers (CTs). All new meter installations, including relocated existing meters, shall be connected from the meter, to a RJ45 jack in the mechanical room, to a patch panel in the communications room, and then to the Air Force switch in the communications room.

Base communication installation guidelines shall be followed at all times. The final connection to the Air Force switch may have to be performed by the base communications organization. In that event, three (3) feet of additional communications cabling shall be left for the third party to make the final connection.

1.2 AMRS Compliant Meter List

• Electro Industries Nexus 1500+

• Schneider Electric ION 8650

• Schneider Electric PM8000

• Electro Industries Nexus 1272

• Electro Industries Nexus 1262

• Schneider Electric PM5560

• Schneider Electric PM850SD

2.0 AMRS Compatible Gas Meter Specifications

AMRS compatible gas metering solutions consist of a componential system to achieve the goal of delivering gas consumption data into the AMRS. To accurately scale output pulses the contractor shall obtain building gas usage from base personnel, taking into account peak demand when sizing the components that are necessary as well as determining peak pulse rate as to not saturate the receiving device and risk losing captured pulse data. The various components that may be necessary include but are not limited to the following: Gas Meter, Pulse Kit, High Speed Dividing Pulse Relay, Surge Suppression Device, Accumulator, Electric Meter with digital input availability.

All exterior to interior communication links shall have surge suppression.

• Pulse kit must be able to produce a two-wire (Form A) pulse output

• Pulse output shall be delivered to a high speed dividing pulse relay that has the capability of producing a wetting voltage if necessary

• High speed dividing pulse relay shall provide isolated pulse outputs (Form A) that shall be delivered to an AMRS compatible electric meter

• In the event a facility does not have a compatible AMRS electric meter, a high speed dividing pulse relay shall provide isolated pulse outputs (Form A) that shall be delivered to an accumulator that speaks the Modbus protocol natively and can communicate to AMRS via the Modbus/TCP protocol

• Gas Meters that can communicate to AMRS via the Modbus/TCP protocol may be acceptable if they can pass technical and cybersecurity evaluations directed by the AMRS PMO. At this time there are no tested or approved Modbus /TCP gas meters

3.0 AMRS Compatible Translation Devices and Accumulators

3.1 The following devices are compatible with the AMRS platform, are consistent with the need of the existing site conditions, and have been tested and passed cybersecurity requirements:

• Advantech ADAM-6051 I/O Modbus TCP Module with firmware v5.04 B01

• Perle IOLAN SDS1P Serial to Ethernet Device Server with firmware v4.6 F1

4.0 Typical AMRS Electric Meter Parameter

Measured Parameter

• Voltage Phase A-N and A-B, Typical settings

• Voltage Phase B-N and B-C, Typical

• Voltage Phase C-N and C-A, Typical

• Current Phase A

• Current Phase B

• Current Phase C

• Current Phase N, Neutral

• Power (Real) or Active, Total

• Power Reactive, Total

• Power (Volts Amps) or VA, Total

• Power Factor Total, COS

• Frequency in HZ

• Demand, Block Average (15 Minute)

(BWA)

• Energy, KWH (Active or Real)

• Meter I/O

END OF UTILITY METER REQUIREMENTS

1.0 AMRS AMRS Electric Meter Specifications
1.1 New Meter Installations
1.2 AMRS Compliant Meter List
3.0 AMRS Compatible Translation Devices and Accumulators
4.0 Typical AMRS Electric Meter Parameter

File details come from the government source that posted it. Updated .